    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Platform and Subsea Structure

  • 7/25/2019 2. Offshore Structure1 External

    2/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Platform and Subsea structureDesign Study

  • 7/25/2019 2. Offshore Structure1 External

    3/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Types of Offshore Platforms

    Fixed Platformmost common

    Minimum Structuresfree standing caisson

    Gravity Based Platformconcrete

    Guyed Towerguylines for lateral support

    Tension Leg Platform - Hutton, Jolliet, Heidrun, Magnolia

    Spar

    Hybrid TLP - Devil

    s Tower Compliant TowerAmarada HessBald Pate

  • 7/25/2019 2. Offshore Structure1 External

    4/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deepwater ConceptsDeepwater ConceptsMedium/Shallow

    Water - to 400

  • 7/25/2019 2. Offshore Structure1 External

    5/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jack-up Processing Platform

    4750 temaximum

    operating

    weight

    80*38*6.5m

    deck

    3mbuoyancy

    box

    6m skirt

  • 7/25/2019 2. Offshore Structure1 External

    6/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    ConventionalPlatforms

    CompliantTowers

    Tension LegPlatforms

    SPARS

    SemiFPSs

    TankerFPSOs

    EmergingConcepts

    SubseaMethods

    0 1000 2000 3000 4000 5000 6000 7000

    Water Depth Range (Feet)

    MethodsTechnical /Commercial Range of Applicability

    Matching Technology to DemandsMatching Technology to Demands

  • 7/25/2019 2. Offshore Structure1 External

    7/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Offshore Platform Design Codes

    API RP 2A WSDRecommended Practice for Planning, Design and ConstructingFixed Offshore Platforms - Working strength Design (WSD)

    AISCAmerican Institute of Steel Construction

    AWS D1.1Structural Welding Code Steel

    Company Specifications

    Government Regulations

  • 7/25/2019 2. Offshore Structure1 External

    8/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Operational Considerations

    FunctionWellhead, Production, LQ, Combination

    LocationDesign Wave, Current, Earthquake, etc

    OrientationPrevailing Seas, Winds, Currents

    Water DepthPlus Tide Fluctuations

    Deck ElevationsAir Gap, Equipment Heights

    Deck Area LayoutEquipment Locations, Landing Areas

  • 7/25/2019 2. Offshore Structure1 External

    9/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Environmental Considerations

    Normal Conditions 1 year ; 10 year

    Extreme Conditions 100 year

    Earthquake Seismic Exposure

    Wind, Wave and Tides

    Currents

    Marine Growth

    Scour Seabed Erosion

    Extreme Conditions Mud Slide, Floating Ice

    Site Investigations Geotechnical and Geophysical

  • 7/25/2019 2. Offshore Structure1 External

    10/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Wellhead Platform Contents of:

    Topside Structure

    Jacket Structure

  • 7/25/2019 2. Offshore Structure1 External

    11/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Design

    In-Place Analysis

    Dynamic Analysis

    Fatigue analysis

    Construction Conditions analysis

    Load-Out Analysis

    Lift Analysis

    Transportation and Barge Stability analysis

    Floatation/Upending Analysis

    On-Bottom Stability analysis & Mudmat Design

    Piling Design

    Miscellaneous Analysis and Design Check

  • 7/25/2019 2. Offshore Structure1 External

    12/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Design Loads

    Dead Loads Environmental Loads

    Risers, Casings, Conductors and Appurtenances

    Vessel Impact Loads

    Installations Loads

  • 7/25/2019 2. Offshore Structure1 External

    13/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Topsides Design

    In-Place Analysis

    Design for Construction Condition

    Load-Out Analysis

    Transportation Analysis

    Lifting Analysis

    Heliport Design

    Crane pedestal Design

    Fatigue

    Dynamic Analysis

  • 7/25/2019 2. Offshore Structure1 External

    14/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Topside Design Load

    Dead Loads

    Live Loads

    Uniform Area Live Loads

    Environmental Loads

    Wave Loads on Members

    in The Air Gap

    Drilling Loads

    Equipment Loads

    Earthquake Loads

    Test Loads

  • 7/25/2019 2. Offshore Structure1 External

    15/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Platform and Subsea Structure Fabrication

  • 7/25/2019 2. Offshore Structure1 External

    16/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Fabrication Sequence

    Stage 1

    Stage 2

    Stage 3

    Stage 4

  • 7/25/2019 2. Offshore Structure1 External

    17/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deck Fabrication Sequence (1)

    DECK STACKINGDECK STACKING

    Fabricate Deck Leg and Braces Below Cellar DeckFabricate Deck Leg and Braces Below Cellar Deck

    Off h S

  • 7/25/2019 2. Offshore Structure1 External

    18/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deck Fabrication Sequence (2)DECK STACKINGDECK STACKING

    Stab CellarStab CellarDeckDeck

    Install Deck PlatingInstall Deck Plating

    Install Cellar DeckInstall Cellar DeckEquipmentEquipment

    Fabricate Deck Leg and BracesFabricate Deck Leg and Bracesabove Cellar Deckabove Cellar Deck

    Off h S

  • 7/25/2019 2. Offshore Structure1 External

    19/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deck Fabrication Sequence (3)DECK STACKINGDECK STACKING

    Stab Main Deck FramingStab Main Deck Framing Install Deck PlatingInstall Deck Plating

    Install Main Deck EquipmentInstall Main Deck Equipment Install Deck Leg and BracesInstall Deck Leg and Bracesabove Main Deckabove Main Deck

    Off h S

  • 7/25/2019 2. Offshore Structure1 External

    20/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deck Fabrication Sequence (4)DECK STACKINGDECK STACKING

    Stab Drilling DeckStab Drilling DeckFramingFraming

    Install Drilling DeckInstall Drilling Deck

    Plating andPlating and

    EquipmentEquipment

    Off h St t

  • 7/25/2019 2. Offshore Structure1 External

    21/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deck Fabrication Sequence (5)

    Deck with Piping andDeck with Piping and

    EquipmentEquipment

    Deck with Piping andDeck with Piping and

    EquipmentEquipment

    Off h St t

  • 7/25/2019 2. Offshore Structure1 External

    22/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Lifting Equipment:

    Two 544MT Liebherr

    LR1600 cranes

    22 crawler cranes

    18 hydraulic cranes Overhead cranes in

    prefab shops

    One tower crane

    Off h St t

  • 7/25/2019 2. Offshore Structure1 External

    23/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jebel Ali

    Middle East

    Batam Island

    South East Asia

    Morgan CityGulf of Mexico

    Harbor IslandGulf of Mexico

    Baku

    Caspian

    Lagos

    West Africa

    VeracruzGulf of Mexico

    Off h St t

  • 7/25/2019 2. Offshore Structure1 External

    24/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Yard Size: 241 acresComponent Prefab: Fully equipped coveredbuildings for pre-assembly of large decks anddeck components

    Reinforced Bulkhead:

    Length: North yard: 131ft

    South yard: 2 x bulkheads 600fteach

    Work Load Capacity: No limitation for

    fabrication of any size moduleCertification: ISO 9001

    Minimum Channel Depth to Open Sea:27.8ft

    Distance to the Open Sea: 0 milesSOUTH EAST ASIA

    Largest jacket: 17,063MT to date

    Largest single deck: 4,092MT to date

    Largest complex: 11,026MT to date

    Largest spar hull: 10,886MT to date

    Largest onshore plant: 17,500MT todate

    McDermott Batam Fabrication Yard

    Offshore Str ct re

  • 7/25/2019 2. Offshore Structure1 External

    25/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Offshore Installation

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    26/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    DB 60 DB30 KP1

    Derrick Barge 27 420 x 128 x 28 S-Lay (72 OD) 2,400

    Derrick Barge KP1 456 x 99 x 30 S-Lay (60 OD) 600

    Derrick Barge 26 400 x 106 x 28.5 S-Lay (40 OD) 900

    Derrick Barge 30 420 x 158 x 28 S-Lay (72 OD) 3,090

    Derrick Barge 60 607x115x50 S-Lay (72 OD) 2,000

    Installation Size Pipelay Lift CapacityVessel (LxWxD)ft Capabilities (Short Tons)

    DB26

    DB27

    DB26

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    27/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Derrick Barge 26Dimensions: 122 x 32 x 8.7(m)

    Year Built: 1975

    Crane Capacity:

    Fixed: 900ST

    Revolving: 800ST

    Max. Water Depth: 457.5m

    Max. Pipelay: 40 OD

    Tension Capacity: 250,000lbsAccommodation: 273 men

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    28/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Derrick Barge 30Dimensions: 128 x 48 x 8.5(m)

    Year Upgraded: 1999

    Crane Capacity:

    Fixed: 3,080 ST

    Revolving: 2,300 STMax. Water Depth: 610m

    Max. Pipelay: 72 OD

    Tension Capacity: 300,000lbsAccommodation: 294 men

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    29/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    1995: Elf - NKossa NKF, Congo Jacket

    Construction of two drilling decks and a four-leg jacket for the NKossa Field. The jacket wasfabricated using the bent type assembly and the decks using a pancake deck framing

    assembly. At the time the 6,834 ST jacket was the largest offshore structure to be built in the

    Middle East.

    *Year of completion

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    30/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Dry Transportation

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    31/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Dry Transportation

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    32/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Crane Barge

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    33/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Lifting

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    34/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Floating

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    35/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Start to Lift

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    36/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Jacket Piling

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    37/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deck Towing

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    38/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Deck Installation on Jacket

    Offshore Structure

  • 7/25/2019 2. Offshore Structure1 External

    39/39

    Offshore Structure

    KOMUNITAS MIGAS INDONESIA

    Offshore Commissioning