1991 Texas Clean Rivers Program

28
2011 Lower Basin Stakeholder Forum Nueces River Authority Feb 16, 2011 – Uvalde Feb 23, 2011 – Corpus Christi

description

2011 Lower Basin Stakeholder Forum Nueces River Authority Feb 16, 2011 – Uvalde Feb 23, 2011 – Corpus Christi. 1991 Texas Clean Rivers Program. To monitor and assess the water quality in the 25 basins throughout Texas TCEQ developed partnerships to manage CRP 15 Partner Agencies - PowerPoint PPT Presentation

Transcript of 1991 Texas Clean Rivers Program

Page 1: 1991 Texas Clean Rivers Program

2011 Lower Basin Stakeholder Forum

Nueces River Authority

Feb 16, 2011 – Uvalde Feb 23, 2011 – Corpus Christi

Page 2: 1991 Texas Clean Rivers Program

1991 Texas Clean Rivers Program• To monitor and assess the

water quality in the 25 basins throughout Texas

• TCEQ developed partnerships to manage CRP

– 15 Partner Agencies • State agencies• River Authorities• Local Governments

Page 3: 1991 Texas Clean Rivers Program

NRA’s Area of Responsibility

– Nueces River Basin

– S.A. Nueces Coastal Basin

– Nueces Rio Grande Coastal Basin

– Bays and Estuaries

• 44 Segments• 30,500 Square

Miles

Page 4: 1991 Texas Clean Rivers Program

Texas Clean Rivers Program

• $9 Million Allocated Statewide Amongst CRP Partners Over 2 Years:

• NRA: $548,272 Over 2 Years

– NRA CRP Budget By Task• Project Administration – 21%• Quality Assurance – 4%• Water Quality Monitoring – 39%• Data Management – 13%• Data Analysis and Reporting – 9%• Stakeholder Participation and Public Outreach – 13%• Special Projects: Petronila Creek Continuous Monitoring – 1%

Page 5: 1991 Texas Clean Rivers Program

Routine Monitoring– pH– DO– Conductivity– Temp– Ammonia– Nitrates– Phosphorus– Chlorophyll-a– Turbidity– Bacteria – Chloride– Sulfate

Page 6: 1991 Texas Clean Rivers Program

NRA Database http://www.nueces-ra.org/CP/CRP/SWQM/index.php

Page 7: 1991 Texas Clean Rivers Program

Interactive Map http://www.nueces-ra.org/CP/CRP/SWQM/index.php

Page 8: 1991 Texas Clean Rivers Program
Page 9: 1991 Texas Clean Rivers Program
Page 10: 1991 Texas Clean Rivers Program
Page 11: 1991 Texas Clean Rivers Program

Coordinated Monitoring Schedulehttp://cms.lcra.org

Page 12: 1991 Texas Clean Rivers Program

NRA Coordinated Monitoring Meeting

– Plan sampling for upcoming year

– Invite:– TCEQ Regional

Offices

– TPWD

– CBBEP

– USGS

– Soil Board

– Other Interested Parties

Page 13: 1991 Texas Clean Rivers Program

Assessment (Integrated Report)

• Every 2 Years

• Based on 7 Years of Data:– 2010 – December 1, 2001 – November 30, 2008– 2012 – December 1, 2003 – November 30, 2010

Page 14: 1991 Texas Clean Rivers Program

Classified Water Bodies Are Assigned Designated Uses

– Aquatic Life • Exceptional• High • Intermediate• Limited

– Oyster Waters– Contact Recreation

• Primary Contact • Secondary Contact 1 and 2 (New)• Noncontact

– Public Water Supply– Fish Consumption– General Use

Page 15: 1991 Texas Clean Rivers Program

Water Quality Criteria are Assigned to Designated Uses

• Aquatic Life– Dissolved Oxygen

• Public Water Supply– Chloride– Sulfate– TDS

• Recreation– Bacteria

• General Use– Water Temperature– pH– Ammonia– Nitrogen– Phosphorus

• Fish Consumption– Fish Tissue

Page 16: 1991 Texas Clean Rivers Program

Assessment Includes 2 Lists:

– 305(B) List Concerns

– 303(d) List Impairments

Page 17: 1991 Texas Clean Rivers Program

Concerns 305(b) List

• 20% of samples > criteria– Ammonia-Nitrogen– Nitrate+Nitrite– Orthophosphorus– Total phosphorus– Chlorophyll-a

Page 18: 1991 Texas Clean Rivers Program

Impairments 303(d) List

Water bodies that do not meet the criteria for support of one or more of its beneficial uses

Page 19: 1991 Texas Clean Rivers Program

Impairments 303(d) List

• TDS, Chloride, Sulfate– Average > criteria (Public Water Supply Impairment)

• DO: grab samples and 24-Hr average– 10% of samples < criteria (Aquatic Life Impairment)

• pH– 10% of samples outside range (General Use

Impairment)

• E. coli, Enterococcus– Geometric mean > criteria (Recreation use Impairment)

Page 20: 1991 Texas Clean Rivers Program

Impairments in the Lower BasinBacteria Impairments

• 2001 Mission River Tidal• 2003 Aransas River Tidal• 2004A Aransas Creek• 2203 -2204 Petronila Creek (New Listing) • 2201 Arroyo Colorado• 2462 San Antonio Bay/Hynes Bay (New Listing Oyster Waters) • 2472 Copano Bay (Oyster Waters)• 2481 Corpus Christi Bay (Ropes and Cole Parks)• 2483 Redfish Bay (Oyster Waters)• 2485A Oso Creek, Bay (Oyster Waters)• 2491 Laguna Madre• 2492 San Fernando Creek• 2494 Brownsville Ship Channel (New Listing)• 2494A Port Isabel Fishing Harbor (New Listing)

Page 21: 1991 Texas Clean Rivers Program

2010 Integrated Report

• 2201 Arroyo Colorado Impaired forLow DO

Mercury and PCBs in edible tissue

DDE in edible tissue (New Listing)

• 2202 Arroyo Above Tidal Impaired forMercury and PCBs in edible tissue

DDE in edible tissue (New Listing)

Page 22: 1991 Texas Clean Rivers Program

2010 Integrated Report

• 2204 Petronila Creek Above TidalTDS

Chloride

Sulfate

Chlorophyll-a

• 2482 Nueces BayZinc in edible tissue (New Listing)

• 2491 Laguna MadreLow DO

Page 23: 1991 Texas Clean Rivers Program

CWA Requires State to Take Action to Restore Impaired Waters

(Arthur Talley)

• Additional Monitoring - is the impairment real?

• Use Attainability Analysis (UAA)- Are existing criteria and uses appropriate for water body?

• TMDL

• WPP

• Special Study

Page 24: 1991 Texas Clean Rivers Program

National Coastal Condition Assessment

• EPA National Aquatic Survey

• TCEQ and University of Houston

• 53 sites from Sabine Lake to Lower Laguna Madre

• 7 in Corpus Christi Bay and 2 in Nueces Bay

Page 25: 1991 Texas Clean Rivers Program

Sample Collection

• Water

• Sediment

• Bacteria

• Benthic Community

• Fish Tissue

Page 26: 1991 Texas Clean Rivers Program

2011 Basin Highlights Report– Assessment Year BHR– a snapshot of every segment and any

impairments or concerns– Year Following the Assessment BHR -any updates and ongoing

projects– Every 5th year Basin Summary-more in depth and detailed than the

Basin Highlights Report

Comments to Kati Carberry

Email: [email protected]

Fax: 361-653-2115

Mail: Nueces River Authority

1201 N. Shoreline Blvd.

Corpus Christi, TX 78401

Page 27: 1991 Texas Clean Rivers Program

Input for FY 2011 Planning

• Additional routine monitoring sites?

• Special studies?

• Additional outreach opportunities?

• Additional web-based information?

Page 28: 1991 Texas Clean Rivers Program

Contact Information

http://www.nueces-ra.org

Sky Lewey: [email protected] 830-278-6810

Rocky Freund: [email protected]

Beth Almaraz: [email protected]

361-825-3193