150+ Projects 1,500 MW

21
t a 13,000 MW Operating | Construction | Pipeline 7 BILLION+ kWh Generated and Counting 150+ Projects Owned & Operating 1,500 MW Operating Assets Project Overview

Transcript of 150+ Projects 1,500 MW

Page 1: 150+ Projects 1,500 MW

t

a

13,000 MWOperating | Construction | Pipeline

7 BILLION+ kWhGenerated and Counting

150+ ProjectsOwned & Operating

1,500 MWOperating Assets

Project Overview

Page 2: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

About sPower

Page 3: 150+ Projects 1,500 MW

About sPower

4/22/2020 3

ǀ Headquartered in Salt Lake City

ǀ 1.3GW Operating assets

ǀ 13GW Construction and Pipeline

ǀ 150+ Projects

ǀ Independent Power Producer specializing in developing, constructing and operating renewable energy projects

Wind

Solar

Battery storageUNDER DEVELOPMENTOPERATING PROJECTS

WINDPROJECTUTILITY PROJECT DGPROJECT

Page 4: 150+ Projects 1,500 MW

sPower as a neighbor & partner

4/22/2020 4

• sPower is focused on community support through sponsorships, partnerships, presentations and site tours throughout construction and operation of the project.

• Thus far, we have donated to the Coolidge water tower lighting project and provided COVID-19 relief grants to Community Action Human Resources in Eloy and Hope International Ministries in Coolidge.

• sPower invests in the local community by building, owning and operating its solar facility over the life of the project.

• We are active members of Pinal Partnership, the Coolidge Chamber of Commerce and are pursuing membership with the Eloy COC.

• We engage with neighboring landowners through open houses and proactively making direct contact to answer questions and address any concerns.

Page 5: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

Benefits to businesses and residents

4/22/2020 5

JOBS• 250-300 local employees are projected to be

employed during the 4 to 6-month construction period, providing construction jobs and subcontractor work to local businesses.

ECONOMIC IMPACT

• Direct economic stimulation of local businesses(e.g., purchases of building materials, fuel, hotel rooms, etc.).

• Increased sales and use tax revenues for the County; increased property tax receipts over 35 years.

• $100 million in total project investment, including land (phase 1), with an estimated $300 million in total project investment for entire portfolio

ENVIRONMENTAL BENEFITS

Appx277,000

Renewable MW hrs/year

34,159 Homes

electricity use for one year

195,881 Metric Tons

CO2 Emissions Reduction

Equivalent to 41,588 Cars Removed from the

Road

Page 6: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

About the Projects

Page 7: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.4/22/2020 7

Project Overview

• Size: Three, 100 MW ac solar projects• Phase 1 – East Line Solar• Phase 2 – Central Line Solar• Phase 3 – West Line Solar

• Location: City of Coolidge and City of Eloy, Pinal County, AZ

• Power purchaser: Salt River Project (SRP) for East Line Solar and Central Line Solar

• Project life: 35 years

• Interconnection: Underground 230 kV transmission line (“gen-tie”) connecting to Pinal Central Substation

Page 8: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

Project Size• 700 acres of private land • 100MWac / 125MWdc

Contractor• Rosendin Electric, Inc.

Permitting Status• Conditional Use Permit – received 6/2019• Site Plan Approval – received 10/2019• ROW permit, grading and drainage permit – received

4/2020• Building/structural permit – expected May 2020

Schedule• Breaking ground May/June 2020 (solar array)• System commissioning commercial operation date

December 2020

East Line Solar Project Details

4/22/2020 8

Page 9: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

Project Size• 700 acres of private land • 100MWac / 125MWdc

Permitting Status• Conditional Use Permit 1/2020• PADA 1/2020• Site Plan Approval expected May 2020

Schedule• Breaking ground Q1 2021 (solar array)• System commissioning commercial operation

date November 2021

Central Line Solar Project Details

4/22/2020 9

Page 10: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

About the Substation and Transmission Line

Page 11: 150+ Projects 1,500 MW

Grand Central Substation and 230kV High-Voltage Transmission Line “Gen-tie” Overview

4/22/2020 11

Q2 Q1 Q4 Q1

Collector Substation • All three projects will connect into sPower’s Grand Central Substation

via underground 34.5kV medium voltage collection lines, at which point the power will be stepped up to a 230kV high voltage transmission line aka “gen-tie”.

Gen-tie • Will be shared/utilized by the three projects.• Will be located within the east half of the Eleven Mile Corner Road

public right-of-way “EMC Rd ROW”.• 1.25 miles - the approximate length of the portion of the gen-tie that

will be within the EMC Rd ROW.

Interconnection • The gen-tie will enter SRP-owned property and come above ground at

a riser pole and then connect overhead into the Pinal Central Substation.

Contractors• Design engineer: Electrical Consultants, Inc. (“ECI”)• Construction: EPC Services Company

Jurisdictions• Pinal County – red area• City of Coolidge – orange area

Page 12: 150+ Projects 1,500 MW

Grand Central Substation and Gen-tie

4/22/2020 12

The gen-tie will leave the Grand Central Substation and be installed via a 3-foot wide trench in duct bank at approximately 3’6” below grade.

Page 13: 150+ Projects 1,500 MW

Gen-tie Path

4/22/2020 13

The gen-tie will continue traveling north and be located within an area in the EMC Rd ROW that is approximately 15 feet from the edge of pavement, in a trench that is approximately 3 feet wide and 3’6” deep, except at locations where it will cross existing utilities and at splice vault locations. The gen-tie will be installed pursuant to the requirements of the respective third-party utilities, as described on the following pages.

Page 14: 150+ Projects 1,500 MW

Third-Party Crossings (WAPA)

4/22/2020 14

The gen-tie will cross two existing overhead 115kV transmission corridors owned by WAPA pursuant to a License Agreement received from WAPA dated 4/2/2020.

Crossing #1

Crossing #2

Crossing #1 (south)

Crossing #2 (north)

Page 15: 150+ Projects 1,500 MW

Third-Party Crossings (SCIP)

4/22/2020 15

The gen-tie will cross two existing canals managed by San Carlos Irrigation project (“SCIP”) pursuant to two Encroachment Agreements received from SCIP and the Bureau of Indian Affairs dated 2/11/2020.

Crossing #1 (south) Crossing #2 (north)

Page 16: 150+ Projects 1,500 MW

Third-Party Crossings (continued)

4/22/2020 16

The gen-tie will also cross under other third-party utilities as follows:

• Arizona Water Company – reviewed our designs and provided a no-conflict letter with a request for IFC drawings when available. The gen-tie will be installed at a greater depth at the perpendicular crossing locations, as required by Arizona Water Company.

• Southwest Gas Company – reviewed our designs and provided a no-conflict letter with a request for IFC drawings when available. The gen-tie will be installed at a greater depth at the perpendicular crossing locations, as required by Southwest Gas Company.

• San Carlos Irrigation & Drainage District – provided clearance guidelines with regards to the perpendicular crossing of their overhead 66kV line with our underground gen-tie.

• Electrical District Number 2 – reviewed our designs and provided comments, which have been incorporated into the drawings. We are currently working on finalizing a crossing permit with ED2. We are also working collaboratively with ED2 to implement best-practice safety standards when working next to the 12.47kV energized line, to include installing rubber blankets on the segments of the energized line that are adjacent to installation areas.

Page 17: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

Point of Interconnection

4/22/2020 17

• The gen-tie will leave the EMC Rd ROW once it reaches the Pinal Central Substation and be located pursuant to a private easement from SRP. It will continue underground until it reaches a riser pole within SRP’s property and will then connect overhead into the substation. The “POD” shown below means “Point of Demarcation”, which is also the point of change of ownership between sPower and SRP.

Page 18: 150+ Projects 1,500 MW

STRICTLY CONFIDENTIAL. FOR INTERNAL PURPOSES ONLY. DO NOT COPY OR REDISTRIBUTE.

Vaults

4/22/2020 18

• Due to the length of the gen-tie and the weight of the cable, it is necessary to install three splice vaults, each of which are approximately 11’ X 25’.

• There will be 7 fiber splice locations, with two smaller vaults at each location, one for the primary fiber and one for backup fiber, for a total of 14 vaults. Each vault is 7’x2’.

Page 19: 150+ Projects 1,500 MW

Traffic Control

4/22/2020 19

Page 20: 150+ Projects 1,500 MW

Project Schedule

4/22/2020 20

Substation grading permits received

ROW permit received and pot-holing within EMC Rd to

identify existing utilities complete

Grading of the Grand Central

Substation beginsSubmit IFP

drawings with application for Pinal

County ROW permits

Construction of the gen-tie begins

Construction of the gen-tie continues

System commissioning

commercial operation date

Central Line Solar –construction

underway

Asset Management and O&M teams keep projects running

smoothly. Regular updates to local

government and community partners.

Site visits and community outreach.

TODAY Q2 Q3 Q42020

2020

2021BEYONDQ1

Page 21: 150+ Projects 1,500 MW

Thank you.

21