2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of ...in the Wonogiri Multipurpose Dam Reservoir...

20
The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book Nippon Koei Co.,Ltd. P-5 July 2007 Yachiyo Engineering Co.,Ltd. 2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of Wonogiri Reservoir (1/3) Wonogiri dam abutment on the left side of dam Spillway forebay on thet left side of dam Bank erosion around Wonogiri reservoir. Wonogiri Dam view from chersonese. An old bridge buried in sediment deposits on confluence of Alang and Solo Rivers Dry condition of sediment deposits in Wonogiri reservoir

Transcript of 2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of ...in the Wonogiri Multipurpose Dam Reservoir...

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-5 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.1 View of Wonogiri Reservoir (1/3)

    Wonogiri dam abutment on the left side of dam Spillway forebay on thet left side of dam

    Bank erosion around Wonogiri reservoir. Wonogiri Dam view from chersonese.

    An old bridge buried in sediment deposits on confluence of Alang and Solo Rivers

    Dry condition of sediment deposits in Wonogiri reservoir

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-6 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.1 View of Wonogiri Reservoir (2/3)

    Panoramic view of Wonogiri reservoir (downstream)

    Panoramic view of Wonogiri reservoir (upstream)

    Panoramic view of sedimentation in front of Wonogiri dam

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-7 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.1 View of Wonogiri Reservoir (3/3)

    Outlet of Wonogiri power station. Turbidity current from Keduang River

    Dredging around intake structure Inlet of intake structure immediately after construction of the Wonogiri dam

    Mt. Lawu located north-east boundary of Wonogiri watershed (view from Surakarta City)

    Panoramic view of Wonogiri reservoir on January 14, 2007

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-8 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.2 Facilities of Wonogiri Reservoir

    Wonogiri power station (PLTA) Spillway gate

    Hollow Jet Valve PLTA outlet gate to release water for power generation on September 26, 2005

    Intake gate of Wonogiri dam Turbine of Wonogiri power station

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-9 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.3 Water Releasing from Wonogiri Dam

    Spillout at spillway gate on February, 2006 Spillout at spillway on February, 2006

    Spillout at outlet of spillway on February, 2006 Spillout at outlet of spillway on February, 2006

    Water release from Hollow Jet Valve on November, 2006

    Wonogiri dam spillway gate

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-10 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.4 Colo Weir and Wonogiri Irrigation Area(1/2)

    Colo weir located 14 km downstream of Wonogiri dam

    River bed protection and downstream of Colo weir

    Intake structures of Colo weir Sediment flushing gate of Colo weir

    Overflowing on Colo weir on January 30, 2006 Intake gate of Colo west main canal on December 24, 2004

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-11 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.4 Colo Weir and Wonogiri Irrigation Area (2/2)

    Upstream and left sde of Colo weir

    Wonogiri west main canal on December 24, 2004

    Garbage at intake gate of Colo weir on December 21, 2005

    Wonogiri Irrigation area on December 21, 2005 Wonogiri main canal on December 21, 2005

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-12 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.5 Sedimentation Survey at Intake

    Bathymetric survey at intake on November 11, 2004

    Bathymetric survey at intake on November 11, 2004

    Experimental setup for bathymetric survey at intake on November 11, 2004

    Monitor of eco-sounder for bathymetric survey at intake on November 11, 2004

    Sampling of sediment deposit in Wonogiri reservoir

    Sediment deposit in Wonogiri reservoir mainly compose of clay and silt

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-13 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.6 Tributary of Wonogiri Reservoir (Keduang)

    Bed rocks in upper reach of Keduang River Check dam in upper reach of Keduang River

    Check dam in Keduang River Middle reach of Keduang River

    Lower reach of Keduang River immediately downstream of Keduang Bridge on February 23, 2005

    Lower reach of Keduang River inside of Wonogiri reservoir

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-14 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.6 Tributary of Wonogiri Reservoir (Tirtomoyo)

    Middle reach of Tirtomoyo River immediately downstream of Tirtomoyo Bridge during dry season on September 4, 2004

    Middle reach of Tirtomoyo River immediately downstream of Tirtomoyo Bridge during wet season on December 20, 2005

    Middle reach of Tirtomoyo River immediately upstream of Tirtomoyo Bridge on February 23, 2005

    River condition of lower reach of Tirtomoyo River

    Sand mining activity in lower reach of Tirtomoyo River

    River mouth of Tirtomoyo River in Wonogiri reservoir

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-15 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.6 Tributary of Wonogiri Reservoir (Temon)

    Hard soils on river bed in Temon River River condition in middle reach of Temon River

    River condition in middle reach of Temon River Bridge on middle reach of Temon River

    Panoramic view of sedimentation in Ngachar irrigation dam located in upper reach of Temon River on October, 2004

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-16 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.6 Tributary of Wonogiri Reservoir (Solo)

    Hard rocks in upper reach of Solo River Hard rocks in upper reach of Solo River

    Middle reach of Solo River Sand mining activity on Solo River

    Sedimentation at river mouth of Solo River in Wonogiri reservoir

    Sedimentation at river mouth of Solo River in Wonogiri reservoir

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-17 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.6 Tributary of Wonogiri Reservoir (Alang)

    Automatic water level gauging station in Alan River

    Visible bank erosion in Alang River

    Middle reach of Alang River Visible bank erosion in Alang River

    Visible bank erosion in Alang River Visible bank erosion in Alang River

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-18 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.7 Upper Solo Mainstream

    Jurug Bridge,51.8 km downstream of Wonogiri dam on August 25, 2005

    Hard soils in Upper Solo mainstream (Sari Bridge)

    Confluence of Solo and Sragen Rivers, 89 km downstream of Wonogiri dam on February 19, 2005

    Tangen Bridge 99.4 km downstream of Wonogiri dam

    Ngunengon Bridge 162.9 km downstream of Wonogiri dam on February 19, 2005

    Confluence of Solo and Madiun Rivers, 200 km downstream of Wonogiri dam on February 19, 2005

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-19 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.8 Discharge & SS Concentration Survey

    Measurement of flow velocity at Upper Solo River

    Sampling of flood water for measurement of SS concentration at Tirtomoyo River

    Sampling of flood water for measurement of SS concentration at Upper Solo River

    Measurement of water temperature at Upper Solo River

    Labeling of sampling date and time on the bottle of collected water at Alang River

    Bottles of sampling water in one flood at Tirtomoyo River

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-20 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.9 Hydro-meteorological Station(1/2)

    Daily and hourly rainfall gauge at Nawangan in Alan River basin on July 26, 2005

    Daily and hourly rainfall gauges at Tawangumangu close to Keduwang River basin

    Automatic water level gauging station at Jarum, Dengkeng River on July 26, 2005

    Rainfall telemetry gauging station at Batuwarno, Temon River on June 4, 2005

    Hourly reservoir water level gauge at turbine Inlet, Wonogiri dam on December 20, 2005

    Meteorological station at Wonogiri dam on January 4, 2006

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-21 July 2007 Yachiyo Engineering Co.,Ltd.

    2.9 Hydro-meteorological Station(2/2)

    Automatic water level gauge at Jurug in Bengawan Solo River managed by PBS on February 4, 2007

    Automatic water level gauge at Ngadipiro in Keduang River managed by BP2TPDAS

    Automatic water level gauge at Sembukan in Keduang River managed by PBS.

    Automatic water level gauge at Duwet in Temon River managed by BP2TPDAS

    Automatic water level gauge at Ngrembang in Solo River managed by PBS

    Automatic water level gauge at Banaran in Alang River managed by BP2TPDAS

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-22 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.10 Garbage Problem

    Garbage removal by divers in front of the intake of Wonogiri reservoir on September 26, 2005

    Garbage removal by divers in front of the intake of Wonogiri reservoir on September 26, 2005

    Garbage removed from the intake: plastic dusts from houses as well as vegetative debris on September 26, 2005

    Garbage removed from the intake: plastic net used for fishery in the reservoir on September 26, 2005

    Garbage removed from the intake: plastic dusts from houses as well as vegetative debris on February 1, 2007

    Garbage removal work by backhoe at the intake on January, 2004

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-23 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.11 Water and Bed Material Quality Analysis

    Discharge measurement at Tirtomoyo River on May 2005

    Discharge measurement at West Canal of Colo weir on December 2004

    Water sampling at Keduang River on December 2004

    Bed material sampling for environmental study in Wonogiri Reservoir on May 2005

    Sampled bed material at Alang River on December, 2004

    Field analysis of basic parameters near sampling location in Upper Solo on May 2005

  • The Study on Countermeasures for Sedimentation Final Report in the Wonogiri Multipurpose Dam Reservoir Volume VII: Photo Book

    Nippon Koei Co.,Ltd. P-24 July 2007 Yachiyo Engineering Co.,Ltd.

    2. PRESENT CONDITION OF THE RESERVOIR

    2.12 Periodic Water Quality Monitoring

    Measurement of water depth in Wonogiri reservoir on December 7, 2004

    Sampling of surface water upstream of Colo Weir for TSS (Total Suspended Solids) analysis on December 7, 2004

    Equipment for sampling of suspended sediment in Wonogiri Reservoir

    Measurement of water temperature and DO (Dissolved Oxygen) in Wonogiri Reservoir on January 4, 2005

    Sampled water taken from the reservoir from 0 (surface) to 10m in depth

    Turbidity meter used for field measurement

    2. PRESENT CONDITION OF THE RESERVOIR2.1 View of Wonogiri Reservoir2.2 Facilities of Wonogiri Reservoir2.3 Water Releasing from Wonogiri Dam2.4 Colo Weir and Wonogiri Irrigation Area2.5 Sedimentation Survey at Intake2.6 Tributary of Wonogiri Reservoir2.7 Upper Solo Mainstream2.8 Discharge & SS Concentration Survey2.9 Hydro-meteorological Station2.10 Garbage Problem2.11 Water and Bed Material Quality Analysis2.12 Periodic Water Quality Monitoring