17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC, SENEGAL)

Transcript of 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER...

Page 1: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

17th UPDEA CONGRESS

IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC, SENEGAL)

Page 2: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

INTRODUCTIONIn order to anchor the

planning tool in the daily management of the power company, with an approach open to the great ideas developed in the "Smart Grid” roadmap.

This permits to improve infrastructure management and to better the performance of African power companies.

Page 3: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

GENERAL OBJECTIVEWith the aim of having an

actual hold on physical flows on infrastructures expressed in electrical and monetary unit.

For real-time operational planning in the short and medium term.

Resulting in a continuous improvement in management through the direct and immediate means to justify the impact of new investments.

Page 4: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

SPECIFIC OBJECTIVES: CUSTOMERS Modeling energy demand by drawing attention to the

different uses and those who are willing to satisfy a request for deletion.

Determine the billing estimate in the year following this request, with easy interpretation by the client to sensitize and interest him/her in the policy of response to deletion request.

Therefore, redefine the sample form of subscription application for the electric service, to be designed with easiness of transmission by electronic mail (see sample).

Page 5: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

SPECIFIC OBJECTIVES: MV/LV SUBSTATIONS

Connect customers to the grid by geo-referencing the point of connection to the power grid.

Check the cable section system and consider reinforcements where necessary (sizing).

Determine the technical and commercial performance of each distribution substation.

Plan the network’s development situation for year N+x with a predefined load growth rate and a in planning criteria variation roadmap.

.

Page 6: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

SPECIFIC OBJECTIVES: DISTRIBUTION NETWORK Determine investment volume and,

depending on predefined funding conditions, draw up the financial depreciation table,

Determine the characteristic values of its management and the profitability of the investment and its operation, by means of a rational allocation of predefined expenses: operation, personnel and taxes etc. (Profitability).

Page 7: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

MOTIVATIONSIn Senelec’s 2008 management, a one (1) per cent improvement in the gross global performance was recorded; this corresponds, at the same year’s average price, to an income of FCFA 2,688,421,120.

Page 8: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

CONTEXT

The concept of a smart meter capable of providing energy billing by the hour and so allow consumers to choose the best rate, but also to modulate consumption hours, thus enabling a better use of the power grid and its sources.

Page 9: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

CONTEXT Deregulation has not altered

the technical foundation of power grid management; in particular, it does not significantly alter the physical flows of electricity in interconnected grids, which remain determined by the geographical location of the generation facilities and consumption areas, and by Kirchhoff's laws. (Flow Diagram)

Page 10: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

SOFTWARE PLATEFORM (Architecture and data)

GIS: Geographical Information System PIS: Production Information System TNIS: Transmission Network Information System DNIS: Distribution Network Information System CIS: Commercial Information System SREG: System for the Regulation of the Power Sector by the Regulatory

Commission SICF: Dealer’s Accounting and Financial Information System

Page 11: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

CONCLUSIONBlueprint PlanningGeneration/Transmission focus on the

medium term (5 years), imitating the most developed power markets like the New York Independent System Operator (NYISO), creating competition among all energy sources (oil, gas, coal, etc..) with ultimately potential interconnection patterns at the most competitive KW capacity cost.

Page 12: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

CONCLUSIONIn order to curb the recurring power generation

deficits and to open the energy market, it is advisable to mention in the PIS and TNIS, the estimated and variable power generation and transmission capacity price from year n to year n+5, corresponding to:

Power generation offer in periods of low load (December-May;

additional generation offer for the period of high load (June-November);

the specific offer of generation of rapid units to get through peaks.

Page 13: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

CONCLUSION

However, taking into account implementation delays, the prices displayed in year N+3 should be related to duly signed contracts for the construction of new works.

Page 14: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

CONCLUSION The response to the deletion request, self

power generation and storage should be a structured and regulated market, accessible to all sector players, allowing to smooth the demand curve at peak time but also to curb delays in new works commissioning and contingency cases.

In this perspective, the regulatory commission must display pricing grid forecasts over the next 3 years to assess the profitability of players’ investment projects.

Page 15: 17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,

November 2011

Thank you for your attention