Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE Create Bill of material File Name: PP02 Release Date 00.00.0000 Responsibility: Production planning & Control Status Released Consultant’s Name: Module Page No. - 1 M.Y.Mohan Production Planning & Control RAHMAN GROUP User Training Manual Production Planning and Control (PP) 2. Create Bill of material

description

BOM

Transcript of 2. Bom - Footwear-rhmn

Page 1: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 1

M.Y.Mohan Production Planning & Control

RAHMAN GROUP

User Training Manual

Production Planning and Control

(PP)

2. Create Bill of material

Page 2: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 2

M.Y.Mohan Production Planning & Control

Bill of Material A bill of material is a complete, formally structured list of the components that make up a product or assembly. The list contains the object number of each component, together with the quantity, unit of measure and quantity distribution profile.

Transaction Code CS01

Menu Path SAP Easy Access SAP Menu Logistics Production Master Data Bill of Material Bill of Material Create

When you enter the above mentioned transaction code in the command line & press enter the below Screen will appear & valid from date is assigned automatically.

Page 3: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 3

M.Y.Mohan Production Planning & Control

In the above screen enter the appropriate values for the below mentioned fields:

Field name Description R/O/C User actions and values

Material Material code for which BOM is created

R CT-LMMSPSTYAALG1

Plant In which plant this material code exists

R U100

BOM Usage Key, which defines the area where the BOM is used.

R 1

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page 4: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 4

M.Y.Mohan Production Planning & Control

See the below screen for example:

Now press enter to go to the next screen as shown below

Page 5: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 5

M.Y.Mohan Production Planning & Control

In above screen enter the appropriate values in the below field:

Field name Description R/O/C User actions and values

Item category

Specify whether the item is stock item or Non-stock, for example.

R L

Component

Which BOM item is required to produce the BOM header material?

R BFS321BK001MHL2

Quantity

BOM item quantity R 17.650

Qty. Distribution Profile BOM item distribution R

Page 6: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 6

M.Y.Mohan Production Planning & Control

See the screen as below

Assign the Qty Distribution Profile

Page 7: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 7

M.Y.Mohan Production Planning & Control

When you press enter, the systems will automatically pick-up the unit of measure from the respective material master of the component & assign the valid from and valid to dates to the components. Also assign the Qty. Distribution Profile in respective grid material. If Header & Component materials are same grid then no need to assign the Qty. Distribution Profile.

To see the distribution values select the line and click on the

Page 8: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 8

M.Y.Mohan Production Planning & Control

Page 9: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 9

M.Y.Mohan Production Planning & Control

Now push Header button. And see the below screen.

Page 10: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 10

M.Y.Mohan Production Planning & Control

Now enter the appropriate Base quantity for the Header Material as shown in the screen below. Base Qty. – The quantity of a component needed to produce the base quantity of a product or assembly. Here we are preparing the BOM for 01 PAA. So Base Qty. is 1.

Now push button from the above screen & see the screen.

Page 11: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 11

M.Y.Mohan Production Planning & Control

Then Push (Save) button to save the BOM. Below screen will appear confirming the creation of BOM.

Page 12: 2. Bom - Footwear-rhmn

Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE

Create Bill of material

File Name: PP02 Release Date

00.00.0000

Responsibility: Production planning & Control Status Released

Consultant’s Name: Module Page No. - 12

M.Y.Mohan Production Planning & Control

The BOM is created for the Material.