Transcript of 14155770 Operation Research Project Transportation
-
7/30/2019 14155770 Operation Research Project Transportation
1/11
Operations research projectON
Transportation Problem
-
7/30/2019 14155770 Operation Research Project Transportation
2/11
As any good work is incomplete without acknowledging the people whomade it possible, this acknowledgement is incomplete without thanking our
family, friends, and our faculty, without whose support this project wouldn't
have taken shape.
Since we have joined Jaipuria Institute of Management, LUCKNOW we
have gained so much knowledge, which has been possible due to the well-
managed education imparted to us under conditions, which are quite
conducive to learning, at our college.
We express our sincere gratitude toDr. Masood Siddiqui, our teacher of
Operations Research , who has helped us clarify our concepts by sharing
his valued experiences in his teaching, research and training which have
thereby become an unconscious part of our ideas and thoughts while
analyzing the Operations Research project work on Management of
Kaiserbagh Bus Depot.
Without his sincere help and guidance the project report would have not
been a possible.
We thank all our team members who had worked hard to make the report to
its present form.
Lastly we would like to thank our families for their continuing support,
blessings and encouragement.
-
7/30/2019 14155770 Operation Research Project Transportation
3/11
I ntroduction
Linear P rogramming
In mathematics, linear programming (LP) is a technique foroptimization of
a linearobjective function, subject to linear equality and linear inequality
constraints. Informally, linear programming determines the way to achieve
the best outcome (such as maximum profit or lowest cost) in a given
mathematical model and given some list of requirements represented as
linear equations.
More formally, given apolytope (for example, apolygon or apolyhedron),
and a real-valued affine function
Defined on this polytope, a linear programming method will find a point in
the polytope where this function has the smallest (or largest) value. Such
points may not exist, but if they do, searching through the polytope vertices
is guaranteed to find at least one of them.
Linear programs are problems that can be expressed in canonical form:
Maximize: ctxSubject to: Ax
-
7/30/2019 14155770 Operation Research Project Transportation
4/11
Linear Programming Assumptions
Linear programming requires linearity in the equations as shown in the
above structure. In a linear equation, each decision variable is multiplied by
a constant coefficient with no multiplying between decision variables and no
nonlinear functions such as logarithms. Linearity requires the following
assumptions:
1) Proportionality - a change in a variable results in a proportionate change
in that variable's contribution to the value of the function.
2) Additivity - the function value is the sum of the contributions of each
term.
3) Divisibility - the decision variables can be divided into non-integervalues, taking on fractional values.Integer programmingtechniques can be
used if the divisibility assumption does not hold.
In addition to these linearity assumptions, linear programming assumes
certainty; that is, that the coefficients are known and constant.
The Effect of Constraints
Constraints exist because certain limitations restrict the range of a variable's
possible values. A constraint is considered to be bindingif changing it alsochanges the optimal solution. Less severe constraints that do not affect the
optimal solution are non-binding.
Tightening a binding constraint can only worsen the objective function
value, and loosening a binding constraint can only improve the objective
function value. As such, once an optimal solution is found, managers can
seek to improve that solution by finding ways to relax binding constraints.
-
7/30/2019 14155770 Operation Research Project Transportation
5/11
Route planning
Network arises in numerous settings and in variety of guises. Transportation,
electrical networks pervade our daily lives. Many network optimization
models are special types of linear programming models. Route planning or
the shortest path problem is one of them. In this problem we consider an
undirected and connected network with 2 special nodes, called source and
destination. Associated with each link is nonnegative distance. The objective
is to find the shortest path from the source to the destination. A relatively
straightforward algorithm is available for this problem. The essence of this
procedure is that it fans out from the origin, identifying the shortest path to
each node of the network in the ascending order of their shortest distances
from the origin, thereby solving the problem when destination node is
reached.
The Transportation Problem
There is a type of linear programming problem that may be solved using a
simplified version of the simplex technique called transportation method.
Because of its major application in solving problems involving several
product sources and several destinations of products, this type of problem is
frequently called the transportation problem. It gets its name from its
application to problems involving transporting products from several sources
to several destinations. Although the formation can be used to represent
more general assignment and scheduling problems as well as transportationand distribution problems. The two common objectives of such problems are
either (1) minimize the cost of shipping m units to n destinations or (2)
maximize the profit of shipping m units to n destinations.
Let us assume there are m sources supplying n destinations. Source
capacities, destinations requirements and costs of material shipping from
each source to each destination are given constantly. The transportation
problem can be described using following linear programming mathematical
model and usually it appears in a transportation tableau.
There are three general steps in solving transportation problems.
We will now discuss each one in the context of a simple example. Suppose
one company has four factories supplying four warehouses and its
management wants to determine the minimum-cost shipping schedule for its
http://orms.czu.cz/text/MatModelTransProb.htmlhttp://orms.czu.cz/text/MatModelTransProb.htmlhttp://orms.czu.cz/text/TranspTableau.htmlhttp://orms.czu.cz/text/MatModelTransProb.htmlhttp://orms.czu.cz/text/MatModelTransProb.htmlhttp://orms.czu.cz/text/TranspTableau.html -
7/30/2019 14155770 Operation Research Project Transportation
6/11
weekly output of chests. Factory supply, warehouse demands, and shipping
costs per one chest (unit) are shown below.
Data for Transportation Problem
At first, it is necessary to prepare an initial feasible solution, which may be
done in several different ways; the only requirement is that the destinationneeds be met within the constraints of source supply.
The Transportation Matrix
The transportation matrix is where supply availability at each factory is
shown in the far right column and the warehouse demands are shown in the
bottom row. The unit shipping costs are shown in the small boxes within the
cells. It is important at this step to make sure that the total supply
availabilities and total demand requirements are equal. Often there is an
excess supply or demand. In such situations, for the transportation method towork, a dummy warehouse or factory must be added. Procedurally, this
involves inserting an extra row (for an additional factory) or an extra column
(for an ad warehouse). The amount of supply or demand required by the
dummy equals the difference between the row and column totals.
It deals with sources where a supply of some commodity is available and
destinations where the commodity is demanded. The classic statement of the
transportation problem uses a matrix with the rows representing sources and
columns representing destinations. The algorithms for solving the problem
are based on this matrix representation. The costs of shipping from sources
to destinations are indicated by the entries in the matrix. If shipment is
impossible between a given source and destination, a large cost of M is
entered. This discourages the solution from using such cells. Supplies and
demands are shown along the margins of the matrix. As in the example, the
classic transportation problem has total supply equal to total demand.
-
7/30/2019 14155770 Operation Research Project Transportation
7/11
Matrix model of a transportation problem.
The network model of the transportation problem is shown in Fig. 10.
Sources are identified as the nodes on the left and destinations on the right.
Allowable shipping links are shown as arcs, while disallowed links are not
included.
Network flow model of the transportation problem.
Only arc costs are shown in the network model, as these are the only
relevant parameters. All other parameters are set to the default values. The
network has a special form important in graph theory; it is called a bipartite
network since the nodes can be divided into two parts with all arcs going
from one part to the other.
On each supply node the positive external flow indicates supply flow
entering the network. On each destination node a demand is a negative fixed
external flow indicating that this amount must leave the network.
-
7/30/2019 14155770 Operation Research Project Transportation
8/11
Optimum solution, z = 46.
Variations of the classical transportation problem are easily handled by
modifications of the network model. If links have finite capacity, the arc
upper bounds can be made finite. If supplies represent raw materials that are
transformed into products at the sources and the demands are in units of
product, the gain factors can be used to represent transformation efficiency
at each source. If some minimal flow is required in certain links, arc lower
bounds can be set to nonzero values.
-
7/30/2019 14155770 Operation Research Project Transportation
9/11
Problems faced by Kaiserbagh Bus Depot
1). The Director of Roadways, Uttar Pradesh, Knows that the problem of existing
temporary bus stand in Kaiserbagh is the increased waiting cost on behalf of thecustomers. It is known that customers arrive at a Poisson process at the rate of 100 per
hour. The time required to deal with a customer has an exponential distribution with a
mean service time of 30 seconds. The director feels that the cost of loss in customer
goodwill due to waiting in queue is Rs. 10 per minute.The diector has been approached with the following two alternatives:-
Proposal 1 is to shift the entire operations to a new location i.e. Old Kaiserbagh
Bus Depot. The cost of transfer and designing a new facility is Rs. 4.56 crores. Its
been assumed that the new facility will be operatatble with an estimated life of 10
years. The new facility will reduce the average service time to 15 seconds.
Proposal 2 is to shift the entire operations to a less populated area and designing a
new facility with an estimated cost of Rs. 6.25 crores. The new facility will resultin reduction in average service time to 10 seconds.
The director wants to evaluate the best proposal he should undertake so as to reduce the
total cost of operations.
(The Bus-Stand is operatable for 12 hours in a day for 360 days in a year).
Solution
Inter arrival time() = 100 per hourMean service time () = 30 seconds=120 per hour
Cost of waiting(Cw) = 10 per minute =600 per hour
Model used --- (M/M/1):(/GD)
Total number of passenger waiting in que(Lq) = / (- )= 100/120(120-100)
= 4.167
Total cost of waiting = LqCw= 4.167 600
= 2500.2
Proposal 1.
Inter arrival time() = 100 per hour
Mean service time () = 15 seconds=240 per hour
Cost of waiting(Cw) = 10 per minute =600 per hour
-
7/30/2019 14155770 Operation Research Project Transportation
10/11
Model used --- (M/M/1):(/GD)
Total number of passenger waiting in que(Lq) = / (- )
= 100/240(240-100)
= .297Total cost of waiting = LqCw
= .297 600
= 178.57Initial cost =initial investment/10yrs36012=45600000/43200=1055.55
Total cost = Initial cost + Total cost of waiting
=1055.55 + 178.57=1234.12
Proposal 1.
Inter arrival time() = 100 per hourMean service time () = 10 seconds=360 per hour
Cost of waiting(Cw) = 10 per minute =600 per hourModel used --- (M/M/1):(/GD)
Total number of passenger waiting in que(Lq) = / (- )= 100/360(360-100)
= .107
Total cost of waiting = LqCw= .107 600
= 64.10
Initial cost =initial investment/10yrs36012=62500000/43200=1446.75
Total cost = Initial cost + Total cost of waiting
=1446.75 + 64.10=1510.85
Hence cost is minimum in proposal therefore proposal 1 will be selected.
-
7/30/2019 14155770 Operation Research Project Transportation
11/11
2). The management of the Kaiserbagh Bus Stand is thinking of inaugurating a new
Superfast bus service consisting of three new buses from Kaiserbagh Bus Stand. The
buses are of three categories namely Marcopolo, Tata SE202, Echier Super105.Thelocations are Barabanki, Sitapur and Gonda. The cost structur is as follows:-
Barabanki Sitapur GondaDistance 30 85 105
Proposed Ticket
Charge
20 50 70
The Capacity of buses and the running cost per kilometer is as follows:-
Marcopolo Tata SE202 Echier Super105
Capacity 60 70 80
Cost of Running 10 15 17
Thus, the profit for the respective routes are as follows:-
Barabanki Sitapur Gonda
Marcopolo 900 2150 3150
Tata SE202 950 2225 3625
Echier Super105 1090 2555 3815
Solution and Senstivity Report On excel Sheet.