1601 West Colonial Parkway Inverness, Illinois 60067 Main ...peralte-clark.com/Data/Peralte-Clark...
Transcript of 1601 West Colonial Parkway Inverness, Illinois 60067 Main ...peralte-clark.com/Data/Peralte-Clark...
Peralte - 1
JEAN-ALIX PERALTE, P.E., PTOE PRESIDENT WORK EXPERIENCE President, Peralte-Clark, LLC, Inverness, IL (2017 to Present)
• Founding partner of a new civil engineering firm in the Chicagoland area, specializing in preliminary and final engineering design for public and private sector clients.
Vice President, Midwest Region, STV Incorporated, Chicago, IL (2006 to 2017)
• Manager of the civil engineering design group
• Operations Manager of the Midwest Business Unit
• Business Unit Leader for the Midwest Region Vice President, Chicago Branch Manager, Chicago, IL (2002 to 2006)
• Responsible for the financial and technical performance of the office
Vice President – DB Sterlin Consultants, Inc., Chicago, IL (2002 to 2002)
• Supported the president in managing the operations of the firm
Project Manager/Project Engineer, Clark Dietz, Inc., Chicago, IL (1998 to 2001)
• Led, managed and performed transportation engineering projects
Civil Engineer, Rust Environment and Infrastructure (AECOM), Chicago, IL (1989 to 1998)
• Performed civil engineering duties
SUMMARY Mr. Peralte is a leader with more than 30 years of experience in the design, management, planning, and implementation of major capital projects, including highways and roadways, bridges, transit systems, storm sewer systems, and other infrastructure. In addition to his technical qualifications, Mr. Peralte has also led profit centers of small to large firms. In those roles, he has been responsible for the financial performance and for managing project performance, staff, and engineering groups. Mr. Peralte has established the technical direction of projects, developed cost estimates and schedules, and established management controls used during project implementation. He has also led public involvement and community outreach efforts for several highway reconstruction projects in Illinois, and confirmed projects are delivered according to the client’s specifications.
EDUCATION
Master of Business Administration; Illinois Institute of Technology (1996)
Bachelor of Science, Civil Engineering; Illinois Institute of Technology (1989)
YEARS WITH OTHER FIRMS
31 years
PROFESSIONAL REGISTRATIONS
Professional Engineer:
• Illinois (1994, #62049189, exp. 11/30/17)
• Michigan (1997, #6201042492, exp. 10/31/18)
• Missouri (2010, #2010015707, exp. 12/31/18))
Professional Traffic Operations Engineer (PTOE)
MEMBERSHIPS
Institute of Transportation Engineers (ITE)
American Council of Engineering Consultants (ACEC)
American Society of Civil Engineers (ASCE)
Peralte - 2
RECENT PROJECT EXPERIENCE
CDOT Kinzie Street Improvements CM - Principal-in-Charge Provided executive oversight services for $7.6 million in improvements along Kinzie Street for the Chicago Department of Transportation (CDOT). The scope included new pavement, curbs, signage, landscaping, and sidewalks, as well as the rehabilitation of a retaining wall and structural modifications to the Kinzie Street Bridge over the Kennedy Expressway. (10/15 – 2/17)
Illinois Tollway Elgin O’Hare Western Access - Principal-in-Charge Provided executive oversight during this $3.6 billion extension project to widen roadways and extend the expressway east to provide western access into O’Hare International Airport in a heavily populated region west of Chicago. The scope of work included engineering services for various grade separations within the 127-square-mile project area and for improvements to the Bensenville Freight Yard, the Bryn Mawr Interlocking, and the B-17 Interlocking. (8/13 – 2/17) LCDOT Ela Road at Long Grove Road Intersection Improvement Phase I - Principal-in-Charge Provided executive oversight for Phase I preliminary civil engineering services for planned improvements to the intersection of Ela Road and Long Grove Road in Barrington and Deer Park, IL. Mr. Peralte was responsible for establishing management controls for project implementation, and for overseeing coordination with LCDOT, the Lake County Storm Water Management Commission, the Lake County Forest Preserve District, permitting agencies, and the local community to develop a design that improves roadway safety and capacity while minimizing impacts to surrounding properties. (6/15 – 2/17) Illinois Tollway Jane Addams Memorial Tollway Roadway and Bridge Rehabilitation CM - Project Director Provided executive oversight for the roadway and bridge rehabilitation of a 28-mile portion of the Jane Addams Memorial Tollway in Winnebago, Boone, McHenry, and Kane counties, IL, for Illinois Tollway. (12/13 – 2/17) CDOT Phase II Reconstruction of West Grand Avenue from Chicago Avenue to Damon Avenue - Principal-in-Charge Provided executive leadership for the design of the $12 million roadway improvement project to a section of West Grand Avenue between West Chicago and North Damon avenues in Chicago for the Chicago Department of Transportation (CDOT). (8/13 – 2/17) IDOT IL-31 from IL-176 to IL-120 Phase I - Principal-in-Charge Provided executive oversight for design services for the preparation of a Phase I Environmental Assessment and Combined Design Report for a 6.5-mile, $70 million reconstruction and widening of IL-31 from IL-176 to IL-120 in McHenry County, IL. (1/11 – 2/17) IDOT US 150 from Urbandale Avenue to Detroit Avenue - Project Manager Managed Phase I engineering services for the preparation of a Categorical Exclusion Group II report for the widening of US 150 in Tazewell County, IL, to three lanes. Mr. Peralte supervised data collection, survey alignment and intersection design studies, accident analyses, drainage studies, and oversaw all public involvement efforts for the Illinois Department of Transportation (IDOT) project. (1/08 - 11/12) IDOT IL-21 Reconstruction - Project Manager Responsible for the overall management and design of the reconstruction of approximately 1.4 miles of IL-21, from Willow Road to north of Sanders Road, in Prospect Heights, Glenview, and Mount Prospect, IL. Mr. Peralte oversaw the preparation of preliminary, pre-final and final plans, estimates, and specifications. He also supervised the civil engineering staff and performed quality control reviews of construction documents. (12/06 - 8/11)
TRAINING
• Contract Review (2012)
• Ethics for Architects and Engineers (2012)
• Project Management (2007)
• Emotional Leadership (2013)
• Billing and the False Claims Act (2016)
COMPUTER SKILLS
MicroStation, MS Office, HCS
Clark - 1
JOHN A. CLARK, P.E. VICE PRESIDENT WORK EXPERIENCE Vice President, Peralte-Clark, LLC, Inverness, IL (2017 to Present)
• Founding partner of a new engineering firm in the Chicagoland area, specializing in Phase I and II engineering design for engineering transportation consultants and clients.
Director of Civil Engineering, Midwest Region, STV Incorporated, Chicago, IL (2009 to 2017)
• Manager of the Chicago Civil Highway Practice including oversight of all civil highway deliverables including Phase I studies and Phase II PS&E for transportation agencies within the Chicago and St. Louis Metro Areas.
• Oversaw the development of engineering plans, specifications, contract deliverables, and financial targets
Partner - Seton Engineering, Palatine, IL (2000 to 2004, 2007 to 2009)
• Diverse management and design experience including, municipal utility and roadway, highway design, drainage, traffic engineering, surveying, site development and land planning
• Prepared the firm’s RFQ responses, IDOT SEFC annual reports, Professional Transportation Bulletin submittals, and established marketing strategies for new clients and business sectors
President & Founder - CivilGroup Engineering, Chicago, IL (2004 to 2007)
• Launched civil engineering consulting firm, servicing commercial and residential site development sector
• Oversaw design and land surveying projects for nationally based clients in multiple states
Project Engineer - CTE Engineers, Inc. (AECOM), Chicago, IL (1998 to 2000)
• Completed engineering design, inspection and survey work for national and regional based clients, with concentration in transportation engineering including municipal, roadway, heavy rail and mass transit
SUMMARY
Mr. Clark is a senior project manager with 20 years of diverse management and design experience, including highway, railroad, drainage, hydraulic waterway modeling, municipal utility and roadway, traffic engineering, surveying, site development, and land planning projects. He is responsible for client coordination, resource planning, oversight of contract deliverables, and project performance for national and regional clients. Mr. Clark specializes in the development of engineering studies, plans, and specifications for multimillion-dollar transportation projects.
EDUCATION
Bachelor of Science,
Civil Engineering with Honors
University of Iowa (1997)
YEARS WITH OTHER FIRMS
19 years
PROFESSIONAL REGISTRATIONS
Professional Engineer:
• Colorado (2005/#PE-0039125/exp. 10/31/17)
• Florida (2005/#63463/exp. 2/28/17)
• Illinois (2002/#062055684/ exp. 11/30/17)
• Indiana (2005/#PE10504968/ exp. 7/31/18)
• Iowa (2015/#23052/exp. 12/31/16)
• Michigan (2006/ #6201053816/exp. 10/31/17)
• Missouri (2013/#2013037645 /exp. 12/31/17)
• Texas (2011/Civil Engineering/ #109595/exp. 9/30/17)
Clark - 2
RECENT PROJECT EXPERIENCE Lake County Division of Transportation Ela Road at Long Grove Road Intersection Improvement Phase I - Project Manager Oversaw Phase I preliminary civil engineering services at the intersection of Ela Road and Long Grove Road in Barrington and Deer Park, IL, for the Lake County Division of Transportation (LCDOT). (6/15 – 02/17) IDOT IL-31 Reconstruction from IL-176 to IL-120 Phase I - Project Manager Project Manager for a 6.5-mile Environmental Assessment which studied the reconstruction and widening of IL-31 from IL-176 to IL-120 in McHenry County, IL, for the Illinois Department of Transportation (IDOT). (1/11 – 02/17) CDOT Phase II Reconstruction of West Grand Avenue from Chicago Avenue to Damen Avenue - Project Manager Oversaw Phase II roadway plan preparation for West Grand Avenue in Chicago for the Chicago Department of Transportation (CDOT) including preparation of plans, specifications, and estimates (PS&E) for approximately 1.25 miles of roadway. (8/13 – 02/17) DuDOT Various Structural Engineering Services - Senior Civil Engineer Oversaw the development of Phase II highway plans, specifications, and estimates as part of an on-call contract with the DuPage County Division of Transportation (DuDOT) to provide as-needed structural engineering services. (8/15 - 4/16) IDOT IL-2 North of Elmwood Road to Rockton Bypass Reconstruction - Project Manager Project Manager for the Phase II reconstruction of 6 miles of IL-2 from north of Elmwood Road to the Rockton Bypass in Winnebago County, IL, transforming the route from a 2-lane undivided roadway to a 4-lane divided arterial. (6/09 - 7/15) Village of Palatine Smith and Colfax Drainage Study - Project Manager Supervised the preparation of a detailed drainage study and report to identify the causes for flooding within an intersection in downtown Palatine, IL, at Smith Street and Colfax Street. (5/15 – 02/17) Illinois Tollway Jane Addams Memorial Tollway Lee Street to Kennedy Expressway Widening - Project Manager Supervised civil engineering for drainage plans for the reconstruction and widening of a 2.5-mile segment of the Jane Addams Memorial Tollway (I-90) between Lee Street and Kennedy Expressway in Cook County, IL. (2/13 - 10/13) IDOT Torrence Avenue over the Grand Calumet River Bridge Replacement - Lead Civil Engineer Prepared roadway plans, specifications, and estimates for the replacement of the 4-lane, 522-foot-long Torrence Avenue Bridge over the Grand Calumet River and reconstruction of 430 feet of roadway south of the bridge and 350 feet of roadway north of the bridge in Burnham, IL. (4/13 - 7/15)
TRAINING
• OSHA 10-Hour Construction Health and Safety (5/5/15)
• Phase 1 Training; American Council of Engineering Companies of Illinois (ACEC-IL)/Illinois Department of Transportation (IDOT) (2016)
• Fundamentals of Storm Water Pollution and Erosion and Sediment Control; IDOT (2015)
• Inspection of Erosion and Sediment Control Best Management Practices; IDOT (2015)
• Erosion and Sediment Control Planning and Design; IDOT (2015)
• Using HEC-RAS to Model Bridges, Floodplains and Culverts; University of Wisconsin-Madison (2014)
• Microcomputer Applications in Signal Timing; Northwestern University Center for Public Safety (2002)
MEMBERSHIPS
• Civil and Environmental Advisory Board Vice Chair, University of Iowa (2010 - Present)
• National Council of Examiners for Engineering and Surveying (NCEES), Council Record
• Awards Committee Co-Chair, American Public Works Association (APWA)
• IDOT Subcommittee Education Chair (2012 - Present), American Council of Engineering Companies of IL (ACEC-IL)
COMPUTER SKILLS
MicroStation, GEOPAK, AutoCAD Civil 3-D, TR20, TR55, HEC-RAS, StormCAD, PondPack, CulvertMaster, Flowmaster, MS Project