AL MANARAH ENGINEERING CNSULTANCY P. O. Box 3239, P. C. 112, Al Khuwair,Muscat, Sultanate of Oman. Tel. : (+968) 2447569 Fax : (+968) 24475840 DOCUMENT TRANSMITTAL From : AMEC Designation : Assistant General Manager Our Ref. : AMEC-MCT/OGC/2014/TR/004 Date : 18/08/2014 Page: 1 of 1 To : Oman Gas Company SAOC Attn : Mr. Henry Jimeez LPG Project Director. Your Ref. : : Date : PROJECT : PROPOSED LIQUID STORAGE PLOT FOR LPG/OGC PROJECT NO. : OGC/001/2014 Please find attached herewith following documents for your necessary action. DOCUMENT / DRAWING NO. REV NUMBER OF DESCRIPTION STATUS * ORIGINAL S PRINTS AMEC/MCT/0G/DT.12/08/14 INVOICE 14 REMARKS IF ANY : * The status of the above document is indicated in the final column (see key below) 1. Issued for Comments 7. Examined & Returned with Comments 13. Issued for Record 2. Re-issued for Comments 8. Examined & Returned with Approval 14. For Payment 3. Issued for Approval 9. For Information 15. For Further Action 4. Re-issued for Approval 10. As Requested 16. For Distribution at Site 5. Issued for Construction 11. Final Records 17. Issued Controlled Document for Ref. 6. Re-Issued for Construction 12. For Detail Design 18. Other Doc. No.: AMEC/DTF Revision: 0 (August - 2014)

description

transmittal formate

Transcript of 18082014-Transmittal

DOCUMENT TRANSMITTAL FORM

AL MANARAH ENGINEERING CNSULTANCYP. O. Box 3239, P. C. 112, Al Khuwair,Muscat, Sultanate of Oman.Tel. : (+968) 2447569 Fax : (+968) 24475840

DOCUMENT TRANSMITTAL

From : AMECDesignation: Assistant General ManagerOur Ref. : AMEC-MCT/OGC/2014/TR/004Date : 18/08/2014

Page: 1 of 1

To: Oman Gas Company SAOCAttn: Mr. Henry Jimeez

LPG Project Director.Your Ref. : : Date :

PROJECT : PROPOSED LIQUID STORAGE PLOT FOR LPG/OGC

PROJECT NO. : OGC/001/2014

Please find attached herewith following documents for your necessary action.

DOCUMENT / DRAWING NO.REVNUMBER OF DESCRIPTIONSTATUS*

ORIGINALSPRINTS

AMEC/MCT/0G/DT.12/08/14INVOICE14

REMARKS IF ANY :

* The status of the above document is indicated in the final column (see key below)

1.Issued for Comments 7.Examined & Returned with Comments13.Issued for Record

2.Re-issued for Comments 8. Examined & Returned with Approval14.For Payment

3.Issued for Approval 9. For Information15.For Further Action

4.Re-issued for Approval10. As Requested16.For Distribution at Site

5.Issued for Construction11. Final Records17.Issued Controlled Document for Ref.

6.Re-Issued for Construction12. For Detail Design18.Other

TRANSMITTED BY :

Sign :

Date 18/08/2014Name : Manoj KumarDesignation: Assistant General Manager

RECEIVED BY :

Sign :

Date :

Name :

Designation :

(Please return signed copy to sender)