1MRK506074-UEN en Installation and Commissioning Manual REL 531 2.3

Click here to load reader

  • date post

    18-Aug-2015
  • Category

    Documents

  • view

    232
  • download

    5

Embed Size (px)

description

installation

Transcript of 1MRK506074-UEN en Installation and Commissioning Manual REL 531 2.3

ABB Automation Products AB2001Substation Automation DivisionInstallation and commissioning manualREL 531*2.3High speed line distance protectionterminalAbout this manualDocID: 1MRK 506 074-UENIssue date: June 2001Status: NewVersion: 2.3Revision: 00COPYRIGHTWE RESERVE ALL RIGHTS TO THIS DOCUMENT, EVEN IN THE EVENT THAT A PATENT IS ISSUED AND A DIFFERENT COMMERCIAL PROPRIETARY RIGHT IS REGISTERED. IMPROPER USE, IN PARTICULAR REPRODUCTION AND DIS-SEMINATION TO THIRD PARTIES, IS NOT PERMITTED.THIS DOCUMENT HAS BEEN CAREFULLY CHECKED. IF THE USER NEVERTHELESS DETECTS ANY ERRORS, HE IS ASKED TO NOTIFY US AS SOON AS POSSIBLE.THE DATA CONTAINED IN THIS MANUAL IS INTENDED SOLELY FOR THE PRODUCT DESCRIPTION AND IS NOT TO BE DEEMED TO BE A STATEMENT OF GUARANTEED PROPERTIES. IN THE INTERESTS OF OUR CUSTOMERS, WE CON-STANTLY SEEK TO ENSURE THAT OUR PRODUCTS ARE DEVELOPED TO THE LATEST TECHNOLOGICAL STAN-DARDS. AS A RESULT, IT IS POSSIBLE THAT THERE MAY BE SOME DIFFERENCES BETWEEN THE HW/SW PRODUCT AND THIS INFORMATION PRODUCT.Manufacturer:ABB Automation Products ABSubstation Automation DivisionSE-721 59 VstersSwedenTel: +46 (0) 21 34 20 00Fax: +46 (0) 21 14 69 18Internet: http://www.abb.seContentsPage ChapterChapter 1 Introduction ..................................................................... 1Introduction to the installation and commissioning manual ................. 2About the complete set of manuals to a terminal............................ 2About the installation and commissioning manual.......................... 3Intended audience.......................................................................... 3Related documents......................................................................... 4Revision notes ................................................................................ 4Chapter 2 Safety information........................................................... 5Warning signs...................................................................................... 6Caution signs....................................................................................... 8Note signs............................................................................................ 9Chapter 3 Overview........................................................................ 11Commissioning and installation overview.......................................... 12Chapter 4 Unpacking and checking the terminal ........................ 13Receiving, unpacking and checking .................................................. 14Chapter 5 Installing the terminal ................................................... 15Overview............................................................................................ 16Mounting the terminal ........................................................................ 17Mounting in a 19-inch rack ........................................................... 18Mounting in a 19-inch rack with an additional box type RHGS..... 19Mounting in a flush or semi-flush installation................................ 21Mounting on a wall ....................................................................... 24Making the electrical connections...................................................... 26Connecting the CT circuits............................................................ 26Connecting the auxiliary power, VT and signal connectors.......... 26Connecting to protective ground................................................... 27Making the screen connection...................................................... 27Installing the optical fibres ................................................................. 28Installing the communication cables.................................................. 29ContentsChapter 6 Checking the external circuitry.................................... 31Overview............................................................................................ 32Checking the CT and VT circuits ....................................................... 33Checking the power supply................................................................ 34Checking the binary I/O circuits ......................................................... 35Binary input circuits....................................................................... 35Binary output circuits .................................................................... 35Chapter 7 Energising the terminal................................................. 37Overview............................................................................................ 38Energising the terminal ...................................................................... 39Checking the self supervision signals................................................ 40Reconfiguring the terminal ............................................................ 40Setting the terminal time............................................................... 40Checking the self supervision function ......................................... 41Self supervision HMI data............................................................. 41Chapter 8 Configuring the digital communication modules....... 43Configuring the fibre optical modem.................................................. 44Configuring the short range fibre optical modem............................... 45Configuring the short range galvanic modem.................................... 49Configure the interface modules for V.36, X.21 and RS530.............. 51Configuring the interface modules for G.703 co-directional ............... 53Chapter 9 Setting and configuring the terminal........................... 55Overview............................................................................................ 56Entering settings through the local HMI ............................................. 57Downloading settings and configuration from a PC........................... 58Establishing front port communication.......................................... 58Establishing rear port communication........................................... 58Downloading the configuration and setting files ........................... 60Chapter 10 Establishing connection and verifying the SPA/IEC-communication.............................................................. 61Entering settings ................................................................................ 62Entering SPA settings................................................................... 62Entering IEC settings.................................................................... 62Verifying the communication.............................................................. 64Verifying SPA communication ...................................................... 64Verifying IEC communication........................................................ 64ContentsChapter 11 Verifying settings by secondary injection................. 65Overview............................................................................................ 66Preparing for test ............................................................................... 68Overview....................................................................................... 68Preparing the connection to the test equipment ........................... 68Setting the terminal in test mode .................................................. 69Connecting test equipment to the terminal ................................... 69Verifying the connection and the analog inputs............................ 70Releasing the function(s) to be tested .......................................... 71Checking the disturbance report settings ..................................... 72Automatic switch onto fault logic (SOTF)........................................... 74External activation of SOTF function ............................................ 74Automatic initiation of SOTF......................................................... 74Completing the test....................................................................... 74Automatic reclosing function (AR) ..................................................... 75Preparing...................................................................................... 76Checking the AR functionality....................................................... 77Checking the reclosing condition.................................................. 78Testing the multi-breaker arrangement......................................... 79Completing the test....................................................................... 79Binary signal transfer to remote end (RTC) ....................................... 80Breaker failure protection (BFP) ........................................................ 81Measuring the operate limit .......................................................... 81Verifying the retrip setting............................................................. 81Completing the test....................................................................... 82Broken conductor check (BRC) ......................................................... 83Measuring the operate and time limit of set values ...................... 83Communication channel Logic (CCHL) ............................................. 85Testing the time delayed operation for only one communications signal .............................................................. 85Testing the unblocking logic within each separate signal ............. 86Testing the simultaneous presence of two carrier receive signals ............................................................ 86Completing the test....................................................................... 86Communication channel test logic (CCHT)........................................ 87Testing the logic ........................................................................... 87Current circuit supervision (CTSU) ........