    BARAKAH NUCLEAR POWER PLANT PROJECT

    P ease Turn o your

    mobile! Or Switch to

    vibration mode!

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Check! Right Now!

  • 7/29/2019 121st HSJV Weekly Meeting

    2/25

    6/2/20

    SCREEN

    Dont Panic11

    Switch Off All Electrical Equipment22

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Run, Walk Fast!33

    Go to the Assembly Point44

    Wait for the Final Instruction55

    1. Safety Moment

    2. Previous Meeting

    1. Safety Moment

    2. Previous Meeting

    6. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    6. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    Findings Analysis- cause

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    Findings Analysis- cause

    7. Medical Cases

    8. Environmental Issues

    9. Action Plans

    Seoyong Infra

    Younchang (Infra)

    7. Medical Cases

    8. Environmental Issues

    9. Action Plans

    Seoyong Infra

    Younchang (Infra)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    w se, ompany, an rea HSE Findings by Company

    Evaluation by Findings Score

    w se, ompany, an rea HSE Findings by Company

    Evaluation by Findings Score

  • 7/29/2019 121st HSJV Weekly Meeting

    3/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    4/25

    6/2/20

    NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS ACTION BYACTION BYDUEDUE

    DATEDATE

    STATUSSTATUS

    High HSE

    Younchang Infra Subcontractor of HSJ V acquired highnumber of HSE findings with score of 5.5. This rating isbased on established scoring by HSE Department that Next

    Findings is having value equivalent to severity of given risk.Younchang Infra will present on next meeting theircorrective actions.

    Meeting

    2Low HSE

    Findings

    Seoyong Infra submitted low HSE findings compare to

    the combine findings from KEPCO and HSJ V. Seoyong

    will revert back on next meeting its corrective actions.

    Seoyong InfraNext

    Meeting

    The scheduled emergency drill planned this month with KEPCOune2013

    BARAKAH NUCLEAR POWER PLANT PROJECT

    postponed.

    HSJ V

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    5/25

    6/2/20

    Descript ion :Descript ion :

    -- Every month HSE team recogni zesEvery month HSE team recogni zesindiv idual and organizat ion who hasindiv idual and organizat ion who has

    contr ibuted to the improvement of HSE.contr ibuted to the improvement of HSE.

    Th is ac tiv i t romotes HSE oodThis ac tiv i t romotes HSE ood

    pract ices and programs at s i te.pract ices and programs at s i te.

    Date :Date :-- 02 June 201302 June 2013

    TimeTime-- 6:30 AM6:30 AM

    Par ti ci an tsPar ti ci an ts

    BARAKAH NUCLEAR POWER PLANT PROJECT

    -- HSJV Site Manager, Disci plin eHSJV Site Manager, Disci plin eManagers, Subcontractors SiteManagers, Subcontractors Site

    Manager, HSE PersonnelManager, HSE Personnel

    Aw ar deesAw ar dees ((3030Aw ar ds)Aw ar ds)-- Indiv idual and Spot Awards, BestIndividual and Spot Awards, Best

    Subcontractor Subcontractor Award (Aw ar d (Younchan gYounchang PB)PB )

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion Workers were checked by Subcontractors as per checkl ist in procedure.Workers were checked by Subcontractors as per checkl ist in procedure.

    Those found fai l ing are further evaluated by KEPCO medical team.Those found fai l ing are further evaluated by KEPCO medical team.

  • 7/29/2019 121st HSJV Weekly Meeting

    6/25

    6/2/20

    What is MidWhat is Mid--day Break Ruleday Break Rule-- Th e l oc al f ed er al o ver nm en t o f Ab uTh e l oc al f ed er al o ver nm en t o f Ab uDhabi imposed measures to preventDhabi imposed measures to prevent

    possible in jur ies dur ing summer duepossible in jur ies dur ing summer due

    to high temperature and humidto high temperature and humid

    environment. A mandatory breakenvironment. A mandatory break

    enforced that prohibi ts outd oorenforced that prohibi ts outd oor

    works .works .

    Effect iv i ty :Effect iv i ty :-- 15 June to September 15, 201315 June to September 15, 2013

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TimeTime

    -- 12:30 PM ~ 03:00 PM12:30 PM ~ 03:00 PM

    Loose

    ComponentsUnsafe

    Dismantling

    Unsecured

    Scaffold

    ScaffoldingFindingsApril2013 Correct ive Act ionsCorrect ive Act ions ThoroughThorough inspect ion of scaf foldinspect ion of scaf fold

    by Supervisorby Supervisor

    10%

    MissingParts

    44%NoInspection

    8%

    NoTag

    13%

    Substandard

    Components

    15%

    2% 8%wareness o uperv so r onwareness o uperv so r on

    standard of scaf foldingstandard of scaf folding

    Workers awareness of basicWorkers awareness of basic

    scaf folding.scaf folding.

    EvaluationEvaluat ion of scaf foldingof scaf folding

    inspectorsinspectors

    BARAKAH NUCLEAR POWER PLANT PROJECT

    f orfor scaf foldersscaf folders, and inspectors., and inspectors.

    Training of al l invol ved personnelTraining of al l involved personnel--

    workers using scaf foldworkers using scaf fold

    scaf foldersscaf folders, inspectors, and, inspectors, and

    supervisorssuperv isors

  • 7/29/2019 121st HSJV Weekly Meeting

    7/25

    6/2/20

    NotInspected

    14%Loose

    AccessLadderFindingsApril2013Correct ive Act ionsCorrect ive Act ions

    Us eUse of approved ladders asof approved ladders as

    NoLadder

    7%

    Clamp/Fitting

    43%

    per type and specif icat ions.per type and specif icat ions.

    Provide f irm landing andProvide f irm landing and

    prov is ion of fa l l protect ionprov is ion of fa l l protect ion

    Use of appropriate clampsUse of appropriate clamps

    and fastening devices.and fastening devices.

    CloseClose access beforeaccess before

    BARAKAH NUCLEAR POWER PLANT PROJECT

    landingarea

    14%Substandard

    Ladder22%

    inspect ion is performed.inspect ion is performed.

    Prohibits use ofProhibits use of

    substandard l adder.substandard l adder.

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    8/25

    6/2/20

    ItemAncil lary Ar ea Camp Area Offic e Area Power Bloc k Village 1 Village 2 HSJV Total

    For theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    Cum

    Near Misses 0 0 0 0 0 2 0 16 0 0 0 0 0 18

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1

    (This Week From May 25 May 31, 2013)

    First Aid Cases (FA) 0 4 0 0 0 6 3 42 1 6 0 3 4 61

    Medical TreatmentCases (MTC) 0 1 0 1 0 5 1 10 0 0 0 1 1 18

    Restricted Work

    Cases (RWC) 0 2 0 1 0 0 1 5 0 0 0 0 1 8

    LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3

    Property/Vehicle

    Accid ents 0 3 0 1 0 4 0 7 0 1 0 1 0 17

    Environmental

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 24 (2013)

    Release

    Forthisweek CumulativeOneStrike Policy 3 129*

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    9/25

    6/2/20

    (This Week From May 25 May 31, 2013)

    Issued

    NearMissNearMissCARCAR

    0 0 0 0

    0 42 176 218

    Findings TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 0

    0 15 0 0 27 176

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TOTALTOTAL

    OC&WFOC&WF 0 26 402 4280 68 578 646

    0 0 0 0 26 402

    0 15 0 0 53 578

    3442

    4748

    49

    Signs,Barriers&barricades

    PPE

    FirePrevention

    MaterialManagement

    FallProtection

    (This Week From May 25 May 31, 2013)

    1415

    232525

    2626

    2728

    3131

    3233

    Environmental

    PoorIllumination

    ColorCoding

    Hand&PowerTools

    Scaffolding

    Access&Egress

    Lifting

    WasteManagement

    Plant&Equipment

    WorkingatHeight

    ElectricalSafety

    Health&Welfare

    HotWorks

    BARAKAH NUCLEAR POWER PLANT PROJECT

    22

    34

    910 12

    0 10 20 30 40 50 60

    ManualHandling

    Supervision

    ConfinedSpace

    Excavation

    Training

    DocumentsPTW

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 121st HSJV Weekly Meeting

    10/25

    6/2/20

    Ensure trash bin are free of

    cigarette butts

    Install temporary hand rail atInstall temporary hand rail at

    the first floor of constructedthe first floor of constructed

    Proper storage of paint

    should be established.

    1 32

    ,,

    Set storage area for gas

    cylinder tanks (TGB2, D&I)(TGB2, D&I)

    Safekeeping flammable

    materials with protection

    from direct sunlight, and

    bunding (CWDC, Al(CWDC, Al RaeelRaeel))

    Construction chemicals

    buildingbuilding (( Village 1,Village 1, owersowers

    Tech)Tech)

    Warn workers not to s eat on

    side railings of Manbasket

    (Village 2,(Village 2, HanlimHanlim))

    Install barriers within

    endpoint of slabs(O&M,(O&M, SeobonSeobon))

    ,,

    Empty gallons fromchemicals must have proper

    storage. (AB Unit 1,(AB Unit 1, AdvanAdvan))

    Practice correct storage of

    hazardous materials as

    stated in MSDS. (AB Unit(AB Unit

    1, DOW)1, DOW)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    s ou e un er a roo o r

    with protection from direct

    sunlight (Village(Village 1, Towers1, Towers

    Tech)Tech)

    Ensure guardrails are

    provided for steel fixers

    (GIB,(GIB, HilalcoHilalco))

    em ova o s ac carpen ry

    materials from edge of

    excavation (Office(Office

    Area,Area, Seobo nSeobon))

    Fall Protection Fire PreventionMaterial Management

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    11/25

    6/2/20

    112

    100

    120

    33

    2332

    23

    39

    19

    38

    17 20 16

    40

    60

    80

    BARAKAH NUCLEAR POWER PLANT PROJECT

    82 3 1 4 3

    0

    100

    120ManualHandling

    Hou

    ConfinedSpace

    Excavation

    Supervision

    Training

    10,HotWorks

    40

    60

    80Documents

    Plant&Equipment

    PTW

    ColorCoding

    Environmental

    Hand&PowerTools

    PoorIllumination

    Scaffolding

    Access&Egress

    WasteManagement

    ElectricalSafety

    Si ns Barriers & Barricades

    3,PPE3,FallProtection 7,Housekeeping

    4,Housekeeping5 Housekee in

    5,FallProtection6,FirePrevention

    5,AccessandEgress

    3,Environmental

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    20

    ,

    Health&

    Welfare

    Lifting

    HotWorks

    WorkingatHeight

    FirePrevention

    PPE

    MaterialManagement

    FallProtection

    Housekeeping

    ,,

  • 7/29/2019 121st HSJV Weekly Meeting

    12/25

    6/2/20

    700

    80090

    100KEPCO/HSJV

    SUBCON

    (This Week From May 25 May 31 , 2013)

    100

    200

    300

    400

    500

    600

    203040506070 Manpower

    BARAKAH NUCLEAR POWER PLANT PROJECT

    00

    Seoyo

    ng

    Seoyong(PB)

    TowersTech

    Gusan

    Eunm

    in

    Jongh

    ap

    Jonghap(PB)

    YounChang

    YounChang(PB)

    Hwach

    on

    W

    BG

    Hila

    lco

    Advan

    Hanlim

    Uw

    ell

    YooA

    HyundaiC

    &I

    Sam

    jin

    Euge

    ne

    Daemyu

    ng

    Seob

    on

    D

    &I

    AlRa

    eel

    DO

    W

    Sam

    ho

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    13/25

    6/2/20

    10.0

    FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)Source: CAR, Near Miss, Walkthrough and

    Observation Card reported by KEPCO & HSJV

    0.0

    2.0

    4.0

    6.0

    8.0 .

    2.4

    4.4

    0.5

    6.3

    1.00.4

    3.6 3.2

    1.0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem1.JointInspection willbecarriedoutbyAreaManagementTeam.

    2.SpotTrainingwillbegiven toworkersaboutmajorfindings

    3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby Seoyong (PB)

    Legend : (I) Infra, (PB) Power Block

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    14/25

    6/2/20

    Top Hazards

    Total No. of Findings: 99

    FallProtection,16

    Housekeeping,13HotWorks

    PTW,2Training,2

    Plant&Equipment,1

    Environmental,1 PoorIllumination,1Manual

    Handling,1Health&Welfare,1

    ColorCoding,1FallProtection 16Housekeeping 13

    Control Measure Due Date

    Supervisorstomonitorpersonneltoensurethatharnessarehookedduringworking atheight.

    Done

    Access&

    ElectricalSafety,4

    Signs,Barriers&Barricades,4

    Lifting,4FirePrevention,3

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Properarrangementofconstructionmaterialsduringandafterworkingtime

    Alw ays

    WasteManagement,10

    Scaffolding,7Hand&Power

    Tools,6PPE,6WorkingatHeight,5

    MaterialManagement,4Egress,4

    Source: CAR, Near Miss, Walkthrough and Observation Card

    Top Hazards

    Cause Nos

    WorkingatHeight 9

    Total No. of Findings: 68

    WorkingatHeight,9

    Waste

    Management,2Environmental,2

    Training,2Hand&Power

    Tools,1

    ColorCoding,1Documents,1Scaffolding,1

    F re Prevent on 7

    Control Measure Due Date

    Provideproperworkingplatformonheights &useofproperaccess. Alw ays

    FirePrevention,7

    Housekeeping,4

    Signs,Barriers&Barricades,3

    PPE,3

    Welfare,3

    BARAKAH NUCLEAR POWER PLANT PROJECT

    beinspected regularlyandprovideduringhotworks. Done

    ,

    Lifting,6Material

    Management,5ElectricalSafety,4

    PoorIllumination,4

    HotWorks,4

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 121st HSJV Weekly Meeting

    15/25

    6/2/20

    Top Hazards

    Cause Nos

    Fall Protection 10

    Total No. of Findings : 53

    FallProtection,10

    Scaffoldin 2

    WorkingatHeight,2 ColorCoding,1

    PoorIllumination,1 HotWorks,1

    FirePrevention,1Poor

    Illumination,1

    Access&Egress 6

    Control Measure Due Date

    Supervisorstomonitorpersonneltoensurethatharnessarehookedduringworking atheight.

    Done

    Access&Egress,6

    Plant&Health&Welfare,2

    Environmental,2Housekeeping,2

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ensurethatitisproperlyattachedforsafeuse. Done Lifting,4

    Scaffolding,3Waste

    Management,3

    MaterialManagement,3PPE,3Excavation,2

    Signs,Barriers&Barricades,2

    ,

    Source: CAR, Near Miss, Walkthrough and Observation Card

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    16/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    InspectionInspection DateDate AttendeesAtt endees RemarkRemark

    Committee I nspection None HSJV, KEPCO, HSE Management Team

    Weekly Inspection 2013-05-29 HSJV HSE Team 16 Findings

    3

    4

    5

    FindingsperCompany

    3

    5

    NoHarness

    Noproperplatform

    FindingsperCausal

    3

    2

    4

    2

    4

    1

    0

    1

    2

    Advan D&I Gusan Seobon Seoyong(PB) TowersTech

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    1

    1

    2

    2

    0 1 2 3 4 5 6

    Usingunsafeladder

    Noassistance

    Noproperaccess

    Nohardbarricade

    Substandardscaffold

    Nothooking

    lanyard

    Key item : Working at Height

  • 7/29/2019 121st HSJV Weekly Meeting

    17/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Descr ip tion

    Immediate

    Act ion

    Planned

    Supervisor

    Preventive Act ion

    1

    Injuryleft

    foot;swelling

    fromfalling

    object

    about 3040

    Seoyong

    SteelStr.Worker

    RebarShop

    Ancillaryarea

    May29,20131720hrs,

    Mr.Shake Shohorab

    Hossen Kuti (IP)was

    workinginthebending

    machinewhensuddenlya

    pieceofbendedrebar(36

    mm.diameter)from

    AssessedbyDr.

    Kim

    Analgesiccream

    applied

    Elastic banda e

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Kgs. 2905

    2013

    17:20

    bending

    machine

    placed

    ongroundaccidentallyhit

    IPsleftfeet.

    applied

  • 7/29/2019 121st HSJV Weekly Meeting

    18/25

    6/2/20

    No.Source of

    InjuryArea Descr ip tion

    Immediate

    Act ion

    PlannedSupervisor

    Preventive Act ion

    2

    Injuryleft

    smallfinger

    laceration

    Advan

    RebarForeman

    PowerBlock;

    TowerCraneNo.

    7

    Injuredperson(IP)wanted

    toplacewoodensupport

    underarebarthatwasto

    beliftedbyaforkliftand

    gothislittlefingerstuckin

    AssessedbyDr.

    Kim

    Woundcleansing

    done

    Compression

    dressingdone

    Tetanustoxoid

    injectiongivenat

    ri ht deltoid

    BARAKAH NUCLEAR POWER PLANT PROJECT

    28052013

    16:30

    betweenthewoodand

    therebar.

    muscle

    Referredto

    Gayathi HospitalforXRay.

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    Planned

    Supervisor

    Preventive Acti on

    3

    Injury Left

    Thumb

    Contusion

    Seoyong

    Carpenter

    Helper

    PowerBlockAB

    Theaccident

    happenedon25th

    May2013,injured

    persontriedtodrive

    nailsinthe

    formworks when he

    AssessedbyDr.Kim

    Nailpuncturedone

    Dressingapplied

    BARAKAH NUCLEAR POWER PLANT PROJECT

    25052013

    16:45

    hithis

    left

    thumb

    by

    hammer.

  • 7/29/2019 121st HSJV Weekly Meeting

    19/25

    6/2/20

    No.Source of

    InjuryArea Descr ip tion

    Immediate

    Act ion

    PlannedSupervisor

    Preventive Act ion

    4

    InjuryPainin

    theleft

    Forearm

    HyundaiC&IElectHelper

    Village1

    Building05

    Whilepackingupfrom

    work,hewasunfolding

    theAtypeladderandat

    thatmomentlockof

    laddercaughthislefthand

    AssessedbyDr.

    Kim

    Analgesic

    ointmentapplied

    Elastic banda e

    BARAKAH NUCLEAR POWER PLANT PROJECT

    25052013

    15:10

    forearmcausingminor

    pain

    applied

    No.Source of

    InjuryArea Descr ip tion

    Immediate

    Act ion

    Planned

    Supervisor

    Preventive Act ion

    5

    Injury Right

    indexfinger

    hitbyascrew

    Seoyong

    CommonLabor

    RCBAB1

    PowerBlock

    Theinjuredperson

    performscuttingof

    exposedscrewsandnails

    onrebarwall,whenat

    onemomenthisright

    Steristrip

    applied

    Wounddressing

    done

    Tetanus in ection

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Near

    TC

    1

    25052013

    14:30

    index

    and

    middle

    finger

    hitsanexposedscrews.

    wasgiven.

  • 7/29/2019 121st HSJV Weekly Meeting

    20/25

    6/2/20

    No.Source of

    InjuryArea Descr ip tion

    Immediate

    Act ion

    PlannedSupervisor

    Preventive Act ion

    6

    LowBack

    Pain after

    Lifting

    E ui ment

    Gusan

    FormCarpenter

    CWDCPower

    Block

    SeasideArea

    Injuredpersonvisited

    clinicadayafterliftingtie

    rodduringliftingwork.

    Patientsufferedpainat

    AssessedbyDr.

    Kim

    Analgesic

    ointment

    appliedand

    BARAKAH NUCLEAR POWER PLANT PROJECT

    28052013

    14:00

    lowerback massage the

    affectedarea

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    21/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    AFTER

    Location Samjin Laydown Area Power Block

    Description Poor Waste management and segregation, hazardous cans and plastic mixed wi th metal scrap.

    Act ion taken Ensure to follow and comply continuously on waste management and segregation system.

    Status CLOSED

    BEFORE

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BEFORE

    Location D & I Laydown Area Power Block

    Description While relocating chemical storage, drip tray was observed gap on base plate which is inefficientto contain in case of spillage of hazardous materials.

    Act ion taken Drip tray base already fully w elded to ensure the integrity in case of spillage.

    Status CLOSED

    AFTER

  • 7/29/2019 121st HSJV Weekly Meeting

    22/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    AFTER

    Location Shinwoo Laydown Area Power Block

    Description Full hazardous skip bin wit h contaminated paint cans/pails.

    Act ion taken Coordinated to ESP for proper handling, hauling, storage and transport for disposal.

    Status CLOSED

    BEFORE

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.0 DateActio n by

    CompanyDescription Status Closing Date

    Expiration

    Date

    Ref. No.

    CARM ai n Area Sub -A re a Issu ed By

    Issuer

    Company

    130 May

    2013Samjin

    Metal skip bin mixed with

    contaminated hazardous cans/pails

    and plastic waste.

    CLOSED31 May

    2013

    30 May

    20131437 PB

    Laydown

    Area

    Renato

    PonceHSJV

    230 May

    2013Shinwoo

    Full hazardous skip bin with

    contaminated paint cans/pails

    observed.

    CLOSED31 May

    2013

    30 May

    20131439 PB

    Laydown

    Area

    Renato

    PonceHSJV

    330 May

    2013D & I

    While relocating chemical storage,

    drip tr ay observed gap on base plate

    which is inefficient to contain hazmatCLOSED

    31 May

    2013

    30 May

    20131465 PB

    Laydown

    Area

    Renato

    PonceHSJV

    in case of spillage.

  • 7/29/2019 121st HSJV Weekly Meeting

    23/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    WASTEMANAGEMENTUPDATEWeek=23/05/2013 29/05/2013

    Thisweek LastweekCollected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

    Paper 64 0 45 80 0 0

    Metal 64 0 0 32 0 90

    Construction 152 405 0 144 675 0

    Concrete 0 0 0 0 0 0

    Wood(Good) 0 0 45 0 0 0

    Wood(Bad) 400 405 0 232 270 0

    Plastic 144 0 45 112 0 0

    Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea

    Recycle Treatedwaste(GMET)toRecyclingPlants

    Municipal 0 320 0 0 312 0

    Hazardous 0 0 0 8 8 0

    TotalSolidWaste 824 1,130 135 10.67% 608 1,265 90 6.64%

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    24/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 121st HSJV Weekly Meeting

    25/25

    6/2/20

    BARAKAH NUCLEAR POWER PLANT PROJECT