120220 Pin Up

download 120220 Pin Up

of 22

Transcript of 120220 Pin Up

  • 8/3/2019 120220 Pin Up

    1/22

    Intere

    Wil

    com

    Wil

    com

    tec

    Will reduce

    but is a

    in

    Applicability

    Element

    WIND TURBINE AND COURTYARD COVER

  • 8/3/2019 120220 Pin Up

    2/22

  • 8/3/2019 120220 Pin Up

    3/22

    EnergyFrom AwayEven though NYC generates asignificant portion of its ownenergy, the great majority ofelectrical power is delivered tothe city through a transmission gridthat collects energy from distantpower plants. As much as 70% ofthe fuel consumed in the generationof power for the grid is lost during

    generation and transmission.Removing impediments torenewable energy within NYC willmake the power grid more reliable,reducing the risk of blackoutsand brownouts.

    EF 16

    Remove Landmarks Impedimentsto Alternative Energy

    Issue:In historic districts, rooftop equipment including solar panels, wind turbines and micro-turbines -- is not permitted if visible from thestreet without a lengthy review by the LandmarksPreservation Commission.

    Recommendation:Treat alternative and distributed energy equipmentthe same as other rooftop mechanical equipment,

    which is allowed to be visible from the street.

    Benefits Costs

    Savings

    Environment

    Cost

    Health & Safety

    page 39, executive summary

    This is a N

    Whil

    proposal

    a

    Adds a lo

    cost becaus

    Gives old b

    opp

    gener

    Allow

    Green Code Task Force

    EF 16: Remove landmark impediments to alternate energy

  • 8/3/2019 120220 Pin Up

    4/22

    Awareness =

    EfficiencyNew York State studies have shownthat metering tenant electrical usein a multi-famliy building can reduceapartment electricity consumptionby approximately 17%-27%.

    EO 2

    Measure Electricity Usein Tenant Spaces

    Issue:Because electricity is often unmetered incommercial tenant spaces, tenants are unaware ofthe energy they consume. This, in turn, can lead toexcessive use and waste.

    Recommendation:All new commercial tenant spaces of 10,000 squarefeet or larger shall be metered for electricity. Asimilar proposal was incorporated into the Greener,Greater Buildings Plan, which became law prior tothe issuance of this report.

    Benefits Costs

    Health & Safety

    Savings Cost

    Environment

    page 54, executive summary

    This is

    Whil

    proposal

    idea for

    Co

    co

    Old build

    metered b

    c

    Metering

    appa

    need

    Green Code Task Force

    EO 2: Measure electricity use in tenant spaces

  • 8/3/2019 120220 Pin Up

    5/22

    Executive SummaryFebruary 2010

    NYC GREEN

    CODESTASK FORCE

    A REPORT TO MAYOR MICHAEL R. BLOOMBERG & SPEAKER CHRISTINE C. QUINN

    C-BIP Process

    How to address city and design as inputs and outputs

    HIGHLY

    PRESCRIPTIVE

    SOMEWHAT

    PRESCRIPTIVE

    PRESC

    SOLU

    INPUT

    C

    ANALY

    PLAYER

    S

  • 8/3/2019 120220 Pin Up

    6/22

    Precedents

    Projects with similar interests and goals

    Girasol

  • 8/3/2019 120220 Pin Up

    7/22

    Multi-directional turbine

    Vertical axis quiet turbine

    Research

    Wind Turbines

  • 8/3/2019 120220 Pin Up

    8/22

    Delight Cloth - woven optical fibers

    Mycoply - flexible biomaterial

    Research

    Materials

  • 8/3/2019 120220 Pin Up

    9/22

    Tools

    SolidWorks - FloXpress - Wind simulator

    nightTIME

  • 8/3/2019 120220 Pin Up

    10/22

    Element

    Applications

    DAYTIME

    nightTIME

  • 8/3/2019 120220 Pin Up

    11/22

  • 8/3/2019 120220 Pin Up

    12/22

    Element

  • 8/3/2019 120220 Pin Up

    13/22

    Element

    Inputs/Outputs

    external site specific

    geometry

    measure

    parameter

    distance

    wind simulation

    excel data

    ground plane

    corner points

    module size

    height factor

    turbine angle

    width ratio

    output

    t

    e

    internal

    Element

  • 8/3/2019 120220 Pin Up

    14/22

    Element

    Turbine

    external site specific

    geometry

    measure

    parameter

    point 3

    point 4

    output

    internal turbine

    enclosure

  • 8/3/2019 120220 Pin Up

    15/22

  • 8/3/2019 120220 Pin Up

    16/22

  • 8/3/2019 120220 Pin Up

    17/22

  • 8/3/2019 120220 Pin Up

    18/22

  • 8/3/2019 120220 Pin Up

    19/22

  • 8/3/2019 120220 Pin Up

    20/22

  • 8/3/2019 120220 Pin Up

    21/22

  • 8/3/2019 120220 Pin Up

    22/22