21 INTERCADE CONSULTANCY & TRAINING www.intercade.org 41 Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade 797 Mining Truck Specifications 797F Gradeability/Speed/Rimpull To determine gradeability performance. Read from gross weight down to the percent of total resistance. Total resistance equals actual percent grade plus 1% for cach 10kg/t(20Ib/ton) og rolling resistance. From this weight-resistance point, read horizontally to the curve with the highest obtainable gear then down to maximum speed. Usable rimpull will depend upon traction available and weight on drive wheels. 42 Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

description

camiones en mineria superficial

Transcript of 176102_MATERIALDEESTUDIO-TALLERPARTEII

  • 21

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    41

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    797 Mining Truck Specifications797F Gradeability/Speed/RimpullTo determine gradeability performance. Read from gross weight down to the percent oftotal resistance. Total resistance equals actual percent grade plus 1% for cach10kg/t(20Ib/ton) og rolling resistance. From this weight-resistance point, read horizontally tothe curve with the highest obtainable gear then down to maximum speed. Usable rimpullwill depend upon traction available and weight on drive wheels.

    42

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

  • 22

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    43

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    TALLER 5: CURVAS DE FRENADO

    Para camin un CAT 785, definir la velocidad mxima,de bajada, de una rampa con inclinacin de 10% yresistencia a rodadura de 5%.

    Considerar camin vaco y cargado. Considerar la longitud de la rampa de 300 m y 1000 m.

    44

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    TABLA DE RETARDO CAT 775D (HBK)

  • 23

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    45

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    46

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

  • 24

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    47

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    SUPOSICIONES

    Para las faenas mineras de transporte de material, se hadecidido utilizar un camin CAT 797F, cuyas principalescaractersticas se muestran en las tablas adjuntas.

    El material ser transportado desde la zona A hasta lazona B, siguiendo un perfil longitudinal mostrado en latabla siguiente, sobre un camino de tierra que presentaun coeficiente de traccin = 0.55.

    Determinar la velocidad de subida y bajada en cadatramo, utilizando la ecuacin que relaciona potencia,fuerza y velocidad o con los grficos de rimpull y frenadosegn corresponda.

    48

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DEFINIR PRODUCTIVIDAD HORARIA DEL CAMION 797C DE CAT

    Tramo 1 (de carga) Longitud: 150 m, RR: 5%, pendiente: 2%

    Tramo 2 (la rampa) Longitud: 800 m, RR: 4%, pendiente: 10%

    Tramo 3 (hasta parada) Longitud: 200 m, RR: 4%, pendiente: -2%

    Especificaciones del camin 797Fhttp://xml.catmms.com/servlet/ImageServlet?imageId=C639683

  • 25

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    49

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    797 Mining Truck Specifications797F Gradeability/Speed/RimpullTo determine gradeability performance. Read from gross weight down to the percent oftotal resistance. Total resistance equals actual percent grade plus 1% for cach10kg/t(20Ib/ton) og rolling resistance. From this weight-resistance point, read horizontally tothe curve with the highest obtainable gear then down to maximum speed. Usable rimpullwill depend upon traction available and weight on drive wheels.

    50

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

  • 26

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    51

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DISEO DE LAS VIAS

    52

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    ANCHO

    Carg

    a

    w

    ZZ

    UU

    C

    W=2(U+F +F +Z)+CA B C=Z(U+F +F )/2A B

    FAFA

    FB FBFB

    One-Halfveniclewioth

    Lone 1

    Lone 2

    6 6 6 6 612 12 12 1224

    4260

    70

    Lone 3 Lone 4

  • 27

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    53

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DISEO DE VIAS: ANCHO, CORONA Y PENDIENTE

    TRANSVERSAL

    54

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    PENDIENTE TRANSVERSAL

    Siempre esnecesario.

    Es funcin de Inclinacin de la

    va. Condiciones

    climticas dominantes.

    ..

  • 28

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    55

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    ANCHO DE LA VIA

    Definir el ancho mnimo de la va para el camin930 de Komatsu (el tramo recto y plano), tal comoel diseo de la superficie de esta va.

    56

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

  • 29

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    57

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    PERALTE

    Definir el peralte recomendado para una curva conradio de 100 m, si la velocodad de camin viajandopor ella es 15 km/h.

    58

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DISEO DE CURVAS:RADIO VS. VELOCIDAD

    De CAT

  • 30

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    59

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    BASE DE LA VIA

    Definir el diseo de la base de la va para el camin777D, asumiendo que la CBR de la subbase es 5%.Materiales disponibles tienen CBR 20% (@ $ 2/m3) yCBR 50 (@ $ 3/m3).

    60

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    PRESION DE CONTACTO DEL CAMINO

    SURFACE

    40,000 lbs

    lFTlFT

    40FTCBR= 4 (SILTY CLAY)

    (SAND & GRAVEL)CBR = 25

    CBR = 80

    CBR = 80

    2

    2

    45

    3222

    55

  • 31

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    61

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    CALIFORNIA BEARING RATIO (CBR)10

    10

    20

    30

    40

    50

    60

    70

    3 4 5 6 7 8 9 10 15 20 25 30 40 50 60 70 80 100

    4000

    1000

    12000

    25000

    40000

    7000

    0

    1000

    0012

    0000

    WHEEL LOADIN POUNOS

    SUBB

    ASE

    THIC

    KNES

    S in

    ches

    VEHI

    CLES

    100,

    000

    to 40

    0,00

    0 tb

    VEHI

    CLES

    < 40

    0,00

    0 tb

    VEHI

    CLES

    < 10

    0,00

    0 tb

    SILTY CLAYSMEDIUM

    PLASTICITY

    SANDS FAIRLY CLEAN

    GRAVEL WITH CLAY,POORLY GRADED

    GOOD GRAVEL,WELL - GRADED

    CROSMEDROCK

    HIGHLYPLASTIC

    CLAYRANGES OF BEARINGRATIOS FOR TYPICAL

    SOILS AND UNTREATEDBASE MATERIALS -COMPACTED AND

    SOAKED SPECIMENS

    SANDYCLAY,LOW

    PLASTICITY

    SAND - CLAYMIXTURES,

    POORLYGRADED

    SAND - CLAYMIXTURES,

    WELL - GRADEDROUND TO ANGULAR

    62

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    BASE DE LA VIA

    Definir el diseo de la base de la va para el camin777D, asumiendo que la CBR de la subbase es 5%.Materiales disponibles tienen CBR 20% (@ $2/m3)y CBR 50 (@ $3/m3).

  • 32

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    63

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    64

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    10

    10

    20

    30

    40

    50

    60

    70

    3 4 5 6 7 8 9 10 15 20 25 30 40 50 60 70 80 100

    4000

    1000

    12000

    25000

    40000

    7000

    0

    1000

    0012

    0000

    WHEEL LOADIN POUNOS

    SUBB

    ASE

    THIC

    KNES

    S in

    ches

    VEHI

    CLES

    100,

    000

    to 40

    0,00

    0 tb

    VEHI

    CLES

    < 40

    0,00

    0 tb

    VEHI

    CLES

    < 10

    0,00

    0 tb

    SILTY CLAYSMEDIUM

    PLASTICITY

    SANDS FAIRLY CLEAN

    GRAVEL WITH CLAY,POORLY GRADED

    GOOD GRAVEL,WELL - GRADED

    CROSMEDROCK

    HIGHLYPLASTIC

    CLAYRANGES OF BEARINGRATIOS FOR TYPICAL

    SOILS AND UNTREATEDBASE MATERIALS -COMPACTED AND

    SOAKED SPECIMENS

    SANDYCLAY,LOW

    PLASTICITY

    SAND - CLAYMIXTURES,

    POORLYGRADED

    SAND - CLAYMIXTURES,

    WELL - GRADEDROUND TO ANGULAR

    CALIFORNIA BEARING RATIO (CBR)

  • 33

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    65

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DISPONIBILIDAD, USO DE DISPONIBILIDAD, ETC.

    Asumiendo que ests abriendo una mina nueva conequipos modernos, define las tareas para lo siguiente: Disponibilidad mecnica Disponibilidad fsica Uso de disponibilidad Horas de trabajo (camiones) por ao

    66

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DISPONIBILIDAD MECANICA (MA)

    Cuntas reparaciones son necesarias por hora deoperacin?

    Definida una razn entre horas trabajadas y la suma dehoras trabajadas y horas de reparacin.

    MA = W / (W + R) Medidas

    Conveniencia del equipo para la tarea Eficiencia del mantenimiento

    Discrepancias en definicin

  • 34

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    67

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DEFINICION DE USO DE DISPONIBILIDAD(UTILIZACION)

    DefinicinUdeD = W / ( W + S)

    Mide la eficiencia del uso del equipo. Hay diferentes definiciones posibles.

    Clasificacin de varias componentes del tiempo Considerar atrasos operativos, relocalizaciones de

    equipos, etc.

    68

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    DISPONIBILIDAD, USO DE DISPONIBILIDAD, ETC.

    Asumiendo que ests abriendo una mina nueva conequipos modernos, define las tareas para lo siguiente: Disponibilidad mecnica Disponibilidad fsica Uso de disponibilidad Horas de trabajo (camiones) por ao

  • 35

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    69

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    Note las diferencias en la terminologa.

    70

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    EJEMPLO: CAJAS ESTANDAR DE CAT 793

  • 36

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    71

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    72

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    1 2 3 4Selection

    ofbody

    Workapplication Specific

    gravity ofmaterial

    Conditionsof runway

    Conditionsof runway

    Travelspeed

    Kinds ofmaterial

    DownhillFlatness of runwayLoading

    machines

    Sizeof rocks

    Weightof rocks

    Loadingmachines

    Selectionof body

    Selectionof canopyspill guard

    Selectionof

    tailgate

    SELECCION DEL DISEO DE LA TOLVA(KOMATSU)

  • 37

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    73

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    QUE LIMITA EL TAMAO DEL CAMION?

    Disponibilidad de ruedas Los nuevos diseos (bajo perfil) hicieron posible

    camiones de 320 a 360 ton. Recordar: Presenta solo 2 ejes.

    74

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    RADIO Y VELOCIDAD DE UN CAMION

    .

  • 38

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    75

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

    PRESION DE CONTACTO DEL CAMION

    SURFACE

    40,000 lbs

    lFTlFT

    40FTCBR= 4 (SILTY CLAY)

    (SAND & GRAVEL)CBR = 25

    CBR = 80

    CBR = 80

    2

    2

    45

    3222

    55

    76

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade

  • 39

    INTERCADECONSULTANCY & TRAINING

    www.intercade.org

    77

    Ph.D. Tadeus(z) S. Golosinski, P.Eng. - [email protected] - Consultor Intercade