130 MW NTPC LIMITED BHADLA, RAJASTHAN

Transcript of 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever...

Page 1: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

130 MWNTPC LIMITEDB H A D L A , R A JA ST H A N

Page 2: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

10

NTPC LIMITEDBhadla, Rajasthan

RSite Co-ordinates 27.5N, 72.0ERPlant capacity 130 MW (2 blocks of 65 MW each)RConnection Type & Connected to Grid connected - Bhadla 220 kV Pooling Station -1RRated System Power 130 MWRTotal Site Span 3.5 km length & 1.0 km wideRNumber of Modules About 4,40,000 nos.RInverter Solar Grid Connected Inverter (104 nos.)RPower Evacuation At GSS-1 pooling station (132 kV) Bhadla Solar Park Phase-II, Village Bhadla, Tehsil Bap, District Jodhpur, RajasthanRTotal Land Area 663 acres

PROJECT OVERVIEW

Page 3: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

11

CASE STUDIESEPC

Weather: Extreme weather conditions at the project site posed a problem. The summer temperature was as high as 50°C; from April to July, cyclonic storm ensued with prevalence of strong wind between 11 am to 4 pm and work came to a halt. Similarly, the temperature during winter was as low as 5°C (night).

Mitigation: Controlled working hours along with a dynamic work schedule allowed us to deliver the project on time. Continuous hydration of the workers ensured better productivity.

Soil & Land Strata: The land strata of the project site varied extensively with presence of small dunes in a sandy terrain. Naturally, the project team faced immense difficultly in moving the construction equipment and machineries. The project team encountered rocks at depth of 0.5 m, 1.5 mm and complete sand due to which the pilling work was done at 3 different depths in Zone A, Zone B & Zone C.

Mitigation: Temporary murram road was built to access the site for construction and moving of machineries.

Local Manpower: The project’s major problem lied with local unskilled manpower.

Mitigation: We had to engage and train local workers for temporary works and hire tractors, trolleys and other small machineries locally to aid the process.

Construction Power and Water: This project had a multitude of problems. Firstly, there was an absence of a continuous power source. But arranging for it with immediacy was quite difficult considering the remoteness of the area. Also, quality of the available bore well water was not suitable for going ahead with the construction work in an uninterrupted way.

Mitigation: We procured power from RRECL for construction site and used Diesel Generator sets to get uninterrupted power. For civil works, we had to arrange for canal water from nearby areas.

Murram Sourcing: Sourcing of murram was a challenge in the area. The process of getting approval from the mining department was tough and required extensive compliances and certificates from our side.

Mitigation: We provided all the backings and fulfilled the compliances for getting the permission from the mining department for sourcing the murram.

CHALLENGES & SOLUTION

NTPC LimitedBhadla, Rajasthan

Page 4: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside
Page 5: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

CASE STUDIESEPC

13

PROJECT USP

• The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation.

• The project is located inside the Bhadla Solar Park, built by RRECL, with basic infrastructural support like GSS, pooling station, bitumen road, approach road, street lights, construction water and land lease.

• Permissions from multiple government bodies were acquired and statutory norms were diligently followed during the installation and commissioning of the plant.

• This was the first-of-its-kind project under our supervision. In order to avoid soil erosion, murram spreading was done up to 1 sq. m. of the pile area for each of the 73,000 piles. Commissioning of 2 x 65 MW blocks was done in 4 phases (40 MW, 25 MW, 25 MW & 40 MW).

• The solar plant was commissioned prior to the scheduled time and generation started about two months in advance, which is considered as an achievement on its own owing to the size of the project. The work started from 8th February and continued up to 24th March.

• Vikram Solar was the first among all the other bidders to commission the project successfully.

• Total 4,40,000 solar PV modules (approx.) were installed in the 130 MW plant.

• Total 7500MT of steel were used for the mounting of the module structure.

• Each 65 MW block has a unique switchyard which steps up the plant voltage from 33 kV level to 132 kV level with the help of 63 MVA grid transformer.

• One of the first helipads in the region was developed inside this project area block.

NTPC LimitedBhadla, Rajasthan

Page 6: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

Module mounting

Structure mounting Structure mounting

Switch yard

STEP BY STEP DEVELOPMENT

Page 7: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

CASE STUDIESEPC

15

Weather monitoring station

Inverter Bay extension

NTPC LimitedBhadla, Rajasthan

Page 8: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

Fencing Transmission line

Control roomControl room: under construction Control room: inside view

STEP BY STEP DEVELOPMENT

Page 9: 130 MW NTPC LIMITED...PROJECT USP • The 130 MW NTPC project is the largest solar PV plant ever executed by Vikram Solar since its incorporation. • The project is located inside

CASE STUDIESEPC

17

ENVIRONMENTAL BENEFITS

Expected Annual Energy Yield 212.44 million unit. The plant is also expected to reduce CO2 emissions to the tune of 203942.4 metric tonnes annually.

Module alignment work

NTPC LimitedBhadla, Rajasthan