1/31
Rules for Capacity Allocationby Explicit Auctions
withinCentral West Europe Region (CWE),Central South Europe Region (CSE)
and Switzerland
Workshop - ForumBrussels, September 26th 2011
2/31
Introduction
• The origin of the project: the Memorandum of Understanding (MoU) signed May 19th 2010 due to CSE works for harmonising– Step 1: delegation to CASC with current rules for CSE and SNB (2011)– Step 2: harmonisation CWE/CSE/Switzerland (2012)
• What is behind the word “harmonization”? – Propose to participants a unique entrance for contracting with the
Joint Auction Operator (CASC) and provide them a similar way of functioning on all borders covered by a single Auction Rules (AR) document
– For 2012, the target is to compile this set of AR even if similar managements are not yet in place for all mechanisms/regions
3/31
Existing Auctions Rules
• CWERules for Capacity Allocation by Explicit Auctions within Central West Europe Region (CWE Auction Rules) version 2.2
• CSEACCESS RULES TO FRANCE-ITALY, SWITZERLAND-ITALY, AUSTRIA-ITALY, SLOVENIA-ITALY, GREECE-ITALY INTERCONNECTIONS (Capacity Allocation Auction Rules) 2011 with Joint Auction Office
• Swiss – AustriaRules and Regulations for the Auctioning of Cross-Border Electricity Transfer Capacity on the Extra-High-Voltage Interconnectors between the Control Areas of APG and Switzerland by Austrian Power Grid AG (APG) and swissgrid ag (Swissgrid) Version 1.02
• Swiss – GermanyRules of EnBW Transportnetze AG (TNG), Amprion GmbH (Amprion), VKW-Netz AG (VKW NETZ), and swissgrid ag (swissgrid) Hereinafter jointly designated the “Auction Partners” for the Yearly, Monthly and Daily Auction of the Available Transfer Capacity in the cross-border electricity trading between the control blocks of Germany and Switzerland no version / no duration
4/31
12 Borders covered by the new AR
• CWE borders: BE-FR, BE-NL, DE-FR, DE-NL,
• Italian borders: FR-IT, CH-IT, AT-IT, SI-IT, GR-IT
• Swiss Northern Borders:AT-CH, CH-DE
• New Border covered:CH-FROn going project for introducing
explicit auctions for the PTRs starting from 2012 as delivery period. This border is included in the new AR.
Dedicated forum: 8th November 2011
FR
DEBE
NL
IT
GR
5/31
PlanningObjective: 1st Yearly Auctions performed beginning of
December 2011 with the new set of AR
Consultation: 13th of September to 4th of October (3 weeks)Comments may be sent to:
6/31
First Yearly Auctionson Dutch Borders
Due to the Dutch Grid code, first Yearly Auctions are scheduled between mid September and mid October, so under current CWE Auction Rules.
But Participants shall be aware that the allocated Capacities during these Auctions will be governed by the new set of Auction Rules when they come into force for the 2012 PTRs.
The draft Auction Rules under consultation are available for participating in these Auctions
7/31
In case the new set of AR cannot be ready in time for governing the allocation of 2012 PTRs, the following solutions could be applied:•For CWE region and for the DE-CH and AT-CH Borders, the current sets of Auction Rules will apply;•For Italian Borders, a 2012 set of Auction Rules mainly based on 2011 Auction Rules will have to be approved;•For FR-CH border, a new set of Auction Rules will have to be issued (based on the Auction Rules under consultation) and approved.
Alternatives to be considered
8/31
Main topics
• Auction Rules structure• Entitlements• Participation in Yearly/Monthly Auctions• Participation in Daily/CWE Shadow Auctions• Financial guarantees• Daily offered capacities lower than non-nominated LT PAs• Fall back procedures• UIOSI and Secondary Market: Transfer and Resale• Scheduling information remaining• Reduction in Held Capacities and Financial Compensation• Reduction in Exchange Programs and Financial Reimbursement• Liability clause / Force Majeure
9/31
• The AR deals with the Allocation of PTRs– Only one Declaration of Acceptance (DoA) dealing with the
Allocation; no DoA for Nomination (DoAN) like currently in the Italian borders AR;
– The DoA will be signed by the Joint Auction Office and the Participant (all documents will have to be re-signed)
• The AR are issued for an unlimited period
• In order to give Participants a general overview, in the AR, remaining border specificities will be explained in the main part, no longer in the appendices and clarify the principles was one of our main goal.
Auction Rules structure
10/31
Entitlement
Section III• Article 3.01/ Registration
• Specific roles: CWE Shadow Auction Only, Beneficiary of a Transfer
• Article 3.02/ Financial Guarantees• Article 3.03/ Entitlement
• Participation in Yearly and Monthly Auctions• Participation in Daily and CWE Shadow Auctions
11/31
• Any entity will be entitled for all Yearly and Monthly auctions operated by the Joint Auction Office under the new set of AR if it is active on the Electricity Market in at least one control area (see list in the next slide)
Participation in Yearlyand Monthly Auctions
UIOSI, Transfer and Resale mechanisms can be used by Participants even if they cannot nominate the PTRs bought
12/31
• a Participation Agreement for the Import/Export Rules with RTE, and/or
• an ARP Contract with ELIA, and/or • a Bilanzkreisvertrag with EnBW TNG, and/or• a Bilanzkreisvertrag with Tennet GmbH, and/or• a Bilanzkreisvertrag with AMPRION, and/or • a Balance Group Contract signed with Slovenian
Market Operator or signed a Contract for settlement of imbalances with the Balance Responsible Party in Slovenia, and/or
• a Balance Group Contract with Swissgrid.• a PV Contract with TenneT TSO BV, and/or• an Energy Transactions Contract with HTSO,
and/or. • a Contratto di Dispacciamento with TERNA,
and/or. • a Datenübermittlungsvertrags-Paar with APG
and a BGV-Vertrag with APCS which together result in a valid Genehmigungsbescheid from Energie-Control Austria.
FR
DEBE
NL
IT
GR
Participation in Yearlyand Monthly Auctions
An entity shall have at least:
13/31
• An entity will be entitled for Daily or CWE Shadow Auctions if it respects specific requirements per border and even per direction
Participation in Dailyand CWE Shadow Auctions
This mechanism entitles only entities being able to use the PTRs allocated
14/31
Participation in Dailyand CWE Shadow Auctions
15/31
Financial Guarantees
Financial checking of the Business Account is now harmonized with only one specificity remaining for the Yearly product:
• 2/12th on most of the Country Borders except on AT-CH where the Yearly product is paid in one settlement.
Beneficiary of Transfer Role: no financial guarantees (Business Account) needed.
As a reminderMonthly Auctions: Valuation of obtained Capacities shall be covered in
the Business Account.Daily Auctions: full Bids valuation shall be covered in the Business
Account.
16/31
Daily Offered Capacities lower than non-nominated Yearly and Monthly PA
Currently, in the Auction Rules:
On all Country Borders, except on CWE Market Coupling Borders, in this case, the non-nominated Yearly and Monthly Programming Authorization are curtailed on a pro-rata basis and the Participants will receive a financial compensation similar as a reduction of Held Capacities (100 or 110% of the original price of the
Capacity).
Disclaimer: On CWE Market Coupling Borders, this article is still under discussion between the TSOs and the Regulators regarding the necessity to introduce, on one or several Country Borders, a mechanism for hedging the financial risks of TSOs (including potential introduction of caps).
17/31
Daily Offered Capacities lower than non-nominated Yearly and Monthly PA
Solutions under discussion among CWE TSOs and NRAs
Option 1: send PA later after coordinated NTC D-1 calculation?
Option 2: capping the UIOSI compensation?
Option 3: assure NTC D-1 ≥ PA through coordination and re-dispatching?Other options or a combination can be envisaged
Feedback from Market Participants is welcome during the Auction Rules consultation period
18/31
CWE-CSE-Switzerland Auction Rules
Fallback modes principles
CWE Market coupling
IT-SI Market Coupling
Equal share
If applicable in terms of timing and only to Participants able to use the daily PTRs
Equal share
If applicable in terms of timing and only to Participants able to use the daily PTRs
Daily Auctions
CWE Shadow Auctions
Fallback mode
Fallback mode
Fallback mode
Fallback mode
Fallback modeFallback mode
Fallback mode
Fallback mode
Yearly & Monthly Auctions
Daily Auctions Fallback modeFallback mode
Fallback modeFallback modePostponement or bidding by fax
Postponement or bidding by fax
19/31
UIOSI mechanism will be applied on all Country Borders.
Explicit resale to Daily Auctions will no longer exist on CH-DE and CH-AT Borders.
UIOSI
20/31
Transfer mechanism of Yearly/Monthly Capacities between Participants is harmonized
The Capacity to be transferred shall be first paid by the Transferor or blocked on its Business Account and the Beneficiary shall accept the Transfer.
Resale of Yearly Capacities to a Monthly Auction remains as today
On CWE Country Borders, the resale is feasible as soon as the Yearly Capacity is allocated (after the end of the contestation period).On all the other Country Borders, the resale is feasible only if the yearly capacity allocated is paid or blocked on the Business Account.
Secondary Market
21/31
• The AR only deal with Capacity Trader (CT) Role• However, depending on mechanism in place on each border,
the Participant can designate a Nomination Agent in some countries for scheduling.
• If this designation mechanism is performed by CASC, the Nomination agent will also receive the Programming Authorization by CASC.
• This is the only information remaining in the AR related to the scheduling like currently in the CWE AR.
• Other information like deadlines for scheduling or the way matching will be performed by TSOs are or will be described in local nomination rules.
Scheduling informationremaining in the AR
22/31
Scheduling informationremaining in the AR
Example:
Nomination Agent 1Nomination Agent 2Nomination Agent BNomination Agent 1
Nomination Agenton exporting side
Nomination Agenton importing side
Participant AParticipant A
Nomination Agent ANomination Agent N
23/31
Scheduling informationremaining in the AR
This table is a clarification of mechanisms that are already in place today!For Yearly and Monthly Capacities:
For Daily Capacities:
24/31
CWE Borders, FR–CH in both directions and FR>IT:•For reasons linked to the Safety of the Power System or in the event of Force Majeure, the Held Capacities can be Reduced until the sending of Programming Authorizations.•After sending and except in case of Force Majeure, the Programming Authorizations are firm for Nominating with the concerned TSOs.
On all the other Borders (CH-IT, AT-IT, AT-CH, CH-DE, SI-IT, GR-IT and IT>FR):•For reasons linked to the Safety of the Power System or in the event of a Force Majeure, the Held Capacities can be reduced, until the deadline for the Nomination with the concerned TSOs (limited to a number of equivalent days on Italian borders for reasons linked to the Safety of the Power System ).
Reduction in Held Capacitiesand financial compensations
25/31
Changes in the Compensation schemes
BE-NL Border> the compensation scheme currently in place on FR-BE Border will apply
Market spread with a cap on the spread prices and a cap related to the Auction revenues collected during the concerned month (1/12 of the Yearly Auctions and Monthly Auctions).
DE-FR and DE-NL Borders> TSOs committed to harmonise CWE compensation by using the same compensation scheme as on FR-BE Border and BE-NL Border
Reduction in Held Capacitiesand financial compensations
26/31
Compensation schemes will be re-examined at the latest when CWE Flow Based MC is introduced in order to be in line with the Framework Guidelines CACM and eventually with the Network Code
Topic to consider:Time factors» Curtailment announced before a reasonable lead-time defined by
NRAs» Curtailments of long duration
Outlook: CWE Future compensation scheme for reduction of held capacities
27/31
Changes in the Compensation schemes
In case of Force Majeure and on all Country Borders:
• Exchange Programs can be reduced;
• and the capacities corresponding to the concerned Exchange Programs are reimbursed at the original price.
Reduction in Exchange Programsand financial compensations
28/31
Liability clause has been harmonized based on the Italian Borders Auction Rules principles.
Force Majeure definition has been modified in order to comply with Framework Guidelines on CACM.
Liability Article / Force Majeure
29/31
Conclusion
30/31
Harmonized features• A unique contract for participating in all explicit allocations on 12
borders covering 2 regions• Same wording / concepts for all these borders• Nomination aspects excluded from HAR (separation of nomination agent and CT
role)
• Entitlement • Financial guarantees Modification of compensation scheme toward Market Spread on BE-
NL, DE-NL and DE-FR borders. UIOSI (now also on CH borders instead of UIOLI) • Many technical differences from Participants point of view are
reduced (publication of auction specifications, number of maximal bids, contestation period, settlement, etc.)
31/31
• Thank you for your participation