Manufacturing Record Book Deionization Package Unit Manufacturing Record Book  A-B14-TOL-MEE- 7510-0902 MRB Cover Page Project Number 105312 Date: 15-JAN-2008, Rev.:  A 309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com MANUFACTURING RECORD BOOK FOR MODEL FD401-4-2 WATERMAKER Tombua Landana Project – CABGOC Block 14 Angola Daewoo Shipbuilding & Marine Engineering Co. Ltd. Potable Water Makers; Chlorine Injection Unit Purchase Order Number 4000310118 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312 Document Number: 52 Client Document Number: A-B14-TOL-MEE-7510-0902 SDRL Code: R04/R05 MRB Manual

Transcript of 125497695-105312-MRB-MANUAL-01152008-pdf

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    1/334

    Manufacturing RecordDeionization Packag

    Manufacturing Record BookA-B14-TOL-MEE-7510-0902

    MRB Cover PageProject Number 105312Date: 15-JAN-2008 Rev : A

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USATelephone: (281) 367-2800Fax: (281) 367-1761

    MANUFACTURING RECORD BOOK

    FOR

    MODEL FD401-4-2 WATERMAKER

    Tombua Landana Project CABGOC Block 14 AngolaDaewoo Shipbuilding & Marine Engineering Co. Ltd.

    Potable Water Makers; Chlorine Injection UnitPurchase Order Number 4000310118

    Equipment Tag No: ME-7510/7511; ZZZ-6700C'treat Project Number 105312

    Document Number: 52Client Document Number:A-B14-TOL-MEE-7510-0902

    SDRL Code: R04/R05MRB Manual

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    2/334

    Date: 15 JAN 2008, Rev.: A Fax: (281) 367 1761

    Manufacturing RecordDeionization Packag

    Manufacturing Record BookA-B14-TOL-MEE-7510-0902MRB IndexProject Number 106372

    309 Briar Rock Rd.The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Project: Tombua Landana Cabgoc Block 14 AngolaContractor: DSMEPO#: 400031018Desc.: Potable Watermakers with Turbine Wash Water Polisher

    INDEX

    Item Section Description Sectio01 Supplier Document Schedule (SDS) 0102 Fabrication Production Schedule 02

    05A General Arrangement Drawing Water makers 105312-01 03

    05B General Arrangement Drawing Chlorine Inj. Unit 105312-02

    04

    06A P&ID Water makers (Pg 1/2, 2/2) 105312-21-1/2 0506B P&ID Chlorine Injection Unit (Pg 1/1) 105312-22 0607A Schematic Diagrams Water makers 105312-11 0707B Schematic Diagrams Chlorine Injection Unit 105312-12 0808 Utilities Schedule 0909 Weight Data Sheets 1010 Equipment Data Sheets 1111 Noise Level Data Sheets 1212 Schedule Elec. Equipment in Hazardous Area 13

    13 Detailed Description of Operation 1414 Instrument Index 1515 Instrument Data Sheets (Format INTools) 1616 Cause & Effect Chart 1717 PLC Logic Diagram 1818 Bill of Materials Limited to Parts Designation Table in IOM 1919 Cross Sect/Exploded View Drawing (Pump Only) 2020 Catalog Data (Major Components & Instrument) 21

    21A Electrical Panel Layout Drawing Water makers 105312-10 2221B Electrical Panel Layout Drawing Chlorine Inj. Unit -

    105312-1323

    22 Termination Diagram REFER TO SDRL C03 2423 Motor Performance Curves 2524 Installation Procedures 2625 Preservation Procedures 2726 Handling and Shipping Procedures 2827 Pre-Commissioning/Commissioning Procedures

    (Included in IOM SDRL R02/03)29

    28 Quality Management System Certification (ISO 9001Certificate)

    30

    29 Inspection & Test Plan 31

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    3/334

    j p ( )

    Manufacturing RecordDeionization Packag

    Manufacturing Record BookA-B14-TOL-MEE-7510-0902MRB IndexProject Number 106372

    309 Briar Rock Rd.The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Manufacturing Record BookModel FD401-4-2 Watermaker

    INDEX CONTINUED

    30 Pressure Test Procedures INCLUDED IN SDRL H05 3231 Inspection & Test Procedure (Including FAT) 33

    32 Lube Oil & Operating Fluids Schedule 3433 Priced Recommended Start Up/Commissioning Spares 3534 Priced Recommended Two Year Operating Spares 3635 Factory Acceptance Test Report 3736 Weighing Report 3837 Dimensional Report 3938 Material Test Certs. (MTRs Frame & Membrane Housing) 4039 Welder Performance Qualification Certificates 4140 NDE Records/Reports 4241 Routine Test Certificates Electrical Machinery (Motors) 4342 Painting/Insulation Inspection Report 44

    43 Dimensional Reports 4544 Certificate of Compliance 4645 Release Note(s) 4746 Material Safety Data Sheets (MSDS) 4847 WPS/WPQRs 4948 Non Destructive Exam Procedures 5049 Surface Preparation & Painting Procedures 5150 Dispatch Dossier 5251 IOM Manual (CTreat Standard) ISSUED AS SEPARATE

    VOLUME53

    53 Instrument Calibration or Set Point Cert. (AI, PSL, PSV, PI

    only)

    54

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    4/334

    j p ( )

    Manufacturing Record Book

    01 Document Schedule (SDS)

    Project Number 105312

    Date: 14-Dec-06 Rev.: 0

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection UnitDSME Purchase Order No.: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 01

    CABGOC Document Number: A-B14-TOL-MEE-7510-0008SDRL Code: A01

    Document Schedule (SDS)

    0 12/14/06 Revised Per Comments SLY RT -A 10/05/06 For Information SLY RT -

    Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    5/334

    ( )

    Project: TOMBUA LANDANA PROJECT - CABGOC BLOCK 14 ANGOLA Document No.: 01

    Buyer: DSME Rev: 0

    Buyer's P.O. No.: 400031018

    Project No.: 105312 CODE 1: ACCEPTED

    Equipment Desc.: POTABLE WATERMAKERS W/ TURBINE WASH WATER POLISHER CODE 2:

    Tag No.: ME-7510/7511; ZZZ-6700 CODE 3: NOT ACCEP

    PO Pkg No: ME-220 CODE 4: RECEIPT NO

    CODE 5: CERTIFIED (

    ITEM Ref. #SDRL

    CODEDocument Title

    C'treat

    Document No.

    Client

    Document No.

    First Submittal

    Due(weeks ARO)

    First Submittal

    Due(date)Date Subm

    1 A01 Supplier Document Schedule (SDS) A-B14-TOL-MEE-7510-0008 2 27-Sep-06 5-Oct-06

    15-Dec-0

    2 A02 Fabrication Production Schedule A-B14-TOL-MEE-7510-0010 2 27-Sep-06 9-Oct-06

    14-Dec-0

    7-Feb-0

    3 A03 Progress Reports (Due every 4 Wks) A-B14-TOL-MEE-7510-0002 4 11-Oct-06 10-Jan-0

    31-Jan-0

    16-Feb-0

    28-Feb-0

    16-Mar-0

    4 A05 Table of Contents (all manuals) A-B14-TOL-MEE-7510-0003 12 6-Dec-06 19-Sep-0

    5A B01 General Arrangement Drawing - Watermakers 105312-01 D-B14-TOL-MEE-7510-0011 3 4-Oct-06 4-Oct-06

    12/14/200

    12/18/06

    15-Jan-0

    5B B01 General Arrangement Drawing - Chlorine Inj. Unit 105312-02 D-B14-TOL-ZZZ-6700-0012 3 4-Oct-06 4-Oct-06

    18-Dec-0

    7-May-0

    6A C01 P&ID - Potable Watermakers (Pg 1/2, 2/2) 105312-21-1 / 2 D-B14-TOL-MEE-7510-0013 3 4-Oct-06 4-Oct-06

    11-Dec-0

    12-Feb-0

    9-May-0

    15-Jan-0

    6B C01 P&ID - Chlorine Injection Unit (Pg 1/1) 105312-22 D-B14-TOL-MEE-7510-0014 3 4-Oct-06 4-Oct-06

    11-Dec-0

    12-Feb-0

    9-May-0

    Document Register

    ACCEPTED

    COMMENTS

    T- Prior to Completion/Inspection/Tesing in weeks.

    T+ Post Completion/Inspection/Testing in weeks.

    D- Prior to Dispatch in weeks.

    1 of 4 G:\Netshare2\Ctreat\Projects\2 - Active Projects\105312 ChevronTexaco Tombua Landan

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    6/334

    Project: TOMBUA LANDANA PROJECT - CABGOC BLOCK 14 ANGOLA Document No.: 01

    Buyer: DSME Rev: 0

    Buyer's P.O. No.: 400031018

    Project No.: 105312 CODE 1: ACCEPTED

    Equipment Desc.: POTABLE WATERMAKERS W/ TURBINE WASH WATER POLISHER CODE 2:

    Tag No.: ME-7510/7511; ZZZ-6700 CODE 3: NOT ACCEP

    PO Pkg No: ME-220 CODE 4: RECEIPT NO

    CODE 5: CERTIFIED (

    ITEM Ref. #SDRL

    CODEDocument Title

    C'treat

    Document No.

    Client

    Document No.

    First Submittal

    Due(weeks ARO)

    First Submittal

    Due(date)

    Date Subm

    Document Register

    ACCEPTED

    COMMENTS

    20-Jun-0

    7A C03 Schematic Diagrams - Watermaker 105312-11 D-B14-TOL-MEE-7510-0016 6 25-Oct-06 3-Nov-0

    12-Jan-0

    12-Feb-0

    28-Aug-0

    7B C03 Schematic Diagrams - Chlorine Injection Unit 105312-12 D-B14-TOL-ZZZ-6700-0015 6 25-Oct-06 3-Nov-0

    15-Jan-0

    28-Aug-0

    15-Jan-0

    8 C04 Utilities Schedule A-B14-TOL-MEE-7510-0200 3 4-Oct-06 4-Oct-06

    14-Dec-0

    9 C05 Weight Data Sheets A-B14-TOL-MEE-7510-0100 3 4-Oct-06 4-Oct-06

    18-Dec-0

    10 C06 Equipment Data Sheets A-B14-TOL-MEE-7510-0101 4 11-Oct-06 24-Oct-0

    19-Dec-0

    12-Feb-0

    7-May-0

    20-Jun-0

    11 C07 Noise Level Data Sheets A-B14-TOL-MEE-7510-0102 4 11-Oct-06 24-Oct-0

    19-Dec-0

    12 C08 Schedule Elec. Equipment in Hazardous Area A-B14-TOL-MEE-7510-0021 10 22-Nov-06 20-Feb-0

    13 C09 Detailed Description of Operation A-B14-TOL-MEE-7510-0022 10 22-Nov-06 12-Feb-0

    7-May-0

    14 C14 Instrument Index A-B14-TOL-MEE-7510-0103 4 11-Oct-06 12-Feb-0

    7-May-0

    20-Jun-0

    15 C15 Instrument Data Sheets (Format INTools) A-B14-TOL-MEE-7510-0105 8 8-Nov-06 12-Mar-0

    16 C16 Cause & Effect Chart B-B14-TOL-MEE-7510-0500 8 8-Nov-06 20-Feb-0

    24-Aug-0

    17 C17 PLC Logic Diagram A-B14-TOL-MEE-7510-0023 T+2 24-Aug-0

    T- Prior to Completion/Inspection/Tesing in weeks.

    T+ Post Completion/Inspection/Testing in weeks.

    D- Prior to Dispatch in weeks.

    2 of 4 G:\Netshare2\Ctreat\Projects\2 - Active Projects\105312 ChevronTexaco Tombua Landan

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    7/334

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    8/334

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    9/334

    Manufacturing Record Book

    02 Fabrication Production Schedule

    Project Number 105312

    Date: 7-Feb-07 Rev.: 0Page 1 of 3

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No: 4000310118

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    PO Pkg No: ME-220

    C'treat Project Number 105312

    Document Number 02

    CABGOC Document No: A-B14-TOL-MEE-7510-0010

    SDRL Code: A02

    Fabrication Production Schedule

    0 2/7/07 For Construction RT - -

    B 12/14/06 Revise cover page per comments RT - -

    A 10/09/06 For Information RT GS GSRev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    10/334

    Activity NameStart

    Date

    Finish

    Date 27 3 10 17 24 1 8 15

    Aug '06 Sept '06 Oct '06

    27 3 10 17 24 1 8 15

    1

    2

    3

    4

    5

    67

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    ENGINEERING

    Prepare Drawings/Data 9/20/06 11/22/06

    Vendor Data Approval 10/4/06 12/6/06

    Resolve Comments 10/18/06 11/15/06

    PROCUREMENTFrame Fabrication 10/25/06 11/29/06

    Frame Painting 11/30/06 12/11/06

    Motors 11/1/06 12/26/06

    Pumps 11/1/06 12/6/06

    Tanks 11/1/06 12/6/06

    Piping 11/15/06 12/6/06

    Instruments 11/1/06 12/1/06

    Electrical 11/1/06 12/6/06

    ASSEMBLY

    Set Equipment 12/12/06 1/5/07

    Piping 12/15/06 1/19/07

    Wire Control Box 1/3/07 1/31/07

    Instrument/Electrical 1/26/07 2/9/07

    TESTING

    Check-Out 2/12/07 2/15/07

    Factory Test (FAT) 2/16/07 2/16/07

    SHIPPING PREP.

    Drain and Package 2/19/07 2/21/07

    Storage 2/21/07

    DELIVERY

    CABGOC- Tombua Landana Contract No. 40003101

    Project No. 105312 - Watermaker and Chlorine Injection Unit Produ

    TBD

    TBD BY 9/30/07

    Page 2 of 3

    CABGOC DOC NO: A-B14-TOL-MEE-7510-0010, REV. 0

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    11/334

    Activity NameStart

    Date

    Finish

    Date 17 24 31 7 14 21 28 4

    Dec '06 Jan '07

    17 24 31 7 14 21 28 4

    1

    2

    3

    4

    5

    67

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    1920

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    ENGINEERING

    Prepare Drawings/Data 9/20/06 11/22/06

    Vendor Data Approval 10/4/06 12/6/06

    Resolve Comments 10/18/06 11/15/06

    PROCUREMENTFrame Fabrication 10/25/06 11/29/06

    Frame Painting 11/30/06 12/11/06

    Motors 11/1/06 12/26/06

    Pumps 11/1/06 12/6/06

    Tanks 11/1/06 12/6/06

    Piping 11/15/06 12/6/06

    Instruments 11/1/06 12/1/06

    Electrical 11/1/06 12/6/06

    ASSEMBLY

    Set Equipment 12/12/06 1/5/07

    Piping 12/15/06 1/19/07

    Wire Control Box 1/3/07 1/31/07

    Instrument/Electrical 1/26/07 2/9/07

    TESTING

    Check-Out 2/12/07 2/15/07

    Factory Test (FAT) 2/16/07 2/16/07

    SHIPPING PREP.

    Drain and Package 2/19/07 2/21/07

    Storage 2/21/07

    DELIVERY

    CABGOC- Tombua Landana Contract No. 40003101

    Project No. 105312 - Watermaker and Chlorine Injection Unit Produ

    Page 3 of 3

    TBD

    TBD BY 9/30/07

    CABGOC DOC NO.: A-B14-TOL-MEE-7510-0010, REV. 0

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    12/334

    Manufacturing Record Book

    05A General Arrangement - Watermaker

    Project Number 105312

    Date: 15-JAN-08 Rev.: 1

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761

    CABGOC

    Tombua Landana Project CABGOC Block 14 AngolaFD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No.: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 05ACABGOC Document Number: D-B14-TOL-MEE-7510-0011

    SDRL Code: B01

    General Arrangement Drawing Watermakers

    1 01/15/08 AS-BUILT SLY RT RT

    0 12/14/06 Revised per Comments SLY RT RT

    A 10/04/06 For Information SLY - RTRev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    13/334

    ( )

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    14/334

    Manufacturing Record Book

    05B General Arrangement Chlorine Injection Unit

    Project Number 105312

    Date: 07-May-07 Rev.: 1

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761

    CABGOC

    Tombua Landana Project CABGOC Block 14 AngolaFD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No.: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 05BCABGOC Document Number: D-B14-TOL-MEE-6700-0012

    SDRL Code: B01

    General Arrangement Drawing Chlorine Injection Unit

    1 05/07/07 Final-as-Built SLY RT RT

    0 12/18/06 Revised per Comments SLY RT RT

    A 10/04/06 For Information SLY - RTRev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    15/334

    y ( )

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    16/334

    Manufacturing Record Book

    06A P & ID Watermaker (Pg1/2, 2/2)

    Project Number 105312

    Date: 15-JAN-08 Rev.: 2Page 1 of 2

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 AngolaFD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No.: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 06ACABGOC Document Number: D-B14-TOL-MEE-7510-0013

    SDRL Code: C01

    P&ID Watermaker (Pg 1/2, 2/2)

    2 01/15/08 For your Information SLY RT RT1 05/09/07 Final-as-Built SLY RT RT

    0 02/12/07 Revised per Comments SLY RT RT

    B 12/11/06 Revised per Comments SLY RT RT

    A 10/04/06 For Information SLY - RTRev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    17/334

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    18/334

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    19/334

    Manufacturing Record Book

    06B P&ID Chlorine Injection Unit (Pg 1/1)

    Project Number 105312Date: 20-JUNE-07 Rev.: 2

    Page 1 of 2

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800Fax: (281) 367-1761

    www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No.: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 06B

    CABGOC Document Number: D-B14-TOL-MEE-7510-0014

    SDRL Code: C01P&ID Chlorine Injection Unit (Pg 1/1)

    2 06/20/07 For your Information SLY RT RT

    1 05/09/07 Final-as-Built SLY RT RT

    0 02/12/07 Revised per Comments SLY RT RT

    B 12/11/06 Revised per Comments SLY RT RTA 10/04/06 For Information SLY - RT

    Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    20/334

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    21/334

    Manufacturing Record Book

    07A Schematic Diagrams - Watermaker

    Project Number 105312

    Date: 28-AUG-07 Rev.: 1Page 1 of 2

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No.: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 07A

    CABGOC Document Number: D-B14-TOL-MEE-7510-0016

    SDRL Code: C03Schematic Diagrams Watermaker

    1 08/28/07 Certified-As-Built SLY RT RT

    0 02/12/07 For Construction SLY RT RT

    B 01/12/07 Revised per Comments SLY RT RT

    A 11/03/06 For Information SLY - RTRev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    22/334

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    23/334

    Manufacturing Record Book

    07A Schematic Diagrams Chlorine Injection Unit

    Project Number 105312

    Date: 15-JAN-08 Rev.: 1

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761

    CABGOC

    Tombua Landana Project CABGOC Block 14 AngolaFD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No.: 400310118

    PO Pkg. No.: ME220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 07BCABGOC Document Number: D-B14-TOL-ZZZ-6700-0015

    SDRL Code: C03

    Schematic Diagrams Chlorine Injection Unit

    1 01/15/08 For Information SLY RT RT0 08/28/07 Certified-As-Built SLY RT RT

    0 01/05/07 For Construction SLY RT RT

    A 11/03/06 For Information SLY - RTRev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    24/334

    ( )

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    25/334

    Manufacturing Record Book

    08 Utilities Schedule

    Project Number 105312

    Date: 14-Dec-06 Rev.: 0Page 1 of 2

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order Number: 4000310118

    PO Pkg No: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 08

    CABGOC Document No: A-B14-TOL-MEE-7510-0200

    SDRL Code: C04

    Utilities Schedule

    0 12/14/06 Revise per Comments RT - -

    A 10/04/06 For Information RT - -Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    26/334

    Manufacturing Record Book

    08 Utilities Schedule

    Project Number 105312

    Date: 14-Dec-06 Rev.: 0Page 2 of 2

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    Utility Consumption List (Each FD401-4-2 Watermaker ME-7510/7511):

    Electrical Power : 480V/3Ph/60Hz (High-Pressure Pump Motor 60hp (45 kw), Boost Pump Mo

    3 hp (2.2 kw), and 2nd Pass Charge Pump Motor 3 hp (2.2 kw))

    Control Power : 120V/ 1ph / 60 Hz (5A max.)Heater Power : 120V/1Ph/60Hz (Motor Heater for High-Pressure Pump -120W)

    (Rev.0)

    Compressed Air : 80 - 863 kPag (80 125 psig), approx. 3 scfm.

    Seawater

    Temperature : 12.8 - 35C (55 -95 F)Salinity : 35,000 ppm TDS, nominal

    Flow : 9.3 m/hr (41 USgpm)

    Pressure : 345 kPag (50 psig) available

    Utility Consumption List (For Chlorine Injection Unit ZZZ-6700)

    Control Power : 120 V/ 1 ph/ 60 Hz (1A max.) (Chemical Injection Pump 44W per mfr. spec.

    & Power to Pump

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    27/334

    Manufacturing Record Book

    09 - WCoG

    Project Number 105312

    Date: 18-Dec-06 Rev.: 0Page 1 of 3

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 9

    CABGOC Document No: A-B14-TOL-MEE-7510-0100

    SDRL Code: C05

    Weight /Center of Gravity Data Sheet

    0 12/18/06 Revise per Comments RT - -

    A 10/04/06 For Information RT - -Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    28/334

    Project No.

    Item No.

    Revision Date: 12/18/2006

    By Appr'd:

    Unit

    P.O. No.

    Inquiry No.

    Sheet 1

    Doc No.

    Client: Plant:

    Service: Site:

    2

    Service:

    A= 130"

    B= 84"

    C= 91"

    X (DRY)= 58"

    Y (DRY)= 52"

    Z (DRY)= 17"

    X (OP)= 69"

    Y (OP)= 47"

    Z (OP)= 24"

    LBS

    LBS

    LBS

    LBS

    No. Date By Ap

    A 10/4/06 RT R

    0 12/18/06 RT -

    ESTIMATE

    VENDOR INFO

    WEIGHED INFO

    CERTIFIED

    Revision

    Issued for Information

    Revised per Comments

    FACTORY / SKID ELECTRICS

    FACTORY SKID/ STEEL WORK

    FIRE PROOFING

    THERMAL INSULATION

    FACTORY/ SKID INSTRUMENTS

    WEIGHT CHECK LIST

    ITEM APPLICABLE

    INCLUDED IN

    WEIGHT DATA

    IF NOT INCLUDED AND APPLICABLE

    ESTIMATED WEIGHT

    WEIGHT STAT

    10,000

    5%

    5%

    5%

    5%

    7,000

    10,000

    % CONTINGENCY

    ALLOWANCE

    REMARKS

    WEIGHT DATA (LB)

    WEIGHT DATA (LB)

    TYPE

    DRY

    LIFT

    OPERATING

    TEST

    ESTIMATED

    WEIGHT

    7,000

    ALL Manufacturer: C'TREAT OFFSHORE

    Number of Units: Mfr. Model No.: FD401-4-2 POTABLE WATER MAKERS WITH TURBINE WASH WATER POLISHER

    CABGOC TL Drilling and Production Platform

    ALL Offshore Angola, Block 14

    A-B14-TOL-MEE-7510-0100

    ME-220

    of 2DATA SHEE

    RT

    WEIGHT / CENTER OF GRAVITY

    Tombua Landana Project - CABGOC BLK 14 ANGOLA

    6305

    ME-7510/7511

    0

    FACTORY / SKID PIPEWORK

    FINAL WEIGHT DATA

    ITEM METHOD WEIGHT COMMENTS

    PLATFORMS / LADDERS

    CALCULATED

    CRANE LOAD INDICATOR

    CERTIFIED TRUCK SCALE

    LOAD CELLS

    SUPPORT STEEL

    X

    A

    Y

    B

    C

    ZZ

    NOTE:

    1.) ALL DIMENSIONS IN FEET, INCHES.

    2.) SKETCH IN SOME IDENTIFYING ITEMS ABOVE TO HELP ORIENT THE X & Y DIMENSIONS

    PLAN

    ELEVATION

    C OF G

    C OF G

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    YES

    YES

    YES

    YES

    NO

    NO

    NO

    NO

    YES YESNO NO

    Pump

    /Motor

    Page 2 of 3

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    29/334

    Project No.

    Item No.

    Revision Date: 12/18/2006

    By Appr'd:

    Unit

    P.O. No.

    Inquiry No.

    Sheet 2

    Doc No.

    Client: Plant:

    Service: Site:

    1

    Service:

    A= 36"

    B= 14"

    C= 68"

    X (DRY)= 19"

    Y (DRY)= 7.5"

    Z (DRY)= 12"

    X (OP)= 21"

    Y (OP)= 9"

    Z (OP)= 16.5"

    LBS

    LBS

    LBS

    LBS

    No. Date By Ap

    0 12/18/06 RT R

    CERTIFIED TRUCK SCALE

    LOAD CELLS

    CALCULATED

    CRANE LOAD INDICATOR

    FACTORY / SKID PIPEWORK

    FINAL WEIGHT DATA

    ITEM METHOD WEIGHT COMMENTS

    PLATFORMS / LADDERS

    6305

    ZZZ-6700

    0

    RT

    WEIGHT / CENTER OF GRAVITY

    Tombua Landana Project - CABGOC BLK 14 ANGOLA

    A-B14-TOL-MEE-7510-0100

    ME-220

    of 2DATA SHEE

    CABGOC TL Drilling and Production Platform

    ALL Offshore Angola, Block 14

    Number of Units: Mfr. Model No.: N/A CHLORINE INJECTION UNIT

    ALL Manufacturer: C'TREAT OFFSHORE

    WEIGHT DATA (LB)

    WEIGHT DATA (LB)

    TYPE

    DRY

    LIFT

    OPERATING

    TEST

    ESTIMATED

    WEIGHT

    380

    % CONTINGENCY

    ALLOWANCE

    REMARKS WEIGHT STAT

    500

    n/a

    n/a

    5%

    5%

    380

    500

    WEIGHT CHECK LIST

    ITEM APPLICABLE

    INCLUDED IN

    WEIGHT DATA

    IF NOT INCLUDED AND APPLICABLE

    ESTIMATED WEIGHT

    FACTORY / SKID ELECTRICS

    FACTORY SKID/ STEEL WORK

    FIRE PROOFING

    THERMAL INSULATION

    FACTORY/ SKID INSTRUMENTS

    ESTIMATE

    VENDOR INFO

    WEIGHED INFO

    CERTIFIED

    Revision

    Issued for Information

    SUPPORT STEEL

    X

    A

    Y

    B

    C

    ZZ

    NOTE:

    1.) ALL DIMENSIONS IN FEET, INCHES.

    2.) SKETCH IN SOME IDENTIFYING ITEMS ABOVE TO HELP ORIENT THE X & Y DIMENSIONS

    PLAN

    ELEVATION

    C OF G

    C OF G

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    YES

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    YES

    YES

    YES

    YES

    NO

    NO

    NO

    NO

    YES YESNO NO

    Pump

    ABJ-1010

    Cl2 Storage

    Tk.

    Page 3 of 3

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    30/334

    Manufacturing Record Book

    10 Equipment DS

    Project Number 105312

    Date: 19-Jun-07 Rev.:2Page 1 of 16

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No.: 4000310118

    PO Pkg No: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Item Number 10

    CABGOC Document No.:A-B14-TOL-MEE-7510-0101

    SDRL Code: C06

    Equipment Data Sheets

    Rev. 2 (pg 4/16)

    2 6/19/07 Revise per Comment RT - _

    1 5/3/07 Final RT - DM

    0 2/9/07 Revise per comments RT - -

    B 12/19/06 For Construction -Revise per comments RT - -

    A 10/24/06 Issued For Review RT - -Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    31/334

    Project Location: CABGOC Tombua Landana Project, Angola Block 14 Total Qty: 1Project Number: 6501 Sheet 1of 2Equipment Tag No: ABJ-1010Service: Potable Water Chlorine Storage Tank D/S No.: A-B14-TOL-MEE-7510-

    1 GENERAL NOZZLE SCHEDULE

    2 Manufacturer: PENTAIR DESCRIPTION MARK SIZE RATING -

    3 Type of Fluid: Water with 3ppmChlorine Weight/Unit: 20 LBS Top Openning n/a 2.5-#8 #8 Thr4 Flow Rate: A Level gauge Conn (2x) n/a 1/2" FNP

    5 Flow Design Basis: / pump suction

    6 Molecular Weight: 18 Specific Gravity: 1.03 Viscosity: 0.9 cP PW Inlet n/a 1/2" FNP

    7 Operating Pressure: atmPSIG Temperature: Amb F

    8 Contaminants: Characteristics:

    9 Suspended Solids: Solid By Weight: %

    10

    11

    12

    13

    14

    15

    1617

    18

    19

    20 Material: Polyglass (Fiberglass)

    21 Insulation-Paint: n/a

    22 Design Conditions:

    23 Design Pressure: 150PSIG Temperature: 120 F

    24 Corrosion Allowance: n/a In

    25 SKETCH

    26

    27

    28

    2930

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    4243

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    No. Date Revision Description Org'd Rvw'd

    A Supplier shall determine the flow required to maintain a normal chlorine levelof 1.5 ppm and a maximum chlorine level of 3 ppm at outlet of the two PotableWater Maker package, each producing 13805 gallons per day of water.

    A 10/23/06 Ctreat Issued for Review RT

    B Tank shall be sized based on 7 days of continuous consumption. B 12/19/06 For construction- Revise percomments

    RT -

    0 2/9/07 Revise per comments RT -

    1 5/3/07 Final RT -

    2 6/19/07 Resubmit for Record RT -

    2.5-#8

    Openning w/ cap

    10

    44 NPT

    Level Gauge Conn.

    X3/8NPT

    PW Inlet

    39.524Visible

    Length

    Pg 2 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    32/334

    Project Location: CABGOC Tombua Landana Project, Angola Block 14 Total Qty: 1Project Number: 6501Equipment Tag No: PBE-8620 Sheet 2of 2Service: Potable Water Chlorine Injection Pump D/S No.: A-B14-TOL-MEE-7510-0

    1 GENERAL

    2 Service: Chlorination unit Specific Gravity: 1.03 At Pumping Temp: Amb F Fluid Handled: Chlorinated Water Corrosion Due To:

    3 Vapor Pressure: 0.43 PSIA Viscosity: 0.9 Centipoises (at Pumping Temperature)

    4 Type: Plunger Diaphragm Direct Acting Suction from: TANK NPSH at Pump: 34.5 ft

    5 Total Capacity: Max: (A) 3 GPD Min: Normal: (A) 1 GPD

    6 Suction Pressure: Max: (B) 3ft Min: 6 in Normal: 2 FT

    7 Discharge Pressure: Max: 45 PSIG Min: Normal:

    8 Material, Liquid End: PVDF

    9 Capacity Control: Manual Auto; Running Stopped; Pneumatic Elect. Hydraulic; Local Remote by Speed Stroke Lengt

    10 Capacity Indicator: Yes No Guards: Coupling Crank Furnished by: Base Plate to be Furnished by Vendor

    11 Air Pressure Available: Purge: PSIG Control: PSIG

    12 Other Features: Steam Jacketed Stroke Counter Relief Valve Spare Packing Suction Strainer Solenoid Operated Clutch

    13 Timer and Multiport Valve Packing, Flush with

    14 Vendor: CTreat MFR: LMI Model, Size, and Fig No.: E711

    15 Type Pump: Plunger Diaphragm Direct Acting Metering Heads: Simplex Duplex Triplex

    16 Speed Reducer: Integral Separate MFR: LMI Model: Ratio: Class:

    17 Plunger Size: N/A Max Stroke: In BHP Reqd:

    18 Max Working Press: 150 PSIG Limited by: With Max Driver: PSIG

    19 Coupling: N/A Manufacturer: Type:

    20 PERFORMANCE DATA

    21 NPSHr at Pump (Water): Ft

    22 Total Capacity: Max: 60 GPD Min: 0.3 GPD Quoted: 0.04 GPH

    23 Strokes Per Minute Each Head: Max: Min: Quoted:

    24 Suction Pressure: Max: 3 FT Min: 0.5 FT

    25 Discharge Pressure: Max: 150 PSIG Min: PSIG

    26 Test Required: Hydrostatic Performance Certified Witnessed Not Witnessed

    27 CONSTRUCTION MATERIALS - ASTM

    28 Liquid End Matl: PVC Gaskets: Plunger Matl: N/A Max Tem : F29 Diaphragm: FLUOROFLIM Max Temp: 122 F Packing: Max Tem : F30 Frame: Cross Head: Valves: CERAMICBALL Seats: TEFLON

    31 Body: Caps: Gland: Lantern Ring:

    32 CONNECTIONS

    33 Suction Size: 1/4 in Type: MNPT Rating: Facing:

    34 Discharge Size: 1/4 in Type: MNPT Rating: Facing:

    35 Flush: Size: Type: Rating: Facing:

    36 Purge: Size: Type: Rating: Facing: with Air Gas

    37 LIQUID ENDS

    38 Valves Replaceable: Yes No; With Without Removing Piping Built-In Relief Valves: Yes No

    39 Valves: Suction: No.: 1 Type: FOOT Area Each: In2

    40 Discharge: No.: 1 Type: BALL CHECK Area Each: In2

    41 Plunger Support: Cross Head Packing Packing Lube: Cross Head Lube:

    42 Special Seals:

    43 DRIVER

    44 Furnished by: CTreat Mounted by: CTreat

    45 Driver Type: ELECTROMAGNETIC, Size: HP, Speed: RPM MFR: LMI Frame No.: N/A

    46 Electric Motor: 44watt Volt 120 Ph 1 Hz 60 Class: I Group: D Division: 247 Enclosure: EXPLOSION PROOF Bearing Type: N/A Lube: N/A

    48 Air Required: N/A SCFM at PSIG

    49 Steam Jacket Stroke Counter Relief Valve Strainer Spare Packing Timer 8 Multiport Valve Speed Indicator

    50 Net Weight Complete Unit: 41 Lb Less Driver: Lb

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A Supplier shall determine the flow required to maintain a normal chlorine level of 1.5ppm and a maximum chlorine level of 3 ppm at outlet of the two Potable Water Makerpackages, each producing 13805 gallons per day of water.

    No. Date Revision Description Org'd Rvw'd

    B Supplier shall determine the suction pressure based on the Chlorine Storage Tank siteand location.

    B 12/19/06 Revised per comments RT -

    C Tubing materials to be corrosion resistant Polyethylene. (PE) 0 2/9/07 For Construction RT -

    1 5/3/07 Final RT -

    2 6/19/07 Resubmit for Record RT -

    Pg 3 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    33/334

    Pg 3 of 16

    CENTRIFUGAL PUMP DATA SHEET

    Project Location: CABGOC Tombua Landana Project, Angola Block 14 Total Qty: 1Project Number: 6501 Sheet 1Equipment Tag No.: PBE-8845/8846 In Service: Spare: D/S No.: A-B14-TOL-MEE-7510-Service: Potable Water Maker High Pressure Pump

    1 OPERATING CONDITIONS (D) DATA TO BE COMPLETED BY VENDOR

    2 Duty: Continuous Intermittent Standby Manufacturer: ITT -Ctreat Vendor: ITT -Ctreat Offshore

    3 Series Stand Alone Model: Series 20 Curve No: P2GJQ No. Stages: on

    4 Corr/Abrasion due to: Liquid Pumped: Seawater PERFORMANCE DATA

    5 Pumping Temperature: 90 F Viscosity: SSU cP Rated Speed: 14,707 RPM (note 2) Rated Speed: 6 Vapor Pressure: PSIA NPSHA (Top of Foundation): 102 Ft Rated Point Efficiency: 42 % Rated Point Eff

    7 Suction Pressure: PSIG Normal: 50 Rated: 50 Rated Impeller: Rated Head: 2126 Ft; Max (Shut-off) Head: 2218 Ft

    8 Discharge Pressure: PSIG Normal: 986 Rated: 986 Stage Horsepower: 60 HP (Each) NPSHr: 8.5 FT

    9 Differential Pressure: PSID Normal: 936 Rated: 936 Min Submergence: Ft

    10 Flow @ Pumping Temp: GPM Normal: 40 Rated: 40 PUMP AUXILIARY PIPING

    11 Specific Gravity @ P.T.: 1.03 Hydraulic Horsepower: 52Hp N/A

    12 VERTICAL PUMP DATA Auxiliary: GPM, Total: GPM

    13 Pit or Sump Depth: Ft Auxiliary Seal Flush Fluid:

    14 Minimum Submergence: Ft Max. Allowable Cooling Water Supply Press: PSIG

    15 CONSTRUCTION CONSTRUCTION

    16 Type: Horizontal Vertical In-Line Self-Priming Sump Type: End Suction Centrifugal

    17 Vertical Turbine Submerged Rotation Viewed from Coupling End: CW CCW

    18 Mechanical Seal Packing Type: Pump will pass In In In Diamete19 NOZZLE DESCRIPTION Discharge Case: Fabricated Cast

    20 Suction: 2In ANSI Class RF RTJ FF THD Case - Mounting: Centerline Foot Bracket

    21 Discharge: 1.5 In ANSI Class RF RTJ FF THD - Split: Axial Radial Volute: Single Double Diffuser

    22 GEARBOX OR DRIVE MECHANISM (note 2) - Connections Vent Gauge Drain Vibration Probes

    23 Type: Direct Belt External Gear - Maximum Allowable Press: 1,500 PSIG

    24 Supplied by: Ctreat Mounted by: Ctreat Impeller - Design Diameter: 4.615 In, Max: 4.860In, Minimum 4.372 In

    25 Specification No.: GS 4.06 - Mounting: Between Bearings Overhung

    26 PRIMARY DRIVER Bearings -Type: Radial Thrust

    27 Type: Electric Motor Gas Turbine Gas Engine Diesel Engine - Lubrication: Ring Oil Flood Mist Flinger Pressur

    28 Supplied by: Vendor Mounted by: Vendor Packing MFR/Type: / Size/No. Rings:

    29 Power: 60 HP Volts 460pH 3Hz 60 Enclosure: TEFC Mech. Seal MFR/Type: J. Crane / Ctreat API Class Code: BSPFM

    30 Rated Speed: 3,600 RPM Specification No.: G.S.12.03A Column Pipe: Flanged Threaded Length: Ft

    31 AUXILIARY PIPING N/A Line Shaft: Open Enclosed

    32 Cooling Fluid: Water Water-Glycol Bearings: Bowl Line Shaft

    33 Supply Temp: F, Pressure: PSIG Sight Flow Indicator Bearing Lubrication: Water Oil

    34 Piping Material: Carbon Steel : Stainless Tubing : Pipe Pump Thrust: Lb; Up Down

    35 Cooling Water: CONSTRUCTION MATERIALS

    36 Seal Flush Plan: Case/Bowls 316 SSTL Sleeve 316

    37 Auxiliary Seal Plan: Impeller 316 SSTL Internals

    38 PACKAGING Shaft AISI 8620 Float and Rod

    39 Skid: MFR Std Common Base Plate Spec No.: Column N/A Shaft Bearings

    40 Painting: Unpainted Prime Only : Finish Painted Throat Bushing N/A Pipe (Cooling)

    41 : MFR Std Custom - Spec No.: GS 2.02 Wear Rings N/A Tube (Cooling)

    42 Lifting Lugs: : Yes No Sling & Spreader Yes No

    43 Export Crating: Yes No Spec No.: GS 0.03

    44 TESTING See TIR for package WEIGHTS (Lb)

    45 Description Witnessed Unwitnessed Description Dry/Lift Operating Flooded Notes/Com

    46 Hydrostatic: Skid/Other

    47 NPSHr Primary Driver 1060

    48 Mech. Run with Dismantling after: Run Grbox/Couplngs 150

    49 Performance: Single Point Pump 75

    50 Driver used in Performance Test: Actual MFR Test Block Total 1285

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A 1. Please refer to motor data sheets for FLC and RLC information. No. Date Revision Description Org'd Rvw'd

    B 2. Pumps includes gear box with 4.14 : 1 gear ratio. A 10/18/06 Ctreat Issue RT

    C B 12/19/06 Revise per comments RT -

    D 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    F 2 6/19/07 Add note 2 RT -

    Pg 4 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    34/334

    CENTRIFUGAL PUMP DATA SHEET

    Project Location: CABGOC Tombua Landana Project, Angola Block 14 Total Qty: 1Project Number: 6501 Sheet 1Equipment Tag No.: PBE-8855/8856 In Service: Spare: D/S No.: A-B14-TOL-MEE-7510-Service: Potable Water Maker Booster Pump

    1 OPERATING CONDITIONS (D) DATA TO BE COMPLETED BY VENDOR

    2 Duty: Continuous Intermittent Standby Manufacturer: ITT - Goulds Vendor: ITT - Ctreat Offshore

    3 Series Stand Alone Model: SSV Curve No: 3SV No. Stages: 3

    4 Corr/Abrasion due to: Liquid Pumped: Seawater PERFORMANCE DATA

    5 Pumping Temperature: 90 F Viscosity: SSU cP Rated Speed: 3,500 RPM Rated Speed: 6 Vapor Pressure: PSIA NPSHA (Top of Foundation): 100 Ft Rated Point Efficiency: 60 % Rated Point Eff

    7 Suction Pressure: PSIG Normal: 50 Rated: 50 Rated Impeller: Rated Head: 162 Ft; Max (Shut-off) Head: 195 Ft

    8 Discharge Pressure: PSIG Normal: 130 Rated: 130 Stage Horsepower: 3.0 HP (Each) NPSHr: 4.61 FT

    9 Differential Pressure: PSID Normal: 70 Rated: 70 Min Submergence: Ft

    10 Flow @ Pumping Temp: GPM Normal: 41 Rated: 41 PUMP AUXILIARY PIPING

    11 Specific Gravity @ P.T.: 1.03 Hydraulic Horsepower: 2.77 Hp N/A

    12 VERTICAL PUMP DATA N/A Auxiliary: GPM, Total: GPM

    13 Pit or Sump Depth: Ft Auxiliary Seal Flush Fluid:

    14 Minimum Submergence: Ft Max. Allowable Cooling Water Supply Press: PSIG

    15 CONSTRUCTION CONSTRUCTION

    16 Type: Horizontal Vertical In-Line Self-Priming Sump Type: In-Line Multi-Stage Vertical

    17 Vertical Turbine Submerged Rotation Viewed from Coupling End: CW CCW

    18 Mechanical Seal Packing Type: Pump will pass In In In Diamete19 NOZZLE DESCRIPTION Discharge Case: Fabricated Cast

    20 Suction: 2 In ANSI Class 300 RF RTJ FF THD Case - Mounting: Centerline Foot Bracket

    21 Discharge: 2 In ANSI Class 300 RF RTJ FF THD - Split: Axial Radial Volute: Single Double Diffuser

    22 GEARBOX OR DRIVE MECHANISM - Connections Vent Gauge Drain Vibration Probes

    23 Type: Direct Belt External Gear - Maximum Allowable Press: PSIG 360

    24 Supplied by: Mounted by: Impeller - Design Diameter: In, Max: In, Minimum In

    25 Specification No.: GS 4.06 - Mounting: Between Bearings Overhung

    26 PRIMARY DRIVER Bearings -Type: Radial Thrust

    27 Type: Electric Motor Gas Turbine Gas Engine Diesel Engine - Lubrication: Ring Oil Flood Mist Flinger Pressur

    28 Supplied by: Vendor Mounted by: Vendor Packing MFR/Type: / Size/No. Rings:

    29 Power: 3 HP Volts 460pH 3Hz 60 Enclosure: TEFC Mech. Seal MFR/Type: Goulds API Class Code:

    30 Rated Speed: 3,600 RPM Specification No.: G.S.12.03A Column Pipe: Flanged Threaded Length: Ft

    31 AUXILIARY PIPING N/A Line Shaft: Open Enclosed

    32 Cooling Fluid: Water Water-Glycol Bearings: Bowl Line Shaft

    33 Supply Temp: F, Pressure: PSIG Sight Flow Indicator Bearing Lubrication: Water Oil

    34 Piping Material: Carbon Steel : Stainless Tubing : Pipe Pump Thrust: Lb; Up Down

    35 Cooling Water: CONSTRUCTION MATERIALS

    36 Seal Flush Plan: Case/Bowls 316 SSTL Sleeve

    37 Auxiliary Seal Plan: Impeller 316 SSTL Internals 316

    38 PACKAGING Shaft 316 SSTL Float and Rod

    39 Skid: MFR Std Common Base Plate Spec No.: Column N/A Shaft Bearings

    40 Painting: Unpainted Prime Only : Finish Painted Throat Bushing N/A Pipe (Cooling)

    41 : MFR Std Custom - Spec No.: GS 2.02 Wear Rings N/A Tube (Cooling)

    42 Lifting Lugs: : Yes No Sling & Spreader Yes No

    43 Export Crating: Yes No Spec No.: GS 0.03

    44 TESTING See TIR for package WEIGHTS (Lb)

    45 Description Witnessed Unwitnessed Description Dry/Lift Operating Flooded Notes/Com

    46 Hydrostatic: Primary 35

    47 NPSHr Primary Driver 76

    48 Mech. Run with Dismantling after: Run Grbox/Couplngs

    49 Performance: Single Point Skid/Other

    50 Driver used in Performance Test: Actual MFR Test Block Total 111

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A No. Date Revision Description Org'd Rvw'd

    B A 10/18/06 Ctreat Issued for Review RT -

    C B 12/19/06 Revise per Comments RT -

    D 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    F 2 6/19/07 Resubmit for record RT -

    Pg 5 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    35/334

    CENTRIFUGAL PUMP DATA SHEET

    Project Location: CABGOC Tombua Landana Project, Angola Block 14 Total Qty: 1Project Number: 6501 Sheet 1Equipment Tag No.: PBE- 8850/8851 In Service: Spare D/S No.: A-B14-TOL-MEE-7510-Service: 2ndPass Charge Pump

    1 OPERATING CONDITIONS (D) DATA TO BE COMPLETED BY VENDOR

    2 Duty: Continuous Intermittent Standby Manufacturer: Grundfos Vendor: ITT-Ctreat Offshore

    3 Series Stand Alone Model: CRN1-21 Curve No: CRN1 No. Stages: 21

    4 Corr/Abrasion due to: Liquid Pumped: Fresh Water PERFORMANCE DATA

    5 Pumping Temperature: 90 F Viscosity: SSU cP Rated Speed: 3,450 RPM Rated Speed: 6 Vapor Pressure: PSIA NPSHA (Top of Foundation): 93 Ft Rated Point Efficiency: 38 % Rated Point Eff

    7 Suction Pressure: PSIG Normal: 15 Rated: 15 Rated Impeller: Rated Head: 610 Ft; Max (Shut-off) Head: 620 Ft

    8 Discharge Pressure: PSIG Normal: 279 Rated: 279 Stage Horsepower: HP (Each) NPSHr: 12.5 FT

    9 Differential Pressure: PSID Normal: 264 Rated: 264 Min Submergence: Ft

    10 Flow @ Pumping Temp: GPM Normal: 4.5 Rated: 4.5 PUMP AUXILIARY PIPING

    11 Specific Gravity @ P.T.: 1.0 Hydraulic Horsepower: 1.85 Hp N/A

    12 VERTICAL PUMP DATA N/A Auxiliary: GPM, Total: GPM

    13 Pit or Sump Depth: Ft Auxiliary Seal Flush Fluid:

    14 Minimum Submergence: Ft Max. Allowable Cooling Water Supply Press: PSIG

    15 CONSTRUCTION CONSTRUCTION

    16 Type: Horizontal Vertical In-Line Self-Priming Sump Type: In-Line Multi-Stage Vertical

    17 Vertical Turbine Submerged Rotation Viewed from Coupling End: CW CCW

    18 Mechanical Seal Packing Type: Pump will pass In In In Diamete19 NOZZLE DESCRIPTION Discharge Case: Fabricated Cast

    20 Suction: 1.25 In ANSI Class RF VIC FF THD Case - Mounting: Centerline Foot Bracket

    21 Discharge: 1.25In ANSI Class RF VIC FF THD - Split: Axial Radial Volute: Single Double Diffuser

    22 GEARBOX OR DRIVE MECHANISM - Connections Vent Gauge Drain Vibration Probes

    23 Type: Direct Belt External Gear - Maximum Allowable Press: 360 PSIG

    24 Supplied by: Mounted by: Impeller - Design Diameter: In, Max: In, Minimum In

    25 Specification No.: GS 4.06 - Mounting: Between Bearings Overhung

    26 PRIMARY DRIVER Bearings -Type: Radial Thrust

    27 Type: Electric Motor Gas Turbine Gas Engine Diesel Engine - Lubrication: Ring Oil Flood Mist Flinger Pressur

    28 Supplied by: GE Mounted by: Ctreat Packing MFR/Type: / Size/No. Rings:

    29 Power: 3 HP Volts 460pH 3Hz 60 Enclosure: TEFC Mech. Seal MFR/Type: Grundfos API Class Code:

    30 Rated Speed: 3,600 RPM Specification No.: G.S.12.03A Column Pipe: Flanged Threaded Length: Ft

    31 AUXILIARY PIPING N/A Line Shaft: Open Enclosed

    32 Cooling Fluid: Water Water-Glycol Bearings: Bowl Line Shaft

    33 Supply Temp: F, Pressure: PSIG Sight Flow Indicator Bearing Lubrication: Water Oil

    34 Piping Material: Carbon Steel : Stainless Tubing : Pipe Pump Thrust: Lb; Up Down

    35 Cooling Water: CONSTRUCTION MATERIALS

    36 Seal Flush Plan: Case/Bowls 316 SSTL Sleeve 316

    37 Auxiliary Seal Plan: Impeller 316 SSTL Internals 316

    38 PACKAGING Shaft 316 SSTL Float and Rod

    39 Skid: MFR Std Common Base Plate Spec No.: Column N/A Shaft Bearings

    40 Painting: Unpainted Prime Only : Finish Painted Throat Bushing N/A Pipe (Cooling)

    41 : MFR Std Custom - Spec No.: GS 2.02 Wear Rings N/A Tube (Cooling)

    42 Lifting Lugs: : Yes No Sling & Spreader Yes No

    43 Export Crating: Yes No Spec No.: GS 0.03

    44 TESTING See TIR for package WEIGHTS (Lb)

    45 Description Witnessed Unwitnessed Description Dry/Lift Operating Flooded Notes/Com

    46 Hydrostatic: Pump

    47 NPSHr Primary Driver

    48 Mech. Run with Dismantling after: Run Grbox/Couplngs

    49 Performance: Single Point Skid/Other

    50 Driver used in Performance Test: Actual MFR Test Block Total (est.) 100

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A No. Date Revision Description Org'd Rvw'd

    B A 10/19/06 Ctreat Issued for Review RT -

    C B 12/19/06 Revise per comments RT -

    D 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    F 2 6/19/07 Resubmit for Record RT -

    Pg 6 of 1

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    36/334

    Sheet 1of 6

    LOW VOLTAGE ELECTRIC MOTOR DATA SHEETTotal Qty: 1

    Project Location: CAGBOC Tombua Landana Project, Angola Block 14 Sheet 1Project Number: 6501 D/S No.: A-B14-TOL-MEE-7510-Motor Tag No.: PBE-8845M/ 8846M

    1 GENERAL

    2 Unit: HIGH PRESSURE PUMP MOTOR Driven Equipment: POTABLE WATER MAKER WITH TURBINE WASH WATER POLISHER (ME-7510/7511)

    3 Manufacturer: General Electric Model Number: ULTRA XSD-841 Equipment Numbers: ME-7510 / 7511

    4 MOTOR DESIGN DATA ACCESSORY EQUIPMENT

    5 Applicable Specifications: Per CABGOC G.S. 12.03A Base Plate Soleplate Stator Shift6 NEMA: Std. MG-1 MFR Std Fans Non-Sparking Fans

    7 IEEE Std 841 DC Excitation:

    8 KW Req'd: Volts:

    9 Site Data: By: Purchaser Manufacturer

    10 Area Class.: Hazardous Cl. I Gp. D Div. 2 Non-Haz. Description:

    11 Altitude: 70 Ft Ambient Temps: Max: 95 F, Min: 55 F Enclosed Collector Rings:

    12 Unusual Conditions: Dust Fumes Salt Purged: Medium: Pressure:

    13 Offshore Marine Environment Explosion-Resistant Nonpurged

    14 Drive System: Direct Connected Gear V-Belt Forced Ventilation

    15 CFM: Press Drop: In H2O

    16 Type Motor: Bearing Temperature Devices:

    17 Squirrel Cage Induction Nema Design B Location:

    18 Synchronous: Description:

    19 Power Factor Required: Alarm Setpoint: C Shutdown Setpoint: C

    20 Excitation: Brushless Slip Ring Space Heaters: (Note 1 & 2)

    21 Field Discharge Resistor by Motor Manufacturer Power: 0.12 KW 120 Volts 1 Phase 60 Hertz

    22 Wound Rotor Induction Maximum Sheath Temperature: 200 C

    23 Winding Temperature Detectors:

    24 Enclosure: Thermistors: No./Phase:

    25 Explosion Proof Type: Positive Temperature Coeff. Negative Tempera

    26 TEFC TENV Temperature Switch: Yes No

    27 TEWAC TEIGF, using Gas Resistance Temperature Detectors: No./Phase:

    28 Double Wall Carbon Steel Tubes Resistance Mat'l OHMS

    29 Water Supply: Pressure: PSIG Temperature: F Selector Switch & Indicator by: Purchaser MFR

    30 Water Allow. Diff. Press.: PSID Temp Rise: F Max Stator Winding Temperature: C

    31 Water Side Min Corr Allow.: In Alarm Setpoint: C Shutdown Setpoint: C

    32 and Foul Factor: Winding Temperature Detector & Space Heater Leads:

    33 Air Gas Supply Pressure: In Separate Conduit Boxes

    34 Motor Arranged for Differential Protection:

    35 Weather Protected, Type: Self-Balance Primary-Current Method

    36 Forced Ventilated Open-Drip Proof Open C.T. Description:

    37 Basic Data: Extended Leads Length: Ft

    38 Power Supply: 460 Volts 3Phase 60 Hertz Surge Capacitors

    39 Nameplate HP: 60 Service Factor: 1.15 Lightning Arrestors

    40 Nominal Speed: 3600RPM Fan Current Transformer for Ammeter

    41 Insulation: Class F Type: Non-Hygroscopic Description:

    42 Temperature Rise: 90 C Above 40 C By Resistance method Main Conduit Box Sized for:

    43 Starting: Main Type:

    44 Full Voltage Reduce Voltage % Insulated Non-insulated

    45 Loaded Unloaded C.T.s for Diff. Protection Mounted by:

    46 Voltage Dip % Surge Capacitors Mounted by:

    47 Vibration: Lightning Arrestors Mounted by:

    48 NEMA Standard C.T. for Ammeter Mounted by:

    49 Noise: Space for Stress Cones

    50 NEMA Standard Per CABGOC Spec GS 15.01 Air Filters: MFR: Type:

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A 1. Motors 20 HP and larger shall have space heaters. No. Date Revision Description Org'd Rvw'd

    B 2. Supplier shall submit this completed Motor Data Sheet. A 10/23/06 C'treat issued for review RT

    C 3. Motors 60 HP and larger shall have a separate terminal box for space heater leads. B 12/19/06 Revise per comments RT -

    D 4. GE Motors Spec. and Clarifications/Eceptions attached. 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    2 6/19/07 Resubmit for record RT -

    Pg 7 of

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    37/334

    g

    Sheet 2of 6

    Total QProject Location: CABGOC Tombua Landana Project, Angola Block 14 Sheet 2Project Number: 6501 D/S No.: A-B14-TOL-MEE-7510-Motor Tag No.: PBE-8845M/ 8846M

    1 MANUFACTURER'S DATA SHOP INSPECTION AND TESTS

    2 Manufacturer: GE Description Required Witn

    3 Frame No.: 364 TSD Full Load RPM (Ind.) 3600 Shop Inspection:

    4 Efficiency: Full Load: 95 %, 3/4 Load: 95 % 1/2 Load: 94 % Testing Per NEMA: (Routine)

    5 Power. Factor (Ind.) Full Load: 86 3/4 Load: 83 1/2 Load: 75 MFR Std Shop Tests:

    6 Current (Rated Volt): Full Load: 68.7 Locked Rotor Amps: 424 Immersion Test:

    7 Locked Rotor Power Factor: Special Tests: Chevron Spec. GS 12.03B

    8 Locked Rotor withstand Time (Cold Start):

    9 Torques: Full Load: 88 Ft-Lb

    10 Locked Rotor: 145 Ft-Lb Starting (Syn.): Ft-Lb

    11 Pull-up (Ind.): Ft-Lb Pull-In (Syn.): Ft-Lb

    12 Breakdown (Ind.): 233Ft-Lb Pull-Out (Syn.): Ft-Lb

    13 Open Circuit Time Constant: 1.011 Sec. COUPLING

    14 Symmetrical Contribution to 30 Terminal Fault: Supplied by: Pump Vendor

    15 At 1/2 Cycles: At 5 Cycles: MFR: Lovejoy Model:

    16 Reactances: Sub-Transient (X'd): Motor Half Mounted By: Motor MFR Purchaser Ctreat

    17 Transient (X'd): Synchronous (X'd):

    18 AC Stator Resistance: OHMS @ C PAINTING

    19 Rated KVA: Manufacturer's Standard

    20 KVA Inrush @ Full Voltage & Locked Rotor (Syn.): Code G Chevron Spec. GS 2.02 ( per GE Clarifications)

    21 KVA @ Full Voltage & 95% Speed: %

    22 Max Line Current in Stator on 1st Slip Cyc @ Pull-Out: SHIPMENT

    23 (Syn): Domestic Export Export Boxing

    24 Acceleration Time: 33 Sec Motor Only @ Rated Volt. Outdoor Storage over 3 Months

    25 Acceleration Time: Sec Motor & Load @ 85% Rated Volt. OEM PARTS FOR WATERMAKER (WHICH IS EXPORT PACKED)

    26 Rotor/Field WK2@ Motor Shaft: Lb-Ft2

    27 Rotation Facing Coupling End: WEIGHTS

    28 Maximum Number of Starts per Hour: Net Weight: 1060 Lb Shipping Weight: Lb

    29 Field Discharge Resistor: OHMS Rotor Weight: Lb Max Erection Wt: Lb

    30 Rated Excitation Field Voltage: DC Max Maint. Weight: Lb Description:

    31 Resistance of Excitation Field @ 25C: OHMS Dimension:

    32 Excitation Field AMPS @ Full Load & Rated PF: Length: Width: Height:

    33 Excitation Field AMPS: Maximum: Minimum:34 Excitation Field: Rheostate Fixed Resistor

    35 Supplied by:

    36 Bearing Type: Ball Lubrication: Grease

    37 Lube Oil Flow Rate: GPM Supply Pressure: PSIG

    38 Total Shaft End Float:

    39 Limit End Float to:

    40 Motor Rotor: Solid Split

    41 Motor Hub: Solid Split

    42 For TEWAC & TEIGF Motors:

    43 Cooling Water Req'd: GPM

    44 CW Temp Rise: C Press Drop: PSID

    45 Air Gas Req'd: SCFM Press Maint. In H2O

    46 Curves Required Based on Motor Saturation @ Rated Voltage:47 Speed vs. Torque (Also @ % Rated Voltage)

    48 Speed vs. Power Factor

    49 Speed vs. Current

    50

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A No. Date Revision Description Org'd Rvw'd

    B A 10/23/06 C'treat issued for review RT

    C B 12/19/06 Revise per comments RT -

    D 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    2 6/19/07 Resubmit for record RT -

    Pg 8 o

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    38/334

    g

    Sheet 3of 6

    LOW VOLTAGE ELECTRIC MOTOR DATA SHEETTotal Qty: 1

    Project Location: CAGBOC Tombua Landana Project, Angola Block 14 Sheet 1Project Number: 6501 D/S No.: A-B14-TOL-MEE-7510-Motor Tag No.: PBE-8855M/ 8856M

    1 GENERAL

    2 Unit: BOOSTER PUMP MOTOR Driven Equipment: POTABLE WATER MAKER WITH TURBINE WASH WATER POLISHER (ME-7510/7511)

    3 Manufacturer: General Electric Model Number: ULTRA XSD-841 Equipment Numbers: ME-7510/ 7511

    4 MOTOR DESIGN DATA ACCESSORY EQUIPMENT

    5 Applicable Specifications: Per CABGOC G.S. 12.03A Base Plate Soleplate Stator Shift6 NEMA: Std. MG-1 MFR Std Fans Non-Sparking Fans

    7 IEEE Std 841 DC Excitation:

    8 KW Req'd: Volts:

    9 Site Data: By: Purchaser Manufacturer

    10 Area Class.: Hazardous Cl. I Gp. D Div. 2 Non-Haz. Description:

    11 Altitude: 70 Ft Ambient Temps: Max: 95 F, Min: 55 F Enclosed Collector Rings:

    12 Unusual Conditions: Dust Fumes Salt Purged: Medium: Pressure:

    13 Offshore Marine Environment Explosion-Resistant Nonpurged

    14 Drive System: Direct Connected Gear V-Belt Forced Ventilation

    15 CFM: Press Drop: In H2O

    16 Type Motor: Bearing Temperature Devices:

    17 Squirrel Cage Induction Nema Design B Location:

    18 Synchronous: Description:

    19 Power Factor Required: Alarm Setpoint: C Shutdown Setpoint: C

    20 Excitation: Brushless Slip Ring Space Heaters: (Note 1 & 2) - N/A

    21 Field Discharge Resistor by Motor Manufacturer Power: KW Volts Phase Hertz

    22 Wound Rotor Induction Maximum Sheath Temperature: C

    23 Winding Temperature Detectors:

    24 Enclosure: Thermistors: No./Phase:

    25 Explosion Proof Type: Positive Temperature Coeff. Negative Tempera

    26 TEFC TENV Temperature Switch: Yes No

    27 TEWAC TEIGF, using Gas Resistance Temperature Detectors: No./Phase:

    28 Double Wall Carbon Steel Tubes Resistance Mat'l OHMS

    29 Water Supply: Pressure: PSIG Temperature: F Selector Switch & Indicator by: Purchaser MFR

    30 Water Allow. Diff. Press.: PSID Temp Rise: F Max Stator Winding Temperature: C

    31 Water Side Min Corr Allow.: In Alarm Setpoint: C Shutdown Setpoint: C

    32 and Foul Factor: Winding Temperature Detector & Space Heater Leads:

    33 Air Gas Supply Pressure: In Separate Conduit Boxes

    34 Motor Arranged for Differential Protection:

    35 Weather Protected, Type: Self-Balance Primary-Current Method

    36 Forced Ventilated Open-Drip Proof Open C.T. Description:

    37 Basic Data: Extended Leads Length: Ft

    38 Power Supply: 460 Volts 3Phase 60 Hertz Surge Capacitors

    39 Nameplate HP: 3 Service Factor: 1.15 Lightning Arrestors

    40 Nominal Speed: 3600RPM Fan Current Transformer for Ammeter

    41 Insulation: Class F Type: Non-Hygroscopic Description:

    42 Temperature Rise: 90 C Above 40 C By Resistance method Main Conduit Box Sized for:

    43 Starting: Main Type:

    44 Full Voltage Reduce Voltage % Insulated Non-insulated

    45 Loaded Unloaded C.T.s for Diff. Protection Mounted by:

    46 Voltage Dip % Surge Capacitors Mounted by:

    47 Vibration: Lightning Arrestors Mounted by:

    48 NEMA Standard C.T. for Ammeter Mounted by:

    49 Noise: Space for Stress Cones

    50 NEMA Standard Per CABGOC Spec GS 15.01 Air Filters: MFR: Type:

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A 1. Motors 20 HP and larger shall have space heaters. No. Date Revision Description Org'd Rvw'd

    B 2. Supplier shall submit this completed Motor Data Sheet. A 10/23/06 C'treat issued for review RT

    C 3. Motors 60 HP and larger shall have a separate terminal box for space heater leads. B 12/19/06 Revise per comments RT -

    D 4. GE Motors Spec. and Clarifications/Eceptions attached. 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    F 2 6/19/07 Resubmit for record RT -

    Pg 9 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    39/334

    g

    Sheet 4of 6

    Total QProject Location: CABGOC Tombua Landana Project, Angola Block 14 Sheet 2Project Number: 6501 D/S No.: A-B14-TOL-MEE-7510-Motor Tag No.: PBE-8855M/ 8856M

    1 MANUFACTURER'S DATA SHOP INSPECTION AND TESTS

    2 Manufacturer: GE Description Required Witn

    3 Frame No.: 182 TC Full Load RPM (Ind.) 3600 Shop Inspection:

    4 Efficiency: Full Load: 88.5 %, 3/4 Load: 88.9 % 1/2 Load: 87.2 % Testing Per NEMA: (Routine)

    5 Power. Factor (Ind.) Full Load: 82.5 3/4 Load: 77 1/2 Load: 66.5 MFR Std Shop Tests:

    6 Current (Rated Volt): Full Load: 3.8 Locked Rotor Amps: 25.8 Immersion Test:

    7 Locked Rotor Power Factor: Special Tests: Chevron Spec. GS 12.03B

    8 Locked Rotor withstand Time (Cold Start):

    9 Torques: Full Load: 4.5 Ft-Lb

    10 Locked Rotor: 8.1 Ft-Lb Starting (Syn.): Ft-Lb

    11 Pull-up (Ind.): Ft-Lb Pull-In (Syn.): Ft-Lb

    12 Breakdown (Ind.): 14 Ft-Lb Pull-Out (Syn.): Ft-Lb

    13 Open Circuit Time Constant: 0.370 Sec. COUPLING

    14 Symmetrical Contribution to 30 Terminal Fault: Supplied by: Pump Vendor

    15 At 1/2 Cycles: At 5 Cycles: MFR: ITT - Goulds Model:

    16 Reactances: Sub-Transient (X'd): Motor Half Mounted By: Motor MFR Purchaser Ctreat

    17 Transient (X'd): Synchronous (X'd):

    18 AC Stator Resistance: OHMS @ C PAINTING

    19 Rated KVA: Manufacturer's Standard

    20 KVA Inrush @ Full Voltage & Locked Rotor (Syn.): Code G Chevron Spec. GS 2.02 ( per GE Clarifications)

    21 KVA @ Full Voltage & 95% Speed: %

    22 Max Line Current in Stator on 1st Slip Cyc @ Pull-Out: SHIPMENT

    23 (Syn): Domestic Export Export Boxing

    24 Acceleration Time: 54 Sec Motor Only @ Rated Volt. Outdoor Storage over 3 Months

    25 Acceleration Time: Sec Motor & Load @ 85% Rated Volt. OEM PARTS FOR WATERMAKER (WHICH IS EXPORT PACKED)

    26 Rotor/Field WK2@ Motor Shaft: Lb-Ft2

    27 Rotation Facing Coupling End: WEIGHTS

    28 Maximum Number of Starts per Hour: Net Weight: 76 Lb Shipping Weight: Lb

    29 Field Discharge Resistor: OHMS Rotor Weight: Lb Max Erection Wt: Lb

    30 Rated Excitation Field Voltage: DC Max Maint. Weight: Lb Description:

    31 Resistance of Excitation Field @ 25C: OHMS Dimension:

    32 Excitation Field AMPS @ Full Load & Rated PF: Length: Width: Height:

    33 Excitation Field AMPS: Maximum: Minimum:34 Excitation Field: Rheostate Fixed Resistor

    35 Supplied by:

    36 Bearing Type: Ball Lubrication: Grease

    37 Lube Oil Flow Rate: GPM Supply Pressure: PSIG

    38 Total Shaft End Float:

    39 Limit End Float to:

    40 Motor Rotor: Solid Split

    41 Motor Hub: Solid Split

    42 For TEWAC & TEIGF Motors:

    43 Cooling Water Req'd: GPM

    44 CW Temp Rise: C Press Drop: PSID

    45 Air Gas Req'd: SCFM Press Maint. In H2O

    46 Curves Required Based on Motor Saturation @ Rated Voltage:47 Speed vs. Torque (Also @ % Rated Voltage)

    48 Speed vs. Power Factor

    49 Speed vs. Current

    50

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A No. Date Revision Description Org'd Rvw'd

    B A 10/23/06 C'treat issued for review RT

    C B 12/19/06 Revise per comments RT -

    D 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    F 2 6/19/07 Resubmit for record RT -

    Pg 10 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    40/334

    Sheet 5of 6

    LOW VOLTAGE ELECTRIC MOTOR DATA SHEETTotal Qty: 1

    Project Location: CAGBOC Tombua Landana Project, Angola Block 14 Sheet 1Project Number: 6501 D/S No.: A-B14-TOL-MEE-7510-Motor Tag No.: PBE-8850M/ 8851M

    1 GENERAL

    2 Unit: 2NDPASS CHARGE PUMP MOTOR Driven Equipment: POTABLE WATER MAKER WITH TURBINE WASH WATER POLISHER (ME-7510/7511)

    3 Manufacturer: General Electric Model Number: ULTRA XSD-841 Equipment Numbers: ME-7510/ 7511

    4 MOTOR DESIGN DATA ACCESSORY EQUIPMENT

    5 Applicable Specifications: Per CABGOC G.S. 12.03A Base Plate Soleplate Stator Shift6 NEMA: Std. MG-1 MFR Std Fans Non-Sparking Fans

    7 IEEE Std 841 DC Excitation:

    8 KW Req'd: Volts:

    9 Site Data: By: Purchaser Manufacturer

    10 Area Class.: Hazardous Cl. I Gp. D Div. 2 Non-Haz. Description:

    11 Altitude: 70 Ft Ambient Temps: Max: 95 F, Min: 55 F Enclosed Collector Rings:

    12 Unusual Conditions: Dust Fumes Salt Purged: Medium: Pressure:

    13 Offshore Marine Environment Explosion-Resistant Nonpurged

    14 Drive System: Direct Connected Gear V-Belt Forced Ventilation

    15 CFM: Press Drop: In H2O

    16 Type Motor: Bearing Temperature Devices:

    17 Squirrel Cage Induction Nema Design B Location:

    18 Synchronous: Description:

    19 Power Factor Required: Alarm Setpoint: C Shutdown Setpoint: C

    20 Excitation: Brushless Slip Ring Space Heaters: (Note 1 & 2) - N/A

    21 Field Discharge Resistor by Motor Manufacturer Power: KW Volts Phase Hertz

    22 Wound Rotor Induction Maximum Sheath Temperature: C

    23 Winding Temperature Detectors:

    24 Enclosure: Thermistors: No./Phase:

    25 Explosion Proof Type: Positive Temperature Coeff. Negative Tempera

    26 TEFC TENV Temperature Switch: Yes No

    27 TEWAC TEIGF, using Gas Resistance Temperature Detectors: No./Phase:

    28 Double Wall Carbon Steel Tubes Resistance Mat'l OHMS

    29 Water Supply: Pressure: PSIG Temperature: F Selector Switch & Indicator by: Purchaser MFR

    30 Water Allow. Diff. Press.: PSID Temp Rise: F Max Stator Winding Temperature: C

    31 Water Side Min Corr Allow.: In Alarm Setpoint: C Shutdown Setpoint: C

    32 and Foul Factor: Winding Temperature Detector & Space Heater Leads:

    33 Air Gas Supply Pressure: In Separate Conduit Boxes

    34 Motor Arranged for Differential Protection:

    35 Weather Protected, Type: Self-Balance Primary-Current Method

    36 Forced Ventilated Open-Drip Proof Open C.T. Description:

    37 Basic Data: Extended Leads Length: Ft

    38 Power Supply: 460 Volts 3Phase 60 Hertz Surge Capacitors

    39 Nameplate HP: 3 Service Factor: 1.15 Lightning Arrestors

    40 Nominal Speed: 3600RPM Fan Current Transformer for Ammeter

    41 Insulation: Class F Type: Non-Hygroscopic Description:

    42 Temperature Rise: 90 C Above 40 C By Resistance method Main Conduit Box Sized for:

    43 Starting: Main Type:

    44 Full Voltage Reduce Voltage % Insulated Non-insulated

    45 Loaded Unloaded C.T.s for Diff. Protection Mounted by:

    46 Voltage Dip % Surge Capacitors Mounted by:

    47 Vibration: Lightning Arrestors Mounted by:

    48 NEMA Standard C.T. for Ammeter Mounted by:

    49 Noise: Space for Stress Cones

    50 NEMA Standard Per CABGOC Spec GS 15.01 Air Filters: MFR: Type:

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A 1. Motors 20 HP and larger shall have space heaters. No. Date Revision Description Org'd Rvw'd

    B 2. Supplier shall submit this completed Motor Data Sheet. A 10/23/06 C'treat issued for review RT

    C 3. Motors 60 HP and larger shall have a separate terminal box for space heater leads. B 12/19/06 Revise per comments RT -

    D 4. GE Motors Spec. and Clarifications/Eceptions attached. 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    F 2 6/19/07 Resubmit for record RT -

    Pg 11 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    41/334

    g

    Sheet 6of 6

    Total QProject Location: CABGOC Tombua Landana Project, Angola Block 14 Sheet 2Project Number: 6501 D/S No.: A-B14-TOL-MEE-7510-Motor Tag No.: PBE-8850M/ 8851M

    1 MANUFACTURER'S DATA SHOP INSPECTION AND TESTS

    2 Manufacturer: GE Description Required Witn

    3 Frame No.: 182 TC Full Load RPM (Ind.) 3600 Shop Inspection:

    4 Efficiency: Full Load: 88.5 %, 3/4 Load: 88.9 % 1/2 Load: 87.2 % Testing Per NEMA: (Routine)

    5 Power. Factor (Ind.) Full Load: 82.5 3/4 Load: 77 1/2 Load: 66.5 MFR Std Shop Tests:

    6 Current (Rated Volt): Full Load: 3.8 Locked Rotor Amps: 25.8 Immersion Test:

    7 Locked Rotor Power Factor: Special Tests: Chevron Spec. GS 12.03B

    8 Locked Rotor withstand Time (Cold Start):

    9 Torques: Full Load: 4.5 Ft-Lb

    10 Locked Rotor: 8.1 Ft-Lb Starting (Syn.): Ft-Lb

    11 Pull-up (Ind.): Ft-Lb Pull-In (Syn.): Ft-Lb

    12 Breakdown (Ind.): 14 Ft-Lb Pull-Out (Syn.): Ft-Lb

    13 Open Circuit Time Constant: 0.370 Sec. COUPLING

    14 Symmetrical Contribution to 30 Terminal Fault: Supplied by: Pump Vendor

    15 At 1/2 Cycles: At 5 Cycles: MFR: Grundfos Model:

    16 Reactances: Sub-Transient (X'd): Motor Half Mounted By: Motor MFR Purchaser Ctreat

    17 Transient (X'd): Synchronous (X'd):

    18 AC Stator Resistance: OHMS @ C PAINTING

    19 Rated KVA: Manufacturer's Standard

    20 KVA Inrush @ Full Voltage & Locked Rotor (Syn.): Code G Chevron Spec. GS 2.02 ( per GE Clarifications)

    21 KVA @ Full Voltage & 95% Speed: %

    22 Max Line Current in Stator on 1st Slip Cyc @ Pull-Out: SHIPMENT

    23 (Syn): Domestic Export Export Boxing

    24 Acceleration Time: 54 Sec Motor Only @ Rated Volt. Outdoor Storage over 3 Months

    25 Acceleration Time: Sec Motor & Load @ 85% Rated Volt. OEM PARTS FOR WATERMAKER (WHICH IS EXPORT PACKED)

    26 Rotor/Field WK2@ Motor Shaft: Lb-Ft2

    27 Rotation Facing Coupling End: WEIGHTS

    28 Maximum Number of Starts per Hour: Net Weight: 76 Lb Shipping Weight: Lb

    29 Field Discharge Resistor: OHMS Rotor Weight: Lb Max Erection Wt: Lb

    30 Rated Excitation Field Voltage: DC Max Maint. Weight: Lb Description:

    31 Resistance of Excitation Field @ 25C: OHMS Dimension:

    32 Excitation Field AMPS @ Full Load & Rated PF: Length: Width: Height:

    33 Excitation Field AMPS: Maximum: Minimum:34 Excitation Field: Rheostate Fixed Resistor

    35 Supplied by:

    36 Bearing Type: Ball Lubrication: Grease

    37 Lube Oil Flow Rate: GPM Supply Pressure: PSIG

    38 Total Shaft End Float:

    39 Limit End Float to:

    40 Motor Rotor: Solid Split

    41 Motor Hub: Solid Split

    42 For TEWAC & TEIGF Motors:

    43 Cooling Water Req'd: GPM

    44 CW Temp Rise: C Press Drop: PSID

    45 Air Gas Req'd: SCFM Press Maint. In H2O

    46 Curves Required Based on Motor Saturation @ Rated Voltage:47 Speed vs. Torque (Also @ % Rated Voltage)

    48 Speed vs. Power Factor

    49 Speed vs. Current

    50

    GENERAL NOTES AND COMMENTS REVISION BLOCK

    A No. Date Revision Description Org'd Rvw'd

    B A 10/23/06 C'treat issued for review RT

    C B 12/19/06 Revise per comments RT -

    D 0 2/9/07 For Construction RT -

    E 1 5/3/07 Final RT -

    F 2 6/19/07 Resubmit for record RT -

    Pg 12 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    42/334

    Page 1 of 4

    ATTACHMENT A

    GE MOTORS SPECIFICATIONS AND CLARIFICATIONS/EXCEPTIONS

    Pg 13 o

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    43/334

    Page 2 of 4

    GE Consumer & Industrial

    Customer Information:Name Ronny Teoh Date : 11-Oct-2006

    Company : ITT C'TREAT OFFSHORE Project Name : CVX-Block14-TambuaLandana-GS12.03-IBC064742

    Address : 309 BRIAR ROCK ROAD EBG Quote # :Created By : HADAGALI, SURESHA (SURESH)

    General Electric is pleased to offer the following motor quotation. Index # : 5374W01

    General Description of the AC Motor: (Potable Water Maker High Pressure Pump Motor) Qty =2 total

    Output = 60 HP Phase = 3-Phase NEMA Design = BProduct Name= ULTRA XS- IEEE Std-841 Features

    Synch RPM = 3600 Frequency = 60DE E/S & Mtg= D-Flange E/S &Foot Mounted

    GE Type = Premium EfficNEMA Design B, KS

    Voltage = 460 Shaft Orientation = Horiz. Shaft D-flange Dia. = 14.0 Ambient Temp. = 40 C

    Enclosure = TEFC Hazardous Loc.= Division 2 Frame Material = Cast Iron Insulation Class = F

    IP & IC Code = IP55, IC411Class and Group = CL I, 200 CAuto Ignition Temp (T3)

    Estimated Frame= 364 Service Factor = 1.15

    Load Type =N/A Var. Freq. Speed Range= N/A DE Shaft Extension = TSD Load Connection= Direct

    % Eff FL nominal = 95 dBA = 82 avg pressure level Warranty = 5 Years Est. Weight = 1060

    General Description of the AC Motor: (Boost Pump Motor and 2nd

    Pass Charge Pump Motor) Qty= 4 total

    Output = 3 HP Phase = 3-Phase NEMA Design = BProduct Name= ULTRA XS- IEEE Std-841 Features

    Synch RPM = 3600 Frequency = 60DE E/S & Mtg= C-Face E/S &Round Frame

    GE Type = Premium EfficNEMA Design B, KS

    Voltage = 460Shaft Orientation = Horiz. MotorMounted Vert., Shaft Down

    C-face Dia. = 8.5 Ambient Temp. = 40 C

    Enclosure = TEFC Hazardous Loc.= Division 2 Frame Material = Cast Iron Insulation Class = F

    IP & IC Code = IP55, IC411Class and Group = CL I, 200 CAuto Ignition Temp (T3)

    Estimated Frame= 182 Service Factor = 1.15

    Load Type =N/A Var. Freq. Speed Range= N/A DE Shaft Extension = TC Load Connection= Direct

    % Eff FL nominal = 89 dBA = 62 max pressure level Warranty = 5 Years Est. Weight = 76

    ===================================================================================================Motor Adders:Service Factor 1.15IP&IC Code : IP55, IC411 (per RFQ sheet)

    Access Box Accessory Box/ Condulet(Only for 60HP per spec GS 12.03A)Fasteners: Material Stainless Steel, 300 series (per RFQ sheet)Grease Fittings: Hydraulic & Auto-relief (per RFQ sheet)

    Terminal Board: in Main terminal box (per RFQ sheet)Mounting And Conduit Box Location: F2 (per RFQ sheet)

    Special Paint: 3-part Carboline Carbothane 134hg # C 705 (Per data sheet)

    Burndy Hydent Lead Terminals Burndy Hydent Lead Terminals (Per spec GS 12.01)Space Heater Thermostat Controlled 110 - 120 V (Only for 60HP per spec GS 12.03A)

    Routine test Non-Witnessed & Report (Per RFQ sheet)

    Data pack and others:

    Data Pack 5 sets

    ** (Other testing not included)

    ====================================================================================================

    Pg 14

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    44/334

    Page 3 of 4

    Clarifications or ExceptionsDivision 2, Class I Hazardous Locations:Motors are required to be non-arcing, non-sparking, and have surface temperaturesnormal operating conditions that are below the ignition temperature of the gas or vapor in that location. The motor is not UL LisCSA Certified for Division 2 locations. The motor nameplate will not refer to Division, Class, Group or T-Code to avoid confusionListed or Certified motor for a Division 1 location.

    RFQ sheet, Data sheet EAL-4400 (A-B14-TOL-DPP-80-ME7510) 2 pagesScotchcast Kit 2130 in cavity:Assuming that this is the requirement of lead cavity sealing. This is not applicable to the requeste

    motors hence was not considered.Voltage: Quoting 460V rated motor for 480V supply condition per Chevron site requirementHP: Quoting HP as requested through e-mail. Data sheet is considered only to note other requirementsAIT: quoting motor for 200 C AIT per general requirement of Chevron siteLoad Connection:Belting indicated on data sheet was not considered. Assumed direct since half coupling was also requested.Half Coupling:Customers one-piece coupling half can be mounted on the motor shaft at a price adder. The coupling half must bemachined and key seated and sent transportation prepaid to the factory. Motor vibration characteristics will be measured after coupinstallation, however motor will not be rebalanced after coupling assembly.Following specifications are only considered for providing the quotations. Other specifications are not relevant to the quotations are not considered:GS-2.02, revision B Paint and Protecting coatings 44 pages

    Quoting 3 part Carboline paint system, which is very similar to that required by GS-2.02. It includes a primer which is nobased, then an intermediate tie coat which is 2 mils thick, an epoxy filler coat which is 5 to 7 mils thick. The top coat isCarbothane 134HG #C705 and is 2 to 3 mils thick. The TFT for this system is 10 mils.

    Specification: GS 17.01, Rev A , 10/01/01 Basic Equipment Packaging 78 pages.GS-0.03, revision B Preparation for Shipping and Storage 10 pages

    GE Standard packaging applies. Standard GE Export packaging can be done at a price adder. Protection for extended sis others responsibility.

    GS-0.02, Revision B Engineering Documentation 18 pagesGS-0.05, revision B Drawing Standards 75 pages

    Standard data package with motor details per annexure -1 will be furnished. Additional curves at different voltage levels included.

    Drawings will be as per GEs standard design practicesGS-12.01, revision B General Electrical Specification for Offshore Facilities 35 pages (Sections 4.3 and 9.1 arconsidered)

    Sec. 4.3: Quoting motor against the spec GS-12.03A as indicated against this section Sec. 9.1.5: Burndy Hydent type lead terminals will be provided with the motors.

    GS-15.01, Revision B Noise 21 pages

    Noise level Equipment noise level compliance is others responsibility. Offered motor has average expected no loadpressure levels as specified above, measured at 3ft from motor surface. Noise value is not guaranteed.

    Specification: GS 12.03A, Rev B , 8/05 Squirrel-Cage Induction Motors less than 250HP 12 pages.1. Sec. 2.0: References Proposed motors will be built as per NEMA MG-1 and IEEE 841 with comments and exceptions ment

    herein.2. Sec. 5.3: Motors were not requested for VFD operation hence was not quoted.3. Sec. 6.8: See comment on noise requirement above.4. Sec. 9.3: Efficiency testing is part of Complete Test, option quoted. Exception to penalty described. (Warranty/ Guarantee will

    previously agreed to by GE/ Chevron.)5. Sec. 11.0: GE provided space heaters are readily de-rated and design for 120V rated volts. Use of 240V rated heaters on 120

    cause inadequate heating. Hence use of 240V rated heater on 120V is not recommended.6. Sec. 13.0: Warranty and Guarantee per Chevron Texaco / GE alliance agreement IMA0427. Sec 15.0: Standard GE data pack is included with this order. Included are Motor detail data, outline drawing, electrical diagra

    speed torque curve at 100% voltage, and starting limits is included with the price. Additional information if required is extra.Documentation can be furnished through email on request. These are not offered through floppy disks or CD-ROM

    8. Sec. 16.0: Standard GE Export packaging N/A. Motor is OEM parts for ITT- Ctreat Offshore.

    Conditions of Sale:

    Warranty and Guarantee per Chevron Texaco / GE alliance agreementIMA042Current lead times are 50 Days

    Pg 15 of 1

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    45/334

    Page 4 of 4

    Annexure 1The Standard Data Pack contains:

    1) Customer, Customer Order Number, GE Requisition Number, GE Job Number, and Distribution list.2) Special Project Marking / Identification requirements.3) Motor Model Number, outline drawing number, installation instruction number, and motor nameplate data such as:

    GE Type, Frame identification, enclosure type, estimated weight, DE and ODE bearing type, horsepower, full-load speedphases, voltage, frequency, service factor, time rating, maximum ambient temperature, insulation system class, NEMA DCode (if appropriate), full-load current, full load power factor, maximum KVAR for power factor correction, and NEMA stacode (if appropriate). If the motor is an Energy $aver then both NEMA nominal efficiency and guaranteed full load efficwill be provided

    4) Connection diagrams for motor power and accessories such as heaters, bearing temperature detectors, winding therand thermostats.

    5) Outline drawing of the motor.6) Performance characteristic data including: Motor efficiency, current and power factor at 0, 25, 50, 75, 100, 115 and 1

    load at rated voltage, locked rotor current, locked- rotor torque, full load torque, breakdown torque, power factor at rotor, starting limitations, starting time with maximum NEMA inertia, open and short circuit AC time constants, short circtime constant, reactance to resistance ratio, and speed vs. torque and current curves.

    7) Motor installation instructions.

    Pg 16 of 16

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    46/334

    Manufacturing Record Book

    11 Noise DS

    Project Number 105312

    Date: 19-Dec-06 Rev.: 0Page 1 of 2

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order No: 4000310118

    PO Pkg No.: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Item Number 11

    CABGOC Document No.: A-B14-TOL-MEE-7510-0102

    SDRL Code: C07

    Noise Level Data Sheet

    0 12/19/06 Revise per comments RT - -

    A 10/20/06 For Customer Review RT - -Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    47/334

    CABGOCTombuaLandana Proect Total Qty: 1Project Location: Offshore Angola, Block 14 Sheet : 1 of 1Project Number: 6501 D/S No.:

    1 GENERAL EQUIPMENT NOISE

    2 Service:Potable Water Makers (ME-7510/7511)3 Sound pressure levels (SPL) in decibels (Reference 0.0002 Microbar) shall be measured 3 feet from major boundary surfaces, excluding minor projections such as

    4 conduit boxes and bearing housings, at one-half the vertical height for equipment up to 10 feet high following the standards of ANSI S1.13, Methods for the Measurement

    5 of Sound Pressure Levels (SPLs are to be Measured During Normal Operation at Full Load).

    6 Specific Worker Location:

    7 Other Than 3 Feet Criteria:

    8 Exceptions:

    9 Also Measure at 50 Percent Load: , 120 Percent Load: , Other Load:

    10 Company requirements are listed below. The vendor shall be provided with one copy of this form for each piece of equipment or integrated unit (such as compressor,

    11 speed changers, and driver). NA (Not Applicable) has been marked in any manufacturer's requirement section below which does not apply.

    12

    13 COMPANY NOISE CRITERIA

    14 Maximum Sound Levels for Complete Unit 85 dBA

    15 Instructions to Suppliers, Manufacturers, or Equipment Vendors:

    16 1. Complete the stock item blanks for both estimate and guaranteed Maximum sound levels in the table below, and complete all items below the table. If these stock item

    17 maximum sound levels do not exceed the Company Maximum Criteria, Omit Step 2.

    18 2. If the SPL for the Stock Item (i.e., standard design) exceeds Company Maximum Noise Criteria, complete the estimated and guaranteed table portions for special

    19 design and with acoustic treatment. The vendor shall describe any special design and acoustical treatment and the costs below the table.

    2021 NOISE CRITERIA (To be comp leted b y Vendor)

    22 Maximum Sound Levels for Complete Unit

    23 Preferred Center Frequencies (Hertz)

    24 63 125 250 500 1000 2000 4000 8000 dBA

    25 Estimated ,

    26 Stock Items

    27 Special Design

    28 With Acoustic Treatment

    29 Guaranteed

    30 Stock Items

    31 Special Design

    32 With Acoustic Treatment

    33 Indicate and describe any directional tendencies of equipment noise:

    3435 Describe Special Design:

    36 Added Cost:

    37 Describe Acoustic Treatment:

    38 Added Cost:

    39 We Equipment Will Not Exceed the Company Maximum Noise Criteria

    40 Equipment Will Not Exceed the Guaranteed SPL Listed in the Table Above

    41 Supplier, Manufacturer, or Vendor:

    42 Represented By: Title:

    43 Signature: Date:

    44

    45

    46

    47

    REVISION BL OCKNo. Date Revision Description Org'd Rvw'd Apv'd

    A 10/20/06 Issued for Approval RT

    0

    A-B14-TOL-MEE-7510-0102

    8245 54 64 75 76 74 76 71 (No

    Notes:

    1. Noise data is based on previous test data for the same model (FD40) watermaker.

    C'treat Offshore

    12/19/06 For Construction RT - -

    Page 2 of 2

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    48/334

    Manufacturing Record Book

    16 Schedule Elec Equipment

    Project Number 105312

    Date: 20-Feb-07 Rev.: APage 1 of 3

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order Number: 4000310118

    PO Pkg No: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 12

    CABGOC Document No: A-B14-TOL-MEE-7510-0021

    SDRL Code: C08

    Schedule Electrical Equipment in Hazardous Area

    A 2/20/07 Issued For Review RT - -Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    49/334

    Manufacturing Record Book

    16 Schedule Elec Equipment

    Project Number 105312

    Date: 20-Feb-07 Rev.: APage 2 of 3

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CTREAT JOB No; 105312 - TOMBUA LANDANA CABGOC BLK 14 ANGOL

    ELECTRICAL EQUIPMENT IN HAZRADOUS AREA

    AREA CLADSIFICATION: CLASS I, DIV 2, GROUP D AREA

    A) POTABLE WATER MAKERS ME-7510/7511

    ITEM DRAWING MANUFACT. MODEL # RATING LAB

    IDENTIFIER

    MOTORS PBE-8855M/ GE ULTRA IEEE-841 CSA8856M XSD-841

    MOTORS PBE-8845M/ GE ULTRA IEEE-841 CSA8846M XSD-841

    MOTORS PBE-8850M/ GE ULTRA IEEE-841 CSA

    8851M XSD-841

    ELECTRICAL COMPONENTS IN/ATTACHED TO CONTROL PANEL CP-7510/7511

    COND. AI-7510A/ ROSEMOUNT 1055 C1/D2/GD CSAMETER 7511A

    FUSE FU1,2,3,4,5,6 FERRAZ- ATMR C1/D2/GD NEC ART.SHAWMUT 501

    FUSE FU1,2,3,4,5,6 FERRAZ- USCC C1/D2/GD NEC ART.HOLDER SHAWMUT 501

    INDICATOR A,G,R ALLEN 800H SERIES C1/D2/GD UL/CSA/CE

    BRADLEY

    PLC ALLEN 1769-L32E C1/D2/GD UL/CSA

    COMPACTLOGIX

    POWER 5A POWER ALLEN 1606series C1/D2/GD UL

    SUPPLY SUPPLY BRADLEY 120AC/24DC

    PRESS. PSL-7510A/ ITT-Neodyne 131P SERIES C1/D2/GD ULSWITCH 7511A

    PUSHBTN/ HS/ES ALLEN 800H SERIES C1/D2/GD UL/CSA/CE

    E-STOP BRADLEY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    50/334

    Manufacturing Record Book

    16 Schedule Elec Equipment

    Project Number 105312

    Date: 20-Feb-07 Rev.: APage 3 of 3

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    ITEM DRAWING MANUFACT. MODEL # RATING LAB

    IDENTIFIER

    RELAY RY SQ-D TYPE 8501 C1/D2/GD UL

    SOLENOID SOL-1-5 SKINNER7133 71335SN2GNJ1 C1/D2/GD UL

    B) CHLORINE INJECTION UNIT ZZZ-6700

    ITEM DRAWING MANUFACT. MODEL # RATING LAB

    IDENTIFIER

    CL2 INJ. PBE-8620 LMI E SERIES C1/D2/GD ULPUMP

    ELECTRICAL COMPONENTS IN CONTROL PANEL CP-6700

    INDICATOR R ALLEN 800H SERIES C1/D2/GD UL/CSA/CEBRADLEY

    RELAY RY-1 SQ-D TYPE 8501 C1/D2/GD UL

    RELAY RY-2 ALLEN HLT C1/D2/GD UL

    BRADLEY

    FUSE FU1 FERRAZ- ATMR C1/D2/GD NEC ART.SHAWMUT 501

    FUSE FU1 FERRAZ- USCC C1/D2/GD NEC ART.HOLDER SHAWMUT 501

    ** End of Document

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    51/334

    Manufacturing Record Book

    13 Description of Operation

    Project Number 105312

    Date: 30-Apr-07 Rev.:0Page 1 of 4

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    CABGOC

    Tombua Landana Project CABGOC Block 14 Angola

    FD401-4-2 Potable Water Makers; Chlorine Injection Unit

    DSME Purchase Order Number: 4000310118

    PO Pkg No: ME-220

    Equipment Tag No: ME-7510/7511; ZZZ-6700

    C'treat Project Number 105312

    Document Number 13

    CABGOC Document No: A-B14-TOL-MEE-7510-0022

    SDRL Code: C09

    Description of Operation

    0 4/30/07 For construction RT - -

    A 2/9/07 Issued For Review RT - -Rev No Date Description BY CHK APPD

    PLAN HISTORY

  • 5/23/2018 125497695-105312-MRB-MANUAL-01152008-pdf

    52/334

    Manufacturing Record Book

    13 Description of Operation

    Project Number 105312

    Date: 30-Apr-07 Rev.:0Page 2 of 4

    309 Briar Rock Rd.

    The Woodlands, TX 77380-3529 USA

    Telephone: (281) 367-2800

    Fax: (281) 367-1761www.ctreat.com

    PROJECT: Tombua Landana project CABGOC Blk 14 Angola

    EQUIPMENT: Potable Water Makers; Chlorine Injection Unit

    TAG: ME-7510/7511: ZZZ-67000

    DESCRIPTION OF OPERATION

    A) POTABLE WATER MAKERS (ME-7510/7511)

    The Watermakers electrical controls are located in the Control Enclosure (Tag: CP-7510/7511). Withienclosure is a Programmable Logic Controller (PLC) which contains the logic for startup and shutdown

    the system. A copy of the PLC Ladder Logic Diagram will be provided in the system Operating Manu

    Depressing the START button starts the system. Refer