21
INTERCADECONSULTANCY & TRAINING
www.intercade.org
41
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
797 Mining Truck Specifications797F Gradeability/Speed/RimpullTo determine gradeability performance. Read from gross weight down to the percent oftotal resistance. Total resistance equals actual percent grade plus 1% for cach10kg/t(20Ib/ton) og rolling resistance. From this weight-resistance point, read horizontally tothe curve with the highest obtainable gear then down to maximum speed. Usable rimpullwill depend upon traction available and weight on drive wheels.
42
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
-
22
INTERCADECONSULTANCY & TRAINING
www.intercade.org
43
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
TALLER 5: CURVAS DE FRENADO
Para camin un CAT 785, definir la velocidad mxima,de bajada, de una rampa con inclinacin de 10% yresistencia a rodadura de 5%.
Considerar camin vaco y cargado. Considerar la longitud de la rampa de 300 m y 1000 m.
44
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
TABLA DE RETARDO CAT 775D (HBK)
-
23
INTERCADECONSULTANCY & TRAINING
www.intercade.org
45
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
46
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
-
24
INTERCADECONSULTANCY & TRAINING
www.intercade.org
47
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
SUPOSICIONES
Para las faenas mineras de transporte de material, se hadecidido utilizar un camin CAT 797F, cuyas principalescaractersticas se muestran en las tablas adjuntas.
El material ser transportado desde la zona A hasta lazona B, siguiendo un perfil longitudinal mostrado en latabla siguiente, sobre un camino de tierra que presentaun coeficiente de traccin = 0.55.
Determinar la velocidad de subida y bajada en cadatramo, utilizando la ecuacin que relaciona potencia,fuerza y velocidad o con los grficos de rimpull y frenadosegn corresponda.
48
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DEFINIR PRODUCTIVIDAD HORARIA DEL CAMION 797C DE CAT
Tramo 1 (de carga) Longitud: 150 m, RR: 5%, pendiente: 2%
Tramo 2 (la rampa) Longitud: 800 m, RR: 4%, pendiente: 10%
Tramo 3 (hasta parada) Longitud: 200 m, RR: 4%, pendiente: -2%
Especificaciones del camin 797Fhttp://xml.catmms.com/servlet/ImageServlet?imageId=C639683
-
25
INTERCADECONSULTANCY & TRAINING
www.intercade.org
49
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
797 Mining Truck Specifications797F Gradeability/Speed/RimpullTo determine gradeability performance. Read from gross weight down to the percent oftotal resistance. Total resistance equals actual percent grade plus 1% for cach10kg/t(20Ib/ton) og rolling resistance. From this weight-resistance point, read horizontally tothe curve with the highest obtainable gear then down to maximum speed. Usable rimpullwill depend upon traction available and weight on drive wheels.
50
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
-
26
INTERCADECONSULTANCY & TRAINING
www.intercade.org
51
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DISEO DE LAS VIAS
52
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
ANCHO
Carg
a
w
ZZ
UU
C
W=2(U+F +F +Z)+CA B C=Z(U+F +F )/2A B
FAFA
FB FBFB
One-Halfveniclewioth
Lone 1
Lone 2
6 6 6 6 612 12 12 1224
4260
70
Lone 3 Lone 4
-
27
INTERCADECONSULTANCY & TRAINING
www.intercade.org
53
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DISEO DE VIAS: ANCHO, CORONA Y PENDIENTE
TRANSVERSAL
54
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
PENDIENTE TRANSVERSAL
Siempre esnecesario.
Es funcin de Inclinacin de la
va. Condiciones
climticas dominantes.
..
-
28
INTERCADECONSULTANCY & TRAINING
www.intercade.org
55
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
ANCHO DE LA VIA
Definir el ancho mnimo de la va para el camin930 de Komatsu (el tramo recto y plano), tal comoel diseo de la superficie de esta va.
56
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
-
29
INTERCADECONSULTANCY & TRAINING
www.intercade.org
57
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
PERALTE
Definir el peralte recomendado para una curva conradio de 100 m, si la velocodad de camin viajandopor ella es 15 km/h.
58
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DISEO DE CURVAS:RADIO VS. VELOCIDAD
De CAT
-
30
INTERCADECONSULTANCY & TRAINING
www.intercade.org
59
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
BASE DE LA VIA
Definir el diseo de la base de la va para el camin777D, asumiendo que la CBR de la subbase es 5%.Materiales disponibles tienen CBR 20% (@ $ 2/m3) yCBR 50 (@ $ 3/m3).
60
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
PRESION DE CONTACTO DEL CAMINO
SURFACE
40,000 lbs
lFTlFT
40FTCBR= 4 (SILTY CLAY)
(SAND & GRAVEL)CBR = 25
CBR = 80
CBR = 80
2
2
45
3222
55
-
31
INTERCADECONSULTANCY & TRAINING
www.intercade.org
61
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
CALIFORNIA BEARING RATIO (CBR)10
10
20
30
40
50
60
70
3 4 5 6 7 8 9 10 15 20 25 30 40 50 60 70 80 100
4000
1000
12000
25000
40000
7000
0
1000
0012
0000
WHEEL LOADIN POUNOS
SUBB
ASE
THIC
KNES
S in
ches
VEHI
CLES
100,
000
to 40
0,00
0 tb
VEHI
CLES
< 40
0,00
0 tb
VEHI
CLES
< 10
0,00
0 tb
SILTY CLAYSMEDIUM
PLASTICITY
SANDS FAIRLY CLEAN
GRAVEL WITH CLAY,POORLY GRADED
GOOD GRAVEL,WELL - GRADED
CROSMEDROCK
HIGHLYPLASTIC
CLAYRANGES OF BEARINGRATIOS FOR TYPICAL
SOILS AND UNTREATEDBASE MATERIALS -COMPACTED AND
SOAKED SPECIMENS
SANDYCLAY,LOW
PLASTICITY
SAND - CLAYMIXTURES,
POORLYGRADED
SAND - CLAYMIXTURES,
WELL - GRADEDROUND TO ANGULAR
62
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
BASE DE LA VIA
Definir el diseo de la base de la va para el camin777D, asumiendo que la CBR de la subbase es 5%.Materiales disponibles tienen CBR 20% (@ $2/m3)y CBR 50 (@ $3/m3).
-
32
INTERCADECONSULTANCY & TRAINING
www.intercade.org
63
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
64
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
10
10
20
30
40
50
60
70
3 4 5 6 7 8 9 10 15 20 25 30 40 50 60 70 80 100
4000
1000
12000
25000
40000
7000
0
1000
0012
0000
WHEEL LOADIN POUNOS
SUBB
ASE
THIC
KNES
S in
ches
VEHI
CLES
100,
000
to 40
0,00
0 tb
VEHI
CLES
< 40
0,00
0 tb
VEHI
CLES
< 10
0,00
0 tb
SILTY CLAYSMEDIUM
PLASTICITY
SANDS FAIRLY CLEAN
GRAVEL WITH CLAY,POORLY GRADED
GOOD GRAVEL,WELL - GRADED
CROSMEDROCK
HIGHLYPLASTIC
CLAYRANGES OF BEARINGRATIOS FOR TYPICAL
SOILS AND UNTREATEDBASE MATERIALS -COMPACTED AND
SOAKED SPECIMENS
SANDYCLAY,LOW
PLASTICITY
SAND - CLAYMIXTURES,
POORLYGRADED
SAND - CLAYMIXTURES,
WELL - GRADEDROUND TO ANGULAR
CALIFORNIA BEARING RATIO (CBR)
-
33
INTERCADECONSULTANCY & TRAINING
www.intercade.org
65
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DISPONIBILIDAD, USO DE DISPONIBILIDAD, ETC.
Asumiendo que ests abriendo una mina nueva conequipos modernos, define las tareas para lo siguiente: Disponibilidad mecnica Disponibilidad fsica Uso de disponibilidad Horas de trabajo (camiones) por ao
66
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DISPONIBILIDAD MECANICA (MA)
Cuntas reparaciones son necesarias por hora deoperacin?
Definida una razn entre horas trabajadas y la suma dehoras trabajadas y horas de reparacin.
MA = W / (W + R) Medidas
Conveniencia del equipo para la tarea Eficiencia del mantenimiento
Discrepancias en definicin
-
34
INTERCADECONSULTANCY & TRAINING
www.intercade.org
67
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DEFINICION DE USO DE DISPONIBILIDAD(UTILIZACION)
DefinicinUdeD = W / ( W + S)
Mide la eficiencia del uso del equipo. Hay diferentes definiciones posibles.
Clasificacin de varias componentes del tiempo Considerar atrasos operativos, relocalizaciones de
equipos, etc.
68
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
DISPONIBILIDAD, USO DE DISPONIBILIDAD, ETC.
Asumiendo que ests abriendo una mina nueva conequipos modernos, define las tareas para lo siguiente: Disponibilidad mecnica Disponibilidad fsica Uso de disponibilidad Horas de trabajo (camiones) por ao
-
35
INTERCADECONSULTANCY & TRAINING
www.intercade.org
69
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
Note las diferencias en la terminologa.
70
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
EJEMPLO: CAJAS ESTANDAR DE CAT 793
-
36
INTERCADECONSULTANCY & TRAINING
www.intercade.org
71
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
72
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
1 2 3 4Selection
ofbody
Workapplication Specific
gravity ofmaterial
Conditionsof runway
Conditionsof runway
Travelspeed
Kinds ofmaterial
DownhillFlatness of runwayLoading
machines
Sizeof rocks
Weightof rocks
Loadingmachines
Selectionof body
Selectionof canopyspill guard
Selectionof
tailgate
SELECCION DEL DISEO DE LA TOLVA(KOMATSU)
-
37
INTERCADECONSULTANCY & TRAINING
www.intercade.org
73
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
QUE LIMITA EL TAMAO DEL CAMION?
Disponibilidad de ruedas Los nuevos diseos (bajo perfil) hicieron posible
camiones de 320 a 360 ton. Recordar: Presenta solo 2 ejes.
74
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
RADIO Y VELOCIDAD DE UN CAMION
.
-
38
INTERCADECONSULTANCY & TRAINING
www.intercade.org
75
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
PRESION DE CONTACTO DEL CAMION
SURFACE
40,000 lbs
lFTlFT
40FTCBR= 4 (SILTY CLAY)
(SAND & GRAVEL)CBR = 25
CBR = 80
CBR = 80
2
2
45
3222
55
76
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade
-
39
INTERCADECONSULTANCY & TRAINING
www.intercade.org
77
Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade