Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 1
M.Y.Mohan Production Planning & Control
RAHMAN GROUP
User Training Manual
Production Planning and Control
(PP)
2. Create Bill of material
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 2
M.Y.Mohan Production Planning & Control
Bill of Material A bill of material is a complete, formally structured list of the components that make up a product or assembly. The list contains the object number of each component, together with the quantity, unit of measure and quantity distribution profile.
Transaction Code CS01
Menu Path SAP Easy Access SAP Menu Logistics Production Master Data Bill of Material Bill of Material Create
When you enter the above mentioned transaction code in the command line & press enter the below Screen will appear & valid from date is assigned automatically.
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 3
M.Y.Mohan Production Planning & Control
In the above screen enter the appropriate values for the below mentioned fields:
Field name Description R/O/C User actions and values
Material Material code for which BOM is created
R CT-LMMSPSTYAALG1
Plant In which plant this material code exists
R U100
BOM Usage Key, which defines the area where the BOM is used.
R 1
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 4
M.Y.Mohan Production Planning & Control
See the below screen for example:
Now press enter to go to the next screen as shown below
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 5
M.Y.Mohan Production Planning & Control
In above screen enter the appropriate values in the below field:
Field name Description R/O/C User actions and values
Item category
Specify whether the item is stock item or Non-stock, for example.
R L
Component
Which BOM item is required to produce the BOM header material?
R BFS321BK001MHL2
Quantity
BOM item quantity R 17.650
Qty. Distribution Profile BOM item distribution R
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 6
M.Y.Mohan Production Planning & Control
See the screen as below
Assign the Qty Distribution Profile
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 7
M.Y.Mohan Production Planning & Control
When you press enter, the systems will automatically pick-up the unit of measure from the respective material master of the component & assign the valid from and valid to dates to the components. Also assign the Qty. Distribution Profile in respective grid material. If Header & Component materials are same grid then no need to assign the Qty. Distribution Profile.
To see the distribution values select the line and click on the
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 8
M.Y.Mohan Production Planning & Control
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 9
M.Y.Mohan Production Planning & Control
Now push Header button. And see the below screen.
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 10
M.Y.Mohan Production Planning & Control
Now enter the appropriate Base quantity for the Header Material as shown in the screen below. Base Qty. – The quantity of a component needed to produce the base quantity of a product or assembly. Here we are preparing the BOM for 01 PAA. So Base Qty. is 1.
Now push button from the above screen & see the screen.
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 11
M.Y.Mohan Production Planning & Control
Then Push (Save) button to save the BOM. Below screen will appear confirming the creation of BOM.
Atum IT Services India Pvt LTD BUSINESS PROCESS PROCEDURE
Create Bill of material
File Name: PP02 Release Date
00.00.0000
Responsibility: Production planning & Control Status Released
Consultant’s Name: Module Page No. - 12
M.Y.Mohan Production Planning & Control
The BOM is created for the Material.