Pranahita – Chevella ProjectPHASE - II

Page 2: +175.00 20 KM 40 KM Pranahita – Chevella Project PHASE - II.

PRANAHITHA IS A TRIBUTARY TO RIVER GODAVARI

Yield from Pranahitha : 190 TMC

Lift height : 65 Mts. (from +110 M to +175M)

Length of the pipe line : 20 Km

Gravity canal : 40 Km

Total length from Pranahita lift point to : 60 Km Yellampally

Utilisation : 160 TMC

Ayacut : 12 Lakhs Acres

Districts Benefited : Adilabad, Karimnagar,

Medak, Nizamabad, Nalgonda, and RR Districts.

Government issued order in G. O. Rt. No. 623, Dt 15-7-2005 for taking up the investigation and preparation of DPR for lifting of 160 TMC of water from Pranahitha to irrigate 12.00Lakh Acres

PRANAHITA – CHEVELLA PROJECT

Page 3: +175.00 20 KM 40 KM Pranahita – Chevella Project PHASE - II.

Pranahita – Chevella Project

Name of Work: Preparation of DPR for diverting 160 TMC of water from

Pranahitha river to Sripada Sagar Project and identify additional Ayacut

of 12.00 lakhs Acres in Adilabad, Karimnagar, Nizamabad, Medak,

Nalgonda and Ranga Reddy Districts including drinking water for enroute

villages and industrial needs of Hyderabad.

PRANAHITA – CHEVELLA PROJECT

Tenders invited.

4 firms participated.

Bids opened on 18-8-2005.

Bids awarded to M/s WAPCOs