17th July 2008 #4-CTF3 Committee 1
CA
.BH
B 0
400
CA
.SN
H 0
110
CA
.SN
I 012
0
CA
.VVS
010
0 CA
.DH
G/D
VG 0
130
CA
.VVS
020
0C
A.M
TV 0
215
CA
.BPM
022
0C
A.D
HG
/DVG
022
5
CA
.SN
G 0
230
CA
.SN
G 0
250
CA
.BPM
024
0
CA
.BPM
026
0
CA
.BPM
031
0
CA
.BPM
038
0
CA
.DH
G/D
VG 0
245
CA
.DH
G/D
VG 0
265
CA
.DH
G/D
VG 0
320
CA
.DH
G/D
VG 0
385
CA
.DH
B/D
VB 0
270
CA
.ICT
0210
CA
.VVS
030
0
CA
.QFD
035
0
CA
.QFD
036
0C
A.Q
DD
035
5
CA
.BPR
037
0
CA
.BPM
041
0
CA
.MTV
039
0
CA
.MTV
042
0C
A.V
VS 0
500
CA
.SD
H 0
340
CA
.DH
B/D
VB 0
230
CA
.DH
B/D
VB 0
250
ACS 0230 ACS 0250 ACS 0270
DUMP
0450
TBTS
ITL
CA
.MTV
012
5(v
irtua
l cat
hode
)
CA
.FC
U 0
430
CALIFES STATUS
17th July 2008 #4-CTF3 Committee 2
CALIFES STATUS: Mechanics/installationWork done on week 27
Laser Beam Transportation: work completed !- all the line is under vacuum @ 30 Torr (0.04 atm)
no leakage- change of the spring which held the lenses- completion of the protection caps on laser table
Pumping ~ in the middle of the transport line
Vacuum gauge near the PI table
1/3
17th July 2008 #4-CTF3 Committee 3
CALIFES STATUS: Mechanics/installationWork done on week 27
Observation: problem of quadrupoles positioning compared to the vacuum chamber center
the 3 quad. have been re-centered at ~±0.25mm compared to the vacuum chamber center(magnetic axis = mechanic axis)
2/3
17th July 2008 #4-CTF3 Committee 4
CALIFES STATUS: Mechanics/installation
Remaining “mechanical” work for end of July-August
• VPM#2 – CA.MTV 0420: recovery of the piece used for mirror introduction important leakage detected new installation foreseen on week 30
• VPM#1/2/3 – CA.MTV 0215-0390-0420: protections necessary for superior part of VPMs chambers Lead shielding necessary to protect cameras from radiations
General vacuum test for CALIFES foreseen from week 30 or beyond ? (CERN)
• Power Phase Shifter: in klystron gallery (CERN) provide water arrival for the Power Phase Shifter
3/3
17th July 2008 #4-CTF3 Committee 5
CALIFES STATUS: Bake out temperature
Following temperatures should not be exceeded during the bake out of the line between the injecting gun and the 1rst LIL
section
• Is a temperature monitoring foreseen during bake out ? • ICT Bergoz will not be able to tolerate an higher temperature than 100°C
17th July 2008 #4-CTF3 Committee 6
CALIFES STATUS: Laser systemWork done on week 25 and 28:
• Main objective Installation of the Pulse Picker and test it: with synchronisation coming from the Masterclock instead of the final fine synchronisation
• Good rise and fall time have been checked OK• “plateau” OK, no discontinuity• transmission measured = 81% in agreement with measurements made in the lab in Saclay
17th July 2008 #4-CTF3 Committee 7
CALIFES STATUS: Laser systemWork done on week 25 and 28:
• No measurements in CLEX with camera (Pulse Picker + transport), due to too low UV energy (0.3nJ) tests are reported to beginning of September
• Checking of CLEX camera: signal doesn’t go up (even with a CERN camera) this problem has been solved ?
• The lines for sensing UV beam at the output of the laser table have been installed The line sensing the profile at the output of BBO uses the same mounting and UV converter as the sensing in CLEX
17th July 2008 #4-CTF3 Committee 8
CALIFES STATUS: BPMs 1/2
Work done on week 26: CA.BPM0220, CA.BPM0240, CA.BPM0260, CA.BPM0310, CA.BPM0380, CA.BPM0410
BPM
Frequencies and the factors of quality of the monopole and dipolar modes were measured on the 6 BPMs Fréquence (MHz)
Mode monopolaire
Facteur qualitémonopolaire
Fréquence (MHz)mode dipolaire
Facteur qualité
dipolaire
Cross-talk (dB)
CA.BPM 0220 3985 27 5987 47.5 26CA.BPM 0240 3979 28.5 5981 52 43CA.BPM 0260 3988 26.5 5987 51 28CA.BPM 0310 3991 26 5985 46.5 27CA.BPM 0380 3990 25 5992 52 30CA.BPM 0410 3995 27 5992 51 32
Example of transmission and reflexion of all modes on 1 BPM on 1 slot
• Similar results from one BPM to another, and in-situ results are comparable to
Saclay in-lab measurements
• Cross-talk 26dB OK
17th July 2008 #4-CTF3 Committee 9
CALIFES STATUS: BPMs 2/2
Work done on week 26:
• Electronics boxes were installed in the CLEX• In the BPMs rack (CLEX-G), the various crates and cables were installed
Work planed by the end of July (week 29 or 30):• Replacement of the LEMO cables + flat cables in CLEX-G• Problem discovered with one Acqiris board (1 channel is out of order)
board sent to Agilent company for repair (at least 4s-8s of delay min ?) M. Draper try to provide us another board temporary during this period
17th July 2008 #4-CTF3 Committee 10
CALIFES STATUS: Control Command of BPMs
Work done on week 26-28: thanks to S. Deghaye’s, etc …
1/Readout of acqiris board signals on OASIS OK
2/Signal processing OK
3/Results sent on graphic windows under JAVA ±OK
The 6 BPMs are implemented(command of the BPMs switchs remotely from control room is not yet tested)
Work planed to be completed by the end of August: • BPMs Control Command: soft written but still some difficulties for communication with the database (not updated), transfer and tests of acqiris boards to their final rack BY064-XG have to be done, with help of CERN team ? task on critical path
17th July 2008 #4-CTF3 Committee 11
CALIFES STATUS: Control Command and database
CALIFES Missing components in Database (status on 11th July 08):
CALIFES Components already in Database (status on 11th July 08): Working set OK for:
• RF measured signals• Solenoids (3)• Quadrupoles (3)• Dipole (1)• Correctors (14 over 18)
Working set not implemented yet for:• LLRF commands• MKS30 commands• RF Timing commands• BPMs signals (CA.BPM0220,etc …)• VPMs signals (CA.MTV0215, etc …)• vacuum ?
We need also some help to transfer/install our software on a Control Room PC
17th July 2008 #4-CTF3 Committee 12
CALIFES STATUS: Conclusion
• End of “mechanical” tasks
• MTVs (Video Profile Monitors): electrical adaptation under progress and Control Command have to be done in Summer-September, with help of CERN team ? task on critical path
• BPMs (Beam Position Monitors) Control Command: soft written but still some difficulties for communication with the database (not updated), transfer and tests of acqiris boards to their final rack BY064-XG have to be done, with help of CERN team ? task on critical path
• Transport of the UV laser beam down to the photocathode, with Pulse Picker working in specifications energy still too low, and have decrease last week …
• RF Power Phase Shifter: Specifications document re-defined and sent to the contractors for acceptation and signature (CEA would manage directly the brazing company for mode convertors official separation of machining and brazing tasks). New order is under progress. We foresee an installation during the shutdown (beginning of 2009).