1. Outstanding task list2. Calendar of upcoming events3. JR Field Test

Summary of JR port calls and schedule Summary of who will attend JR field test

4. Summary of status with Yoshi and contract between IODPMI and MOHR (Chris H.)

5. Status on manual.

Page 2: 14 February 2012 Agenda 1.Outstanding task list 2.Calendar of upcoming events 3.JR Field Test  Summary of JR port calls and schedule  Summary of who.

TasksTask # Action Due Owner Additional Status3.06 Calibrate T2P pressure transducers 6-Jan-12 Peter P Donnie B Overdue3.07 Pressure test T2P 13-Jan-12 Donnie B Overdue4.00 MDHDS Field test – Schlumberger (2) 4-Apr-12 Tom P 4.03 Reserve wireline rental one day 22-Dec-11 Bob A In Progress

4.04 Manufacture modified ERS 8-Mar-12 Dave H Chris H In Progress

4.05 ERS fit test (tentative) 22-Mar-12 Dave H Chris H, & Tom P

4.06 Develop deployment plan for testing 23-Mar-12 Tom P 4.07-10

Deliver testing components (ALL) 3-Apr-12 ALL ALL

4.11 Assemble MDHDS (on site) 3-Apr-12 Tom P Peter P, Donnie B

4.12 Lead deployment of the T2P, MDHDS, ERS, MFTM and wireline at the Genesis Rig at Schlumberger Sugarland.

4-Apr-12 Tom P

4.13 Realtime data acquisition 4-Apr-12 Eric M Gerry I 4.14 Direct deployment on the rig 5-Apr-12 Tom P 4.15 Demonstrate the ability of the MDHDS, ERS, and MFTM

to operate as expected under field conditions5-Apr-12 Tom P

4.16Rebuild spring compression tool

2-Apr-12 Tom P Added Since Last Meeting

4.17 Developing a stop for lifting the tool out of bore 2-Apr-12 Tom P Added Since Last Meeting

Page 3: 14 February 2012 Agenda 1.Outstanding task list 2.Calendar of upcoming events 3.JR Field Test  Summary of JR port calls and schedule  Summary of who.

Task # Action Due Owner Additional Status5.00 Deliverables 15-Apr-12 All5.01 Parts List for MDHDS (outer barrel) 15-Apr-12 Tom P5.02 Engineering Drawings of MDHDS 15-Apr-12 Tom P5.03 Parts List for MDHDS (inner barrel & tether assembly) 15-Apr-12 Peter P Donnie B Complet

ed5.04 Parts List for T2P 15-Apr-12 Peter P Donnie B In

Progress5.05 Deployment Manual for MDHDS (outer barrel) 15-Apr-12 Tom P5.06 Deployment Manual for MDHDS (inner barrel & tether

assembly)15-Apr-12 Peter P Donnie B In

Progress5.07 Deployment Manual for T2P 15-Apr-12 Peter P Donnie B In

Progress6.00 MDHDS JR Field Test 1-Jun-12 Peter F Bob A 6.01 Identify personnel for testing deployment 24-Jan-12 Peter F Gerry I Overdue6.02 Coordinate with Peter Blum to have rig access en route

to site1-Feb-12 Peter F Overdue

6.03 Coordinate with Peter Blum medical forms and paperwork

1-Feb-12 Peter P Overdue

6.04-7 Travel arrangements 1-Feb-12 ALL Overdue6.09 UT Deliver components to TAMU (MDHDS inner barrel,

tether assembly, T2P & tools)15-Apr-12 Peter P

6.10 LDEO Deliver components to TAMU (MFTM & ERS) 15-Apr-12 Gerry I 6.11 Pettigrew Deliver components to TAMU (MDHDS outer

barrel)15-Apr-12 Tom P

6.12 Yoshi payment to Pettigrew for ship time 15-Jun-12 Yoshi K

Page 4: 14 February 2012 Agenda 1.Outstanding task list 2.Calendar of upcoming events 3.JR Field Test  Summary of JR port calls and schedule  Summary of who.

Task # Action Due Owner Additional Status7.00 Closeout TBD Peter F7.01 MDHDS Manual/Parts List (inner barrel and tether) 29-Feb-12 Peter P In

Progress7.02 MDHDS Manual/Parts List (outer barrel and latch) 29-Feb-12 Tom P In

Progress7.03 MFTM Manual/Parts List 29-Feb-12 Gerry I Added

Since Last

Meeting7.04 T2P Manual/Parts List 29-Feb-12 Donnie B Peter P In

Progress7.05 ERS Manual/Parts List 29-Feb-12 Chris H Added

Since Last

Meeting

Page 5: 14 February 2012 Agenda 1.Outstanding task list 2.Calendar of upcoming events 3.JR Field Test  Summary of JR port calls and schedule  Summary of who.

Upcoming DatesDate Event

29-Feb-12 Complete Parts List and Deployment Manual for MDHDS & T2P

1-Mar-12 Phone Meeting

15-Mar-12 Phone Meeting

22-Mar-12 ERS/MFTM Bench Test at MOHR (Tentative)

29-Mar-12 Phone Meeting

4-Apr-12 MDHDS Field test – Schlumberger

12-Apr-12 Phone Meeting

26-Apr-12 Phone Meeting

10-May-12 Phone Meeting

29-May-12 Phone Meeting

1-Jun-12 MDHDS JR Field Test

1-Jul-12 Closeout

Page 6: 14 February 2012 Agenda 1.Outstanding task list 2.Calendar of upcoming events 3.JR Field Test  Summary of JR port calls and schedule  Summary of who.

JR Field Test

Summary of JR port calls and schedule Summary of who will attend JR field test

Page 7: 14 February 2012 Agenda 1.Outstanding task list 2.Calendar of upcoming events 3.JR Field Test  Summary of JR port calls and schedule  Summary of who.

• Summary of status with Yoshi and contract between IODPMI and MOHR (Chris H.)

Page 8: 14 February 2012 Agenda 1.Outstanding task list 2.Calendar of upcoming events 3.JR Field Test  Summary of JR port calls and schedule  Summary of who.

• Status on manual.