Multi-stage Centrifugal Compressor Modifications and Rerates
#1908 Sour Service (>5%) 1680HP Two Stage Compressor with … · 2020. 10. 13. · It’s a...
Transcript of #1908 Sour Service (>5%) 1680HP Two Stage Compressor with … · 2020. 10. 13. · It’s a...
#1908
Sour Service (>5%) 1680HP Two Stage Compressor with 900ANSI Discharge
FOR IMMEDIATE SALE
Cleaned, preserved, and now ready to move.
It’s a Waukesha 7044GSI and Ariel JGK/4 - 2 stage compressor package. The compressor has double distance pieces and purge packing along with sweet gas purge on both stages. Fun fact: this was operated in a 30% H2S Sour gas facility. It has 62177 recorded ESM hours and just over 11,000 hours on full
engine and compressor overhaul. The second stage cooler bundle has the option to bypass the last two cooler passes for a higher discharge temperature.
FOR IMMEDIATE SALE
#1908Sour Service (>5%) 1680HP Two Stage Compressor with 900ANSI Discharge
Condition Field Ready/Minor Repair
Manufactured Enerflex 2008
Location West Central, Alberta
Registration Alberta Only
Status / Availability Available
Service Sour >5%
Driver / Driven Waukesha 7044GSI with ESM and an Ariel JGK/4-2, c/w double distance piece and purge packing.
Stages Two
Cylinders & MAWP 9.125”K 1st @ 1270psi, 5.875”K @ 2050psi.
Package MAWP 1932psi.
Control panel ProFace HMI and Allen Bradley PLC
Cooler Manufacturer AXH Air Coolers m/n: 156-EF-R
Additional Notes Lighting, gas & H2S detection, fire eyes, exhaust fans, etc, all fully wired to JB’s. Cooler has warm air recirculation system.
Take a 3D walkthrough at https://bit.ly/2RSo8Ge
Sample Performance
AS CONFIGURED 2 STAGE
Suction Pressure: 205psi Discharge Pressure: 1200psi 440 10³M³ @ 1632 HP
Suction Pressure: 175psi Discharge Pressure: 1650psi 345 10³M³ @ 1630 HP
For information only, subject to engineering review.
Take a 3D walkthrough at https://bit.ly/2RSo8Ge