±12,000 RSF PROCURING BROKER COMMISSION “Plug and Play ... · • Equipped with furniture,...

2
±12,000 RSF “Plug and Play” Space Elaine Hartin [email protected] 916-367-6344 CA RE License #01047857 PROCURING BROKER COMMISSION $1.00/RSF per year of remaining sublease term

Transcript of ±12,000 RSF PROCURING BROKER COMMISSION “Plug and Play ... · • Equipped with furniture,...

Page 1: ±12,000 RSF PROCURING BROKER COMMISSION “Plug and Play ... · • Equipped with furniture, cubicles, cabling and security alarm in place • High quality tenant improvements with

±12,000 RSF “Plug and Play” Space

Elaine [email protected]

916-367-6344CA RE License #01047857

P R O C U R I N G B R O K E R C O M M I S S I O N $1.00/RSF per year of remaining sublease term

Page 2: ±12,000 RSF PROCURING BROKER COMMISSION “Plug and Play ... · • Equipped with furniture, cubicles, cabling and security alarm in place • High quality tenant improvements with

17-0219 • 08/17

For more information, contact exclusive agent:

Elaine [email protected]

916-367-6344CA RE License #01047857

50

2870 Gold Tailings Court,Rancho Cordova White Rock Rd

Sunrise Blvd

Folsom Blvd

Folsom Blvd

Zinfandel Dr

Zinfandel Dr

Coloma Rd

Not to Scale

The information contained herein has been obtained from sources deemed reliable but has not been verified and no guarantee, warranty or representation, either express or implied, is made with respect to such information. Terms of sale or lease and availability are subject to change or withdrawal without notice.

3005 Douglas Blvd., Suite 130 Roseville, CA 95661

±12,000 RSF “Plug and Play” Space

• Beautifully designed building with ten foot ceilings• Equipped with furniture, cubicles, cabling and security alarm in place• High quality tenant improvements with an excellent glass line • Large Attractive Monument Signage • Well maintained colorful landscaping • Great curb appeal

• Outdoor eating area for employees ~ fenced for privacy• Clean parking lot containing 44 parking stalls, plus street parking • Very safe neighborhood• Master Lease expires September 30, 2020 ~ longer term may be negotiated• Reduced Sublease rate ~ $1.05 Modified Gross

P R O J E C T H I G H L I G H T S