CONTRACT PACKAGE - NHDP- PHASE V NHAI CONCESSIONAIRE PMC CONTRACTOR LEA ASSOCIATES SOUTH ASIA PVT. LTD. LONGJIAN ROAD AND BRIDGE LTD. CO. Calibration of Rapid Moisture Meter No. R-1 Date : 31.03.2010 Accuracy of measuring devi 1 % RMM No. : R-1 RMM capacity = 50 % Calibration of RMM : Lab. Observed reading Oven Dry MC 0 0 0 3 3.02 2.99 6 6.04 6.06 9 9.52 8.93 12 11.55 12.03 15 14.57 15.09 18 17.53 18.11 Corrected Moisture Content( 1to 18) C. f = 1.016 1 1.02 4 4.06 7 7.11 10 10.16 13 13.20 16 2 2.03 5 5.08 8 8.13 11 11.17 14 14.22 17 3 3.05 6 6.09 9 9.14 12 12.19 15 15.24 18 TESTED BY CHECKED BY/APPROVED BY REVIEWED BY (IE) SIGN: SIGN: SIGN: SIX - LANING OF GURGAON- KOTPUTLI - JAIPUR SECTION OF NH - 8 FROM Km 42.70 TO 273.00 (LENGTH - Km 225.60) IN THE STATE OF HARYANA AND RAJASTHAN ON DBFO BASIS INDEPENDENT ENGINEER SNC-AARVEE (JV) Actual Moisture Taken RMM Reading 0 2 4 6 8 10 12 14 16 0 2 4 6 8 10 12 14 16 18 Oven Dry RMM Reading

description

moisture meter calibration

Transcript of 18.07.2013

calibration of RMM (1)SIX - LANING OF GURGAON- KOTPUTLI - JAIPUR SECTION OF NH - 8 FROM Km 42.70 TO 273.00 (LENGTH - Km 225.60) IN THE STATE OF HARYANA AND RAJASTHAN ON DBFO BASISCONTRACT PACKAGE - NHDP- PHASE V

NHAICONCESSIONAIREINDEPENDENT ENGINEERSNC-AARVEE (JV)

PMCCONTRACTORLEA ASSOCIATES SOUTH ASIA PVT. LTD.LONGJIAN ROAD AND BRIDGE LTD. CO.

Calibration of Rapid Moisture Meter No. R-1

Date:31.03.2010Accuracy of measuring device =1%RMM No. :R-1RMM capacity =50%Calibration of RMM:Lab.

Actual Moisture TakenObserved readingRMM ReadingOven Dry MCr000

33.022.99

62.2366.046.0663.21

99.528.93

1211.5512.03

1514.5715.09

1817.5318.11

Corrected Moisture Content( 1to 18)C. f =1.01611.0244.0677.111010.161313.201616.2522.0355.0888.131111.171414.221717.2733.0566.0999.141212.191515.241818.28

TESTED BYCHECKED BY/APPROVED BYREVIEWED BY (IE)SIGN:SIGN:SIGN:NAME:NAME:NAME:

RMM (1)Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

Client: National Highways Authority of IndiaConcessionaire: IRB Pathankot Amritsar toll road pvt. LtdSection: II From Km 57+900 to 108+502Calibration of Rapid Moisture Meter No. R-1Date: 19.01.13Accuracy of measuring device : 1%RMM No. : 58+360L/S (Lab.)RMM capacity : 50%Calibration of RMM: R-1Due Date: 18.07.13

Actual Moisture TakenObserved readingRMM ReadingOven Dry MC000

22.001.98

43.503.9771.571.35

66.006.050.996

87.507.98

1010.0010.05

1212.0011.65

141413.55

1616.516.12

C. f =0.998

Corrected Moisture Content( 1 to 18 %)11.0043.9976.99109.981312.971615.9722.0054.9987.981110.981413.971716.9632.9965.9998.981211.971514.971817.96

Construction TeamIndependent EngineerSupervision TeamDate:Date:Date:

RMM (2)Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

Client: National Highways Authority of IndiaConcessionaire: IRB Pathankot Amritsar toll road pvt. LtdSection: II From Km 57+900 to 108+502Calibration of Rapid Moisture Meter No. R-2Date: 19.01.13Accuracy of measuring device : 1%RMM No. : 58+360L/S (Lab.)RMM capacity : 50%Calibration of RMM: R-2Due Date: 18.07.13

Actual Moisture TakenObserved readingRMM ReadingOven Dry MC000

22.001.89

43.503.877272.53

66.006.12

88.008.33

1010.5010.32

1212.0011.82

1414.013.85

161616.33

C. f =1.007

Corrected Moisture Content( 1 to 18 %)11.0144.0377.051010.071313.101616.1222.0155.0488.061111.081414.101717.1333.0266.0499.071212.091515.111818.13

Construction TeamIndependent EngineerSupervision TeamDate:Date:Date:

RMM (3)Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

Client: National Highways Authority of IndiaConcessionaire: IRB Pathankot Amritsar toll road pvt. LtdSection: II From Km 57+900 to 108+502Calibration of Rapid Moisture Meter No. R-3Date: 19.01.13Accuracy of measuring device : 1%RMM No. : 58+360L/S (Lab.)RMM capacity : 50%Calibration of RMM: R-3Due Date: 18.07.13

Actual Moisture TakenObserved readingRMM ReadingOven Dry MC000

22.001.85

43.504.057472.47

66.006.05

88.508.33

1010.5010.04

1212.5012.01

1414.514.02

1616.516.12

C. f =0.979

Corrected Moisture Content( 1 to 18 %)10.9843.9276.86109.791312.731615.6721.9654.9087.831110.771413.711716.6532.9465.8898.811211.751514.691817.63

Construction TeamIndependent EngineerSupervision TeamDate:Date:Date:

RMM (4)Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

Client: National Highways Authority of IndiaConcessionaire: IRB Pathankot Amritsar toll road pvt. LtdSection: II From Km 57+900 to 108+502Calibration of Rapid Moisture Meter No. R-4Date: 18.07.13Accuracy of measuring device : 1%RMM No. : 58+360L/S (Lab.)RMM capacity : 50%Calibration of RMM: R-4Due Date: 18.07.13

Actual Moisture TakenObserved readingRMM ReadingOven Dry MC000

22.002.13

44.003.8674.573.15

66.005.98

88.508.25

1010.5010.25

1212.5012.33

1414.514.16

1616.516.19

C. f =0.982

Corrected Moisture Content( 1 to 18 %)10.9843.9376.87109.821312.761615.7121.9654.9187.861110.801413.751716.6932.9565.8998.841211.781514.731817.67

Construction TeamIndependent EngineerSupervision TeamDate:Date:Date: