SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
ELEMENT NO.13
EXTERNAL WORKS
EXCAVATION AND EARTHWORK
EXCAVATION
A Clear and remove from site all existing debris, shrubs,
trees bushes and the like and prepare site for filling 1 item
B Allow for excavating in any material including solid
rock, keeping excavations free from water, filling soft spots,
supporting sides of excavations, levelling, compacting, bulking of
materials and all double or mulitple handling
1 item
Excavation and Earthwork for Trees
C Excavate tree pit 1250x1250x1000mm deep, including breaking
base to ensure un-restricted drainage with selected sweet soil mix
to Engineer's approval
87 No
D Excavate to reduce levels 136 m3
EARTHWORKS
E Filling to make up levels with approved imported desert fill
material compacted layers
136 m3
F 150mm Thick graded limestone levelled and compacted as road
sub-base
4,165 m2
G 100-150mm Thick fine crushed gravel sub-base levelled and
compacted to court areas
806 m2
H 150-200mm Thick fine crushed gravel sub-base levelled and
compacted to court areas
806 m2
J Remove surplus excavated material from site 136 m3
To Collection QR
Item Description Qty Unit
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/1 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
HARD LANDSCAPING
Roads and Parking Areas
A 50mm Thick dense bitumen macadam in two layers as specified
including tack coat on base course
4,165 m2
B 40mm Thk dense bitumen macadam base course including tack
coat on sub-base
4,165 m2
Sports Surfacing
C 50 mm thk base course incl. primer under sports surfacing 806 m2
D 40mm thk wearing course laid on base course under sports 806 m2
E Outdoor sythetic surfacing, Regupol Kombi 1300 (4+4 system) or
equal and approved, laid in accordance with manufacturing
instructions
806 m2
100 x 200 x 60mm thk interlocking paving, jointed and pointed in
cement mortar and laid level or to fall on 100mm sand bed as
specified
F Grey Colour interlock paving 511 m2
G Red colour interlock paving 511 m2
Precast concrete kerb to BS 340 bedded and ointed in cement
mortar and laid on and incl 300 x 150mm concrete base incl
earthworks, formworks, reinforcement, concrete protection etcc, as
specified
H 125 x 250mm kerb incl haunching as required 508 m
J 125 x 250mm curved kerb incl haunching as required 57 m
Wheel guard made of high quality recycled polymer with securing
holes. Hardware for installation over concrete included
K 1800mm x 200mm x 100mm high 33 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/2 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
PLANTING
Plants in prepared planting area including fertilizer, vegetable
mulch; timber stakes, burlap rapping; all as shown on drawings and
as specified
Trees
A Parkinsonia Aculeata 7 No
B Azadirachta Indica 8 No
Succulents
F Yucca Aloifolia 70 No
Climbers
G Bougainvillea Spectablisis 56 No
Ground Covers
H Tradescantia Pallida 139 m2
J Coreopsis Tinctoria 138 m2
M Gazania Rigens 82 m2
N Allow for maintenance , protection and watering up to the
completion date and period of 400 days Item
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/3 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
CONCRETE WORK
PRECAST CONCRETE BOUNDARY WALL
Precasr conc boundary wall comprising 400 x 400 x 2900mm high
precast concrete columns at 4000mm centres, including dowel
fixing into and including precast concrete foundation, 200mm thk x
3500mm high precast concrete panels fixed to 250mm thick x
600mm precast conc. beam between columns, including GRC
panelling, all is indicated on Drawing A-151
A 3800 High Above fiished Ground level, including concrete
foundation, formwork, protection, earthworks, etc.
372 m
Precasr conc boundary wall comprising of 2900mm high various
precast concrete columns at different lengths, including dowel
fixing into and including precast concrete foundation, 200mm thk x
3500mm high precast concrete panels fixed to 250mm thick x
600mm precast conc. beam between columns, including GRC
panelling, all is indicated on the Drawing
B 3800 High Above fiished Ground level, including concrete
foundation, formwork, protection, earthworks, etc.
123 m
STRUCTURAL RETAINING WALL, STAIRS AND RAMPS
AND THE LIKE
C Stair access to pump room complete with all excavation and
earthwork, concrete work, blockwork, including waterproofing,
protection, finishes, handrails etc as specified
D Plan size 6200 x 3000mm; 1 No
Ramp complete with all excaation and earthwork, concrete works,
reinforcement incl waterproofing, protection, finishes, etc as
E Plan size 6000 x 3000mm 2 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/4 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
EXTERNAL SHADES
External shades, including decoration as required, concrete and
earthworks etc as indicated on Dwg A-150A A-150B and A-151-D
A Square shade, overall size 2400x2400x3000mm high 24 No
B Extra for form seating, 7000mm 1500mm 2 No
METALWORK
SHADES
Carpark shades complete including all associated builders work
and finishes as indicated on Dwg A-111
C Plan size 10600 x 6000mm 6 No
D Plan size 7950 x 6000mm 1 No
E Plan size 5300 x 6000mm 3 No
FENCING
Decorative metal fence comprising 125 x 125 x 5mm RHS vertical
post at 2500mm centre with vertical and horizontal RHS section,
including all associated builder's work; all as specified and
indicated on Drawing A-151A
F 3000mm High 142 m
GATES
Decorative gate, comprising 2 Nos 125 x 125 x 5mm post set in
and including foundation, with vertical and horizontal RHS
sectiond; with approved polycarbonate sheeting to internal face; all
as specified and indicated on Drawing A-151A
G Double gate, 8000mm wide; ncluding master keyed locks 4 No
Decorative gate, comprising 2 No. 125 x 125 x 5mm RHS post set
in and including foundation, with vertical and horizontal RHS
sections, all as specified and indicated on Drawing 125
H Ditto: 6000mm wide, including master eyed locks 2 No
J Ditto: 2000mm wide, including master keyed locks 4 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/5 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
SIGNAGE
Qatar Traffic Manual approved traffic signs as indicated on
Drawing A-111 including all associated builder's work complete
A EXIT sign 2 No
B NO EXIT sign 2 No
SPORTS EQUIPMENT
Sports equipment ssupplied by an approved propriety manufacturer
to International standards, all exposed metalwork to be white
polyestes powder oven fired finish as indicated on Dwg. A-150
C Basketball board comprising 100x100x5mm heavy duty tubular
metal post and baseplate, support framework and 24mm thick
1800x1050 backboard, net and frame all set in and including
concrete foundation with base plate, include for formwork and
1 No
D Handball goal set, comprising 80x80mm mild steel frame, 25mm
diameter net support frame and net, frame painted regulation red
and white incl. fixing plates as required.
1 No
E Volleyball net, comprising 2 No. 100mm diameter posts, netting
and antennae set in and including concrete foundation with base
plate, include for formwork and earthwork
1 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/6 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
PLUMBING AND MECHANICAL ENGINEERING
INSTALLATIONS
DOMESTIC WATER INSTALLATION
Copper pipes including fitting with copper tube to BS 2871 fittings
to BS 864 laying and fix under ground, including excavation,
grading bottom, compacting, backfilling, surrounding, remove
surplus from site, as detailed in specification and as shown on
A Cold water supply pipe; 28mm diameter 146 m
B Cold water supply pipe; 42mm diameter 91 m
C Ditto; 54mm diameter 77 m
D Ditto; 56mm diameter 63 m
Ductile Iron pipe : including all fittings laying and fix under
ground, including excavation, grading bottom, compacting,
backfilling, surrounding, remove surplus from site, as detailed in
specification and as shown on drawings
E Treated water supply pipe 65mm diameter 77 m
F Ditto; 100mm diameter 41 m
Watermeter
G Watermeter cabinet as specified to suit KAHRA-MAA regulations
including all accessories and associated builders work
1 No
Valve box as specified including all accessories and associated
builders work
H 600x600 vlve chamber (depth to suit site conditions)complete with
gate valve and connection to copper pipework as specified
4 No
FIRE FIGHTING INSTALLATION
Ductile Iron pipeworks complete with all necessary fittings and
protection
J 100mm Pipe 9 m
K 150mm Pipe 392 m
Fire Hydrant as per Building requirements and local regulations
L Fire Hydrant reference FH 5 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/7 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
PLUMBING AND MECHANICAL ENGINEERING
INSTALLATIONS (Contd)
IRRIGATION RING MAIN
UPVC Pipes and fittings to BS 3505 Class E with solvent welded
joints; laid in trenches, as detailed in specification and as shown on
drawings
A 50 mm diameter pipes 304 m
B Extra over ditto, for branch, bends, etc Item
Quick coupling valves including ball valves as specified complete
with warning cap to read " DO NOT DRINK" in Arabic and
English; jointing to pipe work
C 1" (25mm) Valves assembly with hose connector 3 No
DRIP AND BUBBLER IRRIGATION SYSTEM
Low density polyethylene (LDPE) pipes and fittings as specified
with socket fusion welding joints; laid in trenches.
D 50 mm diameter pipes driper line 76 m
E 32 mm diameter pipes driper line 291 m
F Extra over ditto, for branch, bends, etc Item
Solenoid control valve complete with Isolating valves and strainers
as specified; jointing to pipework; including for control wiring as
necessary
G 2" (50mm) Valve assembly 1 No
Bubblers, pressure compensating type complete with stakes as
specified; jointing to pipework.
H Bubbler assembly adjustable type including polyethylene tabbing
and adjustable flow rate between 0 and 130 litres/hr
44 No
Emmitter installation in ultra violet resistant low density
polyethylene pipes as specified
J Design, supply and install network of drip emitter pipe work
complete with drip emitters to irrigate shrubs and ground covers to
engineers approval: jointing to lateral pipework; allow for all
associated builders works as necssary
Item
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/8 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
PLUMBING, DRAINAGE AND OTHER ENGINEERING
INSTALLATIONS (Contd.)
IRRIGATION INSTALLATION CONTD
Allow for the following
A Allow for designing, re-routing and re-sizing bubbler irrigation
system secondary piping as necssary to provide sufficient irrigation
for all trees and in compliance with bubbler manufacturer's
recommendations
Item
Irrigation controller as detailed on drawing complete with all
intergral components as specified; include for all control wiring
and connection to main feeder
B 1No Station controller 1 No
BUILDERS WORK IN CONNECTION WITH IRRIGATION
Allow for the following
C Holes, chases, cutting back, building in, provision of pipe sleeves,
fire barriers and making good finishes, pavings and landscaping as
necessary
Item
D Allow for sleeves for encasing irrigation pipes passing beneath
roads and paved areas but note indicated on drawings.
Item
E Allow for providing concrete thrust blocks where necessary. Item
F Allow for providing warning / marker tapes as necessary. Item
G Paint finish to exposed pipework and associated supports as
necessary.
Item
H Allow for co-ordinating pipe routes with other underground
utilities and infrastructure works.
Item
J Allow for locating and spacing valve chambers, distribution
chambers as necessary to suit actual site requirements and soft
Item
K Allow for any other builders work deemed necessary for the
completion of the Irrigation Installation.
Item
To CollectionQR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/9 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
Electrical Installations
LIGHTING INSTALLATION
Sup[ply and fix light fittings complete as specified and shown on
Drawings including all holders, ceiling roses, bulbs.flourescent
tubes, final connections and fixing in position including all
necessary suspension chains, rods, brackets, lighting poles and
support frameworks
G Led street lighting fix on 8meter pole made of de cast aluminium, 9
OLED, 114W , 240Volt, 50 HZ, 6000K colour temperature, 1P66
(Type F17)
12 No
H Flood lighting extruded aluminium frame with special adjustable
flang, 54LED, 72W, 50HZ, 6000K Colour temperature, 1P66
(Type F18)
26 No
J Pole mounted flood light 6m height , with 250W high pressure
sodium lamp tripple luminaire (Type F19)
8 No
Wiring to the following points in approved cable including conduit,
trunking, trenches and the like as specified
D General lighting points 46 No
Wiring to the following points in approved cable including conduit,
trunking, trenches and the like as specified for Ancillary Buildings
E General lighting points (Ancillary Buildings) 40 No
Sup[ply and fix light fittings complete as specified and shown on
Drawings including all holders, ceiling roses, bulbs.flourescent
tubes, final connections and fixing in position including all
necessary suspension chains, rods, brackets, lighting poles and
support frameworks
F Surface mounted lighting fixture IP65 connected to essential
circuit, the body is made of grey fibre-glass reinforced polyester
with polycarbonate cover, the fixture is fitted with 2x36 W,
flourescent lamps, complete with electronic ballast and all
necessary accessories required for proper operation. (Type F13)
31 No
G Wall mounted lighting fixture IP65 connected to essential circuit,
the body is made of grey fibre-glass reinforced polyester with
polycarbonate cover, the fixture is fitted with 2x36 W, flourescent
lamps, complete with electronic ballast and all necessary
accessories required for proper operation. (Type F14)
6 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/10 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
LIGHTING INSTALLATION CONTD
A Above mirror wall mounted lighting fixture with 1x18W
flourescent lamp. (Type F4)
3 No
B Cable and conduits including all conduit accessaries between
distribution boards and general power accessories as shown on
drawings and as specified
C General Electrical fittings (Anciliary buildings 57 No
Sup[ply and fix electrical fittings complete as specified and shown
on Drawings including all accessories necessary to complete the
D 240V,13A Single switched socket with neon lamp 2P+E (Type 30 No
E SPN Isolator, rating as indicated (Type 1S1) 7 No
F 20A Double Pole Switch (Type S09) 3 No
G Connection unit with flex outlet (Type S010) 2 No
H 240V, 20A Single Pole, one way, flush mounted lighting switch
one gang (Type S1)
7 No
J 240V, 20A Single Pole, one way, flush mounted lighting switch
two gang (Type S3)
8 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/11 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
Electrical Installations (Contd)
BUILDER'S WORK
PVC duct laid below ground level for electrical cables including
warning tape, draw rope, marker tape, excavation, backfilling,
surrounding, remove surplus materials from site, etc as shown on
Drg. E-01
A 2 x 25mm ducts, width as required, depth not exceeding 800mm 278 m
B 1 x 50mm ducts, width as required, depth not exceeding 800mm 223 m
C 8 x 50mm ducts, width as required, depth not exceeding 800mm 180 m
D 9 x 50mm ducts, width as required, depth not exceeding 800mm 19 m
E 1 x 90mm ducts, width as required, depth not exceeding 800mm 103 m
F 2 x 90mm ducts, width as required, depth not exceeding 800mm 410 m
G 1 x 150mm ducts, width as required, depth not exceeding 800mm 101 m
H 2 x 150mm ducts, width as required, depth not exceeding 800mm 90 m
J 4 x 150mm ducts, width as required, depth not exceeding 800mm 38 m
K 9 x 150mm ducts, width as required, depth not exceeding 800mm 109 m
Telephone manhole to Qtel requirements, including all excavation,
concrete, cover, etc
L Type JRC-4, medium duty cover 11 No
M Type TJB 150 x 150 x 100mm 4 No
N Manhole, medium duty cover 2 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/12 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
Electrical Installations (Contd)
BUILDER'S WORK (Contd)
Manhole for fire cable, including all excavation, concrete
blockwork walls, light duty cover etc. all as specified
A Size 800 x 800 x 1000mm, medium duty cover 10 No
UPVC Ducts and fittings laid in trench as specified
B 25mm Diameter 556 m
C 50mm Diameter 2,120 m
D 90mm Diameter 922 m
E 150mm Diameter 1,411 m
PAINTING AND DECORATING
Prepare and apply white polyurethane paint in two coats to sports
surfacing in accordance with manufacturers instructions
F Court Lines 401 m
G Court Lines, Curved 116 m
Painted Traffic Lines as specified in the Qatar traffic manual and
in accordance with traffic regulations
H Parking Lines 300 m
J Hand-painted traffic arrow 3.0 metres long 14 No
K Hand-painted traffic markings 1.0 metre width 49 m
L Hand-painted fire appliance traffic markings 6000mm x 15000mm 4 No
To Collection QR
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/13 12/20/2012
SECTION G
BILLS OF QUANTITIES
19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls
ELEMENT NO.13 EXTERNAL WORKS
Rate Amount
QR QR
Item Description Qty Unit
EXTERNAL WORKS (Contd)
COLLECTION QR
From Page BQ/4/13/1
From Page BQ/4/13/2
From Page BQ/4/13/3
From Page BQ/4/13/4
From Page BQ/4/13/5
From Page BQ/4/13/6
From Page BQ/4/13/7
From Page BQ/4/13/8
From Page BQ/4/13/9
From Page BQ/4/13/10
From Page BQ/4/13/11
From Page BQ/4/13/12
From Page BQ/4/13/13
To Main Summary
Construction of Four (4) New Schools at Doha Group (7A) Package 2
BA 12-13/C/045/G BQ/4/13/14 12/20/2012