OVERLAY WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
TOME REQUIRED FOR RADIOGRAPHY TEST
C/SEAM OR L/SEAM OR T-FRAME (LS/CS/TF)? LSLG OF SHELL/NOZZLE= 3000 TIME REQUIRED FOR RT= 864 MIN
LOWER THK INCLUDING RAINFORCEMENT 50 14.4 HRSI 0.60 DAYSS
LG OF SHELL/NOZZLE= 3000 THK= 50SPOT LENGTH= 300NO. OF SPOT= 10
TIME CALCUCATIONIRIDIUM COBALT
SPOT 86.4 23.8SPOT FOR FILLET IN T-FRAMES 691.2 113.0PEMOROMIC 2592.0 458.2
RADIOGRAPHY BY IRIDIUM/COBALT(I/C)?SPOT RT OR PENOROMIC RT (S/P)?
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
SINGLE 'V' LS PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG1). SMAW 4 2.00
52THK= 54
2). SAW (C/S) 30 0.27q= 45 (L/S) 18 0.44
6 1.334). GTAW 1.6 5.00
R.F.= 2 LG OF LONG SEAM= 58000 5). TWIN HD. (C/S 24 0.33MATERIAL (SS/STEEL)= ss 14.4 0.56
R.G.= 3 ** WITH 2 OPERATORSDENSITY= 0.000008
1). 1G 12). 2G 1.63). 3G 1.3
ALL DIMENSIONS ARE IN MM
CROSS SEC. AREA TOTAL WELD KGYES 1.15
O/S WELDING= 1420.3 659.0 NO 1C/B WELDING= 298.2 138.4TOTAL WELDING= 1718.5 797.4 CHIP BACK DEPTH(MM)
THK <= 30 6THK > 30 12
LONG SEAMPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 2 0.444 1 1.0 N 1 3514.7 58.6OUT SIDE BALANCE 80% 1 2 1 1.0 N 1 63264.4 1054.4
CHIP BACK WELDING 100% 1 2 1 1.0 N 1 16603.5 276.7TOTAL = 83382.6 1389.7
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=
3).FCAW (1.2 Æ)
SAW ** (L/S)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
4828.8
0.661.11
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
0.661.11
LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
DOUBLE 'V' ls PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG
q= 45 1). SMAW 4 2.00
36.0
THK= 54
2). SAW (C/S) 30 0.27 (L/S) 18 0.44
6 1.334). GTAW 1.6 5.00
R.F.= 3 LG OF LONG SEAM= 1364 5). TWIN HD. (C/S 24 0.33
15.0MATERIAL (SS/STEEL)= steel 14.4 0.56
** WITH 2 OPERATORSÆ= 60 DENSITY= 0.00000785
R.G.= 2 1). 1G 1ALL DIMENSIONS ARE IN MM 2). 2G 1.6
3). 3G 1.3
CROSS SEC. AREA TOTAL WELD KG
YES 1.15O/S WELDING= 710.3 7.6 NO 1C/B WELDING= 514.4 5.5TOTAL WELDING= 1224.7 13.1 CHIP BACK DEPTH(MM)
THK <= 30 6THK > 30 12
LONG SEAMPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 12% 1 2 1 1.0 Y 1.15 120.7 2.0OUT SIDE BALANCE 88% 2 0.444 1 1.0 Y 1 178.5 3.0
CHIP BACK WELDING 100% 2 0.444 1 1.0 Y 1 146.9 2.4TOTAL = 446.1 7.4
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=
3).FCAW (1.2 Æ)
SAW ** (L/S)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
4828.8
0.661.11
LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
0.661.11
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
BACKING STRIP cs PARAMETERS SETTINGPROCESS KG/SHIFT
q= 10 1). SMAW 4
THK= 8
2). SAW (C/S) 30 (L/S) 18
65). TWIN HD. (C/S) 24
I/D OF SHELL 5486 14.4R.G.= STEEL ** WITH 2 OPERATORS
10
DENSITY= 0.00000785
1). 1G 12). 2G 1.63). 3G 1.3
ALL DIMENSIONS ARE IN MM
CROSS SEC. AREA TOTAL WELD KGYES 1.15
O/S WELDING= 119.8 16.2 NO 1
TOTAL WELDING= 119.8 16.2
CIRC SEAMPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUT SIDE BALANCE 100% 2 0.267 2 1.6 Y 1 0.0 0.0
TOTAL = 0.0 0.0
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=
3).FCAW (1.2 Æ)
SAW ** (L/S)MATERIAL (SS/STEEL)=
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
4828.8
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
PARAMETERS SETTINGHRS/KG
2.000.270.441.33
0.330.56
1.3
1.151
MULTIPLICATION FACTOR
MULTIPLICATION FACTOR
4828.8
0.661.11
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
J GROOVE CS PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG
Æ= 10
59.0
THK= 80
1). SMAW 4 2.002). SAW (C/S) 30 0.27 (L/S) 18 0.44
3). FCAW 6 1.334). GTAW 1.6 5.00
I/D OF SHELL 379 5). TWIN HD. (C/S) 24 0.33R= 12
11.0MATERIAL (SS/STEEL)= STEEL 14.4 0.56
** WITH 2 OPERATORSR.F.= 10 DENSITY= 0.00000785
R.G.= 2 1). 1G 1ALL DIMENSIONS ARE IN MM 2). 2G 1.6
3). 3G 1.3
CROSS SEC. AREA TOTAL WELD KGYES 1.15
O/S WELDING= 2186.6 24.8 NO 1C/B WELDING= 486.7 5.5TOTAL WELDING= 2673.3 30.3 CHIP BACK DEPTH(MM)
THK <= 30 6THK > 30 12
CIRC SEAMPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2 1 1.0 Y 1.15 683.1 11.4OUT SIDE BALANCE 80% 1 2 1 1.0 Y 1.15 2732.5 45.5
CHIP BACK WELDING 100% 1 2 1 1.0 Y 1.15 760.3 12.7TOTAL = 4175.9 69.6
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=
SAW ** (L/S)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
4828.8
0.661.11
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
HRS/KG
0.66
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
COMPOUND 'V' CS PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG
Æ= 10
36
THK= 50
1). SMAW 4 2.002). SAW (C/S) 30 0.27 (L/S) 18 0.44
6 1.33q= 45 4). GTAW 1.6 5.00
12I/D OF SHELL= 2600 5). TWIN HD. (C/S) 24 0.33
MATERIAL (SS/STEEL)= STEEL 14.4 0.56** WITH 2 OPERATORS
R.F.= 2 DENSITY= 0.00000785
R.G.= 3 1). 1G 1ALL DIMENSIONS ARE IN MM 2). 2G 1.6
3). 3G 1.3
CROSS SEC. AREA TOTAL WELD KGYES 1.15
O/S WELDING= 738.6 48.3 NO 1C/B WELDING= 298.2 19.5TOTAL WELDING= 1036.8 67.8 CHIP BACK DEPTH(MM)
THK <= 30 6THK > 30 12
CIRC SEAMPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2 1 1.0 Y 1.15 1332.3 22.2OUT SIDE BALANCE 80% 2 0.267 1 1.0 Y 1 617.9 10.3
CHIP BACK WELDING 100% 2 0.267 1 1.0 Y 1 311.8 5.2TOTAL = 2262.0 37.7
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=
3).FCAW (1.2 Æ)
SAW ** (L/S)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
4828.8
0.661.11
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
HRS/KG
0.66
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGPROCESS KG/SHIFT
CFW= 10 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2
INC. ANG=45 2). SAW 14.4
DENSITY= 7.85E-06 6.0
4). GTAW 1.3
NOZZLE O/D= OFF SET=
THK= 26
60 0
R.F.= 2 1). 1G 1
SH
EL
L I
/D=
43
00
2). 2G 1.6
R.G= 3). 3G 1.3
4 NOZ O/D60
YES 1.15
ELLIPSE DIMENSION WELD KG NO 1MAJOR AXIS= 64.0 ON SHELLON D/ENDMINOR AXIS= 64 O/S WELDING= 338.00 0.53 0.53 CHIP BACK DEPTH(MM)LG. OF WELDING= 201.066 C/B WELDING= 56.55 0.09 0.09 THK <= 30
TOTAL WELDING= 0.62 0.62 THK > 30
ON SHELLPROCESS POSITION HEATING
CODE CODE (Y/N) RUN TIMEOUTSIDE ROOT RUN 20% 1 2.5 1 1.0 Y 1.15 (min) (Hrs)OUT SIDE BALANCE 80% 1 2.5 1 1.0 Y 1.15 18.4 0.3
CHIP BACK WELDING 100% 1 2.5 1 1.0 Y 1.15 73.6 1.215.4 0.3
TOTAL = 107.4 1.8
3). FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
WEIGHT CALCULATION
CROSS SEC. AREA
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
PARAMETERS SETTINGHRS/KG
2.50
0.56
1.33
6.25
1
1.6
1.3
1.15
1
CHIP BACK DEPTH(MM)6
12
MULTIPLICATION FACTOR
MULTIPLICATION FACTOR
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
BACKING STRIP NOZZLE ON SHELL/DEND) (D/S) ? d PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG
MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50
CFW= 9 2). SAW 14.4 0.56
INC. ANG= 15 DENSITY= 0.00000785 6.0 1.33
NOZZLE O/D= OFF SET=
THK= 50
300 1100
1). 1G 1
SH
ELL
I/D
=
6800
2). 2G 1.6
R.G= 3). 3G 1.3
10 NOZ O/D300
YES 1.15
ELLIPSE DIMENSIO o/d I/d NO 1MAJOR AXIS= 353.4 303.4 WELD KGMINOR AXIS= 353.4 303.377 ON SHELL ON D/END CHIP BACK DEPTH(MM)LG. OF WELDING= 1110.17 O/S WELDING= 875.44 7.63 7.63 THK <= 30 6
THK > 30 12TOTAL WELDING= 7.63 7.63
ON D/ENDPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUT SIDE BALANCE 100% 1 2.5 1 1.0 Y 1.15 1316.0 21.9
TOTAL = 1316.0 21.9
BACKING STRIPP DIMENSIONOUTER MAJOR AXIS 358.4 O/D= 358.4OUTER MINOR AXIS 340.0 I/D= 275.4WIDTH= 32.3
3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
WEIGHT CALCULATION
CROSS SEC. AREA
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
DOUBLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG
CFW= 9 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50INC. ANG= 45 2). SAW 14.4 0.56
DENSITY= 0.00000785 6.0 1.334). GTAW 1.3 6.25
NOZZLE O/D= OFF SET=
THK= 65
44 194 0
R.F.= 2
191). 1G 12). 2G 1.6
SH
ELL
I/D
=
3020
3). 3G 1.3R.G= NOZ O/D
3 194
INC. ANG= 35 YES 1.15ELLIPSE DIMENSION NO 1
CROSS SEC. AREAWELD KG
MAJOR AXIS= 197.1 ON SHELL ON D/END CHIP BACK DEPTH(MM)MINOR AXIS= 197 O/S WELDING= 1146.50 5.57 5.57 THK <= 30 6LG. OF WELDING= 619.1137 C/B WELDING= 336.45 1.64 1.63 THK > 30 12
TOTAL WELDING= 7.21 7.20
ON SHELLPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.50 1 1.0 Y 1.15 192.2 3.2OUT SIDE BALANCE 80% 1 2.5 1 1.0 Y 1 668.6 11.1
CHIP BACK WELDING 100% 1 2.5 1 1.0 Y 1 245.3 4.1TOTAL = 1106.2 18.4
3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
WEIGHT CALCULATION
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
'J' GROOVE NOZZLE ON SHELL/DEND) (D/S) ? s PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG
MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.502). SAW 14.4 0.56
R.G= NOZZLE LIP O/D= DENSITY= 0.00000785 6.0 1.333 369 4). GTAW 1.3 6.25
THK= 80
R.F.= 10 OFF SET=
0R= 12
1). 1G 1
SH
ELL
I/D
=
4644
2). 2G 1.63). 3G 1.3
INC. ANG.= 5 NOZ O/D369
INC. ANG.= 5YES 1.15
ELLIPSE DIMENSION NO 1
CROSS SEC. AREA WELD KGMAJOR AXIS= 372.4 ON SHELL ON D/END CHIP BACK DEPTH(MM)MINOR AXIS= 372 I/S WELDING= 1456.86 13.37 13.37 THK <= 30 6LG. OF WELDING= 1169.3 C/B WELDING= 414.69 3.81 3.80 THK > 30 12
TOTAL WELDING= 17.18 17.17
ON SHELLPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.5 1 1.0 Y 1.15 461.4 7.7OUT SIDE BALANCE 80% 1 2.5 1 1.0 Y 1.15 1845.4 30.8
CHIP BACK WELDING 100% 1 2.5 1 1.0 Y 1.15 656.6 10.9TOTAL = 2963.4 49.4
3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
WEIGHT CALCULATION
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
R.F. PAD +SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG
INC. ANG= 35 5 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50DENSITY= 0.00000785 2). SAW 14.4 0.56
INC. ANG= 5 6.0 1.33OFF SET= 4). GTAW 1.3 6.25
0THK= 16
R.F.PAD 5MULTIPLICATION FACTOR
THK= 20
NOZZLE O/D= 1). 1G 1602 2). 2G 1.6
NOZ O/D 3). 3G 1.3602
R.F.= 2 FILLET SIZE=30MULTIPLICATION FACTOR
SH
ELL
I/D
=
4300
R.G= YES 1.153 NO 1
CROSS SEC. AREAWELD KG
ON SHELL ON D/END CHIP BACK DEPTH(MM)ELLIPSE DIMENSION O/S WELDING= 554.79 8.29 8.28 THK <= 30 6MAJOR AXIS= 607.0 C/B WELDING= 56.55 0.85 0.84 THK > 30 12MINOR AXIS= 605 R.F.PAD WELDING= 450.00 22.42 22.42LG. OF WELDING= 1903.83 TOTAL WELDING= 31.55 31.54
ON SHELLPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.5 1 1.0 N 1 248.7 4.1OUT SIDE BALANCE 80% 1 2.5 1 1.0 N 1 995.0 16.6
CHIP BACK WELDING 100% 1 2.5 1 1.0 N 1 126.8 2.1R.F.PAD WELDING 100% 1 2.5 1 1.0 N 1 3362.6 56.0
TOTAL = 1370.5 22.8
3).FCAW (1.2 Æ)
POSITION OF WELDING
PREHEATING REQUIRED?
WEIGHT CALCULATION
PADO/D=2000
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
R.F. PAD +SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? D PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG
INC. ANG= 45 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.5010 2). SAW 14.4 0.56
INC. ANG= 5 DENSITY= 0.00000785 6.0 1.33OFF SET=
330THK= 90
R.F.PAD 10MULTIPLICATION FACTOR
THK= 90
NOZZLE O/D= 1). 1G 1345 2). 2G 1.6
NOZ O/D 3). 3G 1.3345
R.F.= 2 FILLET SIZE=40MULTIPLICATION FACTOR
SH
ELL
I/D
=
2450
R.G= YES 1.153 NO 1
CROSS SEC. AREAWELD KG
ON SHELL ON D/END CHIP BACK DEPTH(MM)ELLIPSE DIMENSION o/d I/d O/S WELDING= 13984.83 131.46 131.46 THK <= 30 6MAJOR AXIS= 381.2 331.2 R.F.PAD WELDING= 800.00 20.26 20.26 THK > 30 12MINOR AXIS= 381.2 331.1593 TOTAL WELDING= 151.71 151.71LG. OF WELDING= 1197.447
ON D/ENDPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUT SIDE BALANCE 100% 2 0.56 1 1.0 Y 1 4381.9 73.0
R.F.PAD WELDING 100% 1 2.50 3 1.3 Y 1.15 4542.3 75.7TOTAL = 8924.1 148.7
BACKING STRIPP DIMENSIONOUTER MAJOR AXIS= 386.2OUTER MINOR AXIS= 371.0
WIDTH= 25.2
3).FCAW (1.2 Æ)
POSITION OF WELDING
PREHEATING REQUIRED?
WEIGHT CALCULATION
PADO/D=1000
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
R.F. PAD +SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG
MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50INC. ANG= 35 5 2). SAW 14.4 0.56
DENSITY= 0.00000785 6.0 1.33OFF SET= 4). GTAW 1.3 6.25
THK= 16 545R.F.PAD 5
R.F.= 2 NOZZLE O/D=
THK= 17
407 1). 1G 12). 2G 1.6
NOZ O/D 3). 3G 1.3407
SH
ELL
I/D
=
4300
FILLET SIZE=30
R.G=
3 YES 1.15INC. ANG= NO 1
35CROSS SEC. AREA
WELD KGELLIPSE DIMENSION ON SHELL ON D/END CHIP BACK DEPTH(MM)MAJOR AXIS= 424.7 I/S WELDING= 129.77 0.42 1.36 THK <= 30 6MINOR AXIS= 410 C/B(O/S) WELDING= 314.68 1.01 3.30 THK > 30 12LG. OF WELDING= 1311.309 R.F. PAD WELDING 450.00 22.42 22.42
TOTAL WELDING= 23.85 27.07
ON SHELLPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.5 1 1.0 N 1 12.5 0.2OUT SIDE BALANCE 80% 1 2.5 1 1.0 N 1 50.1 0.8
CHIP BACK WELDING 100% 1 2.5 1 1.0 N 1 151.9 2.5R.F.PAD WELDING 100% 1 2.5 1 1.0 N 1 3362.6 56.0
TOTAL = 3577.2 59.6
3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
WEIGHT CALCULATION
PADO/D=2000
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
R.F.PAD + DOUBLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? D PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG
INC. ANG= 60 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50INC. ANG= 10 10 2). SAW 14.4 0.56
DENSITY= 0.00000785 6.0 1.334). GTAW 1.3 6.25
THK= 30 OFF SET=
R.F.PAD 10 330
NOZZLE O/D=
THK= 60
40 345 1). 1G 12). 2G 1.6
R.F.= 2 3). 3G 1.3
18 NOZ O/D
345
SH
ELL
I/D
=
2450
R.G= FILLET SIZE=30 YES 1.153 NO 1
INC. ANG=CROSS SEC. AREA
WELD KG45 ON SHELL ON D/END CHIP BACK DEPTH(MM)
ELLIPSE DIMENSION O/S WELDING= 4099.95 35.95 35.19 THK <= 30 6MAJOR AXIS= 363.0 C/B WELDING= 450.00 3.95 3.86 THK > 30 12MINOR AXIS= 348 R.F. PAD WELDING 450.00 22.42 22.42LG. OF WELDING= 1117.086 TOTAL WELDING= 39.90 39.05
ON D/ENDPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 2 0.56 1 1.0 Y 1 234.6 3.9OUT SIDE BALANCE 80% 1 2.5 2 1.6 Y 1.15 7769.2 129.5
CHIP BACK WELDING 100% 1 2.5 2 1.6 Y 1.15 1065.9 17.8R.F.PAD WELDING 100% 1 2.5 1 1.0 Y 1.15 3867.0 64.4
TOTAL = 12936.7 215.6
3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
WEIGHT CALCULATION
PADO/D=2000
NOZZLE WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
SET ON NOZZLE IN SHELL/DEND) (D/S) ? S PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG
50 35 NOZ I/D MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.502). SAW 14.4 0.56
19 DENSITY= 0.00000785 6.0 1.33` 4). GTAW 1.3 6.25
INC. ANG.= 15 OFFSET=R.F.= 1 0
CFW= 9INC. ANG.= 50
R.G.= 3 1). 1G 1
THK= 702). 2G 1.6
NOZ I/D 3). 3G 1.3
3400
203NOZ O/D
273
YES 1.15ELLIPSE DIMENSION
WEIGHT CALCULATIONCROSS SEC. AREA WELD KG NO 1
ON SHELL ON D/ENDMAJOR AXIS= 238.2 O/S WELDING= 716.09 4.20 4.20MINOR AXIS= 238
LG. OF WELDING= 748.0 TOTAL WELDING= 4.20 4.20
ON SHELL PROCESS POSITION HEATING RUN TIMECODE CODE (Y/N) (min) (Hrs)
OUTSIDE ROOT RUN 20% 4 6.25 1 1.0 Y 1.15 362.6 6.0OUT SIDE BALANCE 80% 1 2.5 1 1.0 y 1.15 580.2 9.7
TOTAL = 942.9 15.7
3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
SH
EL
L
I/D
=
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
FILLET WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
PARAMETERS SETTINGM PROCESS KG/SHIFT HRS/KG
1). SMAW 3.2 2.50MANUAL LENGTH OF WELDING(MM)= 33615 2). SAW 14.4 0.56
6.0 1.33MATERIAL (SS/STEEL)= STEEL
6DENSITY= 0.00000785
FOR CALCULATING WELD LENGTHRADIUS OF WELDING(MM)= 0
INCLUDED ANGLE OF WELDING(DEG)= 06 CALCULATED LENGTH OF WELDING(MM)= 0.000 1). 1F/2F 1
2) 3F 1.1
LENGTH OF WELDING(MM)= 33615.000
WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGTOTAL WELDING 18.00 4.75 YES 1.15
NO 1
FILLET WELDPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)1 2.50 1 1.0 Y 1 712.5 11.9
712.5 11.9
WELD LG (CALCULATED/MANUAL) (C/M?)
3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
FILLET WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
DOUBLE SIDE FILLET JOINTPARAMETERS SETTING
D PROCESS KG/SHIFT HRS/KG1). SMAW 3.2 2.50
m 2). SAW 14.4 0.566.0 1.33
MANUAL LENGTH OF WELDING(MM)= 1000
13MATERIAL (SS/STEEL)= STEEL
DENSITY= 0.00000785FOR CALCULATING WELD LENGTH
13 RADIUS OF WELDING(MM)= 0 1). 1F/2F 1INCLUDED ANGLE OF WELDING(DEG)= 0 2) 3F 1.1
CALCULATED LENGTH OF WELDING(MM)= 0.000LG OF WELDING= 1000.000
WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGFIRST SIDE WELDING 84.50 0.66SECOND SIDE WELDING 84.50 0.66 YES 1.15
TOTAL WELDING= 169.00 1.33 NO 1
DOUBLE OPERATORPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)FIRST SIDE 100% 1 2.50 1 1.0 Y 1 99.5 1.7
SECOND SIDE SIDE 100% 1 2.50 1 1.0 Y 1 99.5 1.7TOTAL= 99.5 1.7
WELDING BY SINGLE OPERATOR/ DOUBLE OPERATOR(S/D)?
WELD LG (CALCULATED/AMNUAL) (C/M?)3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
FILLET WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
DOUBLE SIDE FILLET JOINTPARAMETERS SETTING
S PROCESS KG/SHIFT HRS/KG1). SMAW 3.2 2.50
6.0 1.33
MATERIAL (SS/STEEL)= STEELSECOND SIDE
20CFW DENSITY= 0.00000785
20CFW 1). 1F/2F 1FIRST SIDE O/D= 400 2) 3F 1.1
WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGFIRST SIDE WELDING 200.00 1.94SECOND SIDE WELDING 200.00 2.01 YES 1.15
TOTAL WELDING= 400.00 3.95 NO 1
SINGLE OPERATORPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)FIRST SIDE 100% 1 2.50 1 1.0 N 1.1 320.1 5.3
SECOND SIDE SIDE 100% 1 2.50 1 1.0 N 1.1 331.0 5.5TOTAL= 651.1 10.9
WELDING BY SINGLE OPERATOR/ DOUBLE OPERATOR(S/D)?
2).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
FILLET WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
DOUBLE SIDE + FULL PENETATION JOINTPARAMETERS SETTING
C PROCESS KG/SHIFT HRS/KG1). SMAW 3.2 2.50
20 C 2). SAW (TWIN HEAD) 14.4 0.56MANUAL LENGTH OF WELDING(MM)= 10000 6.0 1.33
MATERIAL (SS/STEEL)= STEEL 4). GTAW+SMAW 1.3 6.25FOR TIG
1060 DEG DENSITY= 0.00000785
FOR CALCULATING WELD LENGTHRG= 2 RADIUS OF WELDING(MM)= 1000
2 INCLUDED ANGLE OF WELDING(DEG)= 36020 CALCULATED LENGTH OF WELDING(MM)= 6283.185 1). 1F/2F 1
LENGTH OF WELDING(MM)= 6283.185 2) 3F 1.1
CHIP BACK DEPTH(MM)= 6
WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGFIRST SIDE WELDING 137.59 6.79SECOND SIDE WELDING 194.14 9.58 (INCLUDING CHIP BACK) YES 1.15
TOTAL WELDING= 331.73 16.36 NO 1
WITH CHIP BACKPROCESS POSITION HEATING RUN TIME
CODE CODE (Y/N) (min) (Hrs)FIRST SIDE 100% 4 2.63 1 1.0 N 1.1 1175.7 19.6
SCOND SIDE SIDE 100% 4 2.63 1 1.0 N 1.1 1658.9 27.6TOTAL= 2834.7 47.2
PROCESS? (DOT/ WITH CHIP BACK/TIG+SMAW) (D/C/T) ?
WELD LG (CALCULATED/AMNUAL) (C/M?)3).FCAW (1.2 Æ)
POSITION OF WELDING
MULTIPLICATION FACTOR
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
OVERLAY WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
FORGING
GASKET FACE O/LAY BORE O/LAY PARAMETERS SETTINGO/D OF GASKET FACE O/LAY= 229 BORE OF FLANGE AFTER O/LAY= 165 PROCESS KG/SHIFT HRS/KGBORE OF FLANGE AFTER O/L= 165 LENGTH OF FLANGE/FORG= 1234 1). SMAW 4 2.00MEAN DIA OF GASKER GROOVE= 200 THK OF O/LAY= 8 7 1.14DEPTH OF GASKET GROOVE= 10 3). FCAW (MANUAL) 6 1.33WIDTH OF GROOVE AT TOP= 23THK OF O/LAY= 8
GASKET FACE O/LAY= 2.423601 KG BORE O/LAY= 42.9231 KGYES 1.15
BACK FACE O/LAY NO 1O/D OF LIP = 487BORE OF FORG AFTER O/L= 381THK OF O/LAY= 6
BACK FACE O/LAY= 3.46862 KG
TOTAL O/LAY= 48.81532 KG
KG PROCESS HEATING RUN TIME
CODE (Y/N) (min) (Hrs)GASKET FACE OVER LAY 2.4 1 2.00 N 1.00 291 4.8
BORE OVER LAY 42.9 2 1.14 Y 1.15 3385 56.4BACK FACE (PROFILE) OVER LAY 3.5 3 1.33 N 1.00 277 4.6
TOTAL= 3953.1 65.9
2).FCAW (1.2 Æ)(M/C)
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
OVERLAY WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
FLANGE
GASKET FACE O/LAY BORE O/LAY PARAMETERS SETTINGO/D OF GASKET FACE O/LAY= 483 BORE OF FLANGE AFTER O/LAY= 381 PROCESS KG/SHIFT HRS/KGBORE OF FLANGE AFTER O/L= 381 LENGTH OF FLANGE= 168 1). SMAW 4 2.00DIA OF GASKER GROOVE= 450 THK OF O/LAY= 6 7 1.14DEPTH OF GASKET GROOVE= 0 3). FCAW (MANUAL) 6 1.33WIDTH OF GROOVE AT TOP= 0THK OF O/LAY= 7
GASKET FACE O/LAY= 3.876072 KG BORE O/LAY= 9.804182 KGYES 1.15
TOTAL O/LAY= 13.68025 KG NO 1
KG PROCESS HEATING RUN TIME
CODE (Y/N) (min) (Hrs)GASKET FACE OVER LAY 3.9 1 2.00 N 1.00 465 7.8
BORE OVER LAY 9.8 2 1.14 N 1.00 672 11.2TOTAL= 1137.4 19.0
2).FCAW (1.2 Æ)(M/C)
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
OVERLAY WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
ELBOW
I/D O/LAY PARAMETERS SETTINGBORE OF ELBOW AFTER O/LAY= 448 PROCESS KG/SHIFT HRS/KGRADIUS OF ELBOW 1176 1). SMAW 4 2.00INCLUDED ANGLE OF ELBOW= 90 2). FCAW (MANUAL) 6 1.33THK OF O/LAY= 8
BORE O/LAY= 169.3643 KGYES 1.15NO 1
KG PROCESS HEATING RUN TIME
CODE (Y/N) (min) (Hrs.)BORE OVER LAY 169.4 2 1.33 N 1.00 13549 225.8
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
OVERLAY WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
PIPE
I/D O/LAY PARAMETERS SETTINGBORE OF PIPE AFTER O/LAY= 381 PROCESS KG/SHIFT HRS/KGLENGTH OF PIPE= 463 1). SMAW 4 2.00THK OF O/LAY= 6 7 1.14
3). FCAW (MANUAL) 6 1.33
BORE O/LAY= 27.01986 KG
YES 1.15NO 1
KG PROCESS HEATING RUN TIME
CODE (Y/N) (min) (Hrs.)BORE OVER LAY 27.0 2 1.14 Y 1.15 2131 35.5
2).FCAW (1.2 Æ)(M/C)
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
OVERLAY WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
CIRC. SEAM/ LONG SEAM OVERLAYPARAMETERS SETTING
I/D OF SHELL= 3400 THK= 70 PROCESS KG/SHIFT HRS/KGTHK OF O/LAY= 6 I/S INC. ANG.= 35 1). SMAW 4 2.00CLAD STRIP ANG.= 45 I/S 'V' HEIGHT= 47 7 1.14THK OF CLAD= 5 CLAD STRIPPING= 15 3). FCAW (MANUAL) 6 1.33CALCULATION ROOT GAP= 3WIDTH OF O/LAY= 65 LG OF CEAM= 10697.12R.F. WIDTH= 78AREA OF O/LAY= 364.5095 C/SEAM O/LAY= 30.60874
YES 1.15
THK=70
NO 1
C/SEAM OR L/SEAM (LS/CS)? CS
47q= 355
R.G.=
3 155 O/L THK= Æ= 45
635
I/D OF SHELL= 3400
KG PROCESS HEATING RUN TIME
CODE (Y/N) (min) (Hrs.)CIRC. SEAM OVER LAY 30.6 1 2.00 Y 1.15 4224 70.4
2).FCAW (1.2 Æ)(M/C)
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
SHELL ESSC OVERLAY WELD KG & RUN TIME ESTIMATION
document.xls 04/22/2023
SHELL ESSC OVERLAY PARAMETERS SETTINGI/D OF SHELL BEFORE O/LAY= 4500 PROCESS KG/SHIFT HRS/KGLENGTH OF SHELL= 2250 1) ESSC (60 WD) 44 0.18THK OF O/LAY= 8 2) ESSC (90WD) 66 0.12
3) ESSC (120 WD) 84 0.10
BORE O/LAY= 2032.133 KG
KG PROCESS RUN TIME
CODE (min) (Hrs.)I/D OVER LAY(WITH 2 OPERATOR) 2032.1 1 0.18 44337 739.0