BSC6900 GO Installation & Commissioning
www.huawei.com
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
ForewordForewordThe OMU operating system is installed before the OMU is The OMU operating system is installed before the OMU is
delivered
BSC6900 commissioning is performed after the hardware
is installed and before the services are provided. It aims
to ensure that the BSC6900 can work normally through
tasks such as equipment verification, BSC6900 board
software and data file loading, interface verification, and
service verification.service verification.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page1
ReferencesReferences“BSC6900 GSM Commissioning Guide”BSC6900 GSM Commissioning Guide
“BSC6900 OMU Administration Guide”
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page2
ObjectivesObjectivesUpon completion of this course you will be able to:Upon completion of this course, you will be able to:
Describe BSC6900 commissioning procedure
Outline OMU software functions
Complete BSC6900 commissioning
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page3
ContentsContents1 BSC6900 O&M System Introduction1. BSC6900 O&M System Introduction
2. BSC6900 Software Installation
3. BSC6900 Commissioning
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page4
BSC6900 O&M SubsystemBSC6900 O&M Subsystem ComponentComponent
LMT
OMUa boards
SCUa boards
OM modules
on other boards on other boards
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page5
BSC6900 O&M SubsystemBSC6900 O&M SubsystemBSC6900 O&M system adopts server and client modeBSC6900 O&M system adopts server and client mode
OMU as a server
LMT as a client
EMS (Element Management System) systemg y y
iManager M2000 works for integrated O&M
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page6
OMU Ethernet Adapter ConfigurationOMU Ethernet Adapter Configuration
An OMU board is configured An OMU board is configured
with six Ethernet adapters in
total total.
ETH0 and
ETH1(bond1/bond1:0 )
ETH2: ETH2 (bond2)
ETH3-UPDATE (bond3)
ETH4-SCU7 and ETH5-SCU6 ETH4 SCU7 and ETH5 SCU6
(bond0 (vlan1/vlan1:0))
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page7
Definitions of IP addresses of the OMUDefinitions of IP addresses of the OMU The OMU IP addresses include:
External fixed IP addresses
Internal fixed IP addresses
External virtual IP addresses
Internal virtual IP addresses
Debugging IP address.
Backup channel IP address of the active and standby OMUs.
(Optional)
Before an OMU is delivered, six IP addresses are configured. The
d f l IP dd h i f i default IP addresses may not meet the requirement of onsite
planning. All the OMU IP addresses need to be planned on site,
and some of the IP addresses need to be re-set
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page8
and some of the IP addresses need to be re set.
See RemarksSee Remarks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page9
OMU IP Address PlanningOMU IP Address Planning
IP Address Planning Principle
Internal fixed IP
dd
The preset IP addresses of the internal Ethernet adapters are:
address Active BAM: 80.168.3.50 (255.0.0.0)
Standby BAM: 80.168.3.60 (255.0.0.0)
External fixed IP
address
The preset IP addresses of the external Ethernet adapters are:
Active BAM: 172.121.139.201 (255.255.255.0)
Standby BAM: 172.121.139.202 (255.255.255.0)
The settings can be reconfigured on site based on the actual
networking topologynetworking topology
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page10
OMU IP Address PlanningOMU IP Address Planning
IP Address Planning Principle
Internal/External
virtual IP
The virtual IP address is set in the same subnet with the
internal/ external fixed IP addresses of the active and standby
address BAMs
Backup channel The preset backup channel IP addresses of the active and
standby BAMs are:IP addresses standby BAMs are:
Active BAM: 192.168.3.50 (255.255.255.0)
Standby BAM: 192.168.3.60 (255.255.255.0)
Th IP dd h ld t b h dThe IP address should not be changed
Commissioning
IP address
The preset commissioning IP addresses are:
Active BAM: 192.168.6.50 (255.255.255.0)IP addressStandby BAM: 192.168.6.60 (255.255.255.0)
The IP address should not be changed.NOTE: The LMT can access the OMU only through the external virtual IP addres
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page11
OMU Internal Network IP Address PlanningPlanning
Active OMUa Standby OMUaVirtual IP
80.168.3.40/8
Internal80.168.3.50/8 80.168.3.60/8
ETH4-SCU7 ETH4-SCU7networksegment
192.168.3.50/24 192.168.3.60/24
ETH5-SCU6 ETH5-SCU6
Intel Ethernet adapters
Intel Ethernet adapters
Dedicated b kETH3- ETH3-
SCUa SCUa
backup channel
ETH3UPDATE UPDATE
BackboardBSC6900 FAM
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page12
BSC6900 FAM
OMU External Network IP Address Planning
Active OMUa Standby OMUaVirtual IP 172.121.139.200/24
172.121.139.201/24 172.121.139.202/24
ExternalnetworkSegment GE adapter
ETH0
ETH1
ETH0
ETH1
Hub
LMT/
ETH2 ETH2Commissioning Ethernet adapter
LMT/M2000
192.168.6.60/24
192.168.6.50/24
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page13
ContentsContents1 BSC6900 O&M System Introduction1. BSC6900 O&M System Introduction
2. BSC6900 Software Installation
3. BSC6900 Commissioning
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page14
BSC6900 SoftwareBSC6900 Software
MPS/EPS
Host Software
LMT
LMT SoftwareHost Software
ProgramFile
Windows XPSP2
Java Environment
OMU Server
Data File
OMU Application
OMU Server
Patch File(optional)
Dopra Linux Mysql Database
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page15
OMU SoftwareOMU SoftwareThe OMU software The OMU software
consist of multi-
level service level service
monitoring entities
and service
processes
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page16
See RemarksSee Remarks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page17
OMU Software Installation ProcedureOMU Software Installation Procedure
Obtain the Installation Information on the OMU Obtain the Installation Information on the OMU
Logging In to the OMU
Uploading the OMU Application Installation Package to
the OMU
Installing the OMU Application in the Active Workspace
Checking the Installation Directory of the OMU g y
Applications
Checking the Status of omud Processg
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page18
Obtain the Installation Information on the OMU
Before the installation, obtain the following information
from Data Sheet of BAM Software Installation
Password of the operating system administrator
Fixed IP address of the external network, virtual IP address Fixed IP address of the external network, virtual IP address
of the external network, or debugging IP address of the
OMU. OMU.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page19
Logging In to the OMULogging In to the OMU
On the computer run the
SSH terminal, PuTTY
Enter the IP address of
the OMUthe OMU
Log in to the OMU as
user root
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page20
Uploading the OMU Application Installation Package to the OMU
D th BSC6900 i ft k t th Decompress the BSC6900 version software package to the
local drive D
Log in to the OMU through the psftp software
Run the lcd D:\ to set the local directory
Run the mkdir /mbsc/upgrade to create the target directory
Run the cd /mbsc/upgrade to go to the target directory
Run the put -r V900R011C00 to upload the OMU application
installation packet to the OMU
After the loading is complete, enter the exit command to exist the
psftp software
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page21
Installing the OMU Application in the Active Workarea
Assume that the OMU application installation package pp p g
install_bam.sh is saved in
/mbsc/upgrade/V900R011C00/install/setup.
On the PuTTY terminal, run the following commands
cd /mbsc/upgrade/V900R011C00/install/setup
chmod +x ./install_bam.sh
./install_bam.sh
Enter the run mode
Setting the office name
Setting the languageSetting the language
Setting the admin/FTP password
Setting the external virtual IP address
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page22
Setting the OMU system type
Installing the OMU Application in the Active Workarea
Setting the run mode of productSetting the run mode of product
Setting the office name Setting the office name
Setting the language Setting the language
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page23
Installing the OMU Application in the Active Workarea
Setting the admin/FTP password Setting the admin/FTP password
Setting the external virtual IP address
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page24
Installing the OMU Application in the Active Workarea
Setting the OMU system typeSetting the OMU system type
Confirming the installation
Enter Y to install the OMU applications Enter Y to install the OMU applications.
When the message"Install OMU succeed!" is displayed, you
i f h h li i f ll can infer that the OMU applications are successfully
installed.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page25
Checking the Installation Directory of the OMU Applications
The version a and version bThe version_a and version_b
folders save active/standby OMU
workspace files.
Log in to the OMU by PuTTY
Run the cd /mbsc/bam
Check whether the OMU Check whether the OMU
installation directory
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page26
See RemarksSee Remarks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page27
Checking the Status of omud ProcessChecking the Status of omud Process
Log in to the OMU by PuTTYLog in to the OMU by PuTTY
Run the /etc/rc.d/omud status
The returned information is running, it means the omud is
working normally
The returned information is unused, run the /etc/rc.d/omud
start command to start the omudstart command to start the omud
The returned information is neither running nor unused,
reinstall the OMU application in the active workspacereinstall the OMU application in the active workspace
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page28
ContentsContents1 BSC6900 O&M System Introduction1. BSC6900 O&M System Introduction
2. BSC6900 Software Installation
3. BSC6900 Commissioning
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page29
ContentsContents3. BSC6900 Commissioning3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction
3 2 BSC6900 C i i i P d3.2 BSC6900 Commissioning Procedure
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page30
Introduction to BSC6900 CommissioningIntroduction to BSC6900 Commissioning
Definition of BSC6900 CommissioningDefinition of BSC6900 Commissioning
The commissioning of equipment, BSC6900 board
ft d d t fil l di i t f software and data file loading , interfaces
verification , and services verification after hardware
i t ll tiinstallation
To ensures that the BSC6900 works properly as
designed
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page31
Preparation For BSC6900 Commissioning
Preparation For BSC6900 Commissioningp g
Verify hardware status
BSC6900 hardware is installed and passed the hardwareBSC6900 hardware is installed and passed the hardware installation check and powering-on check
OMU is configured before deliveryOMU is configured before delivery
LMT PC meets the configuration requirements
Software preparationSoftware preparation
BAM and LMT application software are ready
License file is readyLicense file is ready
MML command script for initial configuration is ready
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page32
Preparation For BSC6900 Commissioning (Cont.)
Verify commissioning network status
At least one BTS are connected to the local BSC6900. The BTS
should have passed commissioning and can provide basic
functions
At least one set of Core Network (CN) equipment is connected to
the local BSC6900. The CN equipment should have passed the
i i i d id b i f ticommissioning and can provide basic functions
The MSs are ready for test and are registered in the HLR
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page33
ContentsContents3. BSC6900 Commissioning3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction
3 2 BSC6900 C i i i P d3.2 BSC6900 Commissioning Procedure
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page34
BSC6900 Commissioning ProcedureBSC6900 Commissioning Procedure
C i i i P itCommissioing Prerequsites
Check hardware operating Status
L d BSC6900 B d
Local operation
Remote operation
Verify OMU Verify OMU
Load BSC6900 Board Software and Data
files
Connect BSC6900 to M2000
Local operationRemote operation y
through USB Disky
Locally
Log in to BSC6900
based on local coopertation
Remote operation Log in to BSC6900 through LMT
Update OMU Database
Remote operation
Continued in the next page
Activate and Verify the License
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page35Page35
BSC6900 Commissioning Procedure (Cont.)
V if i t f
Remote operation
Verify interfacesthrough LMT
Set NE to be in maintenance mode Verify GSM Inteface
Remote operation based on localcoopertation
Verify interfaces through M2000
End the maintenance
Verify Interface
Verify GSM servicesEnd the maintenance
mode of NE
Create scheduled task
Handle alarms
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page36Page36
See RemarksSee Remarks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page37Page37
Checking the Operating Status of the Hardware
Before verifying the equipment ensure that the cabinet is Before verifying the equipment, ensure that the cabinet is
powered on and operates normally
Checklist of the power supply to the cabinet components
Component Normal LED Status
Board The green RUN LED on the board panel flashes every other second.
The green STATUS LED on the panel of the fan box flashes every
Fan box
g p y
other second after the subrack and independent fan subrack are
powered on.
Power distribution
monitoring board
The green RUN LED on the board panel flashes every other second
and the ALM LED is also OFF.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page38Page38
Main Steps of CommissioningMain Steps of CommissioningVerifying the OMU 1. Logging in to the OMU
2. Check the running status
Activating and Verifying the License
L di h BSC6900 B d S f d D Fil
g of the OMU process
3. Query the current version of the OMU application.
Loading the BSC6900 Board Software and Data Files
Verifying the Interfaces
4. Change the external fixed/ virtual IP address
6. Change the name and set th k d f th OMU
Handling the Alarms
the work mode of the OMU
7. Check the operating status of the OMU
Verifying the Services
Connecting the BSC6900 to the M2000
Creating Scheduled Tasks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page39
Creating Scheduled Tasks
Logging In to the OMULogging In to the OMU
On the computer run the
SSH terminal, PuTTY
Enter the IP address of
the OMUthe OMU
Log in to the OMU as
user root
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page40
Check the running statusCheck the running status Run the /etc/rc d/omud status command to check the Run the /etc/rc.d/omud status command to check the
running status of the OMU process.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page41
Query the current version of the OMU application
h d b d d i h hRun the cd /mbsc/upgrade command to switch to the
OMU installation directory, and then run the ls command
to query the current version of the OMU application.
If the version of the OMU application is different from that pp
required by the operator, Uninstalling the OMU application
firstly , and then install the OMU application in the active y
workspace
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page42
Querying the Network Configuration of the OMU Ethernet Adapters
Querying the external fixed IP address: ifconfig bond1Querying the external fixed IP address: ifconfig bond1
Querying the external virtual IP address: ifconfig bond1:0
Querying the internal fixed IP address: ifconfig vlan1
Querying the internal virtual IP address: ifconfig vlan1:0Querying the internal virtual IP address: ifconfig vlan1:0
Querying the debugging IP address: ifconfig bond2
Querying the IP address for the backup channel between
the active OMU and the standby OMU: ifconfig bond3y g
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page43
Change the external IP addressChange the external IP address Run the cd /mbsc/bam/version_a/bin/bam command to switch
to the directory where the omutool program locates.
Run the ./omutool command to start omutool.
Run the ./omutool extercard The external fixed IP address The subnet mask The gateway IP address command to change the
external fixed IP address and the subnet mask.
./omutool extercard 10.161.10.100 255.255.255.0 10.161.10.1
Run the ./omutool extervip The external virtual IP address The subnet mask command to change the external virtual IP
address and the subnet mask address and the subnet mask.
./omutool extervip 10.161.10.102 255.255.255.0
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page44
See RemarksSee Remarks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page45
Change the name and set the work mode of the OMU
Run the ./omutool hostname OMU name command to change Run the ./omutool hostname OMU name command to change
the name of the OMU.
For example, you can run the following command and then press
Enter to change the OMU name to omu_123: ./omutool hostname
omu_123.
Set the work mode of the OMU according to the number of
OMUa boards that are configured.
If l OMU b d i fi d th / t l d l d If only one OMUa board is configured, run the ./omutool dualmode
single command to set the work mode to the single-server mode.
If two OMUa boards (active and standby OMUa boards) are If two OMUa boards (active and standby OMUa boards) are
configured, run the ./omutool dualmode dual command to set the
work mode to the dual-server mode.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page46
Check the operating status of the OMUCheck the operating status of the OMU
Run the /etc/rc d/omud startRun the /etc/rc.d/omud start
command to start the OMU
application. pp
Run the ps -afx command to
check the operating status of p g
the OMU.
You can infer that the OMU is
in normal state if all OMU
processes exist in the OMU
active workspace active workspace
directory/mbsc/bam/version_a/
bin/bam/monitor.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page47
BSC6900 Commissioning Procedure
Verifying the OMU Locally
Activating and Verifying the License
L di h BSC6900 B d S f d D FilLoading the BSC6900 Board Software and Data Files
Verifying the Interfaces
Handling the Alarms
Verifying the Services
Connecting the BSC6900 to the M2000
Creating Scheduled Tasks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page48
Creating Scheduled Tasks
Activating and Verifying the License
Activating and Verifying the LicenseActivating and Verifying the License
Downloading license to OMU active workspace directory
/ft /li (DLD LICENSE) /ftp/license (DLD LICENSE)
Querying the detail information of the license file (LST
LICENSE)
Activating the license file (ACT LICENSE)
Checking the license consistency between host and OMU
(CMP LICENSE)( )
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page49
Loading the BSC6900 Board Software and Data Files
Loading the BSC6900 Board Software and Data FilesLoading the BSC6900 Board Software and Data Files
Generating the Data File
Cl th d t i th BAM d t b (RST DATA)Clear the data in the BAM database (RST DATA)
Generate the data file in ineffective state
– SET CFGDATAINEFFECTIVESET CFGDATAINEFFECTIVE
– Batch Commands
– FMT DATA
Setting the Loading Mode (SET LODCTRL)
Loading the MPS/EPS/TCS (RST SUBRACK)g
Checking the consistency of the data and the version (ACT CRC &
CMP BRDVER)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page50
BSC6900 Commissioning Procedure
Verifying the OMU Locally
Activating and Verifying the License
L di h BSC6900 B d S f d D Fil
1. Verifying the Abis Interface
Loading the BSC6900 Board Software and Data Files
Verifying the Interfaces
Interface
2. Verifying the A Interface
3 V if i th Gb
Handling the Alarms
3. Verifying the Gb Interface
4. Verifying the Ater I t f (O ti l)
Verifying the ServicesInterface (Optional)
5. Verifying the Pb Interface (Optional)
Connecting the BSC6900 to the M2000
Creating Scheduled Tasks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page51
Creating Scheduled Tasks
Verifying the Abis InterfaceVerifying the Abis InterfaceVerifying the Abis interface (Abis over TDM)Verifying the Abis interface (Abis over TDM)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT)
Verifying the Control Plane on the Abis Interface (DSP
LAPDLNK )
Verifying he timeslot status of the Abis interface (DSP
ABISTS)
To query the Subrack No., Slot No., and Port No. of the timeslots
to be verified, run the MML command (LST BTSCONNECT)
Verifying the Status of Cells and Channels (DSP BTSSTAT)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page52
Verifying the Abis InterfaceVerifying the Abis InterfaceVerifying the Abis interface (Abis over IP)Verifying the Abis interface (Abis over IP)
Verifying Physical Links at the BSC (DSP ETHPORT )
Verifying the Control Plane on the Abis Interface (DSP
LAPDLNK )
Verifying the User Plane on the Abis Interface (DSP
ADJNODE & DSP IPPATH)
Verifying the Status of the Cells and Channels (DSP BTSSTAT)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page53
Verifying the A InterfaceVerifying the A Interface Verifying the A interface (A over TDM) Verifying the A interface (A over TDM)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT)
V if i th C t l Pl th A I t fVerifying the Control Plane on the A Interface
DSP N7DPC
DSP MTP3LNK
DSP MTP2LNK
Verifying the User Plane on the A Interface (DSP ACIC)
To query the OPC Index and DPC Group Index of the E1/T1 to be verified on the A interface, run the MML command LST AE1T1.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page54
Verifying the A InterfaceVerifying the A InterfaceVerifying the A interface (A over IP) Verifying the A interface (A over IP)
Verifying Physical Links at the BSC (DSP ETHPORT )
Verifying the Control Plane on the A Interface
DSP N7DPC
DSP M3LKS
DSP SCTPLNK
Verifying the User Plane on the A Interface (DSP ADJNODE
& DSP IPPATH )& DSP IPPATH )
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page55
Verifying the Gb InterfaceVerifying the Gb InterfaceVerifying the Gb interface (Gb over FR) Verifying the Gb interface (Gb over FR)
Verifying the status of the Bearer Channel (DSP BC)
Verifying the status of the Network Service Virtual
Connection (DSP NSVC)
Verifying the SIG BSSGP Virtual Connection (SIGBVC) status
of the Network Service Entity (DSP SIGBVC & DSP PTPBVC)
To query the configuration of the NSE to be verified, run the MML
command LST NSE
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page56
Verifying the Gb InterfaceVerifying the Gb InterfaceVerifying the Gb interface (Gb over IP) Verifying the Gb interface (Gb over IP)
Verifying the status of the Network Service Virtual Link (DSP
NSVL) NSVL)
To query the configuration of the local or remote NSVL to be verified, run the MML command LST NSVLLOCAL or LST NSVLREMOTE.run the MML command LST NSVLLOCAL or LST NSVLREMOTE.
Verifying the status of the IP Route (DSP GBIPROUTE)
Verifying the SIG BSSGP Virtual Connection (SIGBVC) status Verifying the SIG BSSGP Virtual Connection (SIGBVC) status
of the Network Service Entity (DSP SIGBVC & DSP PTPBVC)
To query the configuration of the NSE to be verified run the MMLTo query the configuration of the NSE to be verified, run the MML command LST NSE
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page57
See RemarksSee Remarks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page58
Verifying the Ater and Pb Interface (Optional)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT)Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT)
Verifying the Ater Interface
Verifying the Status of Timeslots on the Ater interface. (DSP
ATERTS)
If the TCS is configured remotely, run the MML command DSP
ATERSL to query whether the Ater signaling link is normal.
Verifying the Pb Interface
Verifying the LAPD link on the Pb interface (DSP LAPDLNK)
Verifying the status of the circuit on the Pb interface (DSP PBCIC)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page59
BSC6900 Commissioning Procedure
Verifying the OMU Locally
Activating and Verifying the License
L di h BSC6900 B d S f d D FilLoading the BSC6900 Board Software and Data Files
Verifying the Interfaces
Handling the Alarms
Verifying the Services Verifying the GSM Services
Connecting the BSC6900 to the M2000
Creating Scheduled Tasks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page60
Creating Scheduled Tasks
Handling the Alarms Generated During the Commissioning
Handling Alarms During Commissioning Handling Alarms During Commissioning
Checking alarm on the LMT
Handling the Alarms by LMT online help
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page61
Verifying the GSM ServicesVerifying the GSM ServicesTo be sure BSC can provide services defined in license fileTo be sure BSC can provide services defined in license file
Basic services
The basic services consist of speech service and data service.
Feature services
The feature services consist of the inter-RAT handover, location
service, and AMR service.
If the result of service verification cannot meet the
expected results, start message tracing on the LMT over expected results, start message tracing on the LMT over
the Um, Abis, A, Gb, Pb, and Ater interfaces.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page62
BSC6900 Commissioning Procedure
Verifying the OMU Locally
Activating and Verifying the License
L di h BSC6900 B d S f d D FilLoading the BSC6900 Board Software and Data Files
Verifying the Interfaces
Handling the Alarms
Verifying the Services
Connecting the BSC6900 to the M2000
Creating Scheduled Tasks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page63
Creating Scheduled Tasks
Connecting the BSC6900 to the M2000Connecting the BSC6900 to the M2000
Connect the BSC6900 to the OM networkConnect the BSC6900 to the OM network
Configure the IP route from the BSC6900 to the M2000
ADD OMUIPRT
ADD EMSIP
Create the BSC6900 on the M2000
iManagerTM M2000
DCN
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page64
Creating Scheduled TasksCreating Scheduled Tasks
Scheduled tasks for backing up system dataScheduled tasks for backing up system data
ADD SCHTSK
ADD SUBTSK
Scheduled tasks for backing up logs g p g
ADD SCHTSK
ADD SUBTSK
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page65