Transcript of 150120-HSE Inspection Report-148+Attend
-
8/9/2019 150120-HSE Inspection Report-148+Attend
1/11
9 Mr. Dinesh Kumar Mandel - Interarc - HSE Officer
1 M r. K im S ac h - H il l I nt er na ti on al - H SE M an ag er 1 0 M r. A bd ul R af ee q V . - H an li m - H SE O ff ic er
2 M r. J af ar A th an ik ka l - H il l I nt er na ti on al - H SE E ng in ee r 1 1 M r. R ob in so n A su nc io n - C oa st al - H SE O ff ic er
3 Mr. H.J. Chae - HDEC - HSE Manager 12
Contractor : Hyundai Engineering & Construction Co., Ltd 4 Mr. G.S. Seok - HDEC - HSE Engineer 13 Mr. Alfred Joseph - R&R - HSE Officer
5 M r. Ogu nt ime hin H en ry - HDE C - H SE En gi nee r 14 Mr. A gu stin o BA- ONG - Ma rc ega glia - H SE Of fic er 6 Mr. Nick Latumbo - HDEC - HSE Engineer 15
7 Mr. Sanu Rajhovan - NWR - HSE Manager 16
8 Mr. R. Yoharaj - EVS - HSE Officer 17 Mr. Randy Alido - GSE - HSE Officer
Item Count Item Count Item Count Item
1 0 12 0 23 0 34
2 0 13 0 24 0 35
3 3 14 0 25 0 36
4 2 15 0 26 0 37
5 0 16 0 27 0 38
6 0 17 0 28 0 39
7 3 18 0 29 0 40
8 1 19 0 30 0 41
9 1 20 0 31 0 42
10 0 21 0 32 3 43
11 1 22 0 33 0 44
Attendees:
Occupational Health and Environmental
Controls
Helicopters, Hoists, Elevators, and
Conveyors
Office Safety / Facilities
Inspection Part
Construction Management : Hill International
Inspection Part
Client: Qatar Museum Authority
Project Management / Client Representative : ASTAD
Date of Inspection: 20-January-2015Mr. Mafumisebi Abulbish - FIBRO - HSE Officer
Mr. Jessie Aquino - Muehlhan - HSE Officer
Mr. C.J. - BOSTON - HSE Officer
National Museum of QatarConstruction Management & Supervision Services, Contract No.: XC10100800/2011
Date: 22012B-HS-RT-148 Rev: 00 HSE Inspection Report-148
Project: National Museum of Qatar - Package - B&C
NOTE: The HSE inspection report is based on Hill International own methodology and / or experience for auditing and scoring system. We do not assume full compatibility of the mentioned score with its r
tool for the institute to improve its HSE practice.
Contractor
Reply Date Insp. Date Items ClosedReport No.
Others... (Lack of Quality
Project Site)
Reporting, Recording of Occ. Injuries and
Illness
Environmental Controls (Water pollution / AirEmission / Dust & Noise Control / Waste Mgt.)
ASTAD / QP Inspections /
Penalty
Project Security
Materials Handling, Storage, Use, and
Disposal
Signs, Signals, and Barricades
Qatar Legal Requirements on Health
Safety Environment and Fire
General Safety and Health Provisions
HSE Inspections / HSE Re
HSE Meetings (Daily, week
Project HSE Plan, Manua
Risk AssessmentsScaffolds
Fall / Edge Protection
Rollover Protective Structures; Overhead
Protection
HSE Audits / Managemen
Occ. Health & Industrial
Record Maintenance Syst
Hazardous Materials
HSE Orientations / Specia
Records
Powered Platforms, Man lifts, and
Vehicle-Mounted Work Platforms
Personal Protective and Life Saving
Equipment
HILL Re-inspection Status
Power Transmission and Distribution
Concrete and Masonry Construction
Demolition
Underground Construction, Caissons,
Cofferdams, and Compressed Air
Item Open
15
Tools - Hand and Power
We ldin g a nd C utt ing Bla sti ng a nd t he U se of Ex plo sive s
Issue Date
1
Supervision (Foreman./Eng
Loss Prevention and BBS
Exit Routes and Emergency Planning
Cranes and Derricks Used in Demolition
and Underground Construction
Inspection PInspection Part
Cranes & Derricks in Construction
Toxic and Hazardous Substances
Commercial Diving Operations
Ladders
QATAR MUSEUMS AUTHORITY'S PROPRIETARY AND CONFIDENTIAL
This document is confidential to and the property of QATAR MUSEUM AUTHORITY (PO BOX 2777, Doha, Qatar). Copyright and all intellectual property right ownership is reserved by QATAR MUSEUMS AU
copied, reproduced, retained or disclosed to any unauthorized person, either wholly or in part without the prior written consent of QATAR MUSEUMS AUTHORITY.
This report must be return to the Hill International within stipulated time / one week. All citations must be closeout with respective photograph only.
Type of Hazards : Physical- heat, light, noise, vibration, electrical, radiation, manual handling, temperature extremes, trip & fall hazards, ladder, scaffold etc. Chemical- solids, liquids, vapours, gases,
mildew, insects, vermin, animals, fungi, parasites etc. Psychosocial- stress, violence & bullying etc. Environmental- air, water, noise pollution, waste management, poor ventilation & lighting, hot or co
HSE Inspection Report-148 Date: 20 January 2015
Project Contract Condition
Motor Vehicles, Mechanized Equipment,
and Marine Operations
Steel Erection
Excavations
Electrical
Fire Protection and Prevention
Page 1 of 10
-
8/9/2019 150120-HSE Inspection Report-148+Attend
2/11
(A) (B) (C ) (D) (E ) (F) (G) (H) (I) (J) (K) (L) (M)
Ins.
No. Ins. Sl. No.
Date of
Insp. Insp. By
Ite
m
Location
on Site Hazards Details of Unsafe Condition / Act OR Non Compliance OR Observation Priority
Details of Corrective and Preventive Action Taken by the
HYUNDAI Action By
Responsib
le Safety
Rep.
Action
Taken Date
1 48 1 48 .1 2 0- Ja n- 15 H IL L 4 Z o ne 1 5 O th er s
Evidence (Smell) of Urinating in the Building - Basement - Zone # 15:
This picture shows a unused room in the basement being used as a toilet.
Strong urine smell in the room. Urinating in the work area is unhygienic &
against site rules and regulations!
Have this issue discussed again in their daily TBT & if possible, close off this
room.
See the picture # 01
HIGH HDEC S.B. Lee
1 48 1 48 .2 2 0- Ja n- 15 H IL L 3 Z on e 1 5 P hy si ca l
Unsafe Stair Access - Low Overhead Obstacles - No Warning Signs in-place -
Zone # 15 - Basement:
This picture shows there is No caution or warning signs displayed warning
workers there is a low overhead hazard (i.e. low cable tray ) above the access
point!
Have suitable overhead hazard caution signs displayed on this scaffolding!
See the picture # 02
MEDIUM HDEC H.S. Shin
1 48 1 48 .3 2 0- Ja n- 15 H IL L 3 2 Zo ne 1 5 Environme
ntal
Unsafe Practice - Concrete Repair Works with NO Dust Extraction Fans in place -
Zone # 15-Basement:
This picture shows HDEC workers are doing concrete repair works without a
safe dust extraction system in place! Increase risk of respiratory problems for
these workers!
This is UNSAFE and UNACCEPTABLE for this project!
Have this work stopped & install the safe dust extraction fan system that will
reduce the dust levels in this work area.
See the picture # 03
HIGH HDEC S.B. Lee
1 48 1 48 .4 2 0- Ja n- 15 H IL L 3 4 Zo ne 0 9 O th er s
ESSW system not implemented in ALL Locations on-site - Zone # 09- Basement:
This picture shows the Lock out/Tag out (LOTO) system is not implemented at
every location in the basement. The ESSW system for Pl ant & Equipment to be
energized should be in place based on the MEP & HDEC instructions.
Have this room & all rooms in the basement provided with the necessary locks
& warning signs as per the ESSW procedure across the Project.
See the picture # 04
HIGH HDEC / BK
Gulf H.S. Shin
1 48 1 48 .5 2 0- Ja n- 15 H IL L 8 Z on e 0 8 P hy si ca l
Poor Housekeeping - Unwanted material stored Under Stacked Fire panel
Cartons - Zone # 08 - Basement:
This picture shows a number of stacked cartons on shelves with stored
materials under these cartons creating an unsafe worker access to these
shelves.
Have this material separated and the stacked away from the shelves so that
workers can safely access the stacked Fire Panel cartons.
"A Neat and tidy site is a safe site"!
See the picture # 05
MEDIUM HDEC / BK
Gulf H.S. Shin
1 48 1 48 .6 2 0- Ja n- 15 H IL L 3 4 Zo ne 0 8 O th er s
Safe Work Practice - PTW-CSP system in Place - Zone # 08 -Basement:
This picture shows the PTW-Confined Space work permit is in place & is
relevant for the work at hand. This is an example of a good work practice being
implemented across the Project.
See the picture # 06
INFO HDEC H.S. Shin
1 48 1 48 .7 2 0- Ja n- 15 H IL L 3 2 Zo ne 0 8 Environmental
Dust Extraction system Not Functioning Effectively - Basement- Zones # 06-08:
This picture shows dust extraction flexible ducting NOT connected properly;
NOT extending to outside the basement and it has numerous holes & tears. All
these imperfections in the ducting is resulting in the extraction system NOT
working effectively. What is the use of this safety control if the dust is recycledback into the same work area?
Have the ducting connected properly & tears repaired so that the dust
exhausting system will work efficiently & safely!
See the picture # 07
HIGH HDEC H.S. Shin
1 48 1 48 .8 2 0- Ja n- 15 H IL L 3 2 Zo ne 0 8 Environme
ntal
Poor Condition of Dust Extraction Flexible Ducting - Basement- Zone # 08:
This picture shows there are a lot of holes in the dust extraction flexible ducting
being used to extract dust from a concrete repairs and other work area!
Have this hose repaired properly so that the dust exhausting system will work
efficiently & safely!
See the picture # 08
HIGH HDEC H.S. Shin
1 48 1 48 .9 2 0- Ja n- 15 H IL L 1 1 Zo ne 0 6 P hy si ca l
Unsafe Condition - Open DB panel Cover - Zone # 06-Basement:
This picture shows an electrical DB panel door is open and it would appear its
lock mechanism is broken. An increased risk of electric shock or misuse of this
panel by unauthorized workers!
Have the DB panel door checked by an authorized person IMMEDIATELY!
See the picture # 09
MEDIUM HDEC H.S. Shin
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148
National Museum of QatarConstruction Management & Supervisio n Services, Contract No.: XC10100800/2011
Doc./Form No: PQA-1084-PP-16-11-FM Rev.0
Revision Date: 01-Feb-2011Page 2
-
8/9/2019 150120-HSE Inspection Report-148+Attend
3/11
(A) (B) (C ) (D) (E ) (F) (G) (H) (I) (J) (K) (L) (M)
Ins.
No. Ins. Sl. No.
Date of
Insp. Insp. By
Ite
m
Location
on Site Hazards Details of Unsafe Condition / Act OR Non Compliance OR Observation Priority
Details of Corrective and Preventive Action Taken by the
HYUNDAI Action By
Responsib
le Safety
Rep.
Action
Taken Date
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148
National Museum of QatarConstruction Management & Supervisio n Services, Contract No.: XC10100800/2011
1 48 1 48 .1 0 2 0- Ja n- 15 H IL L 7 Z on e 0 5 O th er s
No Information Sign Displayed at the Urinal station - Zone # 05 - Basement:
This picture shows there is No information sign displayed at this urinal station
for the workers' information.
Have this urinal station provided with the appropriate Signage ASAP.
See the picture # 10
LOW HDEC / HSE Chae Hyun
Jik
1 48 1 48 .1 1 2 0- Ja n- 15 H IL L 3 Z o n e 0 3 P hy si ca l
Lack of Task lighting for Worker - Zone # 03-Inside Basement Room:
This picture shows a HDEC worker is working inside a room with NO task
lighting! This work practice is NOT ACCEPTABLE & is UNSAFE.
Have sufficient task lighting made available for this worker.
See the picture # 11
MEDIUM HDEC H.S. Shin
1 48 1 48 .1 2 2 0- Ja n- 15 H IL L 3 5 Zo ne 0 3 O th er s
Unsafe Scaffolding - Scaf-tag Indicate The Scaffold is Not Regularly Inspected -
Zone # 03-Basement:
The picture shows scaffolding being used displaying an "out-of-date" scaf-tag.
WHY? Every scaffold used on-site must be inspected and renewed on weekly
basis by a competent person without fail!
Have this scaffold structure inspected IMMEDIATELY and the Scaf-tag updated.
See the picture # 12
HIGH HDEC H.S. Shin
1 48 1 48 .1 3 2 0- Ja n- 15 H IL L 4 Z on e 0 3 Environme
ntal
No Adequate Ventilation/Pedestal fan provided for painting works inside a
Closed Room - zone # 02-Basement:
This picture shows a number sub-con workers doing painting works inside a
closed room with No Forced ventilation or pedestal fans to provide some
degree of fresh air.
Have this work area provided with fans to increase the refresh air flow through
the closed room.
See the picture # 13
MEDIUM HDEC / NWR H.S. Shin
1 48 1 48 .1 4 2 0- Ja n- 15 H IL L 7 Z on e 0 3 O th er s
No Exit or Direction Signs Displayed in Main Walkway - Zone # 03 - Basement
Corridor:
This picture shows NO Exit or directional signs provided in the main corridor sothat people know where they need to exit out of the basement, especially in an
emergency situation.
Have this area provided proper directional or Exit arrow signs ASAP.
See the picture # 14
MEDIUM HDEC / HSE Chae Hyun
Jik
1 48 1 48 .1 5 2 0- Ja n- 15 H IL L 9 Z o n e 0 5 P hy si ca l
No Hand gloves used for chipping works - Zone # 05 - Basement:
This picture shows a worker is chipping with "home made" hand tool and
hammer without using proper hand protection. An increased risk of
hitting/slipping by hammer on the worker's hand.
Have this worker instructed to use proper chisels and wear hand gloves while
working.
See the picture # 15
MEDIUM HDEC H.S. Shin
1 48 1 48 .1 6 2 0- Ja n- 15 H IL L 7 Z o n e 0 4 P hy si ca l
Unsafe Guardrail system Used for Excavation Edge - Zone # 04-near the Live
road:
This picture shows there are No concrete barriers provided on an excavation
edge next to the live main access road. The section of hand rail is not secured
and can easily be pushed over by workers or passing vehicles.
Have this GI pipe connected to some concrete barriers along the excavation
edge next to the main access road.
See the picture # 16
HIGH HDEC S.B. Lee
1 48 1 48 .1 7 2 0- Ja n- 15 H IL L 3 Z o n e 0 8 P hy si ca l
No Warning Signs and Flash lights provided for Deep Excavation Next to LIVE
Main Access Road - Zone # 08-Lagoon Area:This picture shows there are NO warning si gns or Flashing roadside lights
provided on the water barriers near the LIVE road. Best practice would be to
use concrete barriers along this section of road.
Have this excavation area provided appropriate warning signs and Flashing
roadside lights fixed as required. If possible replace the W/F barriers with
concrete barriers.
See the picture # 15
HIGH HDEC S.B. Lee
Doc./Form No: PQA-1084-PP-16-11-FM Rev.0
Revision Date: 01-Feb-2011Page 3
-
8/9/2019 150120-HSE Inspection Report-148+Attend
4/11
Picture: 03 Picture: 04
Picture: 01 Picture: 02
National Museum of Qatar
Construction Management & Supervision Services, Contract No.: XC10100800/2011
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148 Date
-
8/9/2019 150120-HSE Inspection Report-148+Attend
5/11
National Museum of Qatar
Construction Management & Supervision Services, Contract No.: XC10100800/2011
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148 Date
Picture: 05 Picture: 06
Picture: 07 Picture: 08
-
8/9/2019 150120-HSE Inspection Report-148+Attend
6/11
National Museum of Qatar
Construction Management & Supervision Services, Contract No.: XC10100800/2011
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148 Date
Picture: 09 Picture: 10
Picture:11 Picture:12
-
8/9/2019 150120-HSE Inspection Report-148+Attend
7/11
National Museum of Qatar
Construction Management & Supervision Services, Contract No.: XC10100800/2011
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148 Date
Picture: 13 Picture: 14
Picture:15 Picture: 16
-
8/9/2019 150120-HSE Inspection Report-148+Attend
8/11
National Museum of Qatar
Construction Management & Supervision Services, Contract No.: XC10100800/2011
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148 Date
Picture: 17 Picture:18
Picture:19 Picture: 20
-
8/9/2019 150120-HSE Inspection Report-148+Attend
9/11
Picture: 01 Picture: 02
National Museum of Qatar
Construction Management & Supervision Services, Contract No.: XC10100800/2011
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148 HYUNDAI Compliance
Reply Date:
-
8/9/2019 150120-HSE Inspection Report-148+Attend
10/11
National Museum of Qatar
Construction Management & Supervision Services, Contract No.: XC10100800/2011
2012B-HS-RT-148 Rev: 00 HSE Inspection Report-148 HYUNDAI Compliance
Reply Date:
Picture: 03 Picture: 04
-
8/9/2019 150120-HSE Inspection Report-148+Attend
11/11