SECTION G BILLS OF QUANTITIES 19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls ELEMENT NO.13 EXTERNAL WORKS Rate Amount QR QR ELEMENT NO.13 EXTERNAL WORKS EXCAVATION AND EARTHWORK EXCAVATION A Clear and remove from site all existing debris, shrubs, trees bushes and the like and prepare site for filling 1 item B Allow for excavating in any material including solid rock, keeping excavations free from water, filling soft spots, supporting sides of excavations, levelling, compacting, bulking of materials and all double or mulitple handling 1 item Excavation and Earthwork for Trees C Excavate tree pit 1250x1250x1000mm deep, including breaking base to ensure un-restricted drainage with selected sweet soil mix to Engineer's approval 87 No D Excavate to reduce levels 136 m3 EARTHWORKS E Filling to make up levels with approved imported desert fill material compacted layers 136 m3 F 150mm Thick graded limestone levelled and compacted as road sub-base 4,165 m2 G 100-150mm Thick fine crushed gravel sub-base levelled and compacted to court areas 806 m2 H 150-200mm Thick fine crushed gravel sub-base levelled and compacted to court areas 806 m2 J Remove surplus excavated material from site 136 m3 To Collection QR Item Description Qty Unit Construction of Four (4) New Schools at Doha Group (7A) Package 2 BA 12-13/C/045/G BQ/4/13/1 12/20/2012

description

jhgas

Transcript of 19.13sc-Flr.bill No.4 Khawla Bint Alezour

Page 1: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

ELEMENT NO.13

EXTERNAL WORKS

EXCAVATION AND EARTHWORK

EXCAVATION

A Clear and remove from site all existing debris, shrubs,

trees bushes and the like and prepare site for filling 1 item

B Allow for excavating in any material including solid

rock, keeping excavations free from water, filling soft spots,

supporting sides of excavations, levelling, compacting, bulking of

materials and all double or mulitple handling

1 item

Excavation and Earthwork for Trees

C Excavate tree pit 1250x1250x1000mm deep, including breaking

base to ensure un-restricted drainage with selected sweet soil mix

to Engineer's approval

87 No

D Excavate to reduce levels 136 m3

EARTHWORKS

E Filling to make up levels with approved imported desert fill

material compacted layers

136 m3

F 150mm Thick graded limestone levelled and compacted as road

sub-base

4,165 m2

G 100-150mm Thick fine crushed gravel sub-base levelled and

compacted to court areas

806 m2

H 150-200mm Thick fine crushed gravel sub-base levelled and

compacted to court areas

806 m2

J Remove surplus excavated material from site 136 m3

To Collection QR

Item Description Qty Unit

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/1 12/20/2012

Page 2: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

HARD LANDSCAPING

Roads and Parking Areas

A 50mm Thick dense bitumen macadam in two layers as specified

including tack coat on base course

4,165 m2

B 40mm Thk dense bitumen macadam base course including tack

coat on sub-base

4,165 m2

Sports Surfacing

C 50 mm thk base course incl. primer under sports surfacing 806 m2

D 40mm thk wearing course laid on base course under sports 806 m2

E Outdoor sythetic surfacing, Regupol Kombi 1300 (4+4 system) or

equal and approved, laid in accordance with manufacturing

instructions

806 m2

100 x 200 x 60mm thk interlocking paving, jointed and pointed in

cement mortar and laid level or to fall on 100mm sand bed as

specified

F Grey Colour interlock paving 511 m2

G Red colour interlock paving 511 m2

Precast concrete kerb to BS 340 bedded and ointed in cement

mortar and laid on and incl 300 x 150mm concrete base incl

earthworks, formworks, reinforcement, concrete protection etcc, as

specified

H 125 x 250mm kerb incl haunching as required 508 m

J 125 x 250mm curved kerb incl haunching as required 57 m

Wheel guard made of high quality recycled polymer with securing

holes. Hardware for installation over concrete included

K 1800mm x 200mm x 100mm high 33 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/2 12/20/2012

Page 3: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

PLANTING

Plants in prepared planting area including fertilizer, vegetable

mulch; timber stakes, burlap rapping; all as shown on drawings and

as specified

Trees

A Parkinsonia Aculeata 7 No

B Azadirachta Indica 8 No

Succulents

F Yucca Aloifolia 70 No

Climbers

G Bougainvillea Spectablisis 56 No

Ground Covers

H Tradescantia Pallida 139 m2

J Coreopsis Tinctoria 138 m2

M Gazania Rigens 82 m2

N Allow for maintenance , protection and watering up to the

completion date and period of 400 days Item

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/3 12/20/2012

Page 4: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

CONCRETE WORK

PRECAST CONCRETE BOUNDARY WALL

Precasr conc boundary wall comprising 400 x 400 x 2900mm high

precast concrete columns at 4000mm centres, including dowel

fixing into and including precast concrete foundation, 200mm thk x

3500mm high precast concrete panels fixed to 250mm thick x

600mm precast conc. beam between columns, including GRC

panelling, all is indicated on Drawing A-151

A 3800 High Above fiished Ground level, including concrete

foundation, formwork, protection, earthworks, etc.

372 m

Precasr conc boundary wall comprising of 2900mm high various

precast concrete columns at different lengths, including dowel

fixing into and including precast concrete foundation, 200mm thk x

3500mm high precast concrete panels fixed to 250mm thick x

600mm precast conc. beam between columns, including GRC

panelling, all is indicated on the Drawing

B 3800 High Above fiished Ground level, including concrete

foundation, formwork, protection, earthworks, etc.

123 m

STRUCTURAL RETAINING WALL, STAIRS AND RAMPS

AND THE LIKE

C Stair access to pump room complete with all excavation and

earthwork, concrete work, blockwork, including waterproofing,

protection, finishes, handrails etc as specified

D Plan size 6200 x 3000mm; 1 No

Ramp complete with all excaation and earthwork, concrete works,

reinforcement incl waterproofing, protection, finishes, etc as

E Plan size 6000 x 3000mm 2 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/4 12/20/2012

Page 5: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

EXTERNAL SHADES

External shades, including decoration as required, concrete and

earthworks etc as indicated on Dwg A-150A A-150B and A-151-D

A Square shade, overall size 2400x2400x3000mm high 24 No

B Extra for form seating, 7000mm 1500mm 2 No

METALWORK

SHADES

Carpark shades complete including all associated builders work

and finishes as indicated on Dwg A-111

C Plan size 10600 x 6000mm 6 No

D Plan size 7950 x 6000mm 1 No

E Plan size 5300 x 6000mm 3 No

FENCING

Decorative metal fence comprising 125 x 125 x 5mm RHS vertical

post at 2500mm centre with vertical and horizontal RHS section,

including all associated builder's work; all as specified and

indicated on Drawing A-151A

F 3000mm High 142 m

GATES

Decorative gate, comprising 2 Nos 125 x 125 x 5mm post set in

and including foundation, with vertical and horizontal RHS

sectiond; with approved polycarbonate sheeting to internal face; all

as specified and indicated on Drawing A-151A

G Double gate, 8000mm wide; ncluding master keyed locks 4 No

Decorative gate, comprising 2 No. 125 x 125 x 5mm RHS post set

in and including foundation, with vertical and horizontal RHS

sections, all as specified and indicated on Drawing 125

H Ditto: 6000mm wide, including master eyed locks 2 No

J Ditto: 2000mm wide, including master keyed locks 4 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/5 12/20/2012

Page 6: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

SIGNAGE

Qatar Traffic Manual approved traffic signs as indicated on

Drawing A-111 including all associated builder's work complete

A EXIT sign 2 No

B NO EXIT sign 2 No

SPORTS EQUIPMENT

Sports equipment ssupplied by an approved propriety manufacturer

to International standards, all exposed metalwork to be white

polyestes powder oven fired finish as indicated on Dwg. A-150

C Basketball board comprising 100x100x5mm heavy duty tubular

metal post and baseplate, support framework and 24mm thick

1800x1050 backboard, net and frame all set in and including

concrete foundation with base plate, include for formwork and

1 No

D Handball goal set, comprising 80x80mm mild steel frame, 25mm

diameter net support frame and net, frame painted regulation red

and white incl. fixing plates as required.

1 No

E Volleyball net, comprising 2 No. 100mm diameter posts, netting

and antennae set in and including concrete foundation with base

plate, include for formwork and earthwork

1 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/6 12/20/2012

Page 7: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

PLUMBING AND MECHANICAL ENGINEERING

INSTALLATIONS

DOMESTIC WATER INSTALLATION

Copper pipes including fitting with copper tube to BS 2871 fittings

to BS 864 laying and fix under ground, including excavation,

grading bottom, compacting, backfilling, surrounding, remove

surplus from site, as detailed in specification and as shown on

A Cold water supply pipe; 28mm diameter 146 m

B Cold water supply pipe; 42mm diameter 91 m

C Ditto; 54mm diameter 77 m

D Ditto; 56mm diameter 63 m

Ductile Iron pipe : including all fittings laying and fix under

ground, including excavation, grading bottom, compacting,

backfilling, surrounding, remove surplus from site, as detailed in

specification and as shown on drawings

E Treated water supply pipe 65mm diameter 77 m

F Ditto; 100mm diameter 41 m

Watermeter

G Watermeter cabinet as specified to suit KAHRA-MAA regulations

including all accessories and associated builders work

1 No

Valve box as specified including all accessories and associated

builders work

H 600x600 vlve chamber (depth to suit site conditions)complete with

gate valve and connection to copper pipework as specified

4 No

FIRE FIGHTING INSTALLATION

Ductile Iron pipeworks complete with all necessary fittings and

protection

J 100mm Pipe 9 m

K 150mm Pipe 392 m

Fire Hydrant as per Building requirements and local regulations

L Fire Hydrant reference FH 5 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/7 12/20/2012

Page 8: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

PLUMBING AND MECHANICAL ENGINEERING

INSTALLATIONS (Contd)

IRRIGATION RING MAIN

UPVC Pipes and fittings to BS 3505 Class E with solvent welded

joints; laid in trenches, as detailed in specification and as shown on

drawings

A 50 mm diameter pipes 304 m

B Extra over ditto, for branch, bends, etc Item

Quick coupling valves including ball valves as specified complete

with warning cap to read " DO NOT DRINK" in Arabic and

English; jointing to pipe work

C 1" (25mm) Valves assembly with hose connector 3 No

DRIP AND BUBBLER IRRIGATION SYSTEM

Low density polyethylene (LDPE) pipes and fittings as specified

with socket fusion welding joints; laid in trenches.

D 50 mm diameter pipes driper line 76 m

E 32 mm diameter pipes driper line 291 m

F Extra over ditto, for branch, bends, etc Item

Solenoid control valve complete with Isolating valves and strainers

as specified; jointing to pipework; including for control wiring as

necessary

G 2" (50mm) Valve assembly 1 No

Bubblers, pressure compensating type complete with stakes as

specified; jointing to pipework.

H Bubbler assembly adjustable type including polyethylene tabbing

and adjustable flow rate between 0 and 130 litres/hr

44 No

Emmitter installation in ultra violet resistant low density

polyethylene pipes as specified

J Design, supply and install network of drip emitter pipe work

complete with drip emitters to irrigate shrubs and ground covers to

engineers approval: jointing to lateral pipework; allow for all

associated builders works as necssary

Item

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/8 12/20/2012

Page 9: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

PLUMBING, DRAINAGE AND OTHER ENGINEERING

INSTALLATIONS (Contd.)

IRRIGATION INSTALLATION CONTD

Allow for the following

A Allow for designing, re-routing and re-sizing bubbler irrigation

system secondary piping as necssary to provide sufficient irrigation

for all trees and in compliance with bubbler manufacturer's

recommendations

Item

Irrigation controller as detailed on drawing complete with all

intergral components as specified; include for all control wiring

and connection to main feeder

B 1No Station controller 1 No

BUILDERS WORK IN CONNECTION WITH IRRIGATION

Allow for the following

C Holes, chases, cutting back, building in, provision of pipe sleeves,

fire barriers and making good finishes, pavings and landscaping as

necessary

Item

D Allow for sleeves for encasing irrigation pipes passing beneath

roads and paved areas but note indicated on drawings.

Item

E Allow for providing concrete thrust blocks where necessary. Item

F Allow for providing warning / marker tapes as necessary. Item

G Paint finish to exposed pipework and associated supports as

necessary.

Item

H Allow for co-ordinating pipe routes with other underground

utilities and infrastructure works.

Item

J Allow for locating and spacing valve chambers, distribution

chambers as necessary to suit actual site requirements and soft

Item

K Allow for any other builders work deemed necessary for the

completion of the Irrigation Installation.

Item

To CollectionQR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/9 12/20/2012

Page 10: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

Electrical Installations

LIGHTING INSTALLATION

Sup[ply and fix light fittings complete as specified and shown on

Drawings including all holders, ceiling roses, bulbs.flourescent

tubes, final connections and fixing in position including all

necessary suspension chains, rods, brackets, lighting poles and

support frameworks

G Led street lighting fix on 8meter pole made of de cast aluminium, 9

OLED, 114W , 240Volt, 50 HZ, 6000K colour temperature, 1P66

(Type F17)

12 No

H Flood lighting extruded aluminium frame with special adjustable

flang, 54LED, 72W, 50HZ, 6000K Colour temperature, 1P66

(Type F18)

26 No

J Pole mounted flood light 6m height , with 250W high pressure

sodium lamp tripple luminaire (Type F19)

8 No

Wiring to the following points in approved cable including conduit,

trunking, trenches and the like as specified

D General lighting points 46 No

Wiring to the following points in approved cable including conduit,

trunking, trenches and the like as specified for Ancillary Buildings

E General lighting points (Ancillary Buildings) 40 No

Sup[ply and fix light fittings complete as specified and shown on

Drawings including all holders, ceiling roses, bulbs.flourescent

tubes, final connections and fixing in position including all

necessary suspension chains, rods, brackets, lighting poles and

support frameworks

F Surface mounted lighting fixture IP65 connected to essential

circuit, the body is made of grey fibre-glass reinforced polyester

with polycarbonate cover, the fixture is fitted with 2x36 W,

flourescent lamps, complete with electronic ballast and all

necessary accessories required for proper operation. (Type F13)

31 No

G Wall mounted lighting fixture IP65 connected to essential circuit,

the body is made of grey fibre-glass reinforced polyester with

polycarbonate cover, the fixture is fitted with 2x36 W, flourescent

lamps, complete with electronic ballast and all necessary

accessories required for proper operation. (Type F14)

6 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/10 12/20/2012

Page 11: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

LIGHTING INSTALLATION CONTD

A Above mirror wall mounted lighting fixture with 1x18W

flourescent lamp. (Type F4)

3 No

B Cable and conduits including all conduit accessaries between

distribution boards and general power accessories as shown on

drawings and as specified

C General Electrical fittings (Anciliary buildings 57 No

Sup[ply and fix electrical fittings complete as specified and shown

on Drawings including all accessories necessary to complete the

D 240V,13A Single switched socket with neon lamp 2P+E (Type 30 No

E SPN Isolator, rating as indicated (Type 1S1) 7 No

F 20A Double Pole Switch (Type S09) 3 No

G Connection unit with flex outlet (Type S010) 2 No

H 240V, 20A Single Pole, one way, flush mounted lighting switch

one gang (Type S1)

7 No

J 240V, 20A Single Pole, one way, flush mounted lighting switch

two gang (Type S3)

8 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/11 12/20/2012

Page 12: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

Electrical Installations (Contd)

BUILDER'S WORK

PVC duct laid below ground level for electrical cables including

warning tape, draw rope, marker tape, excavation, backfilling,

surrounding, remove surplus materials from site, etc as shown on

Drg. E-01

A 2 x 25mm ducts, width as required, depth not exceeding 800mm 278 m

B 1 x 50mm ducts, width as required, depth not exceeding 800mm 223 m

C 8 x 50mm ducts, width as required, depth not exceeding 800mm 180 m

D 9 x 50mm ducts, width as required, depth not exceeding 800mm 19 m

E 1 x 90mm ducts, width as required, depth not exceeding 800mm 103 m

F 2 x 90mm ducts, width as required, depth not exceeding 800mm 410 m

G 1 x 150mm ducts, width as required, depth not exceeding 800mm 101 m

H 2 x 150mm ducts, width as required, depth not exceeding 800mm 90 m

J 4 x 150mm ducts, width as required, depth not exceeding 800mm 38 m

K 9 x 150mm ducts, width as required, depth not exceeding 800mm 109 m

Telephone manhole to Qtel requirements, including all excavation,

concrete, cover, etc

L Type JRC-4, medium duty cover 11 No

M Type TJB 150 x 150 x 100mm 4 No

N Manhole, medium duty cover 2 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/12 12/20/2012

Page 13: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

Electrical Installations (Contd)

BUILDER'S WORK (Contd)

Manhole for fire cable, including all excavation, concrete

blockwork walls, light duty cover etc. all as specified

A Size 800 x 800 x 1000mm, medium duty cover 10 No

UPVC Ducts and fittings laid in trench as specified

B 25mm Diameter 556 m

C 50mm Diameter 2,120 m

D 90mm Diameter 922 m

E 150mm Diameter 1,411 m

PAINTING AND DECORATING

Prepare and apply white polyurethane paint in two coats to sports

surfacing in accordance with manufacturers instructions

F Court Lines 401 m

G Court Lines, Curved 116 m

Painted Traffic Lines as specified in the Qatar traffic manual and

in accordance with traffic regulations

H Parking Lines 300 m

J Hand-painted traffic arrow 3.0 metres long 14 No

K Hand-painted traffic markings 1.0 metre width 49 m

L Hand-painted fire appliance traffic markings 6000mm x 15000mm 4 No

To Collection QR

Construction of Four (4) New Schools at Doha Group (7A) Package 2

BA 12-13/C/045/G BQ/4/13/13 12/20/2012

Page 14: 19.13sc-Flr.bill No.4 Khawla Bint Alezour

SECTION G

BILLS OF QUANTITIES

19.10-Flr.BILL NO.4 KHAWLA BINT ALEZOUR.xls

ELEMENT NO.13 EXTERNAL WORKS

Rate Amount

QR QR

Item Description Qty Unit

EXTERNAL WORKS (Contd)

COLLECTION QR

From Page BQ/4/13/1

From Page BQ/4/13/2

From Page BQ/4/13/3

From Page BQ/4/13/4

From Page BQ/4/13/5

From Page BQ/4/13/6

From Page BQ/4/13/7

From Page BQ/4/13/8

From Page BQ/4/13/9

From Page BQ/4/13/10

From Page BQ/4/13/11

From Page BQ/4/13/12

From Page BQ/4/13/13

To Main Summary

Construction of Four (4) New Schools at Doha Group (7A) Package 2