12-I Tax AllowanceEnergy Efficiency TaxReview
2011/2012
-
8/12/2019 12l Tax Sanedi
2/27
July 2010 to March 2012
-
8/12/2019 12l Tax Sanedi
3/27
The 12-I Tax Allowance
BACKGROUND
-
8/12/2019 12l Tax Sanedi
4/27
Objectives To support investmentin manufacturingassets,with a view to improving the productivity ofSouth Africas manufacturing sector;
and To support personnel training, with a view to
improving labour productivity and the skillsprofile of South Africas labour force.
-
8/12/2019 12l Tax Sanedi
5/27
Key Qualification Criteria Upgrade & expand industrial development inSouth Africa. Enhance skills development. Use new, energy efficient technologies. Achieve a minimum, substantiated 10% energy-efficiency improvement.
-
8/12/2019 12l Tax Sanedi
6/27
-
8/12/2019 12l Tax Sanedi
7/27
Energy Efficiency Component Energy efficiency is a pertinent prerequisite. Reported Savings in line with SANS 50010. Minimum 10% improvement, (Greenfields& Brownfieldsprojects are eligible). Modern, viable, energy-efficient equipment and
processes to be deployed. Energy Efficiency improvements to be verified by SANEDI.
-
8/12/2019 12l Tax Sanedi
8/27
SANEDIs Role Confirmation of re l EE-interventions. Verify the methodology & assumptions. Monitor, report & issue annual Tax Clearance
Certificates.
all in accordance withSANS 50010.
-
8/12/2019 12l Tax Sanedi
9/27
THE PROCESS12-I Tax Allowance Process
-
8/12/2019 12l Tax Sanedi
10/27
1
2
1E
2E
3E
34
4E
5
Company decides toexpand or upgradeand utilise the taxallowance
Confirm feasibility and high-levelcompliance with qualifyingcriteria
Submit application &all supportingdocumentation forevaluation to the dti
Accepts & reviewsapplication, conductssite visit & compilesan evaluation report
Adjudicationcommittee review andsubmit report andrecommendation tothe Minister, (the dti)
PROCESS
-
8/12/2019 12l Tax Sanedi
11/27
67
8
9
5E
6E
7E
Communicateadjudication result(inform client, provide SARS with list of approvedallowances and publish list of adjudicatedprojects in Government Gazette)
Implementation of approvedprojects & close-out report
PROCESS, ont
-
8/12/2019 12l Tax Sanedi
12/27
67
8
9
5E
6E
7E
Annual monitoring ofproject during 4-yearbenefit period
Annual reportingsubmitted to
Parliament andAuditor General
PROCESS, contdTotally transparent process
-
8/12/2019 12l Tax Sanedi
13/27
1
2
1E
2E
3E
34
4E
5
1E. Appoint SANASaccredited CMVP* toestablish baseline
2E. Submit baseline report forevaluation to SANEDI and the dti
3E. Baseline reportsubmitted to SANEDItechnical committee forevaluation
4E. If approved,receive certificate &two provisional points,(dependent onverified performance)
EE SUB-PROCESS
-
8/12/2019 12l Tax Sanedi
14/27
67
8
9
5E
6E
7E
5E. CMVP completes & submitsM&V report to SANEDI. SANEDIreviews the data & issues acertificate on approval
6E. Company submits certificatewith annual tax return
7E. Sustained savings over 4 years withannual M&V reports
EE SUB-PROCESS, ont
-
8/12/2019 12l Tax Sanedi
15/27
PERFORMANCE12-I Tax Allowance Assessment
-
8/12/2019 12l Tax Sanedi
16/27
HIGHLIGHTS 12-I)
Note: July 2010 to March 2012
-
8/12/2019 12l Tax Sanedi
17/27
Application Project Types
-
8/12/2019 12l Tax Sanedi
18/27
Geographic Distribution
-
8/12/2019 12l Tax Sanedi
19/27
Industry Sectors Represented
-
8/12/2019 12l Tax Sanedi
20/27
Industry Sectors Representedont
-
8/12/2019 12l Tax Sanedi
21/27
Application Technologies
-
8/12/2019 12l Tax Sanedi
22/27
LESSONS LEARNT
-
8/12/2019 12l Tax Sanedi
23/27
-
8/12/2019 12l Tax Sanedi
24/27
WAY FORWARD
-
8/12/2019 12l Tax Sanedi
25/27
The tax allowance will remain available to the South African manufacturingsector until 2015 or until the available funds have been fully allocated,whichever comes first. Findings and lessons from this initial phase of 12-I has served to inform thedevelopment of supporting processes that will be required by theupcoming12-L energy efficiency tax incentives. In future, SANEDI is expected to report fully on verified savings achieved by
the respective efficiency upgrades and developments as they arecommissioned and to be able to quantify the national benefits resultingfrom the tax allowance. Over the 4-year period relevant to each of the respective projects, SANEDImust still compile a view on the sustainability of energy savings resulting
from different type of interventions. These findings will be available toeffectively serve decision-making regarding energy efficiency interventionsand technical support, among the services offered by SANEDI.
-
8/12/2019 12l Tax Sanedi
26/27
Conclusion Tax regimes are a globally popular mechanism to theaccelerate the uptake of energy efficiency. The ring-fencing of the proposed Carbon Tax for re-investment in EE is a positive step forward. 12-I is an excellent starting point & 12-L will open up themarket. The (energy) bottom-line: The expected efficiencyimprovement was as high as 40%& an average efficiencygain of 18%is expected across all 14 projects
-