1C.2 1C.1 PPS 1B 1E 1D · city of virginia beach eastern shore drive drainage improvements - phase...
1
1D 1C.2 1B CIP Section Drainage Improvement Description 7-151 1C.1 Interim Cape Henry Canal Drainage Improvements 7-065 1C.2 Cape Henry Canal Phase II – Widening and Deepening, Relocation of Sanitary Sewer Gravity Mains 7-069 1D Lynnhaven Drive Pump Station 7-068 1B Lynnhaven Colony Park Pump Station 7-066 1E Elevate Lynnhaven Drive 7-070 1A Vista Circle Pump Station Opening Year 7-070 1A Ult. Page Ave Collection System and Shore-Page Pump Station Expansion 7-085 PPS Poinciana Pump Station and Outfall (Cape Story By The Sea) – Partially Funded 1E 1A 1A Ult. 1C.1 IMPROVEMENT EVALUATION CORRIDORS JANUARY 16, 2020 CHESAPEAKE BAY PPS LYNNHAVEN MUNICIPAL MARINA LYNNHAVEN DR LYNNHAVEN MARINE BOATEL
Transcript of 1C.2 1C.1 PPS 1B 1E 1D · city of virginia beach eastern shore drive drainage improvements - phase...
1D
1C.2
1B
CIP Section Drainage Improvement Description
7-151 1C.1 Interim Cape Henry Canal Drainage Improvements
7-065 1C.2Cape Henry Canal Phase II – Widening and Deepening, Relocation of Sanitary
Sewer Gravity Mains
7-069 1D Lynnhaven Drive Pump Station
7-068 1B Lynnhaven Colony Park Pump Station
7-066 1E Elevate Lynnhaven Drive
7-070 1A Vista Circle Pump Station Opening Year
7-070 1A Ult. Page Ave Collection System and Shore-Page Pump Station Expansion
7-085 PPS Poinciana Pump Station and Outfall (Cape Story By The Sea) – Partially Funded
1E
1A
1A Ult.
1C.1
IMPROVEMENT EVALUATION
CORRIDORS
JANUARY 16, 2020
CHESAPEAKE BAY
PPS
LYNNHAVEN
MUNICIPAL
MARINA
LYNNHAVEN DR
LYNNHAVEN
MARINE
BOATEL