OVERLAY WELD KG & RUN TIME ESTIMATION document.xls 06/14/2022 TOME REQUIRED FOR RADIOGRAPHY TEST C/SEAM OR L/SEAM OR T-FRAME (LS/CS/TF)? LS LG OF SHELL/NOZZLE= 3000 TIME REQUIRED FOR RT= 864 MIN LOWER THK INCLUDING RAINFORCEMENT 50 14.4 HRS I 0.60 DAYS S LG OF SHELL/NOZZLE= 3000 THK= 50 SPOT LENGTH= 300 NO. OF SPOT= 10 TIME CALCUCATION IRIDIUM COBALT SPOT 86.4 23.8 SPOT FOR FILLET IN T-FRAMES 691.2 113.0 PEMOROMIC 2592.0 458.2 RADIOGRAPHY BY IRIDIUM/COBALT(I/C)? SPOT RT OR PENOROMIC RT (S/P)?

description

fdff

Transcript of 164627753 Welding Calculation

Page 1: 164627753 Welding Calculation

OVERLAY WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

TOME REQUIRED FOR RADIOGRAPHY TEST

C/SEAM OR L/SEAM OR T-FRAME (LS/CS/TF)? LSLG OF SHELL/NOZZLE= 3000 TIME REQUIRED FOR RT= 864 MIN

LOWER THK INCLUDING RAINFORCEMENT 50 14.4 HRSI 0.60 DAYSS

LG OF SHELL/NOZZLE= 3000 THK= 50SPOT LENGTH= 300NO. OF SPOT= 10

TIME CALCUCATIONIRIDIUM COBALT

SPOT 86.4 23.8SPOT FOR FILLET IN T-FRAMES 691.2 113.0PEMOROMIC 2592.0 458.2

RADIOGRAPHY BY IRIDIUM/COBALT(I/C)?SPOT RT OR PENOROMIC RT (S/P)?

Page 2: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

SINGLE 'V' LS PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG1). SMAW 4 2.00

52THK= 54

2). SAW (C/S) 30 0.27q= 45 (L/S) 18 0.44

6 1.334). GTAW 1.6 5.00

R.F.= 2 LG OF LONG SEAM= 58000 5). TWIN HD. (C/S 24 0.33MATERIAL (SS/STEEL)= ss 14.4 0.56

R.G.= 3 ** WITH 2 OPERATORSDENSITY= 0.000008

1). 1G 12). 2G 1.63). 3G 1.3

ALL DIMENSIONS ARE IN MM

CROSS SEC. AREA TOTAL WELD KGYES 1.15

O/S WELDING= 1420.3 659.0 NO 1C/B WELDING= 298.2 138.4TOTAL WELDING= 1718.5 797.4 CHIP BACK DEPTH(MM)

THK <= 30 6THK > 30 12

LONG SEAMPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 2 0.444 1 1.0 N 1 3514.7 58.6OUT SIDE BALANCE 80% 1 2 1 1.0 N 1 63264.4 1054.4

CHIP BACK WELDING 100% 1 2 1 1.0 N 1 16603.5 276.7TOTAL = 83382.6 1389.7

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

3).FCAW (1.2 Æ)

SAW ** (L/S)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

4828.8

0.661.11

Page 3: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

0.661.11

Page 4: 164627753 Welding Calculation

LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

DOUBLE 'V' ls PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG

q= 45 1). SMAW 4 2.00

36.0

THK= 54

2). SAW (C/S) 30 0.27 (L/S) 18 0.44

6 1.334). GTAW 1.6 5.00

R.F.= 3 LG OF LONG SEAM= 1364 5). TWIN HD. (C/S 24 0.33

15.0MATERIAL (SS/STEEL)= steel 14.4 0.56

** WITH 2 OPERATORSÆ= 60 DENSITY= 0.00000785

R.G.= 2 1). 1G 1ALL DIMENSIONS ARE IN MM 2). 2G 1.6

3). 3G 1.3

CROSS SEC. AREA TOTAL WELD KG

YES 1.15O/S WELDING= 710.3 7.6 NO 1C/B WELDING= 514.4 5.5TOTAL WELDING= 1224.7 13.1 CHIP BACK DEPTH(MM)

THK <= 30 6THK > 30 12

LONG SEAMPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 12% 1 2 1 1.0 Y 1.15 120.7 2.0OUT SIDE BALANCE 88% 2 0.444 1 1.0 Y 1 178.5 3.0

CHIP BACK WELDING 100% 2 0.444 1 1.0 Y 1 146.9 2.4TOTAL = 446.1 7.4

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

3).FCAW (1.2 Æ)

SAW ** (L/S)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

4828.8

0.661.11

Page 5: 164627753 Welding Calculation

LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

0.661.11

Page 6: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

BACKING STRIP cs PARAMETERS SETTINGPROCESS KG/SHIFT

q= 10 1). SMAW 4

THK= 8

2). SAW (C/S) 30 (L/S) 18

65). TWIN HD. (C/S) 24

I/D OF SHELL 5486 14.4R.G.= STEEL ** WITH 2 OPERATORS

10

DENSITY= 0.00000785

1). 1G 12). 2G 1.63). 3G 1.3

ALL DIMENSIONS ARE IN MM

CROSS SEC. AREA TOTAL WELD KGYES 1.15

O/S WELDING= 119.8 16.2 NO 1

TOTAL WELDING= 119.8 16.2

CIRC SEAMPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUT SIDE BALANCE 100% 2 0.267 2 1.6 Y 1 0.0 0.0

TOTAL = 0.0 0.0

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

3).FCAW (1.2 Æ)

SAW ** (L/S)MATERIAL (SS/STEEL)=

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

4828.8

Page 7: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

PARAMETERS SETTINGHRS/KG

2.000.270.441.33

0.330.56

1.3

1.151

MULTIPLICATION FACTOR

MULTIPLICATION FACTOR

4828.8

0.661.11

Page 8: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

J GROOVE CS PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG

Æ= 10

59.0

THK= 80

1). SMAW 4 2.002). SAW (C/S) 30 0.27 (L/S) 18 0.44

3). FCAW 6 1.334). GTAW 1.6 5.00

I/D OF SHELL 379 5). TWIN HD. (C/S) 24 0.33R= 12

11.0MATERIAL (SS/STEEL)= STEEL 14.4 0.56

** WITH 2 OPERATORSR.F.= 10 DENSITY= 0.00000785

R.G.= 2 1). 1G 1ALL DIMENSIONS ARE IN MM 2). 2G 1.6

3). 3G 1.3

CROSS SEC. AREA TOTAL WELD KGYES 1.15

O/S WELDING= 2186.6 24.8 NO 1C/B WELDING= 486.7 5.5TOTAL WELDING= 2673.3 30.3 CHIP BACK DEPTH(MM)

THK <= 30 6THK > 30 12

CIRC SEAMPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2 1 1.0 Y 1.15 683.1 11.4OUT SIDE BALANCE 80% 1 2 1 1.0 Y 1.15 2732.5 45.5

CHIP BACK WELDING 100% 1 2 1 1.0 Y 1.15 760.3 12.7TOTAL = 4175.9 69.6

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

SAW ** (L/S)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

4828.8

0.661.11

Page 9: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

HRS/KG

0.66

Page 10: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

COMPOUND 'V' CS PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG

Æ= 10

36

THK= 50

1). SMAW 4 2.002). SAW (C/S) 30 0.27 (L/S) 18 0.44

6 1.33q= 45 4). GTAW 1.6 5.00

12I/D OF SHELL= 2600 5). TWIN HD. (C/S) 24 0.33

MATERIAL (SS/STEEL)= STEEL 14.4 0.56** WITH 2 OPERATORS

R.F.= 2 DENSITY= 0.00000785

R.G.= 3 1). 1G 1ALL DIMENSIONS ARE IN MM 2). 2G 1.6

3). 3G 1.3

CROSS SEC. AREA TOTAL WELD KGYES 1.15

O/S WELDING= 738.6 48.3 NO 1C/B WELDING= 298.2 19.5TOTAL WELDING= 1036.8 67.8 CHIP BACK DEPTH(MM)

THK <= 30 6THK > 30 12

CIRC SEAMPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2 1 1.0 Y 1.15 1332.3 22.2OUT SIDE BALANCE 80% 2 0.267 1 1.0 Y 1 617.9 10.3

CHIP BACK WELDING 100% 2 0.267 1 1.0 Y 1 311.8 5.2TOTAL = 2262.0 37.7

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

3).FCAW (1.2 Æ)

SAW ** (L/S)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

4828.8

0.661.11

Page 11: 164627753 Welding Calculation

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

HRS/KG

0.66

Page 12: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGPROCESS KG/SHIFT

CFW= 10 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2

INC. ANG=45 2). SAW 14.4

DENSITY= 7.85E-06 6.0

4). GTAW 1.3

NOZZLE O/D= OFF SET=

THK= 26

60 0

R.F.= 2 1). 1G 1

SH

EL

L I

/D=

43

00

2). 2G 1.6

R.G= 3). 3G 1.3

4 NOZ O/D60

YES 1.15

ELLIPSE DIMENSION WELD KG NO 1MAJOR AXIS= 64.0 ON SHELLON D/ENDMINOR AXIS= 64 O/S WELDING= 338.00 0.53 0.53 CHIP BACK DEPTH(MM)LG. OF WELDING= 201.066 C/B WELDING= 56.55 0.09 0.09 THK <= 30

TOTAL WELDING= 0.62 0.62 THK > 30

ON SHELLPROCESS POSITION HEATING

CODE CODE (Y/N) RUN TIMEOUTSIDE ROOT RUN 20% 1 2.5 1 1.0 Y 1.15 (min) (Hrs)OUT SIDE BALANCE 80% 1 2.5 1 1.0 Y 1.15 18.4 0.3

CHIP BACK WELDING 100% 1 2.5 1 1.0 Y 1.15 73.6 1.215.4 0.3

TOTAL = 107.4 1.8

3). FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

WEIGHT CALCULATION

CROSS SEC. AREA

Page 13: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

PARAMETERS SETTINGHRS/KG

2.50

0.56

1.33

6.25

1

1.6

1.3

1.15

1

CHIP BACK DEPTH(MM)6

12

MULTIPLICATION FACTOR

MULTIPLICATION FACTOR

Page 14: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

BACKING STRIP NOZZLE ON SHELL/DEND) (D/S) ? d PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG

MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50

CFW= 9 2). SAW 14.4 0.56

INC. ANG= 15 DENSITY= 0.00000785 6.0 1.33

NOZZLE O/D= OFF SET=

THK= 50

300 1100

1). 1G 1

SH

ELL

I/D

=

6800

2). 2G 1.6

R.G= 3). 3G 1.3

10 NOZ O/D300

YES 1.15

ELLIPSE DIMENSIO o/d I/d NO 1MAJOR AXIS= 353.4 303.4 WELD KGMINOR AXIS= 353.4 303.377 ON SHELL ON D/END CHIP BACK DEPTH(MM)LG. OF WELDING= 1110.17 O/S WELDING= 875.44 7.63 7.63 THK <= 30 6

THK > 30 12TOTAL WELDING= 7.63 7.63

ON D/ENDPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUT SIDE BALANCE 100% 1 2.5 1 1.0 Y 1.15 1316.0 21.9

TOTAL = 1316.0 21.9

BACKING STRIPP DIMENSIONOUTER MAJOR AXIS 358.4 O/D= 358.4OUTER MINOR AXIS 340.0 I/D= 275.4WIDTH= 32.3

3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

WEIGHT CALCULATION

CROSS SEC. AREA

Page 15: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

DOUBLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG

CFW= 9 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50INC. ANG= 45 2). SAW 14.4 0.56

DENSITY= 0.00000785 6.0 1.334). GTAW 1.3 6.25

NOZZLE O/D= OFF SET=

THK= 65

44 194 0

R.F.= 2

191). 1G 12). 2G 1.6

SH

ELL

I/D

=

3020

3). 3G 1.3R.G= NOZ O/D

3 194

INC. ANG= 35 YES 1.15ELLIPSE DIMENSION NO 1

CROSS SEC. AREAWELD KG

MAJOR AXIS= 197.1 ON SHELL ON D/END CHIP BACK DEPTH(MM)MINOR AXIS= 197 O/S WELDING= 1146.50 5.57 5.57 THK <= 30 6LG. OF WELDING= 619.1137 C/B WELDING= 336.45 1.64 1.63 THK > 30 12

TOTAL WELDING= 7.21 7.20

ON SHELLPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.50 1 1.0 Y 1.15 192.2 3.2OUT SIDE BALANCE 80% 1 2.5 1 1.0 Y 1 668.6 11.1

CHIP BACK WELDING 100% 1 2.5 1 1.0 Y 1 245.3 4.1TOTAL = 1106.2 18.4

3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

WEIGHT CALCULATION

Page 16: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

'J' GROOVE NOZZLE ON SHELL/DEND) (D/S) ? s PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG

MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.502). SAW 14.4 0.56

R.G= NOZZLE LIP O/D= DENSITY= 0.00000785 6.0 1.333 369 4). GTAW 1.3 6.25

THK= 80

R.F.= 10 OFF SET=

0R= 12

1). 1G 1

SH

ELL

I/D

=

4644

2). 2G 1.63). 3G 1.3

INC. ANG.= 5 NOZ O/D369

INC. ANG.= 5YES 1.15

ELLIPSE DIMENSION NO 1

CROSS SEC. AREA WELD KGMAJOR AXIS= 372.4 ON SHELL ON D/END CHIP BACK DEPTH(MM)MINOR AXIS= 372 I/S WELDING= 1456.86 13.37 13.37 THK <= 30 6LG. OF WELDING= 1169.3 C/B WELDING= 414.69 3.81 3.80 THK > 30 12

TOTAL WELDING= 17.18 17.17

ON SHELLPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.5 1 1.0 Y 1.15 461.4 7.7OUT SIDE BALANCE 80% 1 2.5 1 1.0 Y 1.15 1845.4 30.8

CHIP BACK WELDING 100% 1 2.5 1 1.0 Y 1.15 656.6 10.9TOTAL = 2963.4 49.4

3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

WEIGHT CALCULATION

Page 17: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

R.F. PAD +SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG

INC. ANG= 35 5 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50DENSITY= 0.00000785 2). SAW 14.4 0.56

INC. ANG= 5 6.0 1.33OFF SET= 4). GTAW 1.3 6.25

0THK= 16

R.F.PAD 5MULTIPLICATION FACTOR

THK= 20

NOZZLE O/D= 1). 1G 1602 2). 2G 1.6

NOZ O/D 3). 3G 1.3602

R.F.= 2 FILLET SIZE=30MULTIPLICATION FACTOR

SH

ELL

I/D

=

4300

R.G= YES 1.153 NO 1

CROSS SEC. AREAWELD KG

ON SHELL ON D/END CHIP BACK DEPTH(MM)ELLIPSE DIMENSION O/S WELDING= 554.79 8.29 8.28 THK <= 30 6MAJOR AXIS= 607.0 C/B WELDING= 56.55 0.85 0.84 THK > 30 12MINOR AXIS= 605 R.F.PAD WELDING= 450.00 22.42 22.42LG. OF WELDING= 1903.83 TOTAL WELDING= 31.55 31.54

ON SHELLPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.5 1 1.0 N 1 248.7 4.1OUT SIDE BALANCE 80% 1 2.5 1 1.0 N 1 995.0 16.6

CHIP BACK WELDING 100% 1 2.5 1 1.0 N 1 126.8 2.1R.F.PAD WELDING 100% 1 2.5 1 1.0 N 1 3362.6 56.0

TOTAL = 1370.5 22.8

3).FCAW (1.2 Æ)

POSITION OF WELDING

PREHEATING REQUIRED?

WEIGHT CALCULATION

PADO/D=2000

Page 18: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

R.F. PAD +SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? D PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG

INC. ANG= 45 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.5010 2). SAW 14.4 0.56

INC. ANG= 5 DENSITY= 0.00000785 6.0 1.33OFF SET=

330THK= 90

R.F.PAD 10MULTIPLICATION FACTOR

THK= 90

NOZZLE O/D= 1). 1G 1345 2). 2G 1.6

NOZ O/D 3). 3G 1.3345

R.F.= 2 FILLET SIZE=40MULTIPLICATION FACTOR

SH

ELL

I/D

=

2450

R.G= YES 1.153 NO 1

CROSS SEC. AREAWELD KG

ON SHELL ON D/END CHIP BACK DEPTH(MM)ELLIPSE DIMENSION o/d I/d O/S WELDING= 13984.83 131.46 131.46 THK <= 30 6MAJOR AXIS= 381.2 331.2 R.F.PAD WELDING= 800.00 20.26 20.26 THK > 30 12MINOR AXIS= 381.2 331.1593 TOTAL WELDING= 151.71 151.71LG. OF WELDING= 1197.447

ON D/ENDPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUT SIDE BALANCE 100% 2 0.56 1 1.0 Y 1 4381.9 73.0

R.F.PAD WELDING 100% 1 2.50 3 1.3 Y 1.15 4542.3 75.7TOTAL = 8924.1 148.7

BACKING STRIPP DIMENSIONOUTER MAJOR AXIS= 386.2OUTER MINOR AXIS= 371.0

WIDTH= 25.2

3).FCAW (1.2 Æ)

POSITION OF WELDING

PREHEATING REQUIRED?

WEIGHT CALCULATION

PADO/D=1000

Page 19: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

R.F. PAD +SINGLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? S PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG

MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50INC. ANG= 35 5 2). SAW 14.4 0.56

DENSITY= 0.00000785 6.0 1.33OFF SET= 4). GTAW 1.3 6.25

THK= 16 545R.F.PAD 5

R.F.= 2 NOZZLE O/D=

THK= 17

407 1). 1G 12). 2G 1.6

NOZ O/D 3). 3G 1.3407

SH

ELL

I/D

=

4300

FILLET SIZE=30

R.G=

3 YES 1.15INC. ANG= NO 1

35CROSS SEC. AREA

WELD KGELLIPSE DIMENSION ON SHELL ON D/END CHIP BACK DEPTH(MM)MAJOR AXIS= 424.7 I/S WELDING= 129.77 0.42 1.36 THK <= 30 6MINOR AXIS= 410 C/B(O/S) WELDING= 314.68 1.01 3.30 THK > 30 12LG. OF WELDING= 1311.309 R.F. PAD WELDING 450.00 22.42 22.42

TOTAL WELDING= 23.85 27.07

ON SHELLPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 1 2.5 1 1.0 N 1 12.5 0.2OUT SIDE BALANCE 80% 1 2.5 1 1.0 N 1 50.1 0.8

CHIP BACK WELDING 100% 1 2.5 1 1.0 N 1 151.9 2.5R.F.PAD WELDING 100% 1 2.5 1 1.0 N 1 3362.6 56.0

TOTAL = 3577.2 59.6

3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

WEIGHT CALCULATION

PADO/D=2000

Page 20: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

Page 21: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

R.F.PAD + DOUBLE 'V' NOZZLE ON SHELL/DEND) (D/S) ? D PARAMETERS SETTINGCFW= 9 PROCESS KG/SHIFT HRS/KG

INC. ANG= 60 MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.50INC. ANG= 10 10 2). SAW 14.4 0.56

DENSITY= 0.00000785 6.0 1.334). GTAW 1.3 6.25

THK= 30 OFF SET=

R.F.PAD 10 330

NOZZLE O/D=

THK= 60

40 345 1). 1G 12). 2G 1.6

R.F.= 2 3). 3G 1.3

18 NOZ O/D

345

SH

ELL

I/D

=

2450

R.G= FILLET SIZE=30 YES 1.153 NO 1

INC. ANG=CROSS SEC. AREA

WELD KG45 ON SHELL ON D/END CHIP BACK DEPTH(MM)

ELLIPSE DIMENSION O/S WELDING= 4099.95 35.95 35.19 THK <= 30 6MAJOR AXIS= 363.0 C/B WELDING= 450.00 3.95 3.86 THK > 30 12MINOR AXIS= 348 R.F. PAD WELDING 450.00 22.42 22.42LG. OF WELDING= 1117.086 TOTAL WELDING= 39.90 39.05

ON D/ENDPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)OUTSIDE ROOT RUN 20% 2 0.56 1 1.0 Y 1 234.6 3.9OUT SIDE BALANCE 80% 1 2.5 2 1.6 Y 1.15 7769.2 129.5

CHIP BACK WELDING 100% 1 2.5 2 1.6 Y 1.15 1065.9 17.8R.F.PAD WELDING 100% 1 2.5 1 1.0 Y 1.15 3867.0 64.4

TOTAL = 12936.7 215.6

3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

WEIGHT CALCULATION

PADO/D=2000

Page 22: 164627753 Welding Calculation

NOZZLE WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

SET ON NOZZLE IN SHELL/DEND) (D/S) ? S PARAMETERS SETTINGPROCESS KG/SHIFT HRS/KG

50 35 NOZ I/D MATERIAL (SS/STEEL)= STEEL 1). SMAW 3.2 2.502). SAW 14.4 0.56

19 DENSITY= 0.00000785 6.0 1.33` 4). GTAW 1.3 6.25

INC. ANG.= 15 OFFSET=R.F.= 1 0

CFW= 9INC. ANG.= 50

R.G.= 3 1). 1G 1

THK= 702). 2G 1.6

NOZ I/D 3). 3G 1.3

3400

203NOZ O/D

273

YES 1.15ELLIPSE DIMENSION

WEIGHT CALCULATIONCROSS SEC. AREA WELD KG NO 1

ON SHELL ON D/ENDMAJOR AXIS= 238.2 O/S WELDING= 716.09 4.20 4.20MINOR AXIS= 238

LG. OF WELDING= 748.0 TOTAL WELDING= 4.20 4.20

ON SHELL PROCESS POSITION HEATING RUN TIMECODE CODE (Y/N) (min) (Hrs)

OUTSIDE ROOT RUN 20% 4 6.25 1 1.0 Y 1.15 362.6 6.0OUT SIDE BALANCE 80% 1 2.5 1 1.0 y 1.15 580.2 9.7

TOTAL = 942.9 15.7

3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

SH

EL

L

I/D

=

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 23: 164627753 Welding Calculation

FILLET WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

PARAMETERS SETTINGM PROCESS KG/SHIFT HRS/KG

1). SMAW 3.2 2.50MANUAL LENGTH OF WELDING(MM)= 33615 2). SAW 14.4 0.56

6.0 1.33MATERIAL (SS/STEEL)= STEEL

6DENSITY= 0.00000785

FOR CALCULATING WELD LENGTHRADIUS OF WELDING(MM)= 0

INCLUDED ANGLE OF WELDING(DEG)= 06 CALCULATED LENGTH OF WELDING(MM)= 0.000 1). 1F/2F 1

2) 3F 1.1

LENGTH OF WELDING(MM)= 33615.000

WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGTOTAL WELDING 18.00 4.75 YES 1.15

NO 1

FILLET WELDPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)1 2.50 1 1.0 Y 1 712.5 11.9

712.5 11.9

WELD LG (CALCULATED/MANUAL) (C/M?)

3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 24: 164627753 Welding Calculation

FILLET WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

DOUBLE SIDE FILLET JOINTPARAMETERS SETTING

D PROCESS KG/SHIFT HRS/KG1). SMAW 3.2 2.50

m 2). SAW 14.4 0.566.0 1.33

MANUAL LENGTH OF WELDING(MM)= 1000

13MATERIAL (SS/STEEL)= STEEL

DENSITY= 0.00000785FOR CALCULATING WELD LENGTH

13 RADIUS OF WELDING(MM)= 0 1). 1F/2F 1INCLUDED ANGLE OF WELDING(DEG)= 0 2) 3F 1.1

CALCULATED LENGTH OF WELDING(MM)= 0.000LG OF WELDING= 1000.000

WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGFIRST SIDE WELDING 84.50 0.66SECOND SIDE WELDING 84.50 0.66 YES 1.15

TOTAL WELDING= 169.00 1.33 NO 1

DOUBLE OPERATORPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)FIRST SIDE 100% 1 2.50 1 1.0 Y 1 99.5 1.7

SECOND SIDE SIDE 100% 1 2.50 1 1.0 Y 1 99.5 1.7TOTAL= 99.5 1.7

WELDING BY SINGLE OPERATOR/ DOUBLE OPERATOR(S/D)?

WELD LG (CALCULATED/AMNUAL) (C/M?)3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 25: 164627753 Welding Calculation

FILLET WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

DOUBLE SIDE FILLET JOINTPARAMETERS SETTING

S PROCESS KG/SHIFT HRS/KG1). SMAW 3.2 2.50

6.0 1.33

MATERIAL (SS/STEEL)= STEELSECOND SIDE

20CFW DENSITY= 0.00000785

20CFW 1). 1F/2F 1FIRST SIDE O/D= 400 2) 3F 1.1

WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGFIRST SIDE WELDING 200.00 1.94SECOND SIDE WELDING 200.00 2.01 YES 1.15

TOTAL WELDING= 400.00 3.95 NO 1

SINGLE OPERATORPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)FIRST SIDE 100% 1 2.50 1 1.0 N 1.1 320.1 5.3

SECOND SIDE SIDE 100% 1 2.50 1 1.0 N 1.1 331.0 5.5TOTAL= 651.1 10.9

WELDING BY SINGLE OPERATOR/ DOUBLE OPERATOR(S/D)?

2).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 26: 164627753 Welding Calculation

FILLET WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

DOUBLE SIDE + FULL PENETATION JOINTPARAMETERS SETTING

C PROCESS KG/SHIFT HRS/KG1). SMAW 3.2 2.50

20 C 2). SAW (TWIN HEAD) 14.4 0.56MANUAL LENGTH OF WELDING(MM)= 10000 6.0 1.33

MATERIAL (SS/STEEL)= STEEL 4). GTAW+SMAW 1.3 6.25FOR TIG

1060 DEG DENSITY= 0.00000785

FOR CALCULATING WELD LENGTHRG= 2 RADIUS OF WELDING(MM)= 1000

2 INCLUDED ANGLE OF WELDING(DEG)= 36020 CALCULATED LENGTH OF WELDING(MM)= 6283.185 1). 1F/2F 1

LENGTH OF WELDING(MM)= 6283.185 2) 3F 1.1

CHIP BACK DEPTH(MM)= 6

WELD CALCULATION CROSS SEC. AREA TOTAL WELD KGFIRST SIDE WELDING 137.59 6.79SECOND SIDE WELDING 194.14 9.58 (INCLUDING CHIP BACK) YES 1.15

TOTAL WELDING= 331.73 16.36 NO 1

WITH CHIP BACKPROCESS POSITION HEATING RUN TIME

CODE CODE (Y/N) (min) (Hrs)FIRST SIDE 100% 4 2.63 1 1.0 N 1.1 1175.7 19.6

SCOND SIDE SIDE 100% 4 2.63 1 1.0 N 1.1 1658.9 27.6TOTAL= 2834.7 47.2

PROCESS? (DOT/ WITH CHIP BACK/TIG+SMAW) (D/C/T) ?

WELD LG (CALCULATED/AMNUAL) (C/M?)3).FCAW (1.2 Æ)

POSITION OF WELDING

MULTIPLICATION FACTOR

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 27: 164627753 Welding Calculation

OVERLAY WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

FORGING

GASKET FACE O/LAY BORE O/LAY PARAMETERS SETTINGO/D OF GASKET FACE O/LAY= 229 BORE OF FLANGE AFTER O/LAY= 165 PROCESS KG/SHIFT HRS/KGBORE OF FLANGE AFTER O/L= 165 LENGTH OF FLANGE/FORG= 1234 1). SMAW 4 2.00MEAN DIA OF GASKER GROOVE= 200 THK OF O/LAY= 8 7 1.14DEPTH OF GASKET GROOVE= 10 3). FCAW (MANUAL) 6 1.33WIDTH OF GROOVE AT TOP= 23THK OF O/LAY= 8

GASKET FACE O/LAY= 2.423601 KG BORE O/LAY= 42.9231 KGYES 1.15

BACK FACE O/LAY NO 1O/D OF LIP = 487BORE OF FORG AFTER O/L= 381THK OF O/LAY= 6

BACK FACE O/LAY= 3.46862 KG

TOTAL O/LAY= 48.81532 KG

KG PROCESS HEATING RUN TIME

CODE (Y/N) (min) (Hrs)GASKET FACE OVER LAY 2.4 1 2.00 N 1.00 291 4.8

BORE OVER LAY 42.9 2 1.14 Y 1.15 3385 56.4BACK FACE (PROFILE) OVER LAY 3.5 3 1.33 N 1.00 277 4.6

TOTAL= 3953.1 65.9

2).FCAW (1.2 Æ)(M/C)

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 28: 164627753 Welding Calculation

OVERLAY WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

FLANGE

GASKET FACE O/LAY BORE O/LAY PARAMETERS SETTINGO/D OF GASKET FACE O/LAY= 483 BORE OF FLANGE AFTER O/LAY= 381 PROCESS KG/SHIFT HRS/KGBORE OF FLANGE AFTER O/L= 381 LENGTH OF FLANGE= 168 1). SMAW 4 2.00DIA OF GASKER GROOVE= 450 THK OF O/LAY= 6 7 1.14DEPTH OF GASKET GROOVE= 0 3). FCAW (MANUAL) 6 1.33WIDTH OF GROOVE AT TOP= 0THK OF O/LAY= 7

GASKET FACE O/LAY= 3.876072 KG BORE O/LAY= 9.804182 KGYES 1.15

TOTAL O/LAY= 13.68025 KG NO 1

KG PROCESS HEATING RUN TIME

CODE (Y/N) (min) (Hrs)GASKET FACE OVER LAY 3.9 1 2.00 N 1.00 465 7.8

BORE OVER LAY 9.8 2 1.14 N 1.00 672 11.2TOTAL= 1137.4 19.0

2).FCAW (1.2 Æ)(M/C)

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 29: 164627753 Welding Calculation

OVERLAY WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

ELBOW

I/D O/LAY PARAMETERS SETTINGBORE OF ELBOW AFTER O/LAY= 448 PROCESS KG/SHIFT HRS/KGRADIUS OF ELBOW 1176 1). SMAW 4 2.00INCLUDED ANGLE OF ELBOW= 90 2). FCAW (MANUAL) 6 1.33THK OF O/LAY= 8

BORE O/LAY= 169.3643 KGYES 1.15NO 1

KG PROCESS HEATING RUN TIME

CODE (Y/N) (min) (Hrs.)BORE OVER LAY 169.4 2 1.33 N 1.00 13549 225.8

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 30: 164627753 Welding Calculation

OVERLAY WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

PIPE

I/D O/LAY PARAMETERS SETTINGBORE OF PIPE AFTER O/LAY= 381 PROCESS KG/SHIFT HRS/KGLENGTH OF PIPE= 463 1). SMAW 4 2.00THK OF O/LAY= 6 7 1.14

3). FCAW (MANUAL) 6 1.33

BORE O/LAY= 27.01986 KG

YES 1.15NO 1

KG PROCESS HEATING RUN TIME

CODE (Y/N) (min) (Hrs.)BORE OVER LAY 27.0 2 1.14 Y 1.15 2131 35.5

2).FCAW (1.2 Æ)(M/C)

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 31: 164627753 Welding Calculation

OVERLAY WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

CIRC. SEAM/ LONG SEAM OVERLAYPARAMETERS SETTING

I/D OF SHELL= 3400 THK= 70 PROCESS KG/SHIFT HRS/KGTHK OF O/LAY= 6 I/S INC. ANG.= 35 1). SMAW 4 2.00CLAD STRIP ANG.= 45 I/S 'V' HEIGHT= 47 7 1.14THK OF CLAD= 5 CLAD STRIPPING= 15 3). FCAW (MANUAL) 6 1.33CALCULATION ROOT GAP= 3WIDTH OF O/LAY= 65 LG OF CEAM= 10697.12R.F. WIDTH= 78AREA OF O/LAY= 364.5095 C/SEAM O/LAY= 30.60874

YES 1.15

THK=70

NO 1

C/SEAM OR L/SEAM (LS/CS)? CS

47q= 355

R.G.=

3 155 O/L THK= Æ= 45

635

I/D OF SHELL= 3400

KG PROCESS HEATING RUN TIME

CODE (Y/N) (min) (Hrs.)CIRC. SEAM OVER LAY 30.6 1 2.00 Y 1.15 4224 70.4

2).FCAW (1.2 Æ)(M/C)

PREHEATING REQUIRED?

MULTIPLICATION FACTOR

Page 32: 164627753 Welding Calculation

SHELL ESSC OVERLAY WELD KG & RUN TIME ESTIMATION

document.xls 04/22/2023

SHELL ESSC OVERLAY PARAMETERS SETTINGI/D OF SHELL BEFORE O/LAY= 4500 PROCESS KG/SHIFT HRS/KGLENGTH OF SHELL= 2250 1) ESSC (60 WD) 44 0.18THK OF O/LAY= 8 2) ESSC (90WD) 66 0.12

3) ESSC (120 WD) 84 0.10

BORE O/LAY= 2032.133 KG

KG PROCESS RUN TIME

CODE (min) (Hrs.)I/D OVER LAY(WITH 2 OPERATOR) 2032.1 1 0.18 44337 739.0