BC Project Title Sheet No. Sheet Scale 1: @ A1 0070 Sheet Title Technical Design - Modular Building-1 (rectangle) Jerrings Hall Farm 26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333 Reviewed By Project ID - Originator - Volume - Level - Type - Role - Number File Name: NSC Stage 4 Tech stage all mod builds.vwx No. Date Revision Notes Suitability D2 SUITABLE FOR TENDER Code - Description 1831 CMS M1 ZZ DR A - - - - - - Drawn By Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed. . Project Client The Island Project Rev 2020/20/20 Date DR/CH TENDER 1 0 1:50 0 10 5m 1:500 2m 0 4 2 0 1m 1:100 1:200 0 10m 20 0 20m 40 1:1250 1:2500 0.5m 200mm 0 400 40 0 20mm 1:2 100 0 1:5 0 200 100mm 1:10 50mm Scale Bars 1:20 Group or Messy Play Space 10 1-1 space 1 1-1 space 2 1-1 space 3 Office 4 Office 5 Office 6 1-1 space 7 WC02 8 WC01 9 M1D-00-03 M1W-00-09 M1D-00-01 M1D-00-17 M1D-00-15 M1D-00-14 M1D-00-12 M1D-00-10 M1D-00-08 M1D-00-06 M1D-00-04 M1W-00-07 M1W-00-06 M1W-00-05 M1W-00-04 M1W-00-03 M1D-00-05 M1D-00-07 M1D-00-09 M1D-00-11 M1D-00-13 M1W-00-10 M1W-00-01 M1W-00-02 M1D-00-16 M1D-00-18 svp rwp rwp rwp rwp aiv FS M1W-00-08 M1D-00-02 porch a-a A1 a-a A1 Controlled Entrance Door LH kitchenette/wash area Approximate line of foundation perimeter tarmac path channel drainage to entrance Glidvale GRP Access hatch lay linear path edge approximately 100m from main building, infill with 6mm clean stone PROPOSED FLOOR PLAN - G.A. (SCALE 1:50) CONSTRUCTION SECTION - a-a (SCALE 1:50) svp rwp rwp rwp rwp aiv FS Controlled Entrance Door LH 15400 9743 18223 4656-OSW 4096 2000 2032 2033 2031 1876 915 2425 915 801 178 1160 190 801 915 2434 915 1876 15400 1684 915 3559 925 254 1921 925 245 915 997 925 245 915 976 2850 925 1337 915 2197 925 594 1774 1609 925 804 915 1603 925 1185 9743 3410 3089 2987 3041 - OSW 3962 2154-OSW 1216-OSW 2154 - OSW 4849 PROPOSED FLOOR PLAN - SETTING OUT (SCALE 1:50) Mod-Detail-02 Mod-Detail-03 Mod-Detail-01 2585 22.50° Roof tiles as specified fixed in accordance with manufacturers recommendations on treated 25 x 50mm s.w. battens on non breathable roofing membrane fixed to purpose made truss. Note: Refer to structural engineer/ roof manufacturers drawings for full details of roof trusses. UPVC HR Gutter, Downpipe and Fittings fixed to 150mm PAR timber fascia with painted plywood soffit, incorporate @ 1.0m centers Glidvale circular 'hit/miss' vents Mechanically fixed ventilated concrete ridge, 5mm clear ventilation. 3mm Gypsum skim 12.5mm Plasterboard on VCL fixed to underside of trussrafters. 75mm Sand/cement blended screed on 90mm PIR Insulation, seperating layer, on 'insitu' ground bearing concrete slab, onGas/DPC membrane sand blinding on consolidated hardcore all as S.E. DETAILS Studwork partitions refer to S.E. detail refer to S.E. detail void DEPTH TBC DEPTH TBC Insulation: Lay two 200mm layers Rockwool Flexi Insulation (opposite directions) Concrete interlocking tile UPVC half round gutter, downpipes & fittings Mechanically fixed ridge Aluminum Entrance Doors - level threshold 150 2100 150 2100 Aluminum Windows Larch timber cladding (open jointed) PROPOSED ELEVATIONS (SCALE 1:100)

Transcript of 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

Page 1: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

BC

Project Title Sheet No.Sheet Scale

1: @ A10070

Sheet Title

Technical Design - Modular Building-1 (rectangle)

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

NSC

Stage 4 Tech stage all mod builds.vwx

No. Date Revision Notes

Suitability

D2 SUITABLE FOR TENDERCode - Description

1831 CMS M1 ZZ DR A- - - ---Drawn By

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/20/20Date

DR/CH

TENDER10

1:50

0 105m

1:500

2m0 4

20 1m

1:1001:200

0 10m 20

0 20m 40

1:12501:2500

0.5m

200mm0 400

400 20mm

1:2

1000

1:5

0 200100mm

1:10

50mm

Scale Bars1:20

Group or Messy Play Space10

1-1 space1

1-1 space2

1-1 space3

Office4

Office5

Office6

1-1 space7

WC028

WC019

M1D-00-03

M1W-00-09

M1D-00-01

M1D-00-17

M1D-00-15

M1D-00-14M1D-00-12M1D-00-10

M1D-00-08

M1D-00-06

M1D-00-04

M1W-00-07 M1W-00-06 M1W-00-05 M1W-00-04

M1W-00-03

M1D-00-05

M1D-00-07 M1D-00-09 M1D-00-11 M1D-00-13

M1W-00-10 M1W-00-01 M1W-00-02

M1D-00-16

M1D-00-18

svp

rwp

rwp

rwp

rwp

aiv

FS

M1W-00-08

M1D-00-02

porch

a-a

A1

a-a

A1

ControlledEntrance Door

LH

kitchenette/wash area

Approximate lineof foundation

perimeter tarmacpath

channel drainage toentrance

Glidvale GRP Access hatch

lay linear path edgeapproximately 100m from main building, infill with 6mm cleanstone

PROPOSED FLOOR PLAN - G.A. (SCALE 1:50)

CONSTRUCTION SECTION - a-a (SCALE 1:50)

svp

rwp

rwp

rwp

rwp

aiv

FS

ControlledEntrance Door

LH

15400

9743

182234656-OSW 4096 2000

2032 2033 2031

18769152425915801178116019080191524349151876

15400

1684 915 3559 925 254 1921 925 245 915 997 925 245 915 976

2850

925

1337

915

2197

925

594

1774

1609

925

804

915

1603

925

1185

9743

341030892987

3041

- O

SW

3962

2154

-OS

W12

16-O

SW

2154

- O

SW

4849

PROPOSED FLOOR PLAN - SETTING OUT (SCALE 1:50)

Mod-Detail-02

Mod-Detail-03

Mod-Detail-01 2585

22.50°

Roof tiles as specified fixed in accordance with manufacturers recommendations on treated 25 x 50mm s.w. battens on non breathable roofing membrane fixed to purpose made truss.

Note: Refer to structural engineer/ roof manufacturers drawings for full details of roof trusses.

UPVC HR Gutter, Downpipe and Fittings fixed to 150mm PAR timber fascia with painted plywood soffit, incorporate @ 1.0m centers Glidvale circular 'hit/miss'vents

Mechanically fixed ventilated concrete ridge, 5mm clear ventilation.

3mm Gypsum skim 12.5mm Plasterboard on VCL fixed to underside of trussrafters.

75mm Sand/cement blendedscreed on 90mm PIR Insulation, seperating layer, on 'insitu' ground bearing concrete slab, onGas/DPC membranesand blinding on consolidated hardcore all as S.E. DETAILS

Studwork partitions refer to S.E. detail refer to S.E. detail

void

DE

PTH

TB

C

DE

PTH

TB

C

Insulation: Lay two 200mm layersRockwool Flexi Insulation (opposite directions)

Concrete interlocking tile

UPVC half round gutter, downpipes& fittings

Mechanically fixed ridge

Aluminum Entrance Doors - level threshold

150

2100

150

2100

Aluminum Windows

Larch timber cladding (open jointed)

PROPOSED ELEVATIONS (SCALE 1:100)

Page 2: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

BC

Project Title Sheet No.Sheet Scale

1: @ A10071

Sheet Title

Technical Design - Modular Building-2 ('L')

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

NSC

Stage 4 Tech stage all mod builds.vwx

No. Date Revision Notes

Suitability

D2 SUITABLE FOR TENDERCode - Description

1831 CMS M2 ZZ DR A- - - ---Drawn By

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/20/20Date

DR/CH

TENDER10

1:50

0 105m

1:500

2m0 4

20 1m

1:1001:200

0 10m 20

0 20m 40

1:12501:2500

0.5m

200mm0 400

400 20mm

1:2

1000

1:5

0 200100mm

1:10

50mm

Scale Bars1:20CONSTRUCTION SECTION (SCALE 1:50)

PROPOSED ELEVATIONS (SCALE 1:100)

PROPOSED FLOOR PLAN - SETTING OUT (SCALE 1:50)

ControlledEntrance Door

rwp

FS

rwp

rwprwp

rwp

svp

aiv

LH

44004400

1370

044

00

1742

915

1742

533 1160 880 915 4478

7972

1039

915

2186

1160

1247

915

2433

915

898

1750

242

1040

915

1432

915

1009

915

1006

915

964

915

939

915

1180

915

1376

500

993

500

757

1810

0

2792

- O

SW

2200 - OSW

3906

1900

1900

1900

2296

1600

2113 - OSW

815 915 2569 1160 263 915 5729

12366

9365

1855

8

2081 - OSW 1900

2107

- O

SW

Group or Messy Play Space91-1 space

11

Group or Messy Play Space10

DWC022

Quiet Open Teaching Space8

DWC011

1-1 space3

1-1 space4

1-1 space5

1-1 space7

1-1 space6

ControlledEntrance Door

M2D-00-05

W-00-03

rwp

FS

rwp

rwprwp

rwp

M2W-00-14

M2W-00-13

M2W-00-12 M2W-00-11

M2W-00-10

M2W-00-09

M2W-00-08

M2W-00-07

M2W-00-06

M2W-00-04

M2W-00-03

M2W-00-02M2W-00-01

M2W-00-05

M2D-00-06

M2D-00-01

M2D-00-04

svp

aiv

b-b

A1

b-b

A1

M2D-00-03

M2D-00-02 M2D-00-13

M2D-00-12

M2D-00-11

M2D-00-10

M2D-00-09

M2D-00-07 M2D-00-08

LH

Wash area

Approximate lineof foundation

channel drainage toentrance

Glidvale GRP Access hatch

perimeter tarmacpath

lay linear path edgeapproximately 100m from main building, infill with 6mm cleanstone

perimeter tarmacpath

lay linear path edgeapproximately 100m

from main building,infill with 6mm clean

stone

Mod-Detail-02

Mod-Detail-03

Mod-Detail-01

2585

22.50°

DE

PTH

TB

C

Roof tiles as specified fixed in accordance with manufacturers recommendations on treated 25 x 50mm s.w. battens on non breathable roofing membrane fixed to purpose made truss.

Note: Refer to structural engineer/ roof manufacturers drawings for full details of roof trusses.

UPVC HR Gutter, Downpipe and Fittings fixed to 150mm PAR timber fascia with painted plywood soffit, incorperate @ 1.0m centers Glidvale circular 'hit/miss' vents

Mechanically fixed ventilated concrete ridge, 5mm clear ventilation.

3mm Gypsum skim 12.5mm Plasterboard on VCL fixed to underside of trussrafters.

75mm Sand/cement blendedscreed on 90mm PIR Insulation, seperating layer, on 'insitu' ground bearing concrete slab, onGas/DPC membranesand blinding on consolidated hardcore all as S.E. DETAILS

Studwork parttions (load bearing)

refer to S.E. detail

void

refer to S.E. detail

Insulation: Lay two 200mm layersRockwool Flexi Insulation (opposite directions)

Concrete interlocking tile

UPVC half round gutter, downpipes& fittings

Mechanically fixed ridge

Aluminum Entrance Doors - level threshold

Aluminum Windows

Larch timber cladding (open jointed)

Aluminum Entrance Doors - level threshold

Concrete interlocking tile

Aluminum Windows

Concrete interlocking tile

Aluminum Windows

Aluminum Entrance Doors - level threshold

GRP valley gutters

GRP valley gutters

PROPOSED FLOOR PLAN - G.A (SCALE 1:50)

Page 3: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

BC

Project Title Sheet No.Sheet Scale

1: @ A10072

Sheet Title

Technical Design - Modular Buildings-Details

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

NSC

Stage 4 Tech stage all mod builds.vwx

No. Date Revision Notes

Suitability

D2 SUITABLE FOR TENDERCode - Description

1831 CMS M2 ZZ DR A- - - ---Drawn By

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/20/20Date

DR/CH

TENDER10

1:50

0 105m

1:500

2m0 4

20 1m

1:1001:200

0 10m 20

0 20m 40

1:12501:2500

0.5m

200mm0 400

400 20mm

1:2

1000

1:5

0 200100mm

1:10

50mm

Scale Bars1:20

WALLTYPES (SCALE: NTS)

EXTERNAL HEAD & JAMB DETAILS (SCALE 1:10)

MOD DETAIL - 4 - Level Threshold (SCALE 1:10)

MOD DETAIL - 2 - Ridge Detail (SCALE 1:10)

47 x 50mm treated timber batten(horizontally)

designed timberframe structure

47 x 50mm treated timber batten(vertical)

breather membrane

Larch cladding, on insect meshfixed to batten with secret s/s fixings

PCA trim (color tbc)

VCL

Aluminium Window

tuck breather membranebetween window & timber frame

3mm Gypsum plasteron 12.5mm Plasterboard

perimetertimber batten

form felt tray,pinch between soffitt& underside of verticalbatten

apply mastic sealentinternall & externallywindow - frame junctions

47 x 50mm treated timber batten (horizontally)

designed timberframe structure

47 x 50mm treated timber batten (vertical)breather membrane

Rockwool denseinsulation

VCL

Aluminium Window

tuck breather membranebetween window & timber frame

3mm Gypsum plasteron 12.5mm Plasterboard

perimetertimber batten

apply mastic sealentinternall & externally

window - frame junctions

47 x 50mm treated timber batten(horizontally)

designed timberframe structure

47 x 50mm treated timber batten(vertical)

breather membrane

Larch cladding, on insect meshfixed to batten with secret s/s fixings

PCA trim (color tbc)

VCL

Aluminium Window

wrap breather membraneunder cill

PAR- Window board

Wall - Type - 2 - loadbearingInternal Partition-standardtimber stud- Inc Pattress (1 side)

- 3mm 'nom' Gypsum skim- 12.5mm Plasterboard- 100mm treated timber studs- 25mm Rockwool RW3 (pinned)- 9mm WBP Plywood- 12.5mm Plasterboard- 3mm 'nom' Gypsum skim

50 - Rw(Rw+Ctr)30 - minute fire resistance

* note: Oriantation of Plywood TBC

Wall - Type - 1Pre-designed timber frameExternal walls (SIPS) - horizontal timber cladding

Wall - Type - 3 - none loadbearingInternal Partition-standardtimber stud- Inc Pattress (1 side)

- 3mm 'nom' Gypsum skim- 12.5mm Plasterboard- 65mm treated timber studs- 25mm Rockwool RW3 (pinned)- 9mm WBP Plywood- 12.5mm Plasterboard- 3mm 'nom' Gypsum skim

tbc - Rw(Rw+Ctr)30 - minute fire resistance

* note: Oriantation of Plywood TBC

- 25mm 'nom' Larch Timber Cladding- insect mesh- 50mm treated timber batten (vertical)- 50mm treated timber batten (horizontally)- 9mm OSB - 3- 140mm treated timber studwork- 140mm (press fit) Insulation quilt- 9mm OSB - 3- 37.5mm Thermo-laminate board (25mm insulation/12.5mm Plasterboard)

- 3mm 'nom' Gypsum skim

* note: Timber building designed by specialistmanufacturer.

Door elevation and jambs

svp

rwp

rwp

rwp

rwp

aiv

FS

ControlledEntrance Door

LH

ControlledEntrance Door

rwp

FS

rwp

rwprwp

rwp

svp

aiv

LH

Staffordshire Blue brick bedded insand/cement mortar to form brick plinth

Load bearing internal blockwork supporting timber frame

all as S.E. design

DPC

linear channel drain beddedin Gen-2 concrete

Aluminium Entrance Door

Groundbearing floorbuild up. as S.E. design

PAR timber architrave TME

nail or screw fixingtimber plug

timber perimeterstiffener

PAR timber doorstop TME

Refer to door schedule

PAR timber doorlining W x 32mm

PAR timber architrave TME

nail or screw fixingtimber plug

timber lintel designed byspecialist manafacturer.

PAR timber doorstop TME

Refer to door schedule

PAR timber doorlining W x 32mm

CL

CL

150

75

1000

150

Internal flush door

Refer to ironmongery for Lever Door Handle

100

Escutchen+ turn knob if required

Twin Ball bearing102 x 102mm hinge

concrete segmental ridge or hip tilesecured thru clip in to batten

Segmental Ridge Union

Dry RidgeBatten Section

Underlay Cutto Provide Ventilation

solofix Tile Clip50mm x 25mm treated batten

truss roof

breathable roof membrane

MOD DETAIL - 3 - Eaves Detail (SCALE 1:10)

MOD DETAIL - 1 - DPC Detail (SCALE 1:10)

47 x 50mm treated timber batten (horizontally)

designed timberframe structure

47 x 50mm treated timber batten (vertical)breather membraneLarch cladding, on insect meshfixed to batten with secret s/s fixingsPCA trim (color tbc)Staffordshire Blue brick bedded insand/cement mortar to form brick plinthLoad bearing internal blockwork supporting timber frameall as S.E. design

DPC

VCL

BESPOKE DETAILS (SCALE:1:10)

PAR-doorlining W x 32mmPAR-Architrave(chamfered/round)

PAR-Skirting(chamfered/round)

25

50

25

125

32

156

- (or

wid

th o

f par

ttion

)

PAR-Windowboard

165

25

MISC-JOINERY (SCALE:1:5)

TYPICAL INTERNAL DOOR ELEVATION (SCALE:1:20)

INTERNAL HEAD & JAMB DETAILS (SCALE 1:10)

Breathable membrane dressed over eaves carrier.

50mm x 25mm treated batten

truss roof

concrete interlocking tile

Titling fillet with roof membrane over

100mm uPVC gutter deep flow. All to be fixedin accordance with manufacturers details. NBS REF: R10

Painted treated softwood timber fascia boardNBS REF: G20-275A

cement particle board soffit fixed to undersideof truss rafter, circular H&M vent @ 1.0m ctrs

Page 4: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

PR

Project Title Sheet No.Sheet Scale: NTS

4003Sheet TitleModular 1 Building Door Schedule

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By:

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

BC

Door and Window Schedule.vwx

No. Date Revision Notes

Suitability

S4 SUITABLE FOR STAGE APPROVALCode - Description

1831 CMS M1 XX SH A- - - ---Drawn By:

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/02/07Date:Dr/Ch

TENDER

Internal Door ScheduleFire

RatingRef. Width HeightS.O.

Ref. LengthLintel

ThresholdMaterial

FrameFinish Material

Door LeafFinish Width Height Glazing Signage

MaterialArchitrave

FinishDoorStopDepth

SealsP/A

AccessControl Comments

M1D-00-01

Closer KickPlates

DoorTypeLocation

M1-00-10Group Play Space

FireSignage

HoldOpen

IronmongeryPack

M1D-00-02

M1D-00-03

M1D-00-04

M1D-00-05

M1D-00-06

M1D-00-07

M1D-00-08

M1D-00-09

M1D-00-10

M1D-00-11

To be read in conjunction with: - NBS Specification.- Drawing 0103 Internal Door Types.

All glazing to be toughened and laminated.

Notes:- Escutcheons to all locks.- Fire rated doors to have Smoke & Intumescent seals.- SealsP - Privacy A - Acoustic - Both

- Signage FDKC - Fire Door Keep Clear. FDKS - Fire Door Keep Shut. FDKL - Fire Door Keep Locked. FEKC - Fire Exit Keep Clear

M1D-00-12

M1D-00-13

M1D-00-14

M1D-00-15

M1D-00-16

M1D-00-17

M1D-00-18

M1-00-09WC01

M1-00-031-1 Space

M1-00-031-1 Space

M1-00-021-1 SpaceM1-00-021-1 Space

M1-00-011-1 Space

M1-00-011-1 SpaceM1-00-04

OfficeM1-00-041-1 SpaceM1-00-05

OfficeM1-00-051-1 SpaceM1-00-06

OfficeM1-00-061-1 SpaceM1-00-10

Group Play SpaceM1-00-071-1 Space

M1-00-071-1 Space

M1-00-08WC02

1010 2100 TBC

910 2100 95

1010 2100 130

914 2100 TBC

1010 2100 130

914 2100 TBC

1010 2100 130

914 2100 TBC

1010 2100 95

914 2100 TBC

1010 2100 95

914 2100 TBC

1010 2100 95

914 2100 TBC

914 2100 TBC

1010 2100 130

914 2100 TBC

910 2100 95

T

T

T

T

T

T

T

T

S

S

R

R

R

R

R

R

R

Level

Level

Level

Level

Level

Level

Level

Level

Level

Timber stud

Timber stud

Timber stud

Timber stud

Timber stud

Timber stud

Timber stud

Timber stud

T

Timber stud

?

?

?

?

?

?

?

?

?

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

PaintedTimber Timber TimberPainted Painted

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

Alu P.C Alu P.C Alu P.C

I

I

C

C

C

C

C

C

C

FEKC

FEKC

FEKC

FEKC

FEKC

FEKC

FEKC

FEKC

FEKC

FDKC

FDKC

FDKC

FDKC

FDKC

FDKC

FDKC

FDKC

FDKC

Page 5: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

PR

Project Title Sheet No.Sheet Scale: NTS

4004Sheet TitleModular 2 Building Door Schedule

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By:

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

BC

Door and Window Schedule.vwx

No. Date Revision Notes

Suitability

S4 SUITABLE FOR STAGE APPROVALCode - Description

1831 CMS M2 XX SH A- - - ---Drawn By:

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/02/07Date:Dr/Ch

TENDER

Door ScheduleFire

RatingRef. Width HeightS.O.

Ref. LengthLintel

ThresholdMaterial

FrameFinish Material

Door LeafFinish Width Height Glazing Signage

MaterialArchitrave

FinishDoorStopDepth

SealsP/A

AccessControl Comments

M2D-00-01

Closer KickPlates

DoorTypeLocation

M1-00-09Group Play Space

FireSignage

HoldOpen

IronmongeryPack

To be read in conjunction with: - NBS Specification.- Drawing 0103 Internal Door Types.

All glazing to be toughened and laminated.

Notes:- Escutcheons to all locks.- Fire rated doors to have Smoke & Intumescent seals.- SealsP - Privacy A - Acoustic - Both

- Signage FDKC - Fire Door Keep Clear. FDKS - Fire Door Keep Shut. FDKL - Fire Door Keep Locked. FEKC - Fire Exit Keep Clear

M2D-00-02 M1-00-10Group Play Space

M2D-00-03 M1-00-111-1 Space

M2D-00-04 M1-00-10Group Play Space

M2D-00-05 M1-00-09Group Play Space

M2D-00-06 M1-00-08Quiet Teaching Space

M2D-00-07 M1-00-061-1 Space

M2D-00-08 M1-00-071-1 Space

M2D-00-09 M1-00-051-1 Space

M2D-00-10 M1-00-041-1 Space

M2D-00-11 M1-00-031-1 Space

M2D-00-12 M1-00-02Disabled WC 2

M1-00-01Disabled WC 1M2D-00-13

1010 2100 300

1010 2100 130

1010 2100 100

1010 2100 300

1750 2100 300

1010 2100

1010 2100

1010 2100

1010 2100

1010 2100

1010 2100

910 2100

910 2100

300

95

95

130

130

130

95

95

T

T

T

U

S

S

R

R

R

R

R

R

V

LevelTimber stud PaintedTimber Timber TimberPainted Painted

LevelTimber stud PaintedTimber Timber TimberPainted Painted

LevelTimber stud PaintedTimber Timber TimberPainted Painted

LevelTimber stud PaintedTimber Timber TimberPainted Painted

LevelTimber stud PaintedTimber Timber TimberPainted Painted

LevelTimber stud PaintedTimber Timber TimberPainted Painted

LevelTimber stud PaintedTimber Timber TimberPainted Painted

LevelTimber stud PaintedTimber Timber TimberPainted Painted

? Alu P.C Alu P.C Alu P.C

? Alu P.C Alu P.C Alu P.C

? Alu P.C Alu P.C Alu P.C

? Alu P.C Alu P.C Alu P.C

LevelTimber stud PaintedTimber Timber TimberPainted Painted

C

C

C

C

C

C

I

I

Page 6: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

PR

Project Title Sheet No.Sheet Scale: NTS @ A3

4020Sheet TitleFinishes Schedules Mod 1

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By:

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

BC

Modular 1 Finishes:Group 1 Schedule.vwx

No. Date Revision Notes

Suitability

S4 SUITABLE FOR STAGE APPROVALCode - Description

1831 CMS M1 XX SH A- - - ---Drawn By:

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/02/07Date:Dr/Ch

PLANNING

MODULAR BUILDING 1 - FINISHES SCHEDULE - items to be supplied and fitted by the contractor

Dulux trade to colour match - F&B Dove Tale1 Altro Wood safety - Vintage Cherry colour tbc Painted Dulux White

NAME FLOOR COVERING WALLSRoom # SKIRTING / ARCHITRAVECEILINGS OTHERS

1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale2 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale3 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale4 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale5 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale6 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale7 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Set on skirting8 Altro Wood safety - Vintage Cherry colour tbcWC02 Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove TaleVerticle Blind - tbcAltro White Rock - White above basin

Set on skirting9 Altro Wood safety - Vintage Cherry colour tbcWC01 Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove TaleVerticle Blind - tbcAltro White Rock - White above basin

Dulux trade to colour match - F&B Dove Tale10 Altro Wood safety - Vintage Cherry colour tbcGroup/Messy Play Space

Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove TaleHowdens Kitchen units - Greenwich CashmereWorktop - Howdens Matt Cream Stone Effect Laminate with 70mm upstandHandles – Nickle Bar -237mm

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Page 7: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

PR

Project Title Sheet No.Sheet Scale: NTS @ A3

4021Sheet TitleFinishes Schedules Mod 2

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By:

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

BC

Modular 1 Finishes:Group 1 Schedule.vwx

No. Date Revision Notes

Suitability

S4 SUITABLE FOR STAGE APPROVALCode - Description

1831 CMS M2 XX SH A- - - ---Drawn By:

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/02/07Date:Dr/Ch

PLANNING

MODULAR BUILDING 2 - FINISHES SCHEDULE - items to be supplied and fitted by the contractor

Dulux trade to colour match - F&B Dove Tale3 Altro Wood safety - Vintage Cherry colour tbc

NAME FLOOR COVERING WALLSRoom # SKIRTING / ARCHITRAVECEILINGS OTHERS

1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale4 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale5 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale6 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale7 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale8 Altro Wood safety - Vintage Cherry colour tbcQuiet Open Teaching Space

Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Dulux trade to colour match - F&B Dove Tale10 Altro Wood safety - Vintage Cherry colour tbc Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Set on skirting1 Altro Wood safety - Vintage Cherry colour tbc Painted Dulux WhiteWC01 Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove TaleVerticle Blind - tbcAltro White Rock - White above basin

Set on skirting2 Altro Wood safety - Vintage Cherry colour tbcWC02 Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove TaleVerticle Blind - tbcAltro White Rock - White above basin

Dulux trade to colour match - F&B Dove Tale9 Altro Wood safety - Vintage Cherry colour tbcGroup/Messy Play Space

Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove TaleHowdens Kitchen units - Greenwich CashmereWorktop - Howdens Matt Cream Stone Effect Laminate with 70mm upstandHandles – Nickle Bar -237mm

Dulux trade to colour match - F&B Dove Tale11 Altro Wood safety - Vintage Cherry colour tbc1-1 Space Dulux trade to colour match - F&B Skimming Stone Door colour Dulux trade to colour match - F&B Dove Tale

Group/Messy Play Space

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Painted Dulux White

Page 8: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

PR

Project Title Sheet No.Sheet Scale: NTS @ A3

4032Sheet TitleSanitary Schedule - Modular Buildings

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By:

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

BC

Modular Sanitary Schedule.vwx

No. Date Revision Notes

Suitability

S4 SUITABLE FOR STAGE APPROVALCode - Description

1831 CMS XX XX SH A- - - ---Drawn By:

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/02/07Date:Dr/Ch

PLANNING

MODULAR BUILDING 1 - SANITARY SCHEDULE - items to be supplied and fitted by the contractorITEM TOTAL SIZE (mm) TYPE MOUNTING HEIGHTS

(from FFL (mm))ROOM

WC01, WC02WCS AND CISTERNS Contour 21 Schools 355 Close Coupled WC Suite2 N/A Refer to detail

WHB AND MIXER TAP Portman 21 50cm WashbasinS2311(01) Portman 21 washbasin 50cm, 1 taphole with overflow, no chainstay hole

2 N/A Refer to detail

10KITCHEN SINK AND MIXER TAP Sandringham 1000mm Stainless Steel Kitchen SinkS0748(MY) Sandringham 1000mm stainless steel kitchen sink pack 1 1/2 bowl and drainer with single lever kitchen mixer

1 N/A Refer to detail

WC01, WC02

MODULAR BUILDING 2 - SANITARY SCHEDULE - items to be supplied and fitted by the contractorITEM TOTAL SIZE (mm) TYPE MOUNTING HEIGHTS

(from FFL (mm))ROOM

DWC01, DWC02

9KITCHEN SINK AND MIXER TAP Sandringham 1000mm Stainless Steel Kitchen SinkS0748(MY) Sandringham 1000mm stainless steel kitchen sink pack 1 1/2 bowl and drainer with single lever kitchen mixer

2 N/A Refer to detail

DWC01, DWC02

WCS AND CISTERNS Contour 21 Schools 355 Close Coupled WC Suite2 N/A Refer to detail

WHB AND MIXER TAP Portman 21 50cm WashbasinS2311(01) Portman 21 washbasin 50cm, 1 taphole with overflow, no chainstay hole

2 N/A Refer to detail

Page 9: 1831-CMS-M1-ZZ-DR-A-0070-Current Revision

PR

Project Title Sheet No.Sheet Scale: NTS @ A3

4033Sheet TitleFixtures Schedule - Modular Buildings

Jerrings Hall Farm

26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333

Reviewed By:

Project ID - Originator - Volume - Level - Type - Role - Number

File Name:

BC

Sanitary Schedule.vwx

No. Date Revision Notes

Suitability

S4 SUITABLE FOR STAGE APPROVALCode - Description

1831 CMS XX XX SH A- - - ---Drawn By:

Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.

.

Project Client

The Island Project

Rev

2020/02/07Date:Dr/Ch

PLANNING

FIXTURES SCHEDULE - items to be supplied and fitted by the contractorITEM TOTAL SIZE (mm) TYPE MOUNTING HEIGHTS

(from FFL (mm))

MB-00-05 - Upper Kitchen & Dinning area (Life Skills Teaching)

Kitchen Units - Howdens Greenwich – IvoryWorktop - Howdens Matt Cream Stone

Effect Laminate UpstandHandles - Nickle Bar 237mm

Refer to detail

MB-01-11 - Tea point & Staff dinning

Kitchen Units - Howdens Greenwich – IvoryWorktop - Howdens Matt Cream Stone

Effect Laminate UpstandHandles - Nickle Bar 237mm

1121121

1000 sink base unit1000 corner base unit500 base units600 base units1000 wall unit600 wall units4300 length worktop approx.

Refer to detail

LB-01-03 - Dinning area Tea Point Kitchen Units - Howdens Greenwich – IvoryWorktop - Howdens Matt Cream Stone

Effect Laminate UpstandHandles - Nickle Bar 237mm

1121

600 base unit1000 sink base unit600 wall units2235 length worktop approx.

Refer to detail

LB-00-03 - Kitchenette Tea Point Kitchen Units - Howdens Greenwich – IvoryWorktop - Howdens Matt Cream Stone

Effect Laminate UpstandHandles - Nickle Bar 237mm

1111

600 base units1000 base unitBoiler cupboard1721 length worktop approx.

Refer to detail

MB-00-09 - Reception Tea point Kitchen Units - Howdens Fairford – Dark GreenWorktop - Grey laminate – Marble effect Handles - Pewter Cup handles

111

1000 sink base unit1150 length worktop approx.Wall shelf over. Length to suit existing opening.

Refer to detail

Protection from falling bar to windows.

Refer to specification10 To be measured on site Refer to detail

ROOM

MB-00-05

MB-01-11

LB-01-03

LB-00-03

MB-00-09

MB-00-03, MB-01-01, MB-01-10, MB-01-11, MB-01-13 (x2), LB-01-01 (x2), LB-01-02, LB-01-03

Window restrictor Refer to specification3 N/A Refer to detail MB-01-13, LB-01-03, AB-01-03

Timber handrail Refer to specification2 To be measured on site Refer to detail MB-00-06/MB-00-12, MB-00-03/MB-01-13

Socket cover (double) Refer to specification20 N/A Existing socket height MB-00-03 (x2), MB-00-04 (x6), AB-00-06 (x3), AB-00-08 (x5), AB-01-03 (x4)

Socket cover (single) Refer to specification1 N/A Existing socket height MB-00-04

1000 sink base unit900 corner base unit1000 corner base unit300 wall unit800 wall unit600 wall unitCorner wall units5820 length worktop approx.OvenInduction hobCooker hood

11111421111