1617 WALTON WAY AUGUSTA, GA 30904 - contractmgmtinc.com · 2020. 8. 19. · painted steel sched. 40...
Transcript of 1617 WALTON WAY AUGUSTA, GA 30904 - contractmgmtinc.com · 2020. 8. 19. · painted steel sched. 40...
-
DR
AW
N B
Y:
CH
EC
KED
BY
:
REV
ISIO
NS
PR
OJE
CT
NU
MB
ER
MEMBERS OF THE
AMERICAN INSTITUTE OF ARCHITECTS
THIS DOCUMENT IS THE PROPERTY OF STUDIO 3
REPRODUCTION, COPYING OR OTHERWISE USE OFTHIS DOCUMENT IS STRICTLY PROHIBITED AND ANY
STUDIO 3 DESIGN GROUP,P.C.
d e s i g n
1617 WALTON WAYAUGUSTA, GA 30904
studio
g r o u p
202002
PLO
T D
ATE:
ISSU
E D
ATE:
3420 J
ulia
Avenue
Ric
hm
on
d C
ou
nty
Pu
blic S
ch
oo
lsR
ICH
MO
ND
HIL
L K
-8 S
CH
OO
LC
LA
SS
RO
OM
AD
DIT
ION
S
LEGAL ACTION.INFRINGEMENT THEREUPON MAY BE SUBJECT TO
DESIGN GROUP, P.C. THE UNAUTHORIZED
Augusta
,G
eorg
ia
Constr
uction D
ocum
ents
COPYRIGHT 2007
FT
E 1
100
#B
-17-0
10-3
062.4
CIVIL DESIGN SOLUTIONS, L.L.C.
CIVIL ENGINEER
MECHANICAL ENGINEER
PLUMBING ENGINEER
ELECTRICAL ENGINEER
ELECTRICAL DESIGN CONSULTANTS
STRUCTURAL ENGINEER
CRANSTON ENGINEERING
ING CONSULTING, INC.
ING CONSULTING, INC.
ME
CH
AN
ICA
L S
CH
ED
UL
ES
M0.16/17/20
20
6/1
7/2
020
SA
P
JK
F
AIR DEVICE SCHEDULE
TAG MANUFACTURER DESCRIPTION MODEL BORDER TYPE MODULE SIZE OPTIONS
A TITUS SQUARE PLAQUE DIFFUSER OMNI LAY-IN 24 x 24 1, 2
B TITUS EGGCRATE RETURN GRILLE 50F LAY-IN 24 x 24 1, 3
C TITUS EGGCRATE RETURN GRILLE 50F LAY-IN 12 x 12 1, 3
OPTIONS:1. BI-POLAR IONIZATION UNIT2. 14" INSULATED ROOF CURB WITH CURB SEAL3. FUSED DISCONNECT BY ELECTRICIAN. COORDINATE WITH ELECTRICAL4. ECM MOTOR5. LOUVERED HAIL GUARDS6. THROUGH THE BASE CONNECTIONS7. ACTIVE DEHUMIDIFICATION SYSTEM8. STANDARD LEAK ENTHALPY ECONOMIZER WITH BAROMETRIC RELIEF9. LOW GAS HEAT10. TWO STAGE COOLING CAPACITY11. PHASE MONITOR12. VERTICAL DISCHARGE AND RETURN13. 2-YEAR WARRANTY REQUIRED14. PROVIDE UNITS CAPABLE OF STAGED AIR VOLUME CONTROL15. INSTALL NEW FILTERS BEFORE TURNOVER AND ONE SET OF FILTERS AND BELTS FOR EACH UNIT FOR ATTIC STOCK16. WALL MOUNTED, ADJUSTABLE SLIDE THERMOSTAT BY CONTROLS CONTRACTOR.
ROOFTOP UNIT SCHEDULE
TAG MANUFACTURER
FAN PERFORMANCE COOLING PERFORMANCE HEATING PERFORMANCE ELECTRICALWEIGHT
(LBS)OPTIONS
MODELAIRFLOW
(CFM)OUTSIDE
AIRBHP ESP RPM
ENT. AIRDB (°F)
ENT. AIRWB (°F)
LVG. AIR(°F)
SENS. CAP.(BTUh)
TOTAL CAP.(BTUh)
INPUT CAP.(BTUh)
OUTPUT CAP.(BTUh)
EFF. (%)ENT. AIR
(°F)LVG. AIR
(°F)VOLTAGE PHASE MCA
MOCP
RTU-3-19 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-3-20 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-3-21 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-3-22 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-5-19 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-5-20 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-5-21 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-5-22 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-7-25 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-7-26 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-7-27 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
RTU-7-28 CARRIER 48LC*004 1,200 120 1.00 0.50 1,200 97 76 55 29,200 36,000 72,000 59,000 82 65 90 460 3 12 15 740 ALL
OPTIONS:1. MANUFACTURER'S STANDARD WHITE FINISH2. BACK PAN INSULATION OF MIN R-6 INSULATION VALUE3. PROVIDE LINED GRILLE PLENUM. SEE DETAIL
OPTIONS:1. VARIABLE SPEED COMPRESSOR2. FUSED DISCONNECT BY ELECTRICAL CONTRACTOR
OPTIONS:1. UNIT TO RECEIVE POWER FROM OUTDOOR UNIT2. THERMOSTAT INTERFACE MODULE3. MANUFACTURER'S SUPPLIED AIR FILTER. SUPPLY 1 EXTRA FILTER PER UNIT ATTIC STOCK4. FIELD INSTALLED FUSED DISCONNECT5. INTEGRAL CONDENSATE PUMP6. PLASMA AIR CLEANER EQUAL TO GPS7. RELAY CONTROL BOARD FOR INTERLOCKING WITH MOTORIZED OUTSIDE AIR DAMPER.8. WALL-MOUNTED, ADJUSTABLE SLIDE THERMOSTAT BY CONTROLS CONTRACTOR
GENERAL NOTES:1. BRANCH DUCT SIZE IS EQUAL TO AIR DEVICE NECK SIZE UNLESS OTHERWISE NOTED.2. COORDINATE ALL EQUIPMENT INSTALLATION FINAL LOCATIONS TO ALLOW FOR SUFFICIENT MAINTENANCE ACCESS.
VRF INDOOR UNIT SCHEDULE
TAG MANUFACTURER MODELNOMINAL
TONSMOUNT
FANCFM
OUTSIDEAIR CFM
ASSOCIATEDHP
COOLINGCAPACITY (BTUh)
HEATINGCAPACITY (BTUh)
ELECTRICAL WEIGHT(LBS)
SEER EER OPTIONSVOLTAGE PHASE MCA
IHP-3-1 MITSUBISHI NTXCKS12 1.0 CEILING CASSETTE 330 10 OHP-11 12,000 13,000 208 1 0.3 35 19.0 13.5 ALL
IHP-3-2 MITSUBISHI NTXCKS12 1.0 CEILING CASSETTE 330 10 OHP-11 12,000 13,000 208 1 0.3 35 19.0 13.5 ALL
VRF OUTDOOR UNIT SCHEDULE
TAG MANUFACTURER MODEL NOMINAL TONS COOLING CAPACITY (BTUh) HEATING CAPACITY (BTUh)ELECTRICAL
WEIGHT (LBS) SEER EER OPTIONSVOLTAGE PHASE MCA MOCP
OHP-11 MITSUBISHI NTXMPH24 2.0 22,000 25,000 208 1 30.5 40 200 19.0 13.5 ALL
06/17/2020
-
END PLUGCLEANOUT
BARB ADAPTOR WITHSTEEL BANDINGCLAMPS
TYPE "M" COPPER PIPE WITH DWV FITTINGS
TO NEAREST DRAIN
CLEAR VINYL TUBING(3'-0" MAXIMUM)
CONDENSATE PUMP CONNECTION
FAN COIL
NOTE: CONTRACTOR SHALL REFERENCEFINAL EQUIPMENT MANUFACTURERINSTALLATION INSTRUCTIONS FORFINAL DIMENSIONS AND PLACEMENTREQUIREMENTS.
HAND TIGHT PLUG
WATER SEAL
LINE SIZE OF CONDENSATE CONNECTION ON UNIT
SLOPE TO DRAINH
H = FAN INLET PRESSURE (IN. W.C.) + 1 INCH
H/2 MIN.
FROM COIL PAN
EGG CRATE RETURN GRILLE WITH BORDER, FRAME & 22"x22" NECK
LAY-IN CEILING
ACCOUSTICALLY LINED PLENUM
RETURN/EXHAUST PLENUM
LEGEND
W = WIDTHH = HEIGHTD = DIAMETERV.D. = MANUAL VOLUME DAMPER WITH STANDOFF
VERTICAL SUPPLY DUCT
WxH
DØ
VDVD
VD
VD
VDVD
WxH
CROWN 3300-DSOR EQUAL
90° ELBOW WITH DOUBLE THICKNESS TURNING VANES
4'-0"
MA
XIM
UM
FLEXIBLE DUCT. PROVIDE SHEET METAL FITTINGS FOR ALL CHANGES OF DIRECTION.
CROWN 314-DSOOR EQUAL
BULLHEAD TEE WITH TURNING VANES PER SMACNA
ADJUSTABLE PIPING ROLLER SUPPORT W/ HDPE BASE. SPACE SUPPORTS NO GREATER THAN 7'-0" ON CENTER.
PAINTED STEEL SCHED. 40 GAS PIPING.
SCHEDULE 40 PVC CONDENSATE DRAIN PIPE. PRIMED AND PAINTED.
ROOFTOP UNIT
UNION
GAS COCK
SUPPORT EQUAL TO B-LINE MODEL C610 WITH B-LINE ARMAFIX CLAMP.
ROOF
ROOF CURB
GAS PRESSURE REGULATOR & OPD (OVER PRESSUREIZATION DEVICE) W/ VENT PROTECTION
3" LONG SEDIMENT TRAP W/ REMOVABLE SCREW CAP
Y-STRAINER
T/P TESTING PORTS
UNION
DR
AW
N B
Y:
CH
EC
KED
BY
:
REV
ISIO
NS
PR
OJE
CT
NU
MB
ER
MEMBERS OF THE
AMERICAN INSTITUTE OF ARCHITECTS
THIS DOCUMENT IS THE PROPERTY OF STUDIO 3
REPRODUCTION, COPYING OR OTHERWISE USE OFTHIS DOCUMENT IS STRICTLY PROHIBITED AND ANY
STUDIO 3 DESIGN GROUP,P.C.
d e s i g n
1617 WALTON WAYAUGUSTA, GA 30904
studio
g r o u p
202002
PLO
T D
ATE:
ISSU
E D
ATE:
3420 J
ulia
Avenue
Ric
hm
on
d C
ou
nty
Pu
blic S
ch
oo
lsR
ICH
MO
ND
HIL
L K
-8 S
CH
OO
LC
LA
SS
RO
OM
AD
DIT
ION
S
LEGAL ACTION.INFRINGEMENT THEREUPON MAY BE SUBJECT TO
DESIGN GROUP, P.C. THE UNAUTHORIZED
Augusta
,G
eorg
ia
Constr
uction D
ocum
ents
COPYRIGHT 2007
FT
E 1
100
#B
-17-0
10-3
062.4
CIVIL DESIGN SOLUTIONS, L.L.C.
CIVIL ENGINEER
MECHANICAL ENGINEER
PLUMBING ENGINEER
ELECTRICAL ENGINEER
ELECTRICAL DESIGN CONSULTANTS
STRUCTURAL ENGINEER
CRANSTON ENGINEERING
ING CONSULTING, INC.
ING CONSULTING, INC.
ME
CH
AN
ICA
L D
ET
AIL
S
M0.26/17/20
20
6/1
7/2
020
SA
P
JK
F
NOT TO SCALEM0.2
1 CASSETTE COIL CONDENSATE PIPENOT TO SCALEM0.2
2 NEGATIVE PRESSURE CONDENSATE DRAIN TRAPNOT TO SCALEM0.2
3 RETURN/EXHAUST GRILLE
NOT TO SCALEM0.2
4 TYPICAL SUPPLY OR RETURN DUCTNOT TO SCALEM0.2
5 TYPICAL GAS ROOFTOP PIPING
06/17/2020
-
2ND GRADE317
2ND GRADE3162ND GRADE
315
2ND GRADE318
GIRL'S315.2
BOY'S315.3
VEST.315.1
GIRL'S316.3 VESTIBULE
316.1BOY'S316.2
NEW CLASSROOM319
NEW CLASSROOM320
ASSIST. PRINCIPAL321
BOOK STORAGE322
NEW CLASSROOM323 NEW CLASSROOM
324
VE
ST
IBU
LE
319.1
BOY'S TLT.319.2
GIRL'S TLT.319.3 V
ES
TIB
UL
E320.1
BOY'S TLT.320.2
GIRL'S TLT.320.3
CORRIDOR300
8"øA
300
8"øA
300
8"øA
300
8"øA
300
12"x
10"
SA
20"x
9"
SA
12"x
10"
SA
20"x
9"
SA
8"øA
300
8"øA
300
8"øA
300
8"øA
300
22"x22"B
1,200ø16"
22"x22"B
1,200
ø16"
8"x
8"
EA
8"x6" EA
6"x
4"
EA
11"x11"C
75
11"x11"C
75
8"x6" EA
6"x
4"
EA
11"x11"C
75
11"x11"C
75
(E) ECH-1
20"x
9"
SA
20"x
9"
SA
12"x
10"
SA
12"x
10"
SA
8"øA
300
8"øA
300
8"øA
300
8"øA
300
22"x22"B
1,200
ø16" ø16"
22"x22"B
1,200
8"øA
300
8"øA
300
8"øA
300
8"øA
300
8"øA
240
(E) 8"ø
240
(E) ECH-1
IHP-3-1 IHP-3-2
1 14"ø OA4"ø OA
8"x
8"
EA
10"x
8"
SA
10"x
8"
SA
6
6
2
3/4" C
3/4" C33
4 T
T
77
77
(E)8
"x6"
EA
11
T T
TT
S
S
12
12
EXISTING BUILDING
K-2ND ADDITION
KEY PLAN
N
RTU-3-17
RTU-3-18
RTU-3-15
RTU-3-16
(E) EF-3
3/4
" N
G
5
3/4
" N
G3/4
" N
G
1/2" NG
1/2" NG
1/2" NG
1/2" NG
RTU-3-22
RTU-3-20
RTU-3-19
RTU-3-21
OHP-11
(E)
(E)
(E)
(E)
9
9
9
9
10
8
DR
AW
N B
Y:
CH
EC
KED
BY
:
REV
ISIO
NS
PR
OJE
CT
NU
MB
ER
MEMBERS OF THE
AMERICAN INSTITUTE OF ARCHITECTS
THIS DOCUMENT IS THE PROPERTY OF STUDIO 3
REPRODUCTION, COPYING OR OTHERWISE USE OFTHIS DOCUMENT IS STRICTLY PROHIBITED AND ANY
STUDIO 3 DESIGN GROUP,P.C.
d e s i g n
1617 WALTON WAYAUGUSTA, GA 30904
studio
g r o u p
202002
PLO
T D
ATE:
ISSU
E D
ATE:
3420 J
ulia
Avenue
Ric
hm
on
d C
ou
nty
Pu
blic S
ch
oo
lsR
ICH
MO
ND
HIL
L K
-8 S
CH
OO
LC
LA
SS
RO
OM
AD
DIT
ION
S
LEGAL ACTION.INFRINGEMENT THEREUPON MAY BE SUBJECT TO
DESIGN GROUP, P.C. THE UNAUTHORIZED
Augusta
,G
eorg
ia
Constr
uction D
ocum
ents
COPYRIGHT 2007
FT
E 1
100
#B
-17-0
10-3
062.4
CIVIL DESIGN SOLUTIONS, L.L.C.
CIVIL ENGINEER
MECHANICAL ENGINEER
PLUMBING ENGINEER
ELECTRICAL ENGINEER
ELECTRICAL DESIGN CONSULTANTS
STRUCTURAL ENGINEER
CRANSTON ENGINEERING
ING CONSULTING, INC.
ING CONSULTING, INC.
ME
CH
AN
ICA
L -
K-2
ND
GR
AD
E A
DD
ITIO
N
M1.16/17/20
20
6/1
7/2
020
SA
P
JK
F
NO
RT
H
1/8" = 1'-0"M1.1
1 MECHANICAL - K-2ND GRADE CLASSROOM ADDITION
GENERAL NOTES:
KEYNOTES
(THIS SHEET ONLY)
(THIS SHEET ONLY)
NO
RT
H
1/8" = 1'-0"M1.1
2 MECHANICAL ROOF PLAN - K-2ND GRADE CLASSROOM ADDITION
1. BRANCH DUCT SIZE IS EQUAL TO AIR DEVICE NECK SIZE UNLESS OTHERWISE NOTED.
2. COORDINATE ALL EQUIPMENT INSTALLATION FINAL LOCATIONS TO ALLOW FOR SUFFICIENT MAINTENANCE ACCESS.
3. REFRIGERANT AND CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH ½" ARMFLEX FOAM
TERMINATE OUTSIDE AIR INTAKE DUCT TO WALL BRICK VENT WITH INSECT SCREEN. COMPARABLE TO GREENHECK MODEL BVE-808.
ROUTE CONDENSATE PIPING WITH ½" ARMAFLEX INSULATION DOWN EXTERIOR WALL, CONCEALED IN WALL CAVITY OR AIR SPACE, AND TERMINATE TO THE EXTERIOR WITH 90° ELBOW, ABOVE CONCRETE SPLASH BLOCK INSTALLED OVER FINISHED GRADE. PAINT ANY EXPOSED PVC TO MATCH WALL
REFER TO CONDENSATE DRAIN CONNECTION DETAIL #1 / M0.2
CLEANOUT
RECALIBRATING (E) EF-3 TO 1,000 CFM SO AS TO ACCOMMODATE NEW EXHAUST TERMINALS. TEST AND BALANCE 4 NEW DIFFUSERS WITH 8 EXISTING DIFFUSERS AT 75 CFM EACH.
REMOVE AND RELOCATE EXISTING ELECTRIC CEILING HEATER AND ASSOCIATED TEMPERATURE SENSOR (S) TO NEW LOCATION. REPAIR VOID FROM EXISTING LOCATION WITH LIKE MATERIALS AND METHODS. CONTRACTOR SHALL COORDINATE WITH ELECTRICAL.
DUCT UP TO UNIT ON ROOF. SUPPLY DUCT IN CLASSROOMS SHALL RUN PARALLEL TO CORRIDOR WALLS AND INSTALLED WITH NO GREATER THAN 2 FEET BETWEEN FACE OF DUCT AND CORRIDOR WALL (TO ALLOW ROOM FOR ELECTRICAL INSTALLATION). TOP OF INSULATION SHALL BE BUTTED UP AGAINST THE BOTTOM OF JOIST. COORDINATE ROOF CURB INSTALLATION LOCATION SO THAT THE CLOSEST EDGE OF THE CURB IS NO FURTHER THAN 2' AWAY FROM THE JOIST BEARING LOCATION (CORRIDOR WALL). CONTROL BOX FOR UNIT CONTROLS SHALL BE LOCATED ABOVE THE CEILING IN THE CORRIDOR. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTOR. COORDINATE LOCATION OF CONTROL BOX WITH DUCTWORK AND PIPING LOCATED ABOVE THE CEILING.
NEW GAS LINE TAP INTO EXISTING MAIN AT 1½"ø APPROXIMATELY 180' PLAN NORTH (NOT SHOWN) WITH GAS COCK. CONTRACTOR TO FIELD VERIFY.
CONNECT NEW ROOF TOP UNIT INTO EXISTING GAS PIPING. REFER TO DETAIL #5 / M0.2 FOR TYPICAL GAS ROOFTOP PIPING ARRANGEMENT
COORDINATE WITH ROOFING CONTRACTOR TO PROVIDE CURB TO SUPPORT DUCTLESS AIR CONDITIONER. CURB SHALL BE FLASHED INTO ROOFING SYSTEM. PROVIDE FLASHED PITCH POCKET FOR REFRIGERANT PIPING PENETRATION THROUGH ROOF.
BALANCE NEW AND 4 EXISTING AIR DIFFUSERS SERVING CORRIDOR TO 240 CFM EACH.
INSTALL MOTORIZED, NORMALLY SPRING CLOSED, INTAKE DAMPER INTERLOCKED WITH IHP RELAY. PROVIDE TRANSFORMER AS REQUIRED.
1
2
3
4
5
6
7
8
9
10
11
12
06/17/2020
-
EXISTING BUILDING
3RD-5TH ADDITION
KEY PLAN
N
BOYS514
5TH GRADE516
GIRLS512
5TH GRADE518
5TH GRADE517
NEW CLASSROOM519
NEW CLASSROOM520
NEW CLASSROOM521
NEW CLASSROOM522
CORRIDOR500
(E) ECH-1
(E) ECH-1
8"øA
240
(E) 8"ø
240
T
T
T
T
20"x9" SA
12"x10" SA8"øA
300
8"øA
300 8"øA
300
8"øA
300
8"øA
300
22"x22"B
1,200
8"øA
300
8"øA
300
8"øA
300
20"x9" SA
12"x10" SA
ø16
"
ø16
"22"x22"B
1,200
10"x8" SA
20"x9" SA
12"x10" SA
ø16
"
22"x22"B
1,200 8"øA
300
8"øA
300
8"øA
300
8"øA
300
22"x22"B
1,200
ø16
"
8"øA
300
8"øA
300
8"øA
300
8"øA
300
20"x9" SA
12"x10" SA
2
1
1
2
2
2
5
S
S
RTU-5-17
RTU-5-18
RTU-5-16
1" NG
3/4" NG
3/4" NG
1/2"
NG
1/2"
NG
1/2"
NG
1/2"
NG
RTU-5-22
RTU-5-19
RTU-5-20
RTU-5-21
(E)
(E)
(E)
3
4
4
4
4
DR
AW
N B
Y:
CH
EC
KED
BY
:
REV
ISIO
NS
PR
OJE
CT
NU
MB
ER
MEMBERS OF THE
AMERICAN INSTITUTE OF ARCHITECTS
THIS DOCUMENT IS THE PROPERTY OF STUDIO 3
REPRODUCTION, COPYING OR OTHERWISE USE OFTHIS DOCUMENT IS STRICTLY PROHIBITED AND ANY
STUDIO 3 DESIGN GROUP,P.C.
d e s i g n
1617 WALTON WAYAUGUSTA, GA 30904
studio
g r o u p
202002
PLO
T D
ATE:
ISSU
E D
ATE:
3420 J
ulia
Avenue
Ric
hm
on
d C
ou
nty
Pu
blic S
ch
oo
lsR
ICH
MO
ND
HIL
L K
-8 S
CH
OO
LC
LA
SS
RO
OM
AD
DIT
ION
S
LEGAL ACTION.INFRINGEMENT THEREUPON MAY BE SUBJECT TO
DESIGN GROUP, P.C. THE UNAUTHORIZED
Augusta
,G
eorg
ia
Constr
uction D
ocum
ents
COPYRIGHT 2007
FT
E 1
100
#B
-17-0
10-3
062.4
CIVIL DESIGN SOLUTIONS, L.L.C.
CIVIL ENGINEER
MECHANICAL ENGINEER
PLUMBING ENGINEER
ELECTRICAL ENGINEER
ELECTRICAL DESIGN CONSULTANTS
STRUCTURAL ENGINEER
CRANSTON ENGINEERING
ING CONSULTING, INC.
ING CONSULTING, INC.
ME
CH
AN
ICA
L -
3R
D-5
TH
GR
AD
E A
DD
ITIO
N
M1.26/17/20
20
6/1
7/2
020
SA
P
JK
F
NO
RT
H
1/8" = 1'-0"M1.2
1 MECHANICAL - 3RD-5TH GRADE CLASSROOM ADDITION
NO
RT
H
1/8" = 1'-0"M1.2
2 MECHANICAL ROOF PLAN - 3RD-5TH GRADE CLASSROOM ADDITION
GENERAL NOTES:
KEYNOTES
(THIS SHEET ONLY)
(THIS SHEET ONLY)
1. BRANCH DUCT SIZE IS EQUAL TO AIR DEVICE NECK SIZE UNLESS OTHERWISE NOTED.
2. COORDINATE ALL EQUIPMENT INSTALLATION FINAL LOCATIONS TO ALLOW FOR SUFFICIENT MAINTENANCE ACCESS.
3. REFRIGERANT AND CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH ½" ARMFLEX FOAM
REMOVE AND RELOCATE EXISTING ELECTRIC CEILING HEATER AND ASSOCIATED TEMPERATURE SENSOR (S) TO NEW LOCATION. REPAIR VOID FROM EXISTING LOCATION WITH LIKE MATERIALS AND METHODS. CONTRACTOR SHALL COORDINATE WITH ELECTRICAL.
DUCT UP TO UNIT ON ROOF. SUPPLY DUCT IN CLASSROOMS SHALL RUN PARALLEL TO CORRIDOR WALLS AND INSTALLED WITH NO GREATER THAN 2 FEET BETWEEN FACE OF DUCT AND CORRIDOR WALL (TO ALLOW ROOM FOR ELECTRICAL INSTALLATION). TOP OF INSULATION SHALL BE BUTTED UP AGAINST THE BOTTOM OF JOIST. COORDINATE ROOF CURB INSTALLATION LOCATION SO THAT THE CLOSEST EDGE OF THE CURB IS NO FURTHER THAN 2' AWAY FROM THE JOIST BEARING LOCATION (CORRIDOR WALL). CONTROL BOX FOR UNIT CONTROLS SHALL BE LOCATED ABOVE THE CEILING IN THE CORRIDOR. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTOR. COORDINATE LOCATION OF CONTROL BOX WITH DUCTWORK AND PIPING LOCATED ABOVE THE CEILING.
NEW GAS LINE TAP INTO EXISTING MAIN AT 1½"ø APPROXIMATELY 100' PLAN NORTHWEST (NOT SHOWN) WITH GAS COCK. CONTRACTOR TO FIELD VERIFY.
CONNECT NEW ROOF TOP UNIT INTO EXISTING GAS PIPING. REFER TO DETAIL #5 / M0.2 FOR TYPICAL GAS ROOFTOP PIPING ARRANGEMENT
BALANCE NEW AND EXISTING 4 AIR DIFFUSERS SERVING CORRIDOR TO 240 CFM EACH.
1
2
3
4
5
06/17/2020
-
EXISTING BUILDING
5TH-8TH ADDITION
KEY PLAN
N
6TH-8TH CLASSROOM724
6TH-8TH CLASSROOM720
6TH-8TH CLASSROOM722
6TH-8TH CLASSROOM719
6TH-8TH CLASSROOM723
6TH-8TH CLASSROOM721
NEW CLASSROOM725
NEW CLASSROOM726
NEW CLASSROOM727
NEW CLASSROOM728
CORRIDOR700
(E) ECH-1
(E) ECH-18"øA
240
20"x9" SA
12"x10" SA
8"øA
3008"øA
300
8"øA
300
8"øA
300
22"x22"B
1,200ø16"
12"x10" SA20"x9" SA
8"øA
300
8"øA
3008"øA
300
8"øA
300
22"x22"B
1,200
ø16"
12"x10" SAT
20"x9" SA
22"x22"B
1,200
8"øA
300
8"øA
300
8"øA
300
8"øA
300
20"x9" SA
12"x10" SAT
ø16"
22"x22"B
1,200
ø16"
8"øA
300
8"øA
300
8"øA
300
8"øA
300
TT
1
1
2 2
22
5
10"x8" SA
(E) 8"ø
240
SS
RTU-7-23RTU-7-21
RTU-7-20 RTU-7-22 RTU-7-24
RTU-7-19
3/4" NG3/4" NG3/4" NG1" NG
3/4" NG 1/2" NG
1/2
" N
G
1/2
" N
G
1/2
" N
G
1/2
" N
G
RTU-7-25 RTU-7-27
RTU-7-26 RTU-7-28
(E)(E)
(E)
3
4 4
4 4
(E)(E)
(E)
DR
AW
N B
Y:
CH
EC
KED
BY
:
REV
ISIO
NS
PR
OJE
CT
NU
MB
ER
MEMBERS OF THE
AMERICAN INSTITUTE OF ARCHITECTS
THIS DOCUMENT IS THE PROPERTY OF STUDIO 3
REPRODUCTION, COPYING OR OTHERWISE USE OFTHIS DOCUMENT IS STRICTLY PROHIBITED AND ANY
STUDIO 3 DESIGN GROUP,P.C.
d e s i g n
1617 WALTON WAYAUGUSTA, GA 30904
studio
g r o u p
202002
PLO
T D
ATE:
ISSU
E D
ATE:
3420 J
ulia
Avenue
Ric
hm
on
d C
ou
nty
Pu
blic S
ch
oo
lsR
ICH
MO
ND
HIL
L K
-8 S
CH
OO
LC
LA
SS
RO
OM
AD
DIT
ION
S
LEGAL ACTION.INFRINGEMENT THEREUPON MAY BE SUBJECT TO
DESIGN GROUP, P.C. THE UNAUTHORIZED
Augusta
,G
eorg
ia
Constr
uction D
ocum
ents
COPYRIGHT 2007
FT
E 1
100
#B
-17-0
10-3
062.4
CIVIL DESIGN SOLUTIONS, L.L.C.
CIVIL ENGINEER
MECHANICAL ENGINEER
PLUMBING ENGINEER
ELECTRICAL ENGINEER
ELECTRICAL DESIGN CONSULTANTS
STRUCTURAL ENGINEER
CRANSTON ENGINEERING
ING CONSULTING, INC.
ING CONSULTING, INC.
ME
CH
AN
ICA
L -
6T
H-8
TH
GR
AD
E A
DD
ITIO
N
M1.36/17/20
20
6/1
7/2
020
SA
P
JK
F
NO
RT
H
1/8" = 1'-0"M1.3
1 MECHANICAL - 6TH-8TH GRADE CLASSROOM ADDITION
NO
RT
H
1/8" = 1'-0"M1.3
2 MECHANICAL ROOF PLAN - 6TH-8TH GRADE CLASSROOM ADDITION
GENERAL NOTES:
KEYNOTES
(THIS SHEET ONLY)
(THIS SHEET ONLY)
1. BRANCH DUCT SIZE IS EQUAL TO AIR DEVICE NECK SIZE UNLESS OTHERWISE NOTED.
2. COORDINATE ALL EQUIPMENT INSTALLATION FINAL LOCATIONS TO ALLOW FOR SUFFICIENT MAINTENANCE ACCESS.
3. REFRIGERANT AND CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH ½" ARMFLEX FOAM
REMOVE AND RELOCATE EXISTING ELECTRIC CEILING HEATER AND ASSOCIATED TEMPERATURE SENSOR (S) TO NEW LOCATION. REPAIR VOID FROM EXISTING LOCATION WITH LIKE MATERIALS AND METHODS. CONTRACTOR SHALL COORDINATE WITH ELECTRICAL.
DUCT UP TO UNIT ON ROOF. SUPPLY DUCT IN CLASSROOMS SHALL RUN PARALLEL TO CORRIDOR WALLS AND INSTALLED WITH NO GREATER THAN 2 FEET BETWEEN FACE OF DUCT AND CORRIDOR WALL (TO ALLOW ROOM FOR ELECTRICAL INSTALLATION). TOP OF INSULATION SHALL BE BUTTED UP AGAINST THE BOTTOM OF JOIST. COORDINATE ROOF CURB INSTALLATION LOCATION SO THAT THE CLOSEST EDGE OF THE CURB IS NO FURTHER THAN 2' AWAY FROM THE JOIST BEARING LOCATION (CORRIDOR WALL). CONTROL BOX FOR UNIT CONTROLS SHALL BE LOCATED ABOVE THE CEILING IN THE CORRIDOR. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTOR. COORDINATE LOCATION OF CONTROL BOX WITH DUCTWORK AND PIPING LOCATED ABOVE THE CEILING.
NEW GAS LINE TAP INTO EXISTING MAIN AT 1½"ø APPROXIMATELY 200' PLAN WEST (NOT SHOWN) WITH GAS COCK. CONTRACTOR TO FIELD VERIFY.
CONNECT NEW ROOF TOP UNIT INTO EXISTING GAS PIPING. REFER TO DETAIL #5 / M0.2 FOR TYPICAL GAS ROOFTOP PIPING ARRANGEMENT
BALANCE NEW AND EXISTING 4 AIR DIFFUSERS SERVING CORRIDOR TO 240 CFM EACH.
1