Interpod is all about engineering innovative, sustainable alternatives to traditional bathroom building methods.
Over the years we’ve seen firsthand how traditional bathrooms too often become the most problematic area of construction, with countless defects causing costly delays.
There is a more reliable and cost effective solution.
Bathrooms account for approximately 5-10% of the capital cost of a hotel, student accommodation or residential development construction budget, but account for up to 80% of defects. Interpod’s bathrooms can change this equation for the better.
A CALCULATED CONSTRUCTION CHOICE
INTERPOD OFFSITE. IT ADDS UP.
By consolidating the entire bathroom build to a single supplier, Interpod Offsite offers a level of quoting accuracy, cost certainty, quality control and project management efficiency that cannot be achieved onsite in a traditional bathroom build with multiple trades and suppliers.
IN THE TIME IT TOOK US TO BUILD (OFFSITE) 76 BATHROOMS AND INSTALL THEM WE WERE STILL BUILDING 20 CONVENTIONAL BATHROOMS. THAT IN ITSELF TOOK ABOUT THREE TO FOUR MONTHS OFF THE PROGRAMME. - GARY CORY, CROWN INTERNATIONAL
Ideal for student accommodation, residential, hospitality, health, aged care, and military projects, Interpod have the expertise and experience to make your next project the most profitable and efficient project yet.
3
Interpod Offsite are a family-owned company that prides itself on its high quality products, sustainability and innovative contributions to the building industry.
With over 25 years’ experience and a production output of 25 defect free bathroom pods per day, or 6000 pods per year, Interpod have an exceptional track record of providing cost efficient and adaptable alternatives to traditional bathroom builds.
Our team of project managers, designers and engineers collaborate with global affiliates to bring the world’s best practices, methods, ideas and technologies to the local arena. Our craftsmanship has evolved over our decades of experience and enables us to meet diverse client demands and consistently surpass all expectations.
Interpod Offsite is Australia’s industry-leading and pioneering manufacturer of premium modular bathroom pods. We are the only Australian company dedicated to the high volume production of bathroom pods.
OUR STORY
4
ONE CONTRACTONE CONTACT, ONE COST
• A singular, certain and quantified cost with
no variations.
• The simplified procurement process
removes the complications of multiple
contracts.
• Reduced contract administration time.
PROGRAMME AND COST CERTAINTY
Our clients consistently tell us that bathroom pods have helped bring their projects in on time and under budget, by removing many of the risks associated with wet area construction. Interpod contributes to a simple construction and estimation process, reducing the pressure on programme variables and removing the complications associated with multiple stakeholders.
THE TRUE VALUE OF INTERPOD BATHROOMS
DESIGNED FOR YOUYOUR DECISION, DOWN TO THE DETAIL
• Reduce design overhead.
• Improved aesthetic – high quality detailing
and finish.
• Get access to a wide range of quality cost
effective spec alternatives.
• Fast-track FF&E decisions.
• 3D model and strict manufacturing control
guarantee design compliance.
• Maximise project cost savings with the
option of choosing from our standard
pod range.
IT SAVES TIME AND MANAGEMENT REALLY - IT MAKES IT A LOT EASIER FOR US AS BUILDERS AND FOREMEN TO LUMP THAT INTO ONE SYSTEM, RATHER THAN COORDINATING MULTIPLE TRADES. JOHN CHASE ICON CO.
5
BUILT OFFSITE OUTSOURCE, ACCELERATE & SAVE
DELIVERED COMPLETEEASY & SIMPLE THE RELIABILITY YOU NEED
QUALITY GUARANTEED
• Accelerate programme by up to 30%*.
• Remove up to 20% labour from site with
reduced site congestion in wet areas.
• Maximise workforce productivity with less
trade coordination and worksite congestion,
especially in wet areas.
• Reduce the risk of unplanned delays –
including weather delays.
• Reduce cost of waste handling and removal.
• No onsite cleaning of bathrooms.
• Ensure a cleaner, more organised site.
• Reduce pressure on stretched staff and
sub-contract labour.
• Reduce risk of project defects by up to 80%.
• Eliminate the risk of programme delay due
to defect rectification.
• Easy installation means no subcontractors
in bathrooms.
• Reduce risk of cost overruns due to trade
shortages.
• Simplify programme logistics.
• Reduce “end of project” pressure on
programme.
• Structural integrity removes risk of
waterproofing membrane failure.
• Engineered floor grades to waste eliminate
waterproofing failures or plumbing leaks.
• Warranty to match head contract
requirements.
• Reduce the need for ongoing maintenance.
• Factory environment allow for optimal
construction conditions and consistency.
5
THE USE OF POD BATHROOMS HAVE ALLOWED US TO BRING THE JOB IN ON TIME AND ON BUDGET, AND THIS WOULDN’T HAVE HAPPENED WITH A TRADITIONAL BUILD. ROSS SAUNDERS, ARROW INTERNATIONAL
6
PROJECT MANAGEMENT & OVERHEADS
DRIVING COSTS DOWNThe positive impacts Interpod can add to a project’s equation go far beyond the tangible costs.
A project will benefit from the tender or retender of bathroom pods in a multitude of areas, including project efficiency, removal of contingencies and reduction of labour. Interpod have a proven track record of turning optimistic programmes into realistic ones.
Understanding where these costs are in the tender process is paramount when calculating the overall project estimation. Being crystal clear about the works the subcontractor is expected to do will ensure that standard estimating methods and optimistic project planning do not affect the updated programme.
Interpod believe our premium quality bathroom pods can mitigate the following programme costs…
REMOVE
REDUCE
Cost for detailed drawings and elevations of bathrooms.
Contingency for scope gaps.
Additional prelims contingency for programme delay.
Contingency for unplanned workforce to mitigate programme delays.
Factory controlled waterproofing and stronger structure
ensure membrane and other issues are eliminated. If there
are any issues at all, there is no risk of the blame game.
Crane, tools & plant, electricity & services, scaffolding, site
offices, worker amenities, storage yards, insurances, staff
salaries, other holding costs.
Reduction of total worker amenities required.
Waste is generally calculated at $250 - $350 per bathroom.
Be sure to include the labour used to clean up and sort
waste as well as the waste removal costs.
Reduction in trade coordination and defect management.
Savings of up to 5 hours per pod.
Due to reduction in loose materials. Bathrooms are
secured on arrival to site.
The number of invoices and potential for disputes will be
reduced. Consider reducing contracts administration staff.
MAINTENANCE BUDGET
REDUCE P&G COSTS FOR IMPROVED
PROGRAMME
COSTS FOR REDUCED WORKFORCE
WASTE BUDGET
SITE MANAGEMENT COSTS – FINISHES
FOREMAN
CONTINGENCY FOR UNATTRIBUTABLE
DAMAGE AND THEFT.
CONTRACT ADMINISTRATION
STAFF
What our pods can remove from a project’s equation go far beyond the tangible costs.
6
7
SUBCONTRACTORS / SUPPLIERS
DEVELOPER SAVINGS
REDUCE
CREDIT
REMOVE
Allow $3000 to $4000 per pod .
Including all materials, labour, tapware & sanitary ware
Interpod bathrooms are Watermark approved, so ensure no additional
risk is priced in.
Allow $500 - $1000 per pod.
Including all materials & labour.
Allow $2000 - $2500 (for a 4m2 pod).
Includes linings, stud & track for each wall, linings & tophat for ceiling,
consumables, and labour.
Allow $2300 for tile installation plus $50 / m² for bed.
Include tile supply if applicable.
Allow $300.
Full cost of WPM to bathroom.
Allow $80 - $120 per pod.
Interpod bathrooms come fully cleaned and ready for use.
Allow up to $1000 per pod (depending on spec).
Mirror and shower screen supply and install.
Tiles, tapware, sanitary ware, accessories, door hardware, shower
screens, joinery, etc.
Allow $150 – $220 per bathroom, including set-out off gridlines,
minor levelling, and positioning.
Often packaged with plastering subcontract.
Interpod includes one prototype for each project. This can be used in
the display suite if required.
Reduction in loan savings and holding costs due to accelerated programme, if applicable.
PLUMBING
ELECTRICAL
PLASTERER
TILING
WATERPROOFING
COST OF MATERIALS
CLEANING
POD INSTALLATION
COSTS
LOAN SAVINGS AND HOLDING