Offshore Structure
KOMUNITAS MIGAS INDONESIA
Platform and Subsea Structure
-
7/25/2019 2. Offshore Structure1 External
2/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Platform and Subsea structureDesign Study
-
7/25/2019 2. Offshore Structure1 External
3/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Types of Offshore Platforms
Fixed Platformmost common
Minimum Structuresfree standing caisson
Gravity Based Platformconcrete
Guyed Towerguylines for lateral support
Tension Leg Platform - Hutton, Jolliet, Heidrun, Magnolia
Spar
Hybrid TLP - Devil
s Tower Compliant TowerAmarada HessBald Pate
-
7/25/2019 2. Offshore Structure1 External
4/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deepwater ConceptsDeepwater ConceptsMedium/Shallow
Water - to 400
-
7/25/2019 2. Offshore Structure1 External
5/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jack-up Processing Platform
4750 temaximum
operating
weight
80*38*6.5m
deck
3mbuoyancy
box
6m skirt
-
7/25/2019 2. Offshore Structure1 External
6/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
ConventionalPlatforms
CompliantTowers
Tension LegPlatforms
SPARS
SemiFPSs
TankerFPSOs
EmergingConcepts
SubseaMethods
0 1000 2000 3000 4000 5000 6000 7000
Water Depth Range (Feet)
MethodsTechnical /Commercial Range of Applicability
Matching Technology to DemandsMatching Technology to Demands
-
7/25/2019 2. Offshore Structure1 External
7/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Offshore Platform Design Codes
API RP 2A WSDRecommended Practice for Planning, Design and ConstructingFixed Offshore Platforms - Working strength Design (WSD)
AISCAmerican Institute of Steel Construction
AWS D1.1Structural Welding Code Steel
Company Specifications
Government Regulations
-
7/25/2019 2. Offshore Structure1 External
8/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Operational Considerations
FunctionWellhead, Production, LQ, Combination
LocationDesign Wave, Current, Earthquake, etc
OrientationPrevailing Seas, Winds, Currents
Water DepthPlus Tide Fluctuations
Deck ElevationsAir Gap, Equipment Heights
Deck Area LayoutEquipment Locations, Landing Areas
-
7/25/2019 2. Offshore Structure1 External
9/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Environmental Considerations
Normal Conditions 1 year ; 10 year
Extreme Conditions 100 year
Earthquake Seismic Exposure
Wind, Wave and Tides
Currents
Marine Growth
Scour Seabed Erosion
Extreme Conditions Mud Slide, Floating Ice
Site Investigations Geotechnical and Geophysical
-
7/25/2019 2. Offshore Structure1 External
10/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Wellhead Platform Contents of:
Topside Structure
Jacket Structure
-
7/25/2019 2. Offshore Structure1 External
11/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Design
In-Place Analysis
Dynamic Analysis
Fatigue analysis
Construction Conditions analysis
Load-Out Analysis
Lift Analysis
Transportation and Barge Stability analysis
Floatation/Upending Analysis
On-Bottom Stability analysis & Mudmat Design
Piling Design
Miscellaneous Analysis and Design Check
-
7/25/2019 2. Offshore Structure1 External
12/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Design Loads
Dead Loads Environmental Loads
Risers, Casings, Conductors and Appurtenances
Vessel Impact Loads
Installations Loads
-
7/25/2019 2. Offshore Structure1 External
13/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Topsides Design
In-Place Analysis
Design for Construction Condition
Load-Out Analysis
Transportation Analysis
Lifting Analysis
Heliport Design
Crane pedestal Design
Fatigue
Dynamic Analysis
-
7/25/2019 2. Offshore Structure1 External
14/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Topside Design Load
Dead Loads
Live Loads
Uniform Area Live Loads
Environmental Loads
Wave Loads on Members
in The Air Gap
Drilling Loads
Equipment Loads
Earthquake Loads
Test Loads
-
7/25/2019 2. Offshore Structure1 External
15/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Platform and Subsea Structure Fabrication
-
7/25/2019 2. Offshore Structure1 External
16/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Fabrication Sequence
Stage 1
Stage 2
Stage 3
Stage 4
-
7/25/2019 2. Offshore Structure1 External
17/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deck Fabrication Sequence (1)
DECK STACKINGDECK STACKING
Fabricate Deck Leg and Braces Below Cellar DeckFabricate Deck Leg and Braces Below Cellar Deck
Off h S
-
7/25/2019 2. Offshore Structure1 External
18/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deck Fabrication Sequence (2)DECK STACKINGDECK STACKING
Stab CellarStab CellarDeckDeck
Install Deck PlatingInstall Deck Plating
Install Cellar DeckInstall Cellar DeckEquipmentEquipment
Fabricate Deck Leg and BracesFabricate Deck Leg and Bracesabove Cellar Deckabove Cellar Deck
Off h S
-
7/25/2019 2. Offshore Structure1 External
19/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deck Fabrication Sequence (3)DECK STACKINGDECK STACKING
Stab Main Deck FramingStab Main Deck Framing Install Deck PlatingInstall Deck Plating
Install Main Deck EquipmentInstall Main Deck Equipment Install Deck Leg and BracesInstall Deck Leg and Bracesabove Main Deckabove Main Deck
Off h S
-
7/25/2019 2. Offshore Structure1 External
20/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deck Fabrication Sequence (4)DECK STACKINGDECK STACKING
Stab Drilling DeckStab Drilling DeckFramingFraming
Install Drilling DeckInstall Drilling Deck
Plating andPlating and
EquipmentEquipment
Off h St t
-
7/25/2019 2. Offshore Structure1 External
21/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deck Fabrication Sequence (5)
Deck with Piping andDeck with Piping and
EquipmentEquipment
Deck with Piping andDeck with Piping and
EquipmentEquipment
Off h St t
-
7/25/2019 2. Offshore Structure1 External
22/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Lifting Equipment:
Two 544MT Liebherr
LR1600 cranes
22 crawler cranes
18 hydraulic cranes Overhead cranes in
prefab shops
One tower crane
Off h St t
-
7/25/2019 2. Offshore Structure1 External
23/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jebel Ali
Middle East
Batam Island
South East Asia
Morgan CityGulf of Mexico
Harbor IslandGulf of Mexico
Baku
Caspian
Lagos
West Africa
VeracruzGulf of Mexico
Off h St t
-
7/25/2019 2. Offshore Structure1 External
24/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Yard Size: 241 acresComponent Prefab: Fully equipped coveredbuildings for pre-assembly of large decks anddeck components
Reinforced Bulkhead:
Length: North yard: 131ft
South yard: 2 x bulkheads 600fteach
Work Load Capacity: No limitation for
fabrication of any size moduleCertification: ISO 9001
Minimum Channel Depth to Open Sea:27.8ft
Distance to the Open Sea: 0 milesSOUTH EAST ASIA
Largest jacket: 17,063MT to date
Largest single deck: 4,092MT to date
Largest complex: 11,026MT to date
Largest spar hull: 10,886MT to date
Largest onshore plant: 17,500MT todate
McDermott Batam Fabrication Yard
Offshore Str ct re
-
7/25/2019 2. Offshore Structure1 External
25/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Offshore Installation
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
26/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
DB 60 DB30 KP1
Derrick Barge 27 420 x 128 x 28 S-Lay (72 OD) 2,400
Derrick Barge KP1 456 x 99 x 30 S-Lay (60 OD) 600
Derrick Barge 26 400 x 106 x 28.5 S-Lay (40 OD) 900
Derrick Barge 30 420 x 158 x 28 S-Lay (72 OD) 3,090
Derrick Barge 60 607x115x50 S-Lay (72 OD) 2,000
Installation Size Pipelay Lift CapacityVessel (LxWxD)ft Capabilities (Short Tons)
DB26
DB27
DB26
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
27/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Derrick Barge 26Dimensions: 122 x 32 x 8.7(m)
Year Built: 1975
Crane Capacity:
Fixed: 900ST
Revolving: 800ST
Max. Water Depth: 457.5m
Max. Pipelay: 40 OD
Tension Capacity: 250,000lbsAccommodation: 273 men
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
28/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Derrick Barge 30Dimensions: 128 x 48 x 8.5(m)
Year Upgraded: 1999
Crane Capacity:
Fixed: 3,080 ST
Revolving: 2,300 STMax. Water Depth: 610m
Max. Pipelay: 72 OD
Tension Capacity: 300,000lbsAccommodation: 294 men
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
29/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
1995: Elf - NKossa NKF, Congo Jacket
Construction of two drilling decks and a four-leg jacket for the NKossa Field. The jacket wasfabricated using the bent type assembly and the decks using a pancake deck framing
assembly. At the time the 6,834 ST jacket was the largest offshore structure to be built in the
Middle East.
*Year of completion
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
30/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Dry Transportation
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
31/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Dry Transportation
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
32/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Crane Barge
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
33/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Lifting
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
34/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Floating
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
35/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Start to Lift
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
36/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Jacket Piling
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
37/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deck Towing
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
38/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Deck Installation on Jacket
Offshore Structure
-
7/25/2019 2. Offshore Structure1 External
39/39
Offshore Structure
KOMUNITAS MIGAS INDONESIA
Offshore Commissioning