14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the...

106
 solutions.   partnerships.   success.  t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com   FINAL DRAINAGE REPORT FALLBROOK FILING NO. 3 Thornton, CO   August 19, 2015   JN: 14053   Prepared for:  Carlson Associates  Ryland Homes PO Box 247   6161 S. Syracuse Way, Suite 200 Eastlake, CO 80614  Greenwood Village, CO 80111 P: 303.457.2966  P: 303.486.5000   Prepared by:  Jansen Strawn Consulting Engineers 45 W. 2nd Avenue Denver, CO  80223 P:  303.561.3333 F:  303.561.3339               Thomas C. Jansen, PE No. 35942 Principal   

Transcript of 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the...

Page 1: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

 

solutions.  partnerships.  success. 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com 

 

 FINAL DRAINAGE REPORT 

FALLBROOK FILING NO. 3 Thornton, CO 

  

August 19, 2015   

JN: 14053   

Prepared for:  

Carlson Associates    Ryland Homes PO Box 247      6161 S. Syracuse Way, Suite 200 Eastlake, CO 80614    Greenwood Village, CO 80111 P: 303.457.2966    P: 303.486.5000 

  

Prepared by:  

Jansen Strawn Consulting Engineers 45 W. 2nd Avenue Denver, CO  80223 P:  303.561.3333 F:  303.561.3339 

       

             Thomas C. Jansen, PE No. 35942 

Principal    

Page 2: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 2 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

CERTIFICATION I  hereby  affirm  that  this  report  and  plan  for  the  Fallbrook  Filing  No.  3  Subdivision was 

prepared by me, or under my direct supervision, for the owners thereof, in accordance with 

the  provisions  of  the  City  of  Thornton  Standards  and  Specifications  for  the  Design  and 

Construction  of  Public  and  Private  Improvements  for  the  Responsible  Parties  thereof.  I 

understand  that  the City of Thornton does not  and will not  assume  liability  for drainage 

facilities designed by others. 

 

 

 

 

 

 

                       

Thomas C. Jansen, PE          Date 

State of Colorado Registration No. 35942 

For and on behalf of Jansen Strawn  

Consulting Engineers, Inc. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 3: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 3 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

T A B L E   O F   C O N T E N T S 

 

I.  GENERAL LOCATION AND DESCRIPTION .............................................................................................. 4 

II.  DRAINAGE BASINS AND SUB‐BASINS .................................................................................................... 5 

III.  DRAINAGE FACILITY DESIGN ................................................................................................................. 6 

IV.  STORMWATER MANAGEMENT FACILITY DESIGN ................................................................................. 8 

V.  CONCLUSION ....................................................................................................................................... 11 

VI.  REFERENCES ........................................................................................................................................ 11 

 

 

 

 

A P P E N D I C E S 

 

APPENDIX A – Basin Hydrology 

% Impervious Calculations 

“C” Values Calculations 

SF2 & SF3 Rational Method Calculations 

 

APPENDIX B ‐ Hydraulics 

  Detention Pond Analysis 

  Street Capacity Calculations 

  Inlet Calculations 

  Storm Sewer Design 

 

APPENDIX C – Reference Materials 

  Effective FEMA Map Panels 

  NRCS Soil Information 

 

APPENDIX D ‐ Maps 

  Developed Basin Map 

   

 

     

Page 4: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 4 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

I. GENERAL LOCATION AND DESCRIPTION 

 

The purpose of this report is to define and analyze developed runoff quantities and conveyance 

through the Fallbrook Filing No. 3 development.  Runoff from this proposed development will be 

directed to a stormwater detention pond which will be located on the southern portion of the 

site.    

 

A. Site Location 

 

The project site is located in the north half of Section 24, Township 1 North, Range 68 West of 

the Sixth Principal Meridian, County of Adams, Colorado. Portions of the site are bounded by 

Colorado Boulevard to east and E. 140th Avenue to the south. 

 

Adjacent  developments  to  the  site  include  Fallbrook  Subdivision,  Filing  No.  1  to  the  west, 

Cherrywood Park Subdivision, Filing No. 1 to the south, and the Thornton Fire Department Station 

5 to the southeast.  See the below vicinity map for reference.  

 

 

Page 5: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 5 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

 

There are no major drainageways/floodplains, wetlands or irrigation ditches located on the site, 

although Signal Ditch (irrigation ditch) does pass by  just outside the property boundary to the 

northwest. 

 

B. Description of Property 

 

The Fallbrook Filing No. 3 was platted as Tract K of Fallbrook Filing No. 1 for 140th and Colorado, 

LLC. 

 

II. DRAINAGE BASINS AND SUB‐BASINS 

 

A. Major Drainage Basins 

 

The project site lies within the Big Dry Creek watershed and is also located within the study 

area of an Outfall Systems Plan (OSP) titled “Outfall Systems Planning North Area Tributaries 

Big Dry Creek (ADCO)” prepared by Wright Water Engineers,  Inc.   This OSP was previously 

utilized  during  the  design  of  the  adjacent  Fallbrook  Subdivision,  Filing  No.  1 

(MMcEngineering,  Inc.)  and  a  storm  sewer  stub  was  designed  and  installed  as  a  tie‐in 

connection point for the detention pond outlet structure from this current development.   

 

As mentioned previously, there are no FEMA floodplains on the site. According to the Flood 

Insurance Rate Map 08001C0304H, the entire site is within Zone X, which is an area that is 

determined to be outside of the 500‐year floodplain.  Refer to Appendix C for the appropriate 

Flood Insurance Rate Map panel.  

 

The  USCS  Soil  Survey  indicates  that  the  site  is  underlain  by  soils which  are  part  of  the 

hydrologic soil group C.   Hydrologic soil group C soils are  identified as soils having a slow 

infiltration  rate when  thoroughly wetted  and  consisting mostly  of  soils with  a  layer  that 

impedes downward movement of water or soils with moderately‐fine to fine texture.  Refer 

to Appendix C for an excerpt from the NRCS Soils Report for the site. 

 

B. Sub‐Basin Description 

 

The site, which lies within the Big Dry Creek watershed, will drain to the proposed detention 

pond  located on  the  southern portion of  the  site.   The outlet  structure  for  the proposed 

npitteng
Callout
western
Page 6: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 6 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

detention  basin  will  tie  into  a  pre‐existing  storm  sewer  stub  which  was  designed  in 

anticipation of this proposed development.  

 

III. DRAINAGE FACILITY DESIGN 

 

A. Regulations 

 

Stormwater  conveyance  and  detention  facilities  for  this  project  were  designed  in 

conformance with the City of Thornton Standards and Specifications and the Urban Drainage 

Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual (UDSCM), Volumes 1, 

2, and 3.  

 

B. Drainage Studies, Outfall Systems Plans, Site Constraints 

 

As previously mentioned, the project site lies within the Big Dry Creek watershed and is also 

located within the study area of an Outfall Systems Plan (OSP) titled “Outfall Systems Planning 

North Area Tributaries Big Dry Creek (ADCO)” prepared by Wright Water Engineers, Inc.  This 

OSP was previously utilized during the design of the adjacent Fallbrook Subdivision, Filing No. 

1  (MMcEngineering,  Inc.)  and  a  storm  sewer  stub was  designed  and  installed  as  a  tie‐in 

connection point for the detention pond outlet structure from this current development.   

 

C. Hydrology 

 

The minor and major storm frequencies for design are the 5‐year and 100‐year storm events, 

respectively.  The one hour point rainfall for the 5‐year event is 1.38 inches and 2.69 inches 

for the 100‐year event. 

The peak discharge for sizing the onsite storm sewer and for the street capacity calculations 

was calculated using the following Rational Method formula: 

Q=CIA 

Where: 

Q = peak discharge (cfs) 

C = runoff coefficient 

I = rainfall intensity (inches/hour) 

A = drainage area (acres) 

 

Page 7: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 7 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

See Appendix A for Rational Method flow calculations.  The UDFCD SF‐3 form was used to 

determine the total flow at respective design points.   

 

D. Hydraulics 

 

Allowable street and alley capacities for the proposed improvements are in accordance with 

City of Thornton Standards.  At no point will flow from the minor or major storm events be 

allowed to flow  into residential  lots or at a depth greater than 12  inches.   Alley capacities 

were calculated assuming that capacity was limited to the width of the alley.  Street and alley 

capacity calculations for the proposed development are provided in Appendix B. 

Inlets have been designed  throughout  the  site  to  capture  runoff  from  the  streets before 

maximum allowable street and alley capacities are exceeded and at sump  locations.    Inlet 

calculations have been prepared  for  the  site using  the Urban Drainage and Flood Control 

District UD‐Inlet_V2.03.xls spreadsheet.  Inlet capture calculations are provided in Appendix 

B. 

Proposed  storm  sewers  have  been  designed  in  accordance  with  the  City  of  Thornton 

Standards.  Hydraflow Storm Sewers extension for Autodesk AutoCAD Civil 3D was utilized to 

perform hydraulic computations on the proposed storm sewer, including the calculation of 

hydraulic  grade  lines.    Hydraflow  Storm  Sewers  output  for  the  proposed  storm  sewer, 

including profiles with hydraulic grade lines, is included in Appendix B. 

Riprap  for  the  pipe  outlet  into  the  proposed  detention  pond was  sized  and  designed  in 

accordance with UDFCD USDCM Volume 1, Section 7 (Major Drainage) criteria. 

E. Water Quality Enhancement 

Because  the  full‐spectrum detention method  is being used  for  this project,  the water 

quality capture volume (WQCV)  is  included as part of the Excess Urban Runoff Volume 

(EURV). 

 

F. Detention 

As required by the City of Thornton, the stormwater detention pond was designed using 

the full spectrum detention method which is detailed in the UDFCD UDSCM.  This method 

includes  providing  storage  for  the  EURV  and  100‐year  detention  volume.    An  outlet 

structure was designed to release the EURV over a period of 72 hours and to release the 

100‐year detention volume at a rate of 1 cfs/acre.  As required by the City of Thornton, 

an emergency spillway capable of discharging at a rate of twice the 100‐year peak flow 

(with 1 foot of freeboard) was designed for the detention pond.  

npitteng
Highlight
npitteng
Highlight
npitteng
Callout
With no curb and gutter how was this assumption made? How do we know that the flows will not encroach onto lots?
npitteng
Callout
Is there going to be rip rap at this outfall? I do not see it on the CDs or a design for it in the report
npitteng
Callout
This can be designed to pass the 100yr instead with 1 foot of freeboard.
Page 8: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 8 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

 

IV. STORMWATER MANAGEMENT FACILITY DESIGN 

 

A. General Concept 

 

Generally speaking, stormwater runoff from the residential areas will sheet flow to nearby 

streets or alleys.  The runoff will then be captured by storm sewer inlets and conveyed to 

the detention pond.  

B. Specific Details 

 

The Fallbrook Filing No. 3 development consists of the construction of multi‐family residential 

homes on 56 lots.  The site is approximately 17.02 acres.  The residential density for the site 

is computed based on the area of the site that will be developed for residential purposes, 

which  excludes  streets,  sidewalks,  and  open  space.    Each  lot was  estimated  to  have  an 

imperviousness of approximately 60%.   C values were then obtained using UDFCD USDCM 

based on that  imperviousness percentage.   Proposed drainage basins will generally  follow 

historic drainage patterns.  All basins with the exception of basin B1 will direct stormwater 

runoff to the proposed detention pond.  Basin B1 will leave the site undetained.   

 

Basin A1 

 

Basin A1 drains to an existing inlet located in Colorado Boulevard (at DP 1).  Previously, this 

inlet discharged runoff as overland flow through the site.   In the developed condition, this 

inlet will be connected to the proposed storm sewer network which conveys stormwater to 

the proposed detention pond.  

 

Basin A2 drains to a proposed CDOT Type R inlet (on sag) located in Street B (at DP 2) which 

conveys stormwater to the proposed detention pond.  Should this inlet become clogged, the 

overflow path will be through Tract G to Street A.  

Basin A3 drains to a proposed Denver No. 16 valley inlet (on sag) located in Alley D (at DP 3) 

which  conveys  stormwater  to  the  proposed  detention  pond.    Should  this  inlet  become 

clogged, the overflow path will be through Tract G to Street A. 

 

Basin A4 drains to a proposed CDOT Type R inlet (on sag) located in Street A (at DP 4) which 

conveys stormwater to the proposed detention pond.  Should this inlet become clogged, the 

overflow path will be through the open space/park area to the south and into the pond. 

npitteng
Callout
Label tracts on basin map
Page 9: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 9 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

 

Basin A5 drains to a proposed CDOT Type R inlet (on sag) located in Street B (at DP 5) which 

conveys stormwater to the proposed detention pond.  Should this inlet become clogged, the 

overflow path will be through Tract G to Street A.  

 

Basin A6‐1 drains to a proposed Denver No. 16 valley inlet (on grade) located in Alley D (at 

DP 6‐1) which conveys stormwater to the proposed detention pond.   

 

Basin A6‐2 drains to a proposed CDOT Type R inlet (on grade) located in Street C (at DP 6‐2) 

which conveys stormwater to the proposed detention pond.   

 

Basin A7‐1 drains to a proposed Denver No. 16 valley inlet (on grade) located in Alley T (at DP 

7‐1) which conveys stormwater to the proposed detention pond.   

 

Basin A7‐2 drains to a proposed Denver No. 16 valley inlet (on grade) located in Alley T (at DP 

7‐2) which conveys stormwater to the proposed detention pond.   

 

Basin A7‐3 drains to a proposed CDOT Type R inlet (on grade) located in Street C (at DP 7‐3) 

which conveys stormwater to the proposed detention pond.   

 

Basin A8‐1 drains to a proposed Denver No. 16 valley inlet (on grade) located in Alley T (at DP 

8‐1) which conveys stormwater to the proposed detention pond.   

 

Basin A8‐2 drains to a proposed Denver No. 16 valley inlet (on grade) located in Alley T (at DP 

8‐2) which conveys stormwater to the proposed detention pond.   

 

Basin A8‐3 drains to a proposed CDOT Type R  inlet (on sag)  located  in Street A (at DP 8‐3) 

which  conveys  stormwater  to  the  proposed  detention  pond.    Should  this  inlet  become 

clogged, the overflow path will be through the open space/park area to the south and into 

the pond. 

 

Basin A9 drains to a proposed CDOT Type R inlet (on sag) located in Street A (at DP 9) which 

conveys stormwater to the proposed detention pond.  Should this inlet become clogged, the 

overflow path will be through the open space/park area to the south and into the pond. 

 

Page 10: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 10 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

Basin A10 drains to a proposed CDOT Type R inlet (on sag) located in Street A (at DP 10) which 

conveys stormwater to the proposed detention pond.  Should this inlet become clogged, the 

overflow path will be through the open space/park area to the south and into the pond. 

 

Basin A11 drains overland directly into the proposed detention pond.  

 

Basin B1 is located along the perimeter of the north end of the project site and will leave the 

site undetained.  

 

C. Full Spectrum Detention 

 

Onsite  stormwater quality and detention  for  the proposed development will be provided 

using the Urban Drainage and Flood Control District (UDFCD) methods and calculations for 

full spectrum detention. 

 

Full spectrum detention  includes providing a 72‐hour release  for  the Excess Urban Runoff 

Volume (EURV) and providing detention and release controls to limit the 100‐year discharge 

for the site.   Required EURV and 100‐year detention volumes and release rates have been 

determined  for  this  site using  the UD_Detention_2.2.xls  spreadsheet  from UDFCD, which 

utilizes Equation SO‐13 from the Storage section of UDFCD USDCM Volume 2 to determine 

the required EURV.  Each of the proposed ponds utilizes an orifice plate that has been sized 

in accordance with UDFCD criteria for hole‐spacing and hole size for the required EURV.  This 

plate is affixed to the front of the outlet structure, behind a well screen trash rack.  The outlet 

structure, which is covered with a grate, and passes through a restrictor plate that has been 

designed to restrict the outflow from the pond.  

 

The basin has been designed with an all‐weather maintenance access road that is 8 feet wide 

with a maximum longitudinal slope of 7 percent that consists of Class 6 road base material 

with filter fabric.  The maintenance access is provided from Street A (and through the park) 

and will provide access to the front of the outlet structure in the bottom of the pond.   

 

The  maintenance  of  the  proposed  detention  pond  will  be  the  responsibility  of  the 

homeowners association or metropolitan district.  Drainage easements have been dedicated 

by plat for the proposed pond.   

 

The proposed pond has been designed with a EURV storage of 1.12 acre‐feet and a total 100‐

year  storage  volume of 2.02 acre‐feet which  includes  the 0.46 acre‐feet of water quality 

npitteng
Rectangle
npitteng
Callout
Show this on the CDs
npitteng
Callout
Will these flows to offsite be less than historic flows to offsite?
npitteng
Callout
Only 1 pond
Page 11: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Fallbrook Farm Planning Area A August 19, 2015 Page 11 

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

volume.  The design EURV water surface elevation is 5248.08 feet but has been provided at 

5248.10 feet and the 100‐year storage volume of the pond has a water surface elevation of 

5249.5 feet (1.5 feet below top of berm). 

 

V. CONCLUSION  

This drainage report has been prepared in conformance with the City of Thornton Standards 

and Specifications, and  the UDFCD Urban Storm Drainage Criteria Manual.   The proposed 

drainage facilities have been designed to safely convey the runoff from design storm events 

to adequate outfall locations.  

 

VI. REFERENCES 

 

1. City of Thornton – Standards and Specifications, Section 400 – Storm Drainage Design, 

Grading, and Water Quality Technical Criteria, City of Thornton, Revised October 2012. 

2. Urban Storm Drainage Criteria Manual, volumes 1, 2, and 3, Urban Drainage and Flood 

Control District, June 2001, with updates to December 2011. 

3. Natural Resources Conservation Center Web Soil Survey, United States Department of 

Agriculture, site visited July 16, 2015. 

4. Federal Emergency Management Agency Flood  Insurance Rate Map, Community‐Panel 

Number 08001C0304H, Map Revised March 5, 2007. 

5. Outfall Systems Planning North Area Tributaries Big Dry Creek, Wright Water Engineers 

Inc., November 1989.   

Page 12: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

  

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

 

APPENDIX A – Basin Hydrology 

  Time of Concentration 

  “C” Values Calculations 

  SF2 & SF3 Calculations 

 

 

 

Page 13: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

PROJECT: Fallbrook

JOB NO.: 14053

CALC. BY: JMP

DATE: 08/03/15

Impervious Percentages - from UDFCD Urban Storm Drainage Criteria Manual

% Imp 2 5 10 100

RESIDENTIAL 60% 0.41 0.46 0.51 0.63

ASPHALT 100% 0.89 0.90 0.92 0.96

CONCRETE 90% 0.73 0.75 0.77 0.83

LANDSCAPE 0% 0.04 0.15 0.25 0.50

SOIL TYPE: C or D

PROPOSED COMPOSITE IMPERVIOUSNESS

Basin Area (ac) RESIDENTIAL ASPHALT CONCRETE LANDSCAPE Imp. C2 C5 C10 C100

A1 0.55 0.00 0.38 0.05 0.12 77% 0.69 0.72 0.76 0.85

A2 1.69 0.97 0.15 0.20 0.37 54% 0.41 0.47 0.52 0.65

A3 0.68 0.50 0.00 0.13 0.05 61% 0.44 0.49 0.54 0.66

A4 1.55 0.70 0.37 0.17 0.31 61% 0.49 0.53 0.58 0.70

A5 0.22 0.00 0.13 0.05 0.04 80% 0.70 0.73 0.76 0.85

A6-1 0.58 0.42 0.00 0.11 0.05 61% 0.44 0.49 0.54 0.66

A6-2 0.61 0.13 0.23 0.10 0.15 65% 0.55 0.60 0.64 0.76

A7-1 0.47 0.35 0.00 0.09 0.03 62% 0.45 0.50 0.54 0.66

A7-2 0.75 0.48 0.00 0.08 0.19 48% 0.35 0.41 0.47 0.62

A7-3 4.37 0.93 1.34 0.84 1.26 61% 0.51 0.56 0.61 0.73

A8-1 0.88 0.30 0.00 0.14 0.44 35% 0.28 0.35 0.42 0.60

A8-2 0.49 0.16 0.00 0.10 0.23 38% 0.30 0.37 0.44 0.61

A8-3 3.87 0.74 0.58 1.45 1.10 60% 0.50 0.55 0.59 0.72

A9 0.39 0.00 0.23 0.09 0.07 80% 0.70 0.73 0.77 0.85

A10 0.47 0.00 0.27 0.11 0.09 79% 0.69 0.72 0.76 0.84

A11 3.98 1.03 0.00 0.42 2.53 25% 0.21 0.29 0.37 0.57

Detained Areas Total 21.55 6.71 3.68 4.13 7.03 53%

B1 1.16 0.38 0.00 0.09 0.69 27% 0.21 0.30 0.38 0.57

Undetained Areas Total 1.16 0.38 0.00 0.09 0.69

Drainage Study Total 22.71 7.09 3.68 4.22 7.72

C-Values Based on Frequency (yrs)

Areas (ac) Weighted Impervious and C Values

JANSEN STRAWN COMPOSITE C VALUES - PROP8/11/2015

14053_SF2 SF3.xlsx

Page 14: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Calculated By: STANDARD FORM SF-2 Project: Fallbrook

Date: TIME OF CONCENTRATION SUMMARY Job No.: 14053

Checked By:

FINAL REMARKS

tc

DESIG: C5 AREA LENGTH SLOPE ti LENGTH SLOPE VEL. tt COMP. TOT. LENGTH tc=(L/180)+10

Ac Ft % Min Ft % FPS Min tc Ft Min Min

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)

A1 0.72 0.55 10 2.0 1.7 350 20 1.5 2.4 2.4 4.1 360 12.0 5.0

A2 0.47 1.69 40 2.0 5.7 300 20 3.0 3.5 1.4 7.2 340 11.9 7.2

A3 0.49 0.68 40 2.0 5.5 220 20 1.0 2.0 1.8 7.3 260 11.4 7.3

A4 0.53 1.55 40 2.0 5.1 460 20 1.0 2.0 3.8 8.9 500 12.8 8.9

A5 0.73 0.22 40 2.0 3.3 300 20 3.0 3.5 1.4 4.8 340 11.9 5.0

A6-1 0.49 0.58 40 2.0 5.5 190 20 1.0 2.0 1.6 7.1 230 11.3 7.1

A6-2 0.60 0.61 40 2.0 4.5 150 20 3.6 3.8 0.7 5.2 190 11.1 5.2

A7-1 0.50 0.47 40 2.0 5.5 300 20 3.0 3.5 1.4 6.9 340 11.9 6.9

A7-2 0.41 0.75 200 3.0 12.1 90 20 2.0 2.8 0.5 12.7 290 11.6 11.6

A7-3 0.56 4.37 40 2.0 4.9 300 20 3.0 3.5 1.4 6.3 340 11.9 6.3

A8-1 0.35 0.88 40 2.0 6.8 130 20 1.0 2.0 1.1 7.8 170 10.9 7.8

A8-2 0.37 0.49 50 2.0 7.3 110 20 2.4 3.1 0.6 7.9 160 10.9 7.9

A8-3 0.55 3.87 40 2.0 5.0 300 20 3.0 3.5 1.4 6.4 340 11.9 6.4

A9 0.73 0.39 5 2.0 1.2 500 20 3.0 3.5 2.4 3.6 505 12.8 5.0

A10 0.72 0.47 5 2.0 1.2 500 20 2.0 2.8 2.9 4.2 505 12.8 5.0

A11 0.29 3.98 300 3.0 17.4 0 20 2.0 2.8 0.0 17.4 300 11.7 17.4

B1 0.30 1.16 60 2.0 8.9 0 20 2.0 2.8 0.0 8.9 60 10.3 8.9

JMP

8/3/2015

DATA

SUB-BASIN TRAVEL TIME

(tt)

tc CHECK

(URBANIZED BASINS)

INITIAL/OVERLAND

TIME (ti)

Cv

JANSEN STRAWN

TOC8/11/2015

14053_SF2 SF3.xlsx

Page 15: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Calculated By: Project: Fallbrook

Date: Job No.: 14053

Checked By: Design Storm: 2-YR

0.97D

ES

IGN

PO

INT

AR

EA

DE

SIG

N

AR

EA

(AC

)

RU

NO

FF

CO

EF

F

tc

(MIN

)

C *

A

(AC

)

I

(IN

/HR

)

Q

(CF

S)

t c

(MIN

)

S (

C *

A)

(CA

)

I

(IN

/HR

)

Q

(CF

S)

SLO

PE

(%)

ST

RE

ET

FLO

W

DE

SIG

N

FLO

W (

CF

S)

SLO

PE

(%)

PIP

E

DIA

M.

(IN

.)

(2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22)

A1 1 0.55 0.69 5.0 0.38 3.29 1.2

A2 2 1.69 0.41 7.2 0.69 2.96 2.0

A3 3 0.68 0.44 7.3 0.30 2.94 0.9

A4 4 1.55 0.49 8.9 0.75 2.74 2.1

A5 5 0.22 0.70 5.0 0.15 3.29 0.5

A6-1 6-1 0.58 0.44 7.1 0.25 2.97 0.8

A6-2 6-2 0.61 0.55 5.2 0.34 3.26 1.1

A7-1 7-1 0.47 0.45 6.9 0.21 3.00 0.6

A7-2 7-2 0.75 0.35 11.6 0.26 2.47 0.6

A7-3 7-3 4.37 0.51 6.3 2.24 3.08 6.9

A8-1 8-1 0.88 0.28 7.8 0.24 2.87 0.7

A8-2 8-2 0.49 0.30 7.9 0.15 2.86 0.4

A8-3 8-3 3.87 0.50 6.4 1.92 3.06 5.9

A9 9 0.39 0.70 5.0 0.27 3.29 0.9

A10 10 0.47 0.69 5.0 0.32 3.29 1.1

A11 11 3.98 0.21 17.4 0.83 2.05 1.7

B1 B1 1.16 0.21 8.9 0.25 2.75 0.7

LE

NG

TH

(FT

)

VE

LO

CIT

Y

(FP

S)

t t

(MIN

)

REMARKS

2-yr, 1-hour rainfall=

DIRECT RUNOFF TOTAL RUNOFF STREET

BASIN

STANDARD FORM SF-38/3/2015 STORM DRAINAGE SYSTEM DESIGN

(RATIONAL METHOD PROCEDURE)

PIPE

JMP

JANSEN STRAWN

2-YEAR8/11/2015

14053_SF2 SF3.xlsx

Page 16: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Calculated By: Project: Fallbrook

Date: Job No.: 14053

Checked By: Design Storm: 5-YR

1.38D

ES

IGN

PO

INT

AR

EA

DE

SIG

N

AR

EA

(AC

)

RU

NO

FF

CO

EF

F

tc

(MIN

)

C *

A

(AC

)

I

(IN

/HR

)

Q

(CF

S)

t c

(MIN

)

S (

C *

A)

(CA

)

I

(IN

/HR

)

Q

(CF

S)

SLO

PE

(%)

ST

RE

ET

FLO

W

DE

SIG

N

FLO

W (

CF

S)

SLO

PE

(%)

PIP

E

DIA

M.

(IN

.)

(2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22)

A1 1 0.55 0.69 5.0 0.38 4.68 1.8

A2 2 1.69 0.41 7.2 0.69 4.21 2.9

A3 3 0.68 0.44 7.3 0.30 4.18 1.3

A4 4 1.55 0.49 8.9 0.75 3.90 2.9

A5 5 0.22 0.70 5.0 0.15 4.68 0.7

A6-1 6-1 0.58 0.44 7.1 0.25 4.22 1.1

A6-2 6-2 0.61 0.55 5.2 0.34 4.63 1.6

A7-1 7-1 0.47 0.45 6.9 0.21 4.26 0.9

A7-2 7-2 0.75 0.35 11.6 0.26 3.51 0.9

A7-3 7-3 4.37 0.51 6.3 2.24 4.38 9.8

A8-1 8-1 0.88 0.28 7.8 0.24 4.08 1.0

A8-2 8-2 0.49 0.30 7.9 0.15 4.07 0.6

A8-3 8-3 3.87 0.50 6.4 1.92 4.35 8.4

A9 9 0.39 0.70 5.0 0.27 4.68 1.3

A10 10 0.47 0.69 5.0 0.32 4.68 1.5

A11 11 3.98 0.21 17.4 0.83 2.91 2.4

B1 B1 1.16 0.21 8.9 0.25 3.91 1.0

VE

LO

CIT

Y

(FP

S)

t t

(MIN

)

REMARKSBASIN

DIRECT RUNOFF TOTAL RUNOFF STREET PIPE

LE

NG

TH

(FT

)

5-yr, 1-hour rainfall=

JMP STANDARD FORM SF-38/3/2015 STORM DRAINAGE SYSTEM DESIGN

(RATIONAL METHOD PROCEDURE)

JANSEN STRAWN

5-YEAR8/11/2015

14053_SF2 SF3.xlsx

Page 17: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Calculated By: Project: Fallbrook

Date: Job No.: 14053

Checked By: Design Storm: 100-YR

2.69D

ES

IGN

PO

INT

AR

EA

DE

SIG

N

AR

EA

(AC

)

RU

NO

FF

CO

EF

F

tc

(MIN

)

C *

A

(AC

)

I

(IN

/HR

)

Q

(CF

S)

t c

(MIN

)

S (

C *

A)

(CA

)

I

(IN

/HR

)

Q

(CF

S)

SL

OP

E

(%)

ST

RE

ET

FLO

W

DE

SIG

N

FLO

W (

CF

S)

SL

OP

E

(%)

PIP

E D

IAM

.

(IN

.)

(2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22)

A1 1 0.55 0.85 5.0 0.47 9.12 4.3

A2 2 1.69 0.65 7.2 1.11 8.20 9.1

A3 3 0.68 0.66 7.3 0.45 8.15 3.6

A4 4 1.55 0.70 8.9 1.09 7.60 8.3

A5 5 0.22 0.85 5.0 0.19 9.12 1.7

A6-1 6-1 0.58 0.66 7.1 0.38 8.23 3.1

A6-2 6-2 0.61 0.76 5.2 0.46 9.03 4.2

A7-1 7-1 0.47 0.66 6.9 0.31 8.31 2.6

A7-2 7-2 0.75 0.62 11.6 0.46 6.85 3.2

A7-3 7-3 4.37 0.73 6.3 3.20 8.54 27.3

A8-1 8-1 0.88 0.60 7.8 0.53 7.96 4.2

A8-2 8-2 0.49 0.61 7.9 0.30 7.93 2.4

A8-3 8-3 3.87 0.72 6.4 2.78 8.49 23.6

A9 9 0.39 0.85 5.0 0.33 9.12 3.0

A10 10 0.47 0.84 5.0 0.40 9.12 3.6

A11 11 3.98 0.57 17.4 2.26 5.68 12.8

B1 B1 1.16 0.57 8.9 0.66 7.62 5.0

LE

NG

TH

(FT

)

VE

LO

CIT

Y

(FP

S)

t t

(MIN

)

REMARKS

100-yr, 1-hour rainfall=

DIRECT RUNOFF TOTAL RUNOFF STREET

BASIN

STANDARD FORM SF-38/3/2015 STORM DRAINAGE SYSTEM DESIGN

(RATIONAL METHOD PROCEDURE)

PIPE

JMP

JANSEN STRAWN

100-YEAR8/11/2015

14053_SF2 SF3.xlsx

npitteng
Text Box
Include spreadsheet showing inlet capacity and carryover flows
Page 18: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

  

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

 

 

APPENDIX B – Hydraulics  

                Detention Pond Analysis 

                Street Capacity Calculations 

                Inlet Calculations 

                Storm Sewer Design 

 

Page 19: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:Basin ID:

21.55

53.0%

0

53.0%

Percentage of Area Area (acres)0.0% 0.00.0% 0.0

100.0% 21.6

Initial--f i Final--fo

3 0.5 0.0018

(watershed inches) (acre-feet)

0.63 1.12Design Oulet to Empty

EURV in 72 Hours

100-year Detention Volume Including WQCV 5 1.12 2.02 21.55

Notes:

Hydrologic Soil TypeType AType B

Excess Urban Runoff Volume4

Infiltration (inches per hour)

Maximum Allowable

Release Rate, cfs3

4) EURV approximates the difference between developed and pre-developed runoff volume.

5) 100-yr detention volume includes EURV. No need to add more volume for WQCV or EURV

Detention Volumes 2,5

DETENTION VOLUME BY THE FULL SPECTRUM METHOD

Fallbrook 3Total Site

1) Effective imperviousness is based on Figure ND-1 of the Urban Storm Drainage Criteria Manual (USDCM).

Area of Watershed (acres)

Subwatershed ImperviousnessLevel of Minimizing Directly Connected

Impervious Area (MDCIA)

* User input data shown in blue.

2) Results shown reflect runoff reduction from Level 1 or 2 MDCIA and are plotted at the watershed's total imperviousness value; the impact of MDCIA is reflected by the results being below the curves.3) Maximum allowable release rates for 100-year event are based on Table SO-1. Outlet for the Excess Urban Runoff Volume (EURV) to be designed to empty out the EURV in 72 hours. Outlet design is similar to one for the WQCV outlet of an extended detention basin (i.e., perforated plate with a micro-pool) and extends to top of EURV water surface elevation.

Recommended Horton's Equation Parameters for CUHP

Effective Imperviousness1

Type C or D

Decay Coefficient--

0.00

0.50

1.00

1.50

2.00

2.50

0 20 40 60 80 100

Ru

no

ff V

ou

me

-In

ch

es

Percent Total Imperviousness

100-yr Vol Type A Soil

100-yr Vol Type B, C & D Soils

EURV Type A Soil

EURV Type B Soil

EURV Type C/D Soil

100-yr Storage Volume

EURV Storage Volume

UD-Detention_v2.35 - 7-20-15.xls 8/11/2015, 5:32 PM

Page 20: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project: Basin ID:

Design Information (Input):Width of Basin Bottom, W = ft Right Triangle OR…Length of Basin Bottom, L = ft Isosceles Triangle OR…Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…

Circle / Ellipse OR…Irregular (Use Overide values in cells G32:G52)

MINOR MAJORStorage Requirement from Sheet 'Modified FAA': acre-ft.

Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.Storage Requirement from Sheet 'Full-Spectrum': 1.12 2.02 acre-ft.

Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumesfor WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage

Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)

5245.00 (input) 290 0.007 0.0005245.50 0.00 0.00 2,635 731 0.060 0.0175246.00 0.00 0.00 13,704 4,816 0.315 0.1115247.00 0.00 0.00 21,269 22,303 0.488 0.5125248.00 0.00 0.00 27,108 46,491 0.622 1.0675249.00 0.00 0.00 31,735 75,913 0.729 1.7435249.50 0.00 0.00 33,851 92,309 0.777 2.119

#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A

STAGE-STORAGE SIZING FOR DETENTION BASINS

Fallbrook

Check Basin Shape

Total Site

UD-Detention_v2.35 - 7-20-15.xls, Basin 8/11/2015, 5:32 PM

Page 21: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project: Basin ID:

STAGE-STORAGE SIZING FOR DETENTION BASINS

5245.00

5245.50

5246.00

5246.50

5247.00

5247.50

5248.00

5248.50

5249.00

5249.50

5250.00

0.00 0.50 1.00 1.50 2.00 2.50

Sta

ge

(ft.

ele

v.)

Storage (acre-feet)

STAGE-STORAGE CURVE FOR THE POND

UD-Detention_v2.35 - 7-20-15.xls, Basin 8/11/2015, 5:32 PM

Page 22: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Basin ID:

WQCV Design Volume (Input):Catchment Imperviousness, Ia = 53.0 percent

Catchment Area, A = 21.55 acres Diameter of holes, D = 1.408 inchesDepth at WQCV outlet above lowest perforation, H = 2 feet Number of holes per row, N = 1

Vertical distance between rows, h = 4.00 inches ORNumber of rows, NL = 5.00

Orifice discharge coefficient, Co = 0.60 Height of slot, H = inchesSlope of Basin Trickle Channel, S = 0.005 ft / ft Width of slot, W = inches

Time to Drain the Pond = 72 hours

Watershed Design Information (Input): 1.9Percent Soil Type A = 0 %Percent Soil Type B = 0 %

Percent Soil Type C/D = 100 %

Outlet Design Information (Output):Excess Urban Runoff Volume (From 'Full-Spectrum Sheet') 0.626 watershed inches X

N/A 0.00Excess Urban Runoff Volume (From 'Full-Spectrum Sheet') 1.125 acre-feet

Outlet area per row, Ao = 1.56 square inchesTotal opening area at each row based on user-input above, Ao = 1.56 square inchesTotal opening area at each row based on user-input above, Ao = 0.011 square feet

3

Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 5245.00 5245.33 5245.67 5246.00 5246.33 Flow

5245.00 0.0000 0.0000 0.0000 0.0000 0.0000 0.005245.50 0.0368 0.0215 0.0000 0.0000 0.0000 0.065246.00 0.0521 0.0426 0.0299 0.0000 0.0000 0.125246.50 0.0638 0.0563 0.0474 0.0368 0.0215 0.235247.00 0.0736 0.0673 0.0600 0.0521 0.0426 0.305247.50 0.0823 0.0767 0.0704 0.0638 0.0563 0.355248.00 0.0902 0.0851 0.0795 0.0736 0.0673 0.405248.50 0.0974 0.0927 0.0876 0.0823 0.0767 0.445249.00 0.1041 0.0997 0.0950 0.0902 0.0851 0.475249.50 0.1104 0.1063 0.1019 0.0974 0.0927 0.51

#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A #N/A

Override Area

Row 1

Override Area

Row 2

Override Area

Row 3

Override Area

Row 4

Override Area

Row 5

Override Area

Row 6

Override Area

Row 7

Override Area

Row 8

Override Area

Row 9

Override Area

Row 10

Override Area

Row 11

Override Area

Row 12

Override Area

Row 13

Override Area

Row 14

Override Area

Row 15

Override Area

Row 16

Override Area

Row 17

Override Area

Row 18

Override Area

Row 19

Override Area

Row 20

Override Area

Row 21

Override Area

Row 22

Override Area

Row 23

Override Area

Row 24

Central Elevations of Rows of Holes in feet

Collection Capacity for Each Row of Holes in cfs

STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET

Fallbrook

Total Site

UD-Detention_v2.35 - 8-12-15.xls, WQCV 8/12/2015, 8:09 AM

Page 23: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Basin ID:

STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET

Fallbrook

Total Site

5244.50

5245.00

5245.50

5246.00

5246.50

5247.00

5247.50

5248.00

5248.50

5249.00

5249.50

5250.00

0.00 0.10 0.20 0.30 0.40 0.50 0.60

Sta

ge

(fe

et,

ele

v.)

Discharge (cfs)

STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE

UD-Detention_v2.35 - 8-12-15.xls, WQCV 8/12/2015, 8:09 AM

Page 24: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Basin ID:

X

1

#1 Vertical #2 Vertical

Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Orifice Orifice

Water Surface Elevation at Design Depth Elev: WS = 5,249.50 feet

Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 5,245.00 feet

Required Peak Flow through Orifice at Design Depth Q = 21.55 cfs

Pipe/Vertical Orifice Diameter (inches) Dia = 24.0 inchesOrifice Coefficient Co = 0.60

Full-flow Capacity (Calculated)

Full-flow area Af = 3.14 sq ft

Half Central Angle in Radians Theta = 3.14 rad

Full-flow capacity Qf = 28.3 cfs

Percent of Design Flow = 131%

Calculation of Orifice Flow Condition

Half Central Angle (0<Theta<3.1416) Theta = 1.95 radFlow area Ao = 2.29 sq ft

Top width of Orifice (inches) To = 22.30 inches

Height from Invert of Orifice to Bottom of Plate (feet) Yo = 1.37 feet

Elevation of Bottom of Plate Elev Plate Bottom Edge = 5,246.37 feetResultant Peak Flow Through Orifice at Design Depth Qo = 21.6 cfs

Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 1.67 feet

Fallbrook

Total Site

RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES

UD-Detention_v2.35 - 8-12-15.xls, Restrictor Plate 8/12/2015, 8:06 AM

Page 25: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Weir ReportHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Aug 18 2015

Emergency Spillway

Trapezoidal WeirCrest = SharpBottom Length (ft) = 190.00Total Depth (ft) = 1.50Side Slope (z:1) = 3.00

CalculationsWeir Coeff. Cw = 3.10Compute by: Known QKnown Q (cfs) = 207.00

HighlightedDepth (ft) = 0.50Q (cfs) = 207.00Area (sqft) = 95.75Velocity (ft/s) = 2.16Top Width (ft) = 193.00

0 50 100 150 200 250 300 350

Depth (ft) Depth (ft)Emergency Spillway

-0.50 -0.50

0.00 0.00

0.50 0.50

1.00 1.00

1.50 1.50

2.00 2.00

Length (ft)Weir W.S.

npitteng
Rectangle
npitteng
Callout
4
npitteng
Callout
Shown as 200 on plans
Page 26: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 2.9 9.1 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 2.9 9.1 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP-2

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 2 (Type R).xlsm, Q-Peak 8/11/2015, 4:58 PM

Page 27: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 12.5 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 17.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.020 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 17.0 17.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 9.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

Maximum Capacity for 1/2 Street based On Allowable Spread Minor Storm Major Storm

Water Depth without Gutter Depression (Eq. ST-2) y = 4.08 4.08 inches

Vertical Depth between Gutter Lip and Gutter Flowline (usually 2") dC = 2.0 2.0 inches

Gutter Depression (dC - (W * Sx * 12)) a = 1.51 1.51 inches

Water Depth at Gutter Flowline d = 5.59 5.59 inches

Allowable Spread for Discharge outside the Gutter Section W (T - W) TX = 15.0 15.0 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.350 0.350

Discharge outside the Gutter Section W, carried in Section TX QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (QT - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Maximum Flow Based On Allowable Spread QT = SUMP SUMP cfs

Flow Velocity within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity times Gutter Flowline Depth V*d = 0.0 0.0

Maximum Capacity for 1/2 Street based on Allowable Depth Minor Storm Major Storm

Theoretical Water Spread TTH = 18.7 31.2 ft

Theoretical Spread for Discharge outside the Gutter Section W (T - W) TX TH = 16.7 29.2 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.318 0.186

Theoretical Discharge outside the Gutter Section W, carried in Section TX TH QX TH = 0.0 0.0 cfs

Actual Discharge outside the Gutter Section W, (limited by distance TCROWN) QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (Qd - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Total Discharge for Major & Minor Storm (Pre-Safety Factor) Q = 0.0 0.0 cfs

Average Flow Velocity Within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity Times Gutter Flowline Depth V*d = 0.0 0.0

Slope-Based Depth Safety Reduction Factor for Major & Minor (d > 6") Storm R = SUMP SUMP

Max Flow Based on Allowable Depth (Safety Factor Applied) Qd = SUMP SUMP cfs

Resultant Flow Depth at Gutter Flowline (Safety Factor Applied) d = inches

Resultant Flow Depth at Street Crown (Safety Factor Applied) dCROWN = inches

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP-2

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 2 (Type R).xlsm, Q-Allow 8/11/2015, 4:58 PM

Page 28: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project =

Inlet ID =

Design Information (Input) MINOR MAJOR

Type of Inlet Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches

Number of Unit Inlets (Grate or Curb Opening) No = 1 1

Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 9.0 inches

Grate Information MINOR MAJOR

Length of a Unit Grate Lo (G) = N/A N/A feet

Width of a Unit Grate Wo = N/A N/A feet

Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A

Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A

Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A

Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A

Curb Opening Information MINOR MAJOR

Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet

Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches

Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches

Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees

Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet

Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10

Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60

Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67

MINOR MAJOR

Total Inlet Interception Capacity (assumes clogged condition) Qa = 5.4 10.7 cfs

Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 2.9 9.1 cfs

INLET IN A SUMP OR SAG LOCATION

Fallbrook

DP-2

CDOT Type R Curb Opening

H-VertH-Curb

W

Lo (C)

Lo (G)

Wo

WP

Override Depths

Street & Inlet Capacities - DP 2 (Type R).xlsm, Inlet In Sump 8/11/2015, 4:58 PM

npitteng
Callout
This is 10' inlet on CDs
Page 29: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 1.3 3.6 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 1.3 3.6 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 3

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 3 (13 Valley).xlsm, Q-Peak 8/11/2015, 4:59 PM

Page 30: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project =

Inlet ID =

Design Information (Input) MINOR MAJOR

Type of Inlet Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches

Number of Unit Inlets (Grate or Curb Opening) No = 1 1

Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 9.0 inches

Grate Information MINOR MAJOR

Length of a Unit Grate Lo (G) = 3.00 3.00 feet

Width of a Unit Grate Wo = 1.73 1.73 feet

Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43

Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50

Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30

Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60

Curb Opening Information MINOR MAJOR

Length of a Unit Curb Opening Lo (C) = N/A N/A feet

Height of Vertical Curb Opening in Inches Hvert = N/A N/A inches

Height of Curb Orifice Throat in Inches Hthroat = N/A N/A inches

Angle of Throat (see USDCM Figure ST-5) Theta = N/A N/A degrees

Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = N/A N/A feet

Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = N/A N/A

Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = N/A N/A

Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = N/A N/A

MINOR MAJOR

Total Inlet Interception Capacity (assumes clogged condition) Qa = 2.6 4.6 cfs

Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 1.3 3.6 cfs

INLET IN A SUMP OR SAG LOCATION

Fallbrook

DP 3

CDOT/Denver 13 Valley Grate

H-VertH-Curb

W

Lo (C)

Lo (G)

Wo

WP

Override Depths

Street & Inlet Capacities - DP 3 (13 Valley).xlsm, Inlet In Sump 8/11/2015, 4:59 PM

npitteng
Callout
Why is the ponding depth 6'/9' when there is no curb/gutter? The drainage cannot encroach on lots
Page 31: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 2.9 8.3 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 3.0 35.7 cfs

Total Design Peak Flow, Q = 5.9 44.0 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 4

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 4 (Type R).xlsm, Q-Peak 8/11/2015, 5:00 PM

Page 32: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 12.5 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 17.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.020 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 17.0 17.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 12.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

Maximum Capacity for 1/2 Street based On Allowable Spread Minor Storm Major Storm

Water Depth without Gutter Depression (Eq. ST-2) y = 4.08 4.08 inches

Vertical Depth between Gutter Lip and Gutter Flowline (usually 2") dC = 2.0 2.0 inches

Gutter Depression (dC - (W * Sx * 12)) a = 1.51 1.51 inches

Water Depth at Gutter Flowline d = 5.59 5.59 inches

Allowable Spread for Discharge outside the Gutter Section W (T - W) TX = 15.0 15.0 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.350 0.350

Discharge outside the Gutter Section W, carried in Section TX QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (QT - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Maximum Flow Based On Allowable Spread QT = SUMP SUMP cfs

Flow Velocity within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity times Gutter Flowline Depth V*d = 0.0 0.0

Maximum Capacity for 1/2 Street based on Allowable Depth Minor Storm Major Storm

Theoretical Water Spread TTH = 18.7 43.7 ft

Theoretical Spread for Discharge outside the Gutter Section W (T - W) TX TH = 16.7 41.7 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.318 0.130

Theoretical Discharge outside the Gutter Section W, carried in Section TX TH QX TH = 0.0 0.0 cfs

Actual Discharge outside the Gutter Section W, (limited by distance TCROWN) QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (Qd - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Total Discharge for Major & Minor Storm (Pre-Safety Factor) Q = 0.0 0.0 cfs

Average Flow Velocity Within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity Times Gutter Flowline Depth V*d = 0.0 0.0

Slope-Based Depth Safety Reduction Factor for Major & Minor (d > 6") Storm R = SUMP SUMP

Max Flow Based on Allowable Depth (Safety Factor Applied) Qd = SUMP SUMP cfs

Resultant Flow Depth at Gutter Flowline (Safety Factor Applied) d = inches

Resultant Flow Depth at Street Crown (Safety Factor Applied) dCROWN = inches

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP 4

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 4 (Type R).xlsm, Q-Allow 8/11/2015, 5:00 PM

npitteng
Callout
Will the curb extensions be effecting this?
npitteng
Callout
Show street capacity of Street A and make sure major storm is not encroaching on lots, the dmax will be less in front of the homes
Page 33: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project =

Inlet ID =

Design Information (Input) MINOR MAJOR

Type of Inlet Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches

Number of Unit Inlets (Grate or Curb Opening) No = 4 4

Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 12.0 inches

Grate Information MINOR MAJOR

Length of a Unit Grate Lo (G) = N/A N/A feet

Width of a Unit Grate Wo = N/A N/A feet

Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A

Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A

Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A

Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A

Curb Opening Information MINOR MAJOR

Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet

Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches

Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches

Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees

Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet

Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10

Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60

Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67

MINOR MAJOR

Total Inlet Interception Capacity (assumes clogged condition) Qa = 18.2 52.7 cfs

Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 5.9 44.0 cfs

INLET IN A SUMP OR SAG LOCATION

Fallbrook

DP 4

CDOT Type R Curb Opening

H-VertH-Curb

W

Lo (C)

Lo (G)

Wo

WP

Override Depths

Street & Inlet Capacities - DP 4 (Type R).xlsm, Inlet In Sump 8/11/2015, 5:00 PM

npitteng
Callout
how far back does the 12" go into the tract? Show on the grading plan
npitteng
Callout
This is 10' on CDs
Page 34: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 0.7 1.7 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 0.7 1.7 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP-5

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 5 (Type R).xlsm, Q-Peak 8/11/2015, 5:01 PM

Page 35: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 12.5 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 17.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.020 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 17.0 17.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 9.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

Maximum Capacity for 1/2 Street based On Allowable Spread Minor Storm Major Storm

Water Depth without Gutter Depression (Eq. ST-2) y = 4.08 4.08 inches

Vertical Depth between Gutter Lip and Gutter Flowline (usually 2") dC = 2.0 2.0 inches

Gutter Depression (dC - (W * Sx * 12)) a = 1.51 1.51 inches

Water Depth at Gutter Flowline d = 5.59 5.59 inches

Allowable Spread for Discharge outside the Gutter Section W (T - W) TX = 15.0 15.0 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.350 0.350

Discharge outside the Gutter Section W, carried in Section TX QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (QT - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Maximum Flow Based On Allowable Spread QT = SUMP SUMP cfs

Flow Velocity within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity times Gutter Flowline Depth V*d = 0.0 0.0

Maximum Capacity for 1/2 Street based on Allowable Depth Minor Storm Major Storm

Theoretical Water Spread TTH = 18.7 31.2 ft

Theoretical Spread for Discharge outside the Gutter Section W (T - W) TX TH = 16.7 29.2 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.318 0.186

Theoretical Discharge outside the Gutter Section W, carried in Section TX TH QX TH = 0.0 0.0 cfs

Actual Discharge outside the Gutter Section W, (limited by distance TCROWN) QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (Qd - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Total Discharge for Major & Minor Storm (Pre-Safety Factor) Q = 0.0 0.0 cfs

Average Flow Velocity Within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity Times Gutter Flowline Depth V*d = 0.0 0.0

Slope-Based Depth Safety Reduction Factor for Major & Minor (d > 6") Storm R = SUMP SUMP

Max Flow Based on Allowable Depth (Safety Factor Applied) Qd = SUMP SUMP cfs

Resultant Flow Depth at Gutter Flowline (Safety Factor Applied) d = inches

Resultant Flow Depth at Street Crown (Safety Factor Applied) dCROWN = inches

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP-5

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 5 (Type R).xlsm, Q-Allow 8/11/2015, 5:01 PM

Page 36: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project =

Inlet ID =

Design Information (Input) MINOR MAJOR

Type of Inlet Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches

Number of Unit Inlets (Grate or Curb Opening) No = 1 1

Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 9.0 inches

Grate Information MINOR MAJOR

Length of a Unit Grate Lo (G) = N/A N/A feet

Width of a Unit Grate Wo = N/A N/A feet

Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A

Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A

Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A

Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A

Curb Opening Information MINOR MAJOR

Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet

Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches

Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches

Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees

Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet

Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10

Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60

Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67

MINOR MAJOR

Total Inlet Interception Capacity (assumes clogged condition) Qa = 5.4 10.7 cfs

Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 0.7 1.7 cfs

INLET IN A SUMP OR SAG LOCATION

Fallbrook

DP-5

CDOT Type R Curb Opening

H-VertH-Curb

W

Lo (C)

Lo (G)

Wo

WP

Override Depths

Street & Inlet Capacities - DP 5 (Type R).xlsm, Inlet In Sump 8/11/2015, 5:01 PM

npitteng
Callout
This is a 10' inlet on the CDs
Page 37: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 1.1 3.1 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 1.1 3.1 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 6-1

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 6-1 (16 Valley).xlsm, Q-Peak 8/11/2015, 5:02 PM

Page 38: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Design Information (Input) MINOR MAJOR

Type of Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 2.0 2.0 inches

Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1

Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 3.00 3.00 ft

Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = 1.73 1.73 ft

Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = 0.50 0.50

Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = N/A N/A

Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR

Total Inlet Interception Capacity Q = 0.78 1.49 cfs

Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.3 1.6 cfs

Capture Percentage = Qa/Qo = C% = 71 48 %

INLET ON A CONTINUOUS GRADE

Fallbrook

DP 6-1

Denver No. 16 Valley Grate

Street & Inlet Capacities - DP 6-1 (16 Valley).xlsm, Inlet On Grade 8/11/2015, 5:02 PM

npitteng
Callout
This is called out as type 13 in CDs
Page 39: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 1.6 4.2 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.3 1.6 cfs

Total Design Peak Flow, Q = 1.9 5.8 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 6-2

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 6-2 (Type R).xlsm, Q-Peak 8/11/2015, 5:20 PM

Page 40: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 14.0 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.019 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 19.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.021 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.036 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 19.0 19.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 9.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 16.3 49.2 cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP 6-2

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 6-2 (Type R).xlsm, Q-Allow 8/11/2015, 5:20 PM

Page 41: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Design Information (Input) MINOR MAJOR

Type of Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 3.0 3.0 inches

Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1

Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 5.00 5.00 ft

Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = N/A N/A ft

Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = N/A N/A

Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = 0.10 0.10

Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR

Total Inlet Interception Capacity Q = 1.70 3.08 cfs

Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.2 2.7 cfs

Capture Percentage = Qa/Qo = C% = 89 53 %

INLET ON A CONTINUOUS GRADE

Fallbrook

DP 6-2

CDOT Type R Curb Opening

Street & Inlet Capacities - DP 6-2 (Type R).xlsm, Inlet On Grade 8/11/2015, 5:20 PM

Page 42: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 0.9 2.6 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.2 1.7 cfs

Total Design Peak Flow, Q = 1.1 4.3 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 7-1

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 7-1 (16 Valley).xlsm, Q-Peak 8/11/2015, 5:06 PM

Page 43: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Design Information (Input) MINOR MAJOR

Type of Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 2.0 2.0 inches

Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1

Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 3.00 3.00 ft

Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = 1.73 1.73 ft

Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = 0.50 0.50

Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = N/A N/A

Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR

Total Inlet Interception Capacity Q = 0.79 1.79 cfs

Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.3 2.5 cfs

Capture Percentage = Qa/Qo = C% = 70 42 %

INLET ON A CONTINUOUS GRADE

Fallbrook

DP 7-1

Denver No. 16 Valley Grate

Street & Inlet Capacities - DP 7-1 (16 Valley).xlsm, Inlet On Grade 8/11/2015, 5:06 PM

npitteng
Callout
Type 13 on CDs
Page 44: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 0.9 3.2 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 0.9 3.2 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 7-2

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 7-2 (16 Valley).xlsm, Q-Peak 8/11/2015, 5:07 PM

Page 45: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Design Information (Input) MINOR MAJOR

Type of Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 2.0 2.0 inches

Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1

Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 3.00 3.00 ft

Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = 1.73 1.73 ft

Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = 0.50 0.50

Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = N/A N/A

Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR

Total Inlet Interception Capacity Q = 0.67 1.53 cfs

Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.2 1.7 cfs

Capture Percentage = Qa/Qo = C% = 74 48 %

INLET ON A CONTINUOUS GRADE

Fallbrook

DP 7-2

Denver No. 16 Valley Grate

Street & Inlet Capacities - DP 7-2 (16 Valley).xlsm, Inlet On Grade 8/11/2015, 5:07 PM

npitteng
Callout
typ 13
Page 46: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 9.8 27.3 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.3 2.5 cfs

Total Design Peak Flow, Q = 10.1 29.8 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 7-3

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 7-3 (Type R).xlsm, Q-Peak 8/11/2015, 5:08 PM

Page 47: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 14.0 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.019 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 19.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.021 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.036 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 19.0 19.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 9.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 16.3 49.2 cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP 7-3

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 7-3 (Type R).xlsm, Q-Allow 8/11/2015, 5:08 PM

npitteng
Text Box
Show street capacity sheet for street B too
Page 48: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Design Information (Input) MINOR MAJOR

Type of Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 3.0 3.0 inches

Total Number of Units in the Inlet (Grate or Curb Opening) No = 2 2

Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 5.00 5.00 ft

Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = N/A N/A ft

Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = N/A N/A

Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = 0.10 0.10

Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR

Total Inlet Interception Capacity Q = 7.36 12.18 cfs

Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 2.8 17.6 cfs

Capture Percentage = Qa/Qo = C% = 73 41 %

INLET ON A CONTINUOUS GRADE

Fallbrook

DP 7-3

CDOT Type R Curb Opening

Street & Inlet Capacities - DP 7-3 (Type R).xlsm, Inlet On Grade 8/11/2015, 5:08 PM

Page 49: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 1.0 4.2 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 1.0 4.2 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 8-1

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 8-1 (16 Valley).xlsm, Q-Peak 8/11/2015, 5:08 PM

Page 50: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Design Information (Input) MINOR MAJOR

Type of Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 2.0 2.0 inches

Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1

Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 3.00 3.00 ft

Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = 1.73 1.73 ft

Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = 0.50 0.50

Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = N/A N/A

Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR

Total Inlet Interception Capacity Q = 0.72 1.76 cfs

Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.3 2.4 cfs

Capture Percentage = Qa/Qo = C% = 72 42 %

INLET ON A CONTINUOUS GRADE

Fallbrook

DP 8-1

Denver No. 16 Valley Grate

Street & Inlet Capacities - DP 8-1 (16 Valley).xlsm, Inlet On Grade 8/11/2015, 5:08 PM

npitteng
Callout
13
Page 51: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 0.6 2.4 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.3 2.4 cfs

Total Design Peak Flow, Q = 0.9 4.8 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 8-2

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 8-2 (16 Valley).xlsm, Q-Peak 8/11/2015, 5:09 PM

Page 52: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Design Information (Input) MINOR MAJOR

Type of Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 2.0 2.0 inches

Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1

Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 3.00 3.00 ft

Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = 1.73 1.73 ft

Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = 0.50 0.50

Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = N/A N/A

Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR

Total Inlet Interception Capacity Q = 0.65 1.90 cfs

Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.2 2.9 cfs

Capture Percentage = Qa/Qo = C% = 73 39 %

INLET ON A CONTINUOUS GRADE

Fallbrook

DP 8-2

Denver No. 16 Valley Grate

Street & Inlet Capacities - DP 8-2 (16 Valley).xlsm, Inlet On Grade 8/11/2015, 5:09 PM

Page 53: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 8.4 23.6 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.2 2.9 cfs

Total Design Peak Flow, Q = 8.6 26.5 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 8-3

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 8-3 (Type R).xlsm, Q-Peak 8/11/2015, 5:24 PM

Page 54: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 14.0 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.019 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 19.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.021 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 19.0 19.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP 8-3

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 8-3 (Type R).xlsm, Q-Allow 8/11/2015, 5:24 PM

Page 55: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project =

Inlet ID =

Design Information (Input) MINOR MAJOR

Type of Inlet Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches

Number of Unit Inlets (Grate or Curb Opening) No = 2 2

Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches

Grate Information MINOR MAJOR

Length of a Unit Grate Lo (G) = N/A N/A feet

Width of a Unit Grate Wo = N/A N/A feet

Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A

Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A

Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A

Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A

Curb Opening Information MINOR MAJOR

Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet

Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches

Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches

Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees

Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet

Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10

Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60

Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67

MINOR MAJOR

Total Inlet Interception Capacity (assumes clogged condition) Qa = 10.5 10.5 cfs

WARNING: Inlet Capacity less than Q Peak for MAJOR Storm Q PEAK REQUIRED = 8.6 26.5 cfs

INLET IN A SUMP OR SAG LOCATION

Fallbrook

DP 8-3

CDOT Type R Curb Opening

H-VertH-Curb

W

Lo (C)

Lo (G)

Wo

WP

Override Depths

Street & Inlet Capacities - DP 8-3 (Type R).xlsm, Inlet In Sump 8/11/2015, 5:24 PM

Page 56: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 1.3 3.0 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 1.3 3.0 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 9

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 9 (Type R).xlsm, Q-Peak 8/11/2015, 5:11 PM

Page 57: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 12.5 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.019 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 19.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.021 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 19.0 19.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 9.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP 9

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 9 (Type R).xlsm, Q-Allow 8/11/2015, 5:11 PM

Page 58: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project =

Inlet ID =

Design Information (Input) MINOR MAJOR

Type of Inlet Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches

Number of Unit Inlets (Grate or Curb Opening) No = 1 1

Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.3 inches

Grate Information MINOR MAJOR

Length of a Unit Grate Lo (G) = N/A N/A feet

Width of a Unit Grate Wo = N/A N/A feet

Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A

Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A

Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A

Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A

Curb Opening Information MINOR MAJOR

Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet

Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches

Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches

Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees

Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet

Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10

Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60

Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67

MINOR MAJOR

Total Inlet Interception Capacity (assumes clogged condition) Qa = 5.4 5.9 cfs

Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 1.3 3.0 cfs

INLET IN A SUMP OR SAG LOCATION

Fallbrook

DP 9

CDOT Type R Curb Opening

H-VertH-Curb

W

Lo (C)

Lo (G)

Wo

WP

Override Depths

Street & Inlet Capacities - DP 9 (Type R).xlsm, Inlet In Sump 8/11/2015, 5:11 PM

Page 59: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Worksheet Protected

Project:

Inlet ID:

Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm

(local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 1.5 3.6 cfs

* If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet.

Geographic Information: (Enter data in the blue cells):

Subcatchment Area = Acres

Percent Imperviousness = %

NRCS Soil Type = A, B, C, or D

Slope (ft/ft) Length (ft)

Overland Flow =

Channel Flow =

Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm

Design Storm Return Period, Tr = years

Return Period One-Hour Precipitation, P1 = inches

C1 =

C2 =

C3 =

User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C =

User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 =

Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 0.0 cfs

Total Design Peak Flow, Q = 1.5 3.6 cfs

<---

FILL IN THIS SECTION

OR…

FILL IN THE SECTIONS

BELOW.

<---

DESIGN PEAK FLOW FOR ONE-HALF OF STREET

OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD

Fallbrook

DP 10

Site is Urban

Site is Non-Urban

Show Details

Site Type:

Street Inlets

Area Inlets in a Median

Flows Developed For:

Street & Inlet Capacities - DP 10 (Type R).xlsm, Q-Peak 8/11/2015, 5:12 PM

Page 60: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project:

Inlet ID:

Gutter Geometry (Enter data in the blue cells)

Maximum Allowable Width for Spread Behind Curb TBACK = 12.5 ft

Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft

Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020

Height of Curb at Gutter Flow Line HCURB = 6.00 inches

Distance from Curb Face to Street Crown TCROWN = 17.0 ft

Gutter Width W = 2.00 ft

Street Transverse Slope SX = 0.020 ft/ft

Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft

Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft

Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016

Minor Storm Major Storm

Max. Allowable Spread for Minor & Major Storm TMAX = 17.0 17.0 ft

Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 12.0 inches

Allow Flow Depth at Street Crown (leave blank for no) check = yes

Maximum Capacity for 1/2 Street based On Allowable Spread Minor Storm Major Storm

Water Depth without Gutter Depression (Eq. ST-2) y = 4.08 4.08 inches

Vertical Depth between Gutter Lip and Gutter Flowline (usually 2") dC = 2.0 2.0 inches

Gutter Depression (dC - (W * Sx * 12)) a = 1.51 1.51 inches

Water Depth at Gutter Flowline d = 5.59 5.59 inches

Allowable Spread for Discharge outside the Gutter Section W (T - W) TX = 15.0 15.0 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.350 0.350

Discharge outside the Gutter Section W, carried in Section TX QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (QT - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Maximum Flow Based On Allowable Spread QT = SUMP SUMP cfs

Flow Velocity within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity times Gutter Flowline Depth V*d = 0.0 0.0

Maximum Capacity for 1/2 Street based on Allowable Depth Minor Storm Major Storm

Theoretical Water Spread TTH = 18.7 43.7 ft

Theoretical Spread for Discharge outside the Gutter Section W (T - W) TX TH = 16.7 41.7 ft

Gutter Flow to Design Flow Ratio by FHWA HEC-22 method (Eq. ST-7) EO = 0.318 0.130

Theoretical Discharge outside the Gutter Section W, carried in Section TX TH QX TH = 0.0 0.0 cfs

Actual Discharge outside the Gutter Section W, (limited by distance TCROWN) QX = 0.0 0.0 cfs

Discharge within the Gutter Section W (Qd - QX) QW = 0.0 0.0 cfs

Discharge Behind the Curb (e.g., sidewalk, driveways, & lawns) QBACK = 0.0 0.0 cfs

Total Discharge for Major & Minor Storm (Pre-Safety Factor) Q = 0.0 0.0 cfs

Average Flow Velocity Within the Gutter Section V = 0.0 0.0 fps

V*d Product: Flow Velocity Times Gutter Flowline Depth V*d = 0.0 0.0

Slope-Based Depth Safety Reduction Factor for Major & Minor (d > 6") Storm R = SUMP SUMP

Max Flow Based on Allowable Depth (Safety Factor Applied) Qd = SUMP SUMP cfs

Resultant Flow Depth at Gutter Flowline (Safety Factor Applied) d = inches

Resultant Flow Depth at Street Crown (Safety Factor Applied) dCROWN = inches

MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm

MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs

Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)

Fallbrook

DP 10

(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)

Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak'

Street & Inlet Capacities - DP 10 (Type R).xlsm, Q-Allow 8/11/2015, 5:12 PM

Page 61: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Project =

Inlet ID =

Design Information (Input) MINOR MAJOR

Type of Inlet Inlet Type =

Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches

Number of Unit Inlets (Grate or Curb Opening) No = 1 1

Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 9.0 inches

Grate Information MINOR MAJOR

Length of a Unit Grate Lo (G) = N/A N/A feet

Width of a Unit Grate Wo = N/A N/A feet

Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A

Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A

Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A

Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A

Curb Opening Information MINOR MAJOR

Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet

Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches

Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches

Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees

Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet

Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10

Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60

Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67

MINOR MAJOR

Total Inlet Interception Capacity (assumes clogged condition) Qa = 5.4 10.7 cfs

Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 1.5 3.6 cfs

INLET IN A SUMP OR SAG LOCATION

Fallbrook

DP 10

CDOT Type R Curb Opening

H-VertH-Curb

W

Lo (C)

Lo (G)

Wo

WP

Override Depths

Street & Inlet Capacities - DP 10 (Type R).xlsm, Inlet In Sump 8/11/2015, 5:12 PM

npitteng
Callout
This is 10' on CDs
Page 62: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Channel ReportHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Aug 12 2015

Alley Capacity

User-definedInvert Elev (ft) = 0.65Slope (%) = 1.00N-Value = Composite

CalculationsCompute by: Q vs DepthNo. Increments = 10

(Sta, El, n)-(Sta, El, n)...( 0.00, 1.00)-(6.00, 0.82, 0.016)-(8.00, 0.65, 0.016)-(10.00, 0.82, 0.016)-(16.00, 1.00, 0.016)

HighlightedDepth (ft) = 0.35Q (cfs) = 5.201Area (sqft) = 2.14Velocity (ft/s) = 2.43Wetted Perim (ft) = 16.02Crit Depth, Yc (ft) = 0.35Top Width (ft) = 16.00EGL (ft) = 0.44

-2 0 2 4 6 8 10 12 14 16 18

Elev (ft) Depth (ft)Section

0.00 -0.65

0.50 -0.15

1.00 0.35

1.50 0.85

2.00 1.35

Sta (ft)

npitteng
Rectangle
npitteng
Callout
Show that none of the flows within the alley are above this Q100
Page 63: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 64: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 65: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 66: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 67: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 68: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 69: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 70: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 71: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 72: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 73: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 74: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 75: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 76: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
npitteng
Text Box
Label the 100yr WSE, the 5yr WSE and the proposed ground for all pipes
Page 77: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 78: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 79: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 80: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 81: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 82: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 83: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 84: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 85: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 86: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 87: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 88: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 89: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 90: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 91: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 92: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 93: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 94: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 95: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 96: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 97: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 98: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 99: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 100: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

  

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

APPENDIX C – Reference Materials  

Effective FEMA Map Panels 

                NRCS Soil Information    

                 

                 

 

 

 

Page 101: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

17

Custom Soil Resource ReportMap—Hydrologic Soil Group

4422

210

4422

270

4422

330

4422

390

4422

450

4422

510

4422

570

4422

630

4422

210

4422

270

4422

330

4422

390

4422

450

4422

510

4422

570

4422

630

504810 504870 504930 504990 505050 505110

504810 504870 504930 504990 505050 505110

39° 57' 14'' N10

4° 5

6' 3

8'' W

39° 57' 14'' N

104°

56'

23'

' W

39° 56' 59'' N

104°

56'

38'

' W

39° 56' 59'' N

104°

56'

23'

' W

N

Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS840 100 200 400 600

Feet0 30 60 120 180

MetersMap Scale: 1:2,340 if printed on A portrait (8.5" x 11") sheet.

Page 102: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

MAP LEGEND MAP INFORMATION

Area of Interest (AOI)Area of Interest (AOI)

SoilsSoil Rating Polygons

A

A/D

B

B/D

C

C/D

D

Not rated or not available

Soil Rating LinesA

A/D

B

B/D

C

C/D

D

Not rated or not available

Soil Rating PointsA

A/D

B

B/D

C

C/D

D

Not rated or not available

Water FeaturesStreams and Canals

TransportationRails

Interstate Highways

US Routes

Major Roads

Local Roads

BackgroundAerial Photography

The soil surveys that comprise your AOI were mapped at 1:20,000.

Warning: Soil Map may not be valid at this scale.

Enlargement of maps beyond the scale of mapping can causemisunderstanding of the detail of mapping and accuracy of soil lineplacement. The maps do not show the small areas of contrastingsoils that could have been shown at a more detailed scale.

Please rely on the bar scale on each map sheet for mapmeasurements.

Source of Map: Natural Resources Conservation ServiceWeb Soil Survey URL: http://websoilsurvey.nrcs.usda.govCoordinate System: Web Mercator (EPSG:3857)

Maps from the Web Soil Survey are based on the Web Mercatorprojection, which preserves direction and shape but distortsdistance and area. A projection that preserves area, such as theAlbers equal-area conic projection, should be used if more accuratecalculations of distance or area are required.

This product is generated from the USDA-NRCS certified data as ofthe version date(s) listed below.

Soil Survey Area: Adams County Area, Parts of Adams andDenver Counties, ColoradoSurvey Area Data: Version 11, Sep 23, 2014

Soil map units are labeled (as space allows) for map scales 1:50,000or larger.

Date(s) aerial images were photographed: Mar 16, 2012—Sep18, 2014

The orthophoto or other base map on which the soil lines werecompiled and digitized probably differs from the backgroundimagery displayed on these maps. As a result, some minor shiftingof map unit boundaries may be evident.

Custom Soil Resource Report

18

Page 103: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

Table—Hydrologic Soil Group

Hydrologic Soil Group— Summary by Map Unit — Adams County Area, Parts of Adams and Denver Counties, Colorado (CO001)

Map unit symbol Map unit name Rating Acres in AOI Percent of AOI

PlC Platner loam, 3 to 5percent slopes

C 16.7 73.8%

UlD Ulm loam, 5 to 9 percentslopes

C 5.9 26.2%

Totals for Area of Interest 22.6 100.0%

Rating Options—Hydrologic Soil Group

Aggregation Method: Dominant Condition

Component Percent Cutoff: None Specified

Tie-break Rule: Higher

Custom Soil Resource Report

19

Page 104: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
Page 105: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big

  

 

t 303.561.3333 | f 303.561.3339 | 45 West 2nd Avenue, Denver, Colorado 80223 | www.jansenstrawn.com  

 

 

 

APPENDIX D – Maps  

Developed Basin Map 

 

 

Page 106: 14053-Fallbrook-Final Drainage Report - City of Thornton · FINAL DRAINAGE REPORT ... the provisions of the City of Thornton Standards and Specifications for the Design and ... Big
npitteng
Callout
Show that this runoff is less than historic runoff offsite
npitteng
Callout
Show existing storm pipe and inlet
npitteng
Text Box
Provide a historic drainage basin map
npitteng
Callout
Label DP8-2
npitteng
Callout
Label DP 8-1
npitteng
Rectangle
npitteng
Callout
Not used