19th National Award for Excellence in Energy …...©2018, Cognizant Energy Performance Trend-2014...
Transcript of 19th National Award for Excellence in Energy …...©2018, Cognizant Energy Performance Trend-2014...
©2018, Cognizant
GO GREEN
19th National Award for Excellence in Energy Management
Cognizant, Siruseri STPI, Chennai
29th,30th and 31st August 2018
Ramesh Dasarathan - Sr. Manager Kanipandi G- Energy Manger
©2018, Cognizant
Cognizant Overview & Delivery Network
Facility Overview
Energy Performance Trend – 2014 to 2017
Benchmarking & Energy Conservation Approach Methodology
A Glimpse of Energetic Journey
Energy Conservation Projects (Investment and Operational Control)
Best Practices Leads to Energy Conservation
Green Supply Chain for Retrofit Projects
Measurement, Monitoring and Review
Employee Involvement in EMP & CSR
List of Certifications & Achievement
Way forward for next 3 Years
Contents
©2018, Cognizant
• Cognizant is a global leader in providing solution for IT, consulting, digital, technology
and business process outsourcing services, dedicated to helping the world's leading
companies build stronger businesses
• Cognizant is a multinational corporation that provides IT services, including digital,
technology, consulting, and operations services. It is headquartered in Teaneck, New
Jersey, United States.
• Cognizant is included in the NASDAQ-100 and the S&P 500 indices. Cognizant had a
period of fast growth during the 2000s, becoming a Fortune 200 company in 2017. In
2017, Cognizant was named in Fortune’s Future 50 list.
• The company has more than 260,000 employees globally, of which over 180,000 are in
India across 10 locations with a plurality in Chennai.
• US$ 14.81 billion in revenues for FY 2017.
Cognizant Overview
| ©2018, Cognizant 4
Cognizant's Delivery Network
Cognizant is a leading provider of information technology, consulting, and business process outsourcing services,
dedicated to helping the world's leading companies build stronger businesses
75+ delivery and operations centers globally and spread across 38 countries
Occupy 24 million+ built up area and 13.6 million Sqft of Own Facility
Majority of these operations are in hot and humid climate and significant percentage support 24X7 operations
More than 80% of the space is air-conditioned
Our data centers alone constitute more than 15% of the total energy consumption
©2018, Cognizant
Facility Overview Siruseri Campus (SRI)
Cognizant SRI Owned facility
Year of Start : 2004
Seating Capacity: 4000
Present Head Count: 2600 associates & 250 CWR
Software Block –SDB1(G+3) Academy(G+3) &
Cafeteria (G+1)
Total area of Facility - 9 Acres
Total Built-up area- 392,000 Sq. feet
EB Sanctioned Demand: 3250 KVA
HVAC Higher Side : 1610 TR
(SDB - 3x350 TR & Academy – 2x180 TR)
Power Back ups:
Transformer – 2 x 2500 KVA
DG capacity - 3 x 1500 KVA
UPS Capacity - Workstations - 2 x180 KVA, 2x120 KVA
EL Lighting - 1 x 40 KVA
Utilities:
Fire Sumps: 200 KL
Raw Water Sump : 650 KL
Sewage Treatment Plants 200 KLD
HSD Yards : 2 x 15 KL
SDB Cafeteria
Academy
©2018, Cognizant
Energy Performance Trend-2014 to 2017
1.76 1.72
1.69
1.53
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
Year 2014 Year 2015 Year 2016 Year 2017
EPI Comparision-2014 to 2017 (kWh/Month/Sq.feet)
Year
Total Consumption EPIEnergy
Consumption Reduction (%)
Per Capita (kWh/Month/Associate)
Remarks(kWh) (kWh/Annum/Sq.feet) (kWh/Annum/Sq.m)
2014 6607850 21.18 228.7 Baseline 192
2015 6445490 20.66 223.1 2.5% 197
2016 6342170 20.33 219.5 1.6% 189
2017 5728490 18.36 198.3 9.7% 194Chiller Retrofit & Operation Control :-68954 kWh/Month
Overall EPI Reduction-13% from year 2014
©2018, Cognizant
Bench Marking & Approach MethodologySRI, 2014 – 2017
Code 001
STPI Load Pattern Study
EMP year-wise Goal
Setting
Prioritized Focus Areas
Implementation Plan & Tracking
Training + R&R
Monitoring and Review
•HVAC
•UPS
Lighting & Others
JIT
Green CSR
Kaizen & 3R
Innovation Projects & Tiny Change
Complaints relating to comfort – Zero
Downtime of Equipment – Zero
Efficiency – One Unit per square foot per month
Low Hanging Fruits – nil Investment
Stringent Energy Audits
Opportunity Identification
through GEMBA
quarterly Trainings by
SME’s
Toolbox Talks
Kaizen Awards
Cognizant Energy Awards
ACT
Energy Audits
MR, Facility Review
Detailed Investigation with OEM for innovative
solutions
SOPs / WI
WorkEnvironment
Policy
Mailers
EnergyConclaves As per BEE
Benchmark we
are at 1 Star
©2018, Cognizant
A glimpse of our ‘Energetic’ Journey…
2014
1.Conventional UPS replaced with modular UPS (120KVA & 180 KVA * 2 Nos)2,19 % Power Purchase of Renewable Energy (Wind power)
2015
1,3M NV15 - Heat Rejection sun control Film (Sqft 25098)2,Conventional 2x36W CFL replaced with 3x13W T5 in SDB (1600 Nos)3. Installation of New VRV AC Unit in SDB & Academy
2016
1,Conventional 2x18W CFL replaced with 14W LED in across campus ( 2250Nos)
2,28% utilized wind power
2017
1,Retrofit of conventional Chiller to new air cooled chillers in SDB & 2,Academy (280TR * 2 Nos & 350 TR * 3 Nos) 2.Conventional 36W tube Light to 18W LED Tube 4 feet (372 Nos)3.Conventional 250W MH to 24 LED in peripheral areas ( 51 Nos)4. 39% utilized wind power
©2018, Cognizant
ENCON Projects
©2018, Cognizant
Benefit of ENCON Projects – Investment
S.No. Title of Project YearAnnual Electrical
Saving (kWh)
Total Annual
Savings
(INR in million)
Investment Cost
(INR million)
Payback
(Months)
1Retrofit of 3 * 160KVA UPS to Modular 2 *120 KVA UPS in Academy
block 2014 153732 1.23 3.66 36
2 Retrofit of 2 * 400KVA UPS to Modular 2 *180 KVA UPS in SDB 2014 368736 2.95 4.80 20
3 3M NV15 - Heat Rejection sun control Film 2015 222,336 1.78 3.01 20
4 Installation of New VRV AC Unit in SDB & Academy 2015 169200 1.3536 6.1 54
5 T5 Lighting fitting ( Replacing of 2 * 36W CFL to 3 * 13W T5 2015 87600 0.7008 0.6 10
6 Pull cord switch installation work in SDB 2015 3552 0.0284 0.002 1
7Existing 2X18watts light fitting has been replaced with 14watts LED
fitting2016 80340 0.6427 1.5 28
8 Repalcing of 250W MH to 24 LED in outer areas ( 51 Nos) 2017 31452 0.25 0.7 31
10 Retrofit of 36W tube Light to 18W LED Tube 4 feet 2017 29052 0.23 0.15 7
11 AC Duct Modification activities from Cafeteria GF AHU 2017 16080 0.13 0.1 5
13 Motion Control Sensor for rest room lighting 2017 78936 0.63 0.05 1
14Retrofit of conventional ACC was replaced with Energy Efficient ACC
chiller (Commissioned on Dec'2017) 2017 655440 5.24 37.75 86
Grand Total 18,39,612 15 58 46
©2018, Cognizant
Benefit of ENCON Projects – Investment
Reduction of Energy Consumption – 42938/Month
Compact Row based swappable Power Modules
Better efficiency even at lesser load of 20 to 30% (Efficiency of 95%+) thus less UPS losses and energy savings
thereof- Efficiency 95%
Lesser Harmonic distortion < 3% without active filters ensures better Power quality
As UPS of the Modular UPS is in optimum capacity, better system efficiency thus less heatings, power losses
which is in turn reduces Air condition requirement for cooling. Approx. AC cooling requirement will be reduced by
approx. 25 % than Traditional UPS requirement
Payback/Return of investment against UPS Capex (approx.) less than 2.3 Years
ECP-1 Retrofit of conventional UPS(160KVA*3Nos&400KVA*2Nos) to modular UPS(180&120KVA*2Nos)After Modular UPSConventional UPS
©2018, Cognizant
Benefit of ENCON Projects – Investment
ENERGY SAVING DETAILS – SDB UPS – 180 KVA x 2 Nos
SDB UPS Savings
Day
Before AfterDifference In
kWhSaving in %
Energy savings
(kWh/Annum)
Cost saving s
(INR/Annum)( 2nd to 8th
June)
( 23rd to
29th June )Mon 4410 3200 1210 27% 62,920.00 503,360
Tue 4276 3250 1026 24% 53,352.00 426,816.
Wen 4014 3215 799 20% 41,548.00 332,384.
Thr 4333 3256 1077 25% 56,004.00 448,032
Fri 4103 3155 948 23% 49,296.00 394,368
Sat 3809 2850 959 25% 49,868.00 398,944
Sun 3764 2815 949 25% 49,348.00 394,784
362,336.00 2,898,688
Total Investment 4,801,120
Pay back year 1.66
ENERGY SAVING DETAILS – Academy UPS – 120 KVA x 2 Nos
Academy UPS Savings
Day
Before AfterDifference In
kWhSaving in % Energy savings / Annum Cost saving / Annum( 10th to 16th
Mar)
( 24th to 31st
Mar )
Mon 2183 1836 347 16% 18,035.82 144,287
Tue 2216 1726 490 22% 25,468.00 203,744.
Wen 2165 1609 556 26% 28,930.99 231,448
Thr 2140 1634 506 24% 26,301.64 210,413
Fri 2164 1609 555 26% 28,845.75 230,766.
Sat 1988 1520 468 24% 24,313.23 194,506
Sun 1703 1683 20 1% 1,018.66 8,149.
152,914.09 1,223,313
Total investment 3,656,674
Payback year 2.99
©2018, Cognizant
Benefit of ENCON Projects – Investment
Customized Chiller with Energy efficient design which suitable for our operating model
Best in COP with an annual average Electrical consumption of 1.03 kW/TR
Direct Annual Energy savings by (approx.) 655,440 kWh & Energy consumption reduction by 12%
Integrated Variable frequency drives to improve part load efficiencies and reduce inrush current
Integrated EC fans to reduce Power consumption & Improve capacity modulation
The performance of chillers is enabled with Enterprise level software with integrated Chiller plant manager
Payback/Return of investment against Chiller Capex (approx.) 4.8 Years
ECP-2 Inefficient Air Cooled Chiller replaced with efficient air cooled chiller in SDB & Academy
(Academy -280TR * 2Nos & SDB - 350 TR * 3 Nos)
Before (Inefficient ACC-1.5 kW/TR) After (Energy Efficient ACC-1.03 kW/TR
Achieved
Energy
Savings-54,620
kWh/Month
©2018, Cognizant
Sl.No PO No Description Cost In INR Remarks
1 108387 Chiller accessories supply, installation, commissioning and testing ( Inc of 5 years warranty) 18585747
2 98961 Chiller supply 27815000
3 137070 Additional Pipe line and valve requirements 1027580
4 137035 SDB Low side electrical cable supply 556155
5 137036 Academy Low side electrical cable supply 412675
Total Chiller and accessories cost 48397157
BED Extension Work - SDB & Academy
6 123073 Chiller Bed extensions work in SDB 2894000
7 122795 Chiller Bed extension work in Academy 899705
8 112831 Chiller Bed Stability checking , Extension BOQ preparation and certification(consultant) 490000
Total Cost Spent for chiller till date 5,26,80,862
Old Chiller AMC cost for 5 Years 11310455
Old Chiller scrap cost based on Invoice 3617000
Total Savings(AMC & Scrap disposal) 14927455
Total Cost Spent In Rs. 52680862
Total investment In Rs. 377,53,407
Energy saving 78,57,120 INR
Return of investment 4.8 Years
Benefit of ENCON Projects – Investment
©2018, Cognizant
Reduction of Energy Consumption –
222,336 kWh per Annum – Total area
Covered 25,098 Sq.feet
Payback/Return of investment against 3M
Capex less than 2 Years
To avoid transmission of direct sun light
through building facade glass & windows
which increase heat load .
Great heat rejection provides energy
savings and improved comfort
ECP 3- Installation of 3M NV15 - Heat Rejection sun control Film
Benefit of ENCON Projects – Investment
DescriptionNormal Working
Days (kWh/Day)
Weekend Days
(kWh/Day)
Total Monthly
Energy
Consumption
(kWh/Month)
Annual Energy
Consumption
(kWh/Annum)
Without 3M-Sunfilm 9644 5240 254088 30,49,056
With 3M Sunfilm 8980 4750 235560 28,26,720
Energy Savings 664 490 18528 222,336
Total Investment Cost for 3M Sunfilm for 24K Sq.feet (INR) 30,10,000
Total Energy Cost Savings (INR) 17,78,688
Payback Period (Month) 20
©2018, Cognizant
ECP 4 - Conventional 2x36W CFL replaced with 3x13W T5 (1600 Nos) in SDB
Lux level improved
Long life of the lamp
E-Waste optimization
Benefit of ENCON Projects – Investment
Before After
Achieved
Energy
Savings-95,736
kWh/Month
Type of FittingsNormal Working
Days (kWh/Day)
Weekend Days
(kWh/Day)
Total Monthly Energy
Consumption
(kWh/Month)
Annual Energy
Consumption
(kWh/Annum)
2x36W CFL 1269 394 31070 372840
3x13W FTL 958 252 23092 277104
Energy
Savings 311 142 7978 95736
Total Investment Cost for 3x13W FTL (INR) 561562
Total Energy Cost Savings (INR) 765888
Payback Period (Month) 9
©2018, Cognizant
ECP:5 Renewable Energy Usage-Wind Power
Total units demand met by Wind : 14,37,923 kWh
Total GHG Optimized : 1694 MT of CO2
Year TNEB (kWh) DG (kWh) Wind (kWh)
Total
Consumption
(kWh)
TNEB (%) DG (%) Wind (%) Total (%)
2014 4102126 1232100 1273624 6607850 62% 19% 19% 100%
2015 5091857 924490 429143 6445490 79% 14% 7% 100%
2016 4240113 299920 1802137 6342170 67% 5% 28% 100%
2017 3341213 140490 2246787 5728490 58% 2% 39% 100%
Benefit of ENCON Projects – Investment
©2018, Cognizant
ENCON Operational Control
©2018, Cognizant
ECP:01 Transformer Operation Optimization
Benefit of ENCON Projects – Operational Control
BUSINESS HRS
NON - BUSINESS HRS
Transformer 1 Transformer 2
Transformer 1 Transformer 2
WEEKEND OPERATION
Transformer 1 Transformer 2
Energy
Savings – 250
kWh per Day
2500KVA 2500KVA 2500KVA 2500KVA
2500KVA 2500KVA
R NR
R NR
RR
R- Running
NR- Not Running
©2018, Cognizant
ECP: 02 Lift operation optimization
Benefit of ENCON Projects – Operational Control
LIFT-1 LIFT-2 LIFT-3 LIFT-4BUSINESS
HRS
NON-BUSINESS
HRS -AFTER 8
PM
WEEKEND
OPERATION
LIFT-5 LIFT-6 LIFT-7 LIFT-8
LIFT-1 LIFT-2 LIFT-3 LIFT-4 LIFT-5 LIFT-6 LIFT-7 LIFT-8
LIFT-1 LIFT-2 LIFT-3 LIFT-4 LIFT-5 LIFT-6 LIFT-7 LIFT-8
LIFT OperationLift operation was scheduled
based on the requirement
SDB Academy
Annual Energy Savings-
33,696 kWh per Month
R R R R R R R R
R R NR NR NR NR NR NR
R R NR NR NR NR NR NR
R- Running
NR- Not Running
©2018, Cognizant
ECP:03 Modification of Lighting circuit – Across campus
Benefit of ENCON Projects – Operational Control
Enhance-1 Lights are controlled thru MCB
Enhance--2 Lights are controlled thru dedicate switches
Enhance--3 Our Way Forward
Lights will be controlled thru
BMS
Total Energy Consumption - Before Circuit modification -711 kWh/Month
Total Energy Consumption - After Circuit modification – 157 kWh/Month
Achieved Annual Energy savings – 6648 kWh
Switching
Identification
has placed
©2018, Cognizant
ECP:04 Motion sensor based Lighting Operation
Benefit of ENCON Projects – Operational Control
1. Reduction of energy consumption 2820 kWh / Annum
2. Technician/HK team intervention is optimized
3. Burning hrs & Life time will be Increased
4. Lighting will be available in any time
Earlier all the lighting circuit has
connected with switch control & MCB
in rest room, Lighting was burning
around 16 hrs /Day
Description Operation TimeOperating
hrs
No of
lightWatts
kWh/Day/Restr
oom
Without Motion
Sensor8am to 12am 16 6 14 1.344
With Motion SensorBased on
Occupancy10 6 14 0.84
Lighting Energy savings per Restoom 0.504
Total Number of Restroom 15
Total Energy Savings (kWh per Day) 7.6
Monthly Energy Savings 227
Investment Cost for Motion Sensor (INR) 23250
Annual Energy Cost savings (INR) 21773
Payback period (Months) 13
©2018, Cognizant
ECP:04 Installation of Pull cord switches in near Façade glass area for effective utilize the daylight
Benefit of ENCON Projects – Operational Control
Installed LocationNo of Switches
Installed
Before installation -Energy consumption in
kWh per Day
After installation -Energy consumption in
kWh per Day
Saving in kWh/Day
Saving in kWh/Month
SDB Ground Floor North Wing
43 Nos
4 1 3 55
SDB Ground Floor South Wing 7 2 5 103
SDB First Floor North Wing 4 1 3 55
SDB Second Floor North Wing 6 2 4 83
Energy saving per month in kWh 296
Pull Cord switches
Installation – Achieved
Energy Savings – 3552
kWh per Annum
©2018, Cognizant
ECP:05 AC Duct modification in cafeteria block
Benefit of ENCON Projects – Operational Control
Operation Time Operating hoursCapacity
(TR)Consumption/Day
Energy Consumption
(kWh/Month )
Before 10 am to 6 pm 8 11.6 162.4 3573
After10am to 12.30pm
2.30pm to 5.00pm5 11.6 101.5 2233
Achieved Energy savings per month 1340 kWh
Based on the energy conservation We are eliminate the AC
operation hrs from 8 hrs to 5 hrs with support of duct modification
near to event area at cafeteria block
Annual Energy Savings of 16,080 kWh and it resultant in to cost
savings of INR 1.2 Lakhs
©2018, Cognizant
ECP:06 Conventional of 36W Tube Light to 18W LED Tube (372 Nos)
Benefit of ENCON Projects – Operational Control
Total Energy Saving of 2421 kWh per Month / Total Cost saving per month - INR 19368
After this innovation ballast cost also Eliminated - Total Ballast removed 354 Nos / INR 88,500 Saving
Reduction of Manpower interaction
No of light fitting usage also reduced ( 100 Nos)
Reduction of E waste ( Ballast & Tube)
Lux level are maintained around 150-200
©2018, Cognizant
During Cleaning ON OFF
Normal ON ON
Benefit of ENCON
Energy conservation through color coded visual controlInnovation Projects
Lamp identification
©2018, Cognizant
Cognizant overall emission reduction performance (MT of CO2)
Environmental Projects and reduction of Carbon Emission
Description 2014 2015 2016 20172014-2017(Change)
Scope 1 1305 979 318 149
The overall GHG reduced 40% from 2014
(Wind allocation for year 2017 is 39% in the overall
consumption)
Scope 2 2900 3600 2998 2362
Total GHG Emissions 4205 4579 3315 2511
Scope 1 Intensity : GHG Emission for DG based electricity generation
Scope 2 Intensity : GHG emission for EB based Electricity consumption
©2018, Cognizant
Best Practices Leads to Energy Savings
©2018, Cognizant
Energy Savings ContributionsBest Practices
HVAC Outdoor
Chiller Coil cleaning
work
Close monitoring
of the functioning of the DG’s and a multi-
pronged approach effort to
improve the efficiency of its operation
Effectively checking the Belt tension during PPM
work
Thermal image taken for reducing
the loss .
AHU filter wash for
better efficiency
Re routing the lighting circuits as
per business & Non
business Hrs
©2018, Cognizant
Energy Savings ContributionsBest Practices
UPS Air-conditioning
Optimized the workstation UPS load by switching OFF 2 No’s of UPS .
Awareness was created among employees to shut down PC and monitor when they leave
from work.
Auto Push program automatically puts the PC to hibernate mode when it is not in use.(Achieved
88% reduction)
Workplace Temperature policy standardized :
24 ° C to 25 ° C (CODE 001)
Increasing the UPS/Battery room Temperature from 22 ° C to 25 ° C
Hub room temperature were increased from 23 ° C to 25 ° C
Introduction of Induction based heating
Mandatory use of BEE Star rated equipment's
Scheduled Kitchen Operation timing to optimize exhaust and Fresh Air
loads.
Reuse of hot water in bain-marie for washing purpose
Ensure healthiness of the equipment's placed in pantry and cafeteria to minimize the power
consumption
Monthly audit for Electrical, safety and hygiene
Benefits:
• Less energy consumption
• Less energy consumption of A\C load
in workstation due to low heat
generation in CPU
• Reduced carbon footprint
• Reduction in UPS load
Kitchen / Pantry
©2018, Cognizant
Green Supply Chain
Measurement, Monitoring and Review
©2018, Cognizant
Green Supply Chain-Performance Contract for Retrofit ProjectsLED LIGHTING CHILLER
©2018, Cognizant
Monitoring, reporting and implementation methodologies
Power saving details
Daily power indicator
Retrofit tracker
FMS
Monthly report
©2018, Cognizant
Measuring & Monitoring-Tie Up with OEM
DG Service report
Lift Service report
UPS Service report
ACB Service report
©2018, Cognizant
Total Employee Involvement in EMP & Green CSR
List of Certifications
and
Way forward….. !!!!
©2018, Cognizant
Total Employee Involvement in EMP & Green CSR …
Plant sapling
Virtual reality video presented to associate & Organic seeds and
brochure's distributed Manure Distributions
©2018, Cognizant
List of Certifications & Achievement
S.NoName of the
CertificateYear of Receipt Certification Given by
1 OHSAS & EMS 2015Certified Facility for OHSAS 18001:2007
EMS 14001:2004DNV
2 OHSAS & EMS 2016Certified Facility for OHSAS 18001:2007
EMS 14001:2004DNV
3 OHSAS & EMS 2017Certified Facility for OHSAS 18001:2007
EMS 14001:2004DNV
Certifications
Achievement
BYOM Implemented– No Paper Cups across facility
Plastic strips usage stopped across campus
Earth Hour Celebrations
Herbal Garden developed in the campus
Nursery Garden created and Plant sapling in every week
©2018, Cognizant
Charity & Energy Savings begins @
Home !
Culture Change & Green Consumer
with regards to Energy
Our Way Forward : For the next 3 years Rooftop Solar PV Plant
Lift Retrofit
Down light to LED
replacement
Conventional blowers
with EC fans @ AHU
Additional Wind Energy
Quantum
Occupancy based
lighting /AHU control
system
©2018, Cognizant
GO GREEN
Thank you