    Risk Based Inspection for Boilers

    72557

    Lloyds Register International(Thailand) Ltd.

    Chamni Mosagul

    Operation Manager,

    ASME Authorized Inspector and Supervisor (AI, AIS)

    Energy, Inspection Business,

    Lloyds Register International (Thailand) Ltd.

    7 June 2014

    Risk Based Inspection for Boilers

  • 8/12/2019 1_RiskBaseInspection

    2/18

    2

    Risk Based Inspection(RBI)

    Agenda

    RBI Introduction

    Time based vs Risk based inspection(RBI)

    RBI Methodology

    Boiler Deterioration Mechanism

    Criticality assessment

    RBI result implementation for inspection &

    maintenance strategy

    RBI Workshop (if time available)

  • 8/12/2019 1_RiskBaseInspection

    3/18

    3

    RBI Introduction

  • 8/12/2019 1_RiskBaseInspection

    4/18

    4

    What is Risk ?

    Risk Has Two Components:-

    Risk is a measure of BOTH

    PROBABILITY of a failure

    AND

    CONSEQUENCE of a failure

    What is RBI ?

    Risk Based Inspection (RBI) is

    a risk assessment and management process that is focused on

    loss of containment of pressurized equipment in processing

    facilities, due to material deterioration.

    These risks are managed primarily through equipment inspection.

    Referenced Code

    API Recommended practice 580 (Risk Based Inspection)

    API Recommended practice 581 (RBI Base Resource Document)

  • 8/12/2019 1_RiskBaseInspection

    5/18

  • 8/12/2019 1_RiskBaseInspection

    6/18

    6

    Reliability Based Mechanical Integrity

    Criticality Measures

    Probability Ranking

    Very High (1+ per yr.)

    High (10-1 per yr.)

    Moderate (10-2 per yr.)

    Low (10

    -3

    per yr.)

    Very Low (10-4 or less

    per yr.)

    Consequence Ranking

    Catastrophic ( 107 )

    Very Serious ( 106 )

    Serious ( 105 )

    Significant ( 10

    4

    )

    Minor ( 103 )

  • 8/12/2019 1_RiskBaseInspection

    7/18

    7

  • 8/12/2019 1_RiskBaseInspection

    8/18

    8

    RBI Time based vs Risk Based Inspection RBI)

  • 8/12/2019 1_RiskBaseInspection

    9/18

    9

    Advantage of RBI comparing to Time Based inspection

    Previous and existing resolution (Time Based)

    Time based inspection and Maintenance:-

    - Inspecting before knowing where to go

    - Lower safety, reliability

    - waste a lot of money to do unnecessary inspections

    and maintenances cost

    - Higher risk level

    - Low level of assets performance management

    - low Economical competitiveness capability level

  • 8/12/2019 1_RiskBaseInspection

    10/18

    10

    Alternative Technology RBI)

    for assets performance management

    Risk Based Inspection and Maintenance

    - Inspectors can identify:-

    - where the damage mechanisms are,

    - how to inspect them, and

    - how frenquently

    - Inspection is about finding where the

    problems are

    before they find you. RBI helps we do that.

    Alternative Technology RBI)

    for assets performance management

    Risk Based Inspection and Maintenance

    - RBI is about doing the right things

    - It is about getting to mechanical integrity

    and safety,

    - It is not about saving money, saving will

    come after our facilities are safe and reliable.

    - Inspection and Maintenance based on real-

    time evaluated risk level

    - Not doing unnecessary/waste inspection and

    maintenance activities

  • 8/12/2019 1_RiskBaseInspection

    11/18

    11

    Alternative Technology (RBI)for assets performance management

    - Maintain high safety level at Lowest risk

    - Highest performance/lowest cost

    - Maximize profit and economical

    competitiveness capability

    INSPECTION COSTS

    RISK

    Risk Using RBI

    Risk with time driven asset

    management program

    The RBI processreducing costs, reducing risks and measuring value

  • 8/12/2019 1_RiskBaseInspection

    12/18

    12

    FCC Calculated Risk and Risk Reduction

    90% Risk Reduction Achieved by

    Add ressing 12% of Fixed Equipment Items

    As-Found Risk

    After Risk Mitigat ion

    Calculated as the mid value

    consequence multiplied

    by the likelihood

    Risk Distribution

    10 1 10 0 0 0 0

    33 2 1 10 3 18 1

    22 3 0 6 3 12 1

    25 4 5 0 0 17 3

    100 5 27 0 0 65 8

    E D C B A

    190 43 1 6 6 1 12 13

    Initial Risk Study

    Risk Distribution

    3 1 3 0 0 0 0

    13 2 2 6 0 5 0

    25 3 4 10 3 8 0

    35 4 6 0 3 21 5

    114 5 28 0 0 78 8

    E D C B A

    190 43 1 6 6 1 12 13

    Industry Best Practice Case Study #3U. S. Refinery Piping in All Units

    0

    1,000,000

    2,000,000

    3,000,000

    4,000,000

    5,000,000

    HFAlky

    FCC

    GasCon

    #2Crude

    #1Crude

    MEASRU

    #1Reformer

    DistillateUnifiner

    HDH

    SatGas/Dehex

    C5/C6Isom

    FoulWaterSep

    Hydrogen

    C5/C6Desulf

    Reformer#2

    FuelGas

    DDSHydrotreater

    Flare,

    OilSep,

    BD

    #2SRU

    BOILER

    SCOT

    Units

    As Found

    As Left

    CumulativeRisk-

    $/Yr

    Contract

    Inspection Resources

  • 8/12/2019 1_RiskBaseInspection

    13/18

    13

  • 8/12/2019 1_RiskBaseInspection

    14/18

    14

    RBI Methodology

    There are 3 methods commonly used:-

    - Qualitative

    - Quantitative

    - Semi-Quantitative

    RBI Methodology

  • 8/12/2019 1_RiskBaseInspection

    15/18

    15

    RBI Qualitative methodology

    Corrosion engineer 1

    Subject Matter Expert 2

    Subject Matter Expert 3

    Subject Matter Expert 4

    Facilitator

    Data collection

    30 fields

    per asset

    Manual Inspection planning per asset

    RISK Calculator

    RBI Quantitative methodology

    Data collection

    130 fields

    per asset

    Manual Inspection planning per asset

    RISK Calculator

  • 8/12/2019 1_RiskBaseInspection

    16/18

    16

    RBI Risk Modeling

    Calculate Likelihood of Failure

    (events per year)

    Asset type, components

    Degradation mechanisms

    Failure modes

    Age, usage, environment, etc

    Asset condition (based on past and

    future maintenance and condition

    monitoring)

    Calculate Consequence of Failure

    (impact per event)

    Safety, Health or Environmental impactMaintenance costs

    Disruption to use

    Reputation Public/Political

    M&I Task Plan optimized to the

    asset and the business

    Includes industry best practices

    May increased or decrease current

    maintenance requirements

    Will change with time

    Consequence Ranking

    ABCDE

    1

    2

    3

    4

    5

    ProbabilityRanking

    HIGH

    MED HIGH

    MEDIUM

    LOW

    RBI Implementation step

  • 8/12/2019 1_RiskBaseInspection

    17/18

    17

    Semi - Quantitative methodology (Capstone RBMI)

    Corrosion engineer

    Asset

    Perform

    Plan

    Evaluate

    Update

    RISK Calculator

    RISK Calculator

    Data collection

    30 fields

    per asset

    Suggested

    inspection plan

    generated by

    system

    API 573

    (Insp. of Fired

    Boilers/heaters

  • 8/12/2019 1_RiskBaseInspection

    18/18

    Data collection step

    Evaluate Risk level for each Component/item