16NK 11-81 Double Effect Steam Absorption Chillers Nominal cooling capacity 345-4652 kW 50Hz
jefantac
Tampon
jefantac
Zone de texte
PRELIMINARY

2

Double effect steam-fired absorption chillersChilled water can be produced using saturated steam up to 784 kPa. It is a chiller driven by high pressure steam produced

from Waste energy or from heating processes. ♦ NK Model Specification

Version A (050305) NK 11 12 13 21 22 31 32 41

Refrigeration USRT 98 127 156 196 245 294 352 392

Capacity kW 345 447 549 689 861 1,034 1,238 1,378

Chilled water system 12.2→6.7°C ( Fouling Factor = 0.018 m2°C/kW•Max.working pressure 1034kPa )

Flow rate m3/h 53.4 69.2 85.0 107 134 160 192 214

Pressure drop kPa 44 64 64 57 42 41 49 46

Connection(ANSI) inch 4 4 4 5 6 6 6 8

Retention volume m3 0.13 0.15 0.17 0.24 0.28 0.34 0.36 0.46

Cooling water system 29.4→35.4°C ( Fouling Factor = 0.044 m2°C/kW•Max.working pressure 1034kPa )

Flow rate m3/h 89.0 115 142 178 223 267 320 356

Pressure drop kPa 68 40 49 109 74 53 65 67

Connection(ANSI) inch 5 5 5 6 8 8 8 10

Retention volume m3 0.34 0.38 0.42 0.58 0.63 0.89 0.95 1.11

Steam system Saturated steam 784kPa

Consumption Kg/h 400 510 630 790 980 1,180 1,410 1,570

Steam inlet inch 2 2 2 2 2-1/2 2-1/2 3 3

Drain outlet inch 1 1 1 1-1/4 1-1/4 1-1/4 1-1/2 1-1/2

Length (L) mm 2,810 3,850 3,850 3,880 4,920 5,040 5,040 5,100

Width (W) mm 2,050 1,910 1,910 2,240 2,070 2,170 2,170 2,400

Height (H) mm 2,200 2,200 2,200 2,250 2,250 2,390 2,390 2,600

Tube removal mm 2,400 3,400 3,400 3,400 4,500 4,500 4,500 4,500

Operation weight kg 4,600 5,800 6,100 7,500 8,800 11,200 11,800 13,900

Max shipping weight kg 4,200 5,300 5,500 6,700 7,900 10,000 10,500 12,400

Total Shipping weight kg 4,200 5,300 5,500 6,700 7,900 10,000 10,500 12,400

Shipping method 1 1 1 1 1 1 1 1

Electric Power 3 phase 400V 50Hz

Apparent power kVA 7.2 7.2 7.2 8.9 8.9 9.1 9.1 14.0

Total electric current A 10.8 10.8 10.8 13.3 13.3 13.6 13.6 20.7

No1.ABS pumpkW 2.5 2.5 2.5 3.4 3.4 3.4 3.4 5.5

A 6.2 6.2 6.2 8.5 8.5 8.5 8.5 14.0

No2.ABS pumpkW 0.3 0.3 0.3 0.4 0.4 0.4 0.4 1.1

A 1.4 1.4 1.4 1.6 1.6 1.6 1.6 3.2

REF pumpkW 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4

A 1.1 1.1 1.1 1.1 1.1 1.4 1.4 1.4

Purge pumpkW 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4

A 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1

PD cell heater W 38 38 38 38 38 38 38 38

Control circuit W 400 400 400 400 400 400 400 400

SUPER ABSORPTION

3

42 51 52 53 61 62 63 71 72 81

441 490 548 617 686 784 882 980 1127 1323

1,551 1,723 1,927 2,170 2,412 2,757 3,101 3,446 3,963 4,652

12.2→6.7°C ( Fouling Factor = 0.018 m2°C/kW•Max.working pressure 1034kPa )

240 267 299 336 374 427 481 534 614 721

41 98 46 61 123 83 78 54 81 84

8 8 8 8 10 10 10 12 12 14

0.48 0.65 0.71 0.77 0.99 1.06 1.13 1.41 1.61 1.94

29.4→35.4°C ( Fouling Factor = 0.044 m2°C/kW•Max.working pressure 1034kPa )

401 445 498 560 623 712 801 890 1,024 1,202

73 53 71 94 61 83 111 77 113 122

10 12 12 12 14 14 14 16 16 16

1.9 1.87 2.01 2.14 2.79 2.97 3.15 3.67 4.11 4.76

Saturated steam 784kPa

1,770 1,960 2,200 2,470 2,750 3,140 3,530 3,920 4,510 5,300

3 3 4 4 4 5 5 6 6 6

1-1/2 2 2 2 2 2-1/2 2-1/2 2-1/2 2-1/2 3

5,100 5,330 5,870 6,370 6,100 6,190 6,710 6,440 7,460 7,460

2,400 2,770 2,800 2,800 2,970 3,000 3,000 3,300 3,300 3,500

2,600 2,900 2,900 2,900 3,330 3,330 3,330 3,450 3,450 3,650

4,500 4,600 5,100 5,600 5,200 5,700 6,200 6,000 7,000 7,000

14,500 18,800 20,800 22,300 26,500 30,000 32,100 38,000 42,300 47,300

12,800 16,300 18,100 19,400 22,700 26,000 27,800 27,800 30,600 21,700

12,800 16,300 18,100 19,400 22,700 26,000 27,800 33,000 36,600 40,600

1 1 1 1 1 1 1 1 1 3

3 phase 400V 50Hz

14.0 15.4 16.7 16.7 17.4 17.0 17.0 22.9 22.9 22.9

20.7 22.7 24.5 24.5 25.5 25.0 25.0 33.5 33.5 33.5

5.5 6.2 6.2 6.2 6.6 6.6 6.6 9.0 9.0 9.0

14.0 16.0 16.0 16.0 17.0 16.0 16.0 22.0 22.0 22.0

1.1 1.1 1.8 1.8 1.8 1.9 1.9 1.9 1.9 1.9

3.2 3.2 5.0 5.0 5.0 5.5 5.5 5.5 5.5 5.5

0.4 0.4 0.4 0.4 0.4 0.3 0.3 1.1 1.1 1.1

1.4 1.4 1.4 1.4 1.4 1.4 1.4 3.05 3.05 3.05

0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.75 0.75 0.75

1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.9 1.9 1.9

38 38 38 38 76 76 76 76 76 114

400 400 400 400 400 400 400 400 400 400

4

Scope of supply (NK)

1.Standard

ARI 560-2000

89/392/EEC (MD)

73/23/EEC (LVD)

89/336/EEC (EMC)

97/23/EC (PED)

2.Absorption chiller

Parts and instruments in the chiller are selected

by manufacturer.

(1)Lower shell

•Evaporator and refrigerant tray

•Absorber and absorbent tray

•Eliminators

•Bases

(2)Upper shell

•Generator

•Condenser

•Low temperature(LT) generator

•Eliminators

•Rupture disk mounting flange

(3) High temperature (HT) generator

(4)Heat exchangers

•High temperature (HT) heat exchanger

•Low temperature (LT) heat exchanger

•Refrigerant drain heat reclaimer

•HT steam drain heat reclaimer

•LT steam drain heat reclaimer

(5)Pumps

•Absorbent pumps with isolation valves

•Refrigerant pump with isoration valves

•Purge pump

(6)Purge unit

•Strage tank

•Ejector device

•Liquid trap

•Piping and deaphragm valves

•Palladium cell with heater

•Pressure sencor

(7)Steam trap

(8)Control panel

•Controller with data display. Lamps and operation buttons.

•Inverter for absorbent pump.

•Circuit breaker.

•Transformer.

•Relays and terminal blocks.

•Purge pump oeration switch.

(9)Locally mouted parts

•Temperature sensors

•Chilled water flow switch

•Generator pressure switchs

(10) Interconnecting piping and wiring

•Refrigerant and absorbent piping

•Internal power and control wiring

(11) Initial charge

•Absorbent (Lithium Bromide)

•Refrigerant(Water)

•Inhibitor(Lithium Molibdate)

(12) Painting

•Main unit: Rust priventive paint

•Control panel: Finish paint

(13) Accessory

•See attached accessory parts list

3.Factory test

•Check of external dimensions

•Hydraulic pressure test of water headers Test pressure is 1.5 times

of maximum working pressure

•Leak test of vacuum side

•Electroc insulation resistance test

•Dielectric breakdown test

•Function test of electric circuit and safety devices

4.Scop of supply of purchaser

(1)Unloading, Transportation and insurance after port of near

manufacturer.

(2)Building and foundations.

(3)External chilled water, cooling water and steam piping

work including various safety valves. isoration valves,

mating flanges, gaskets, bolts and nuts, etc.

(4)External wiring and piping for the chiller including

necessary parts.

(5) Insulation for the chiller.

(6)Finish painting of the chiller.

(7)Cooling water inlet temperature control device.

(8)Water treatment device of cooling water.

(9)Various temp./press. gauges for water, steam and drain lines.

(10) Cooling tower(s), chilled water pump(s),

cooling water pump(s) and steam two way control valve.

(11) Electric power supply (specified value).

(12) Supply of chilled water, cooling water and steam at rated

conditions.

(13) Maintenance of the chiller.

(14) Necessary tools, workers and materials for installation and

site testing.

(15) Any other items without the scope of supply.

SUPER ABSORPTION

5

The heating cycleScope of order (NK)

Item Standard OptionStandard CE marking No option

TemperatureInlet : 12.2oC Outlet : 5oC thru 12oC

Outlet : 6.7oC Temperature difference 3oC thru 10oC

Flow rate 0.545m3/h•RTChanges depending on chilled water

temperature difference(min. 50%)

Max.working pressure 1034kPa 2068kPa

Hydraulic test pressure Max.working press. X1.5 No option

Fouling factor 0.018m2oC/kW Max. 0.18m2oC/kW

Material of tube Copper tube No option

Water quality Refer to JRA-GL02E-1994 No option

Structure of water header Removal type Marine type

Manufacturing standard of water header SANYO standard No option

TemperatureInlet : 29.4oC

Inlet : 20oC thru 33oCOutlet : 35.4oC

Flow rate 0.908m3/h•RT Within the water flow rate range of each model

Max.working pressure 1034kPa 2068kPa

Hydraulic test pressure Max.working press. X1.5 No option

Fouling factor 0.044m2oC/kW Max. 0.18m2oC/kW

Material of tube Copper tube No option

Water quality Refer to JRA-GL02E-1994 No option

Structure of water header Marine type No option

Manufacturing standard of water header SANYO standard No option

Supply pressure 784kPa 324kPa thru 784kPa

Steam consumption 4.0kg / h•RT Changes depend on the specifications

Max.working pressure 784kPa No option

Hydraulic test pressure Max.working press. X1.5 No option

Material of tube 9/1 copper nickel tube No option

Steam quality Refer to JIS-B-8223 No option

Manufacturing standard of water header SANYO standard No option

3 phase 400V 50Hz

Phase Voltage Frequency (Voltage regulation : within ±10%) No option

(Frequency regulation : within ±5%)

Shipment One section Multi shipment

Chilled water freeze protection

Chilled water flow switch

Cooling water temperature

Safety functions Generator temperature Cooling water flow switch

Generator pressure

Crystallization protection

Motor protection

Capacity control Digital PID control by CHW temp No option

Parts Selected by SANYO No option

Painting Munssel 5Y-7/1 No option

Operation : Green

Indication lamps Stop : Orenge No option

Alarm : Red

Display LED No option

Operation indication

Stop indication

External terminals Alarm indicationNo option

(No-voltage normal open contact) Answer back indication

Cooling mode indication

Purge alarm indication

Structure Indoor type No option

Parts Selected by SANYO No option

Wire : 600V grade polyvinylNo option

Electrical wiring and pipingchloride-insulated wires

Pipe : plicatubeNo option

(flexible metal conduits)

Place Indoor No option

Ambient temperature 5oC thru 40oC No option

Ambient humidity Relative humidity : Max90% at 45oC No option

Be sure the following are not present

Atmosphere*Corrosive gas

No option*Explosive gas

*Poisonous gas

Leak test of vacuum side

Factory testElectric insulation resistance test

Performance test at full loadDielectric breakdown test

Function test of electric circuit

Con

trol

pan

elIn

stal

latio

n co

nditi

onC

ontr

olS

team

Coo

ling

wat

erE

lect

ricity

Chi

lled

wat

er

6

0

595

923

1263

0

Dra

in o

utle

t

Ste

am in

let

Rup

ture

Dis

k2

inch

2 in

ch

1 in

ch

2200

(H)

0

995

207

1810

279

150

1809

2050

(W)

300

1921

1350

01904

2400

(Tub

e re

mov

al)

2810

(L)

0

323

0180200364

1896

CH

W in

let/o

utle

tC

OW

inle

t/out

let

66877

0

Wire

con

nect

ion

0

900

982

R6001083

24362291

374

634

1240

CO

W o

utle

t5

inch

CH

W o

utle

t4

inch

CO

W in

tlet

5 in

ch

CH

W in

tlet

4 in

ch

Fig

ure

1. N

K-1

1

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

7

Dra

in o

utle

t

Ste

am in

let

Rup

ture

Dis

k2

inch

2 in

ch

1 in

ch

CH

W o

utle

tC

HW

inle

tC

OW

inle

tC

OW

out

let

0

0

0

2200

(H)

1910

(W)

300

595

923

1263

1809

207152

1810

1921

1350

01904

3400

(Tub

e re

mov

al)

3850

(L)

66877

0

0

00

Wire

con

nect

ion

323

1781

900

982

180200

541

2916

31163264

R600

396

2620

371

1240

Mod

elA

BC

NK

-12

3097

994

280

NK

-13

3096

995

279

A

C

B

CO

W o

utle

t5

inch

CH

W o

utle

t4

inch

CO

W o

utle

t5

inch

CH

W in

tlet

4 in

ch

Fig

ure

2.

NK

-12

Thr

u N

K-1

3

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

8

Dra

in o

utle

t

Ste

am in

let

Rup

ture

Dis

k2

inch

2 in

ch

1-1/

4 in

ch

CH

W o

utle

tC

HW

inle

tC

OW

inle

tC

OW

out

let

3400

(Tub

e re

mov

al)

Wire

con

nect

ion

0

1168

0

1006

1346

2159

0

205

265

1860

96

605

1980

2240

(W)

2131

300

1500

2250(H)

02089

3880

(L)

0

881003

0

0

1100

1165

212

312831112916

1950

323

1646

R600

568423

2620

430

1390

CO

W o

utle

t6

inch

CH

W o

utle

t5

inch

CO

W in

tlet

6 in

ch

CH

W in

tlet

5 in

ch

Fig

ure

3. N

K-2

1

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

9

Dra

in o

utle

t

Ste

am in

let

Rup

ture

Dis

k2

inch

2-1/

2 in

ch

1-1/

4 in

ch

CH

W in

/out

let

CO

W in

let

CO

W o

utle

t

4500

(Tub

e re

mov

al)

Wire

con

nect

ion

CO

W o

utle

t8

inch

CH

W o

utle

t6

inch

CO

W in

tlet

8 in

ch

CH

W in

tlet

6 in

ch

0

0

605

1019

1333

2159

1980

0

20596

1840

1170

280

2070

(W)

2131

300

1500

2250(H)

02089

4920

(L)

881003

0

0

195225

3936

4131

4309

0

1100

1165

0

343

1899

423568

R600

3640

430

1390

Fig

ure

4. N

K-2

2

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

10

CH

W in

let

CO

W in

let

CO

W o

utle

t

Dra

in o

utle

t

Ste

am in

let

Rup

ture

Dis

k3

inch in

ch

4500

(Tub

e re

mov

al)

Mod

elA

BC

DE

NK

-31

440

368

1855

2-1/

21-

1/4

NK

-32

460

370

1910

31-

1/2

C

A

B

D

inch

E

0

0

611

1066

1476

2198

0

2390

(H)

125218

251

2170

(W)

1256

1600

2298

02323

5040

(L)

0

245250492

3886

4131

4336

0

1200

1256

164

1078

0

0

2107

R 600

1490

3616

509

Wire

con

nect

ion

CO

W o

utle

t8

inch

CH

W o

utle

t6

inch

CO

W o

utle

t8

inch

CH

W in

tlet

6 in

ch

Fig

ure

5. N

K-3

1 T

hru

NK

-32

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

11

CH

W in

let

CO

W in

let

CO

W o

utle

t

4500

(Tub

e re

mov

al)

Wire

con

nect

ion

0

0

0

577

1142

1613

12501321

335

2600

(H)

269

673

2035

2400

(W)

1675

2451

2383

02513

5100

(L)

00

244276492

3886

4130

4354

150

1132

0

1250

1321

0

407

1911

R 600

1565

3616

545

Dra

in o

utle

t

Ste

am in

let

Rup

ture

Dis

k3

inch

3 in

ch

1-1/

2 in

ch

CO

W o

utle

t10

inch

CH

W o

utle

t8

inch

CO

W o

utle

t10

inch

CH

W in

tlet

8 in

ch

Fig

ure

6. N

K-4

1

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

12

CH

W in

let

CO

W in

let

CO

W o

utle

t

4500

(Tub

e re

mov

al)

Wire

con

nect

ion

0

0

0

577

1142

1613

12501321

335

2600

(H)

269

673

2060

2400

(W)

1675

2451

2383

02513

5100

(L)

00

244276492

3886

4130

4354

150

1132

0

1250 399

1321

0

407

1911

R 600

1565

3616

545

Dra

in o

utle

t

Ste

am in

let

Rup

ture

Dis

k3

inch

3 in

ch

1-1/

2 in

ch

CO

W o

utle

t10

inch

CH

W o

utle

t8

inch

CO

W o

utle

t10

inch

CH

W in

tlet

8 in

ch

Fig

ure

7. N

K-4

2

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

13

Rup

ture

Dis

k3

inch

4600

(Tub

e re

mov

al)

0

17001750

182

0

651

1170

1760

2630

02330

947

300

2770

(W)

2900(H)

221

2050

0

5330

(L)

2825

0

2909

265

24027

00

ST

EA

M in

let

3 in

chD

RA

IN o

utle

t 2

inch

0 570

1520

0

650

1940

0

367

CH

W o

utle

tC

OW

out

let

CH

W in

let/C

OW

inle

tW

ire c

onne

ctio

n

0

240265

130

38363966

4206

45824749

3280

R 800

CO

W o

utle

t12

inch

CH

W o

utle

t8

inch

CO

W o

utle

t12

inch

CH

W in

tlet

8 in

ch

Fig

ure

8. N

K-5

1

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

14

(Tub

e re

mov

al)

0

17001750

182

0

651

1170

1760

2630

0947

300

2360

2800

(W)

221

2050

2900(H)

Rup

ture

Dis

k3i

nch

0

0

265

240

2825

2700

ST

EA

M in

let

4 in

chD

RA

IN o

utle

t 2

inch

CH

W in

let/o

utle

tC

OW

out

let

CO

W in

let

Wire

con

nect

ion

265

R 800

0

240

130

3380

1940 0

0

421

0 650

1520

650

AB

CD

E

F

HG

CO

W o

utle

t12

inch

CH

W o

utle

t8

inch

CO

W o

utle

t12

inch

CH

W in

tlet

8 in

ch

Fig

ure

9. N

K-5

2 T

hru

NK

-53

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

Mod

elA

BC

DE

FG

H

NK

-52

4378

4508

4748

5123

5290

5870

5100

3451

NK

-53

4876

5006

5246

5622

5789

6370

5600

3949

15

(Tub

e re

mov

al)

CH

W o

utle

tC

HW

inle

tC

OW

out

let

CO

W in

let

Wire

con

nect

ion

0

751

1315

2025

3051 30

0

01067

2640

3330(H)

2970

(W)

0

250

1800

21501870

0

Rup

ture

Dis

k4i

nch

0

292

3264

310

6100

(L)

5200

3000

3260

CO

W o

utle

t14

inch

CH

W o

utle

t10

inch

CO

W o

utle

t14

inch

CH

W in

tlet

10 in

ch

ST

EA

M in

let 4

inch

DR

AIN

out

let

2 in

ch

0

4756

140

43284468

R 8

00

3260

292310

0

725

2040

0

441

52255392

0 715

1635

4760

250

Fig

ure

10. N

K-6

1

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

16

CO

W o

utle

t14

inch

CH

W o

utle

t10

inch

CO

W o

utle

t14

inch

CH

W in

tlet

10 in

ch

Fig

ure

11. N

K-6

2

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

0

2025

1315

753

3050

1870

0

1800

Ste

am in

let

5 in

ch

Dra

in o

utle

t2-

1/2

inch

2670

250

3330(H)

1545

725

575

3000

(W)

03260

0

432

762

(Tub

e re

mov

al)

Rup

ture

Dis

k4

inch

5700

450

6190

(L)

2565

5116

5430

5062

500

1635

0

CH

W in

/out

CO

W o

utC

OW

inle

tR

800

603

0

5395

3606

2090 0

140

46864826

17

CO

W o

utle

t14

inch

CH

W o

utle

t10

inch

CO

W o

utle

t14

inch

CH

W in

tlet

10 in

ch

Fig

ure

12.

NK

-63

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

0

2025

1315

753

3050

1870

0

1800

0

Ste

am in

let

5 in

ch

Dra

in o

utle

t2-

1/2

inch

3330(H)

2670

250

3000

(W)

1545

575

725

03260

0

435

762

Rup

ture

Dis

k4

inch

(Tub

e re

mov

al)

6200

450

6710

(L)

5945

5641

5587

2565

500

1635

0

R 8

00C

HW

inle

t/out

let

CO

W o

utle

tC

OW

inle

t

1400

603

52115351

5922

725

3561

2090 0

18

CO

W o

utle

t16

inch

CH

W o

utle

t12

inch

CO

W o

utle

t16

inch

CH

W in

tlet

12 in

ch

Fig

ure

13. N

K-7

1

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

0

1960

1335

3135

2410

0

2200

1100

0

Ste

am in

let

6 in

ch

Dra

in o

utle

t2-

1/2

inch

3450(H)

2730

189

735

1563

3300

(W)

575

03370

0

430

44264286

850

1130

5300

(Tub

e re

mov

al)

6000

2613 0

4872

140

6440

(L)

02005

443

R 8

00

803

0

911

915 0

3861

2390

4956

19

CO

W o

utle

t16

inch

CH

W o

utle

t12

inch

CO

W o

utle

t16

inch

CH

W in

tlet

12 in

ch

Fig

ure

14. N

K-7

2

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

0

1960

1335

3050

2410

0

2200

1100

0

DR

AIN

out

let

2-1/

2 in

ch

ST

EA

M in

let

6 in

ch

3450(H)

2730

735

189

1563

3300

(W)

575

03370

0 140

430

5741

54515311

850

1130

6325

(Tub

e re

mov

al)

7000

7460

(L)

5897

2613 0

395

2055

0

R 8

00

803

0

3861

965

2440 0

5981

20

CO

W o

utle

t16

inch

CH

W o

utle

t14

inch

CO

W o

utle

t16

inch

CH

W in

tlet

14 in

ch

Fig

ure

15. N

K-8

1

N

OT

ES

1. D

imen

sion

s (L

), (

W),

(H

) ar

e fo

r st

anda

rd m

achi

ne.

The

dim

ensi

ons

are

chan

ged

by p

arts

add

ed.

2. in

dica

tes

the

posi

tion

of a

ncho

r bo

lts.

3.M

atin

g fla

nges

of a

ll ex

tern

al w

ater

pip

ing

are

prov

ided

wel

ded

AN

SI 1

50LB

flang

e w

ith c

hille

r.

4. in

dica

tes

the

posi

tion

of th

e po

wer

sup

ply

conn

ectio

n on

con

trol

pan

el.

5. In

stal

latio

n cl

eara

nce: Lo

ngitu

dina

l dis

tanc

e10

00 m

mTo

p20

0 m

mO

ther

s50

0 m

m

0

2040

1430

3330

2610

0

2400

146

1200

0

DR

AIN

out

let

3 in

ch

ST

EA

M in

let

6 in

ch

3650(H)

2900

757

1653

3500

(W)

575

03560

0 140

430

54515311

850

6323

1130

(Tub

e re

mov

al)

7000

5981

7460

(L)

5889

0

425

2185

0

R 8

00

830

0

3861

911

1000

2590 0

21

Foundation dimensional data (NK)

Figure 16. NK-11 Thru 61

150

A

JK

B B

D

C

EF

G I

AABB

Table 1. Dimensional data

NOTES :

1. The base of machine has ø50 hole for anchor bolt.2. Anchor bolt should be fixed by shown detail drawing.

Washer should be welded with base.3. There should be a drain ditch around the foundation.4. The floor surface should be made as water proof for ease of

maintenance work.5. Surface of foundation should be made flat.

(The levelness should be below 2mm for 1,000mm length.)6. Anchor bolts and nuts are supplied by customer.

NK-11 4,600 2,300 2,300 1,896 175 90 350 900 150 1,200 160 1,000 100 --NK-12 5,800 2,900 2,900 2,916 175 90 350 900 150 1,200 160 1,000 100 --NK-13 6,100 3,050 3,050 2,916 175 90 350 900 150 1,200 160 1,000 100 --NK-21 7,500 3,750 3,750 2,916 175 90 350 1,100 150 1,400 160 1,200 100 --NK-22 8,800 4,400 4,400 3,936 175 90 350 1,100 150 1,400 160 1,200 100 --NK-31 11,200 5,600 5,600 3,886 200 100 400 1,200 150 1,500 200 1,300 100 --NK-32 11,800 5,900 5,900 3,886 200 100 400 1,200 150 1,500 200 1,300 100 --NK-41 13,900 6,950 6,950 3,886 200 100 400 1,250 150 1,550 200 1,350 100 --NK-42 14,500 7,250 7,250 3,886 200 100 400 1,250 150 1,550 200 1,350 100 --NK-51 18,800 9,400 9,400 4,346 130 190 510 1,700 180 2,060 250 1,800 3,966 3,836NK-52 20,800 10,400 10,400 4,888 130 190 510 1,700 180 2,060 250 1,800 4,508 4,378NK-53 22,300 11,150 11,150 5,386 130 190 510 1,700 180 2,060 250 1,800 5,006 4,876NK-61 26,500 13,250 13,250 4,888 140 210 560 1,800 180 2,160 320 1,900 4,468 4,328NK-62 30,000 15,000 15,000 4,686 140 210 560 1,800 180 2,160 1,900 130 300 130NK-63 32,100 16,050 16,050 5,211 140 210 560 1,800 180 2,160 1,900 130 300 130NK-71 38,000 19,000 19,000 4,286 140 210 560 2,200 180 2,560 2,300 130 300 130NK-72 42,300 21,150 21,150 5,311 140 210 560 2,200 180 2,560 2,300 130 300 130NK-81 47,300 23,650 23,650 5,311 140 210 560 2,400 180 2,760 2,500 130 300 130

Model Weight (kg) Dimensions (mm)No. Oper. AA BB A B C D E F G H I J K

150

A

B B

D

H

EF

G

H

I

AABB

NK-11 to NK-42NK51 to NK-61

150

A

B BI

D

C K

J

EF

G H

AABB

NK-62 to NK-81

22

Control panel (NK)

Figure 17. Control panel

Table 2. Indication lamp

CHILLER

STOP RUN

SET BACK

#1ABS PUMP

#2ABS PUMP

REF PUMP

PURGE PUMP

SAFETY CIRCUIT

POWER

CHILLER ALARM

STAND BY

DILUTIONBUZZER STOP

OPERATIONSTOP RUN

REMOTE

LOCAL

1

6

11

12

4

5

2

3

7

9

10

8

Name Lamp color

Operation indication lamp Green

Stop indication lamp Orange

Alarm indication lamp Red

Remote/Local select key with lamp Green

Operation select key with lamp Green

Data display 7segment LED(Red)

Stand by indication lamp Green

Dilution indication lamp Green

Safety circuit indication lamp Green

Power indication lamp Orange

Data select key

Alarm buzzer stop key

Purge indication lamp Green

Purge pump on - off switch

symbol1

2

3

4

5

6

7

8

9

10

11

12

GL

43P

NK--11 thru NK--61600

A

GL43P

A

1600

300

190

80 80

Power supply∅ 35

Power supply∅ 22

Section A-A

Rubberpacking

23

Field wiring (NK)

Figure 18 Typical eA5lectrical field connection diagram - Hot water-fired (LJ)

358

359

FOR COOLING TOWER FANRUN/STOP SIGNAL

362

FOR DILUTION INDICATION

363

383

382

357

356

323

323

323

CH

52C

O52 COOLING WATER PUMP INTERLOCK

CHILLED WATER PUMP INTERLOCK120

170

FOR STOP INDICATION

350

335

334

E

345

346

342

340

341

0A

344

343

E

UL

L3

L2

L1

G

CE

1 4Y1 4Y

2 4Y1 4Y

2 4Y

Earthing resistance : Local regulation

thickness as the wire of the pow

er supply. )E

arthing cable : Annealed copper w

ire (Please use the w

ire as same the

And also connect w

ire between chiller control panel and earth at field.

The chiller has M

CB

. Please connect pow

er supply wire to the term

inal block.(1) W

iring of power supply and earthing

FIE

LD W

IRIN

G C

ON

NE

CT

ION

DC

24V 10m

A

PA

NE

LS

UP

PLIE

DF

IELD

CO

NT

RO

L PA

NE

L of CH

ILLER

FOR ALARM BUZZER

FOR STEAM SHUTOFF VALVE

FOR OPERATION INDICATION

FOR ALARM INDICATION

REMOTE CHECK SIGNAL

FOR COOLING WATER PUMPRUN/STOP SIGNAL

WATER PUMPFOR CHILLEDRUN/STOP SIGNAL

ANSWER BACK SIGNAL

PREALARM SIGNAL

COM

325

326

324

326

324

324

(3)pulse

326

325

170

170

326

325(2)pulse

324

170

326

351

353

352

337

336

369

368

348

347

355

354

361

360

121

170

(5)pulse

(1)continuous

(4)continuous

TE

RM

INA

L ST

RIP

S IN

TH

E C

ON

TR

OL P

AN

EL

DC

/AC

24VD

C/A

C 24V

324

RE

MO

TE

SIG

NA

L

(1)NO

N-V

oltage Norm

al open contact(a)for start & stop (D

C24V

10mA

). : W

iring the terminal 324 and 323, connect 170 and 326.

(2)NO

N-V

oltage Norm

al open contact(a)for start (DC

24V 10m

A).

: Wiring the term

inal 324 and 325, connect 170 and 326. N

ON

-Voltage N

ormal open contact(a)for stop (D

C24V

10mA

). : W

iring the terminal 325 and 323.

(3)NO

N-V

oltage Norm

al open contact(a)for start (DC

24V 10m

A).

: Wiring the term

inal 324 and 325, connect 170 and 326. N

ON

-Voltage N

ormal close contact(b)for stop (D

C24V

10mA

). : W

iring the terminal 325 and 323.

(4)Continuous signal of D

C/A

C 24V

for start & stop.(Initial S

etting) : W

iring the terminal 324 and 326. (T

hose terminals are non-polarity.)

(5)Pulse signal of D

C / A

C 24V

For start.

: Wiring the term

inal 324 and 326. (Those term

inals are non-polarity.) P

ulse signal of DC

/ AC

24V for stop.

: Wiring the term

inal 325 and 326. (Those term

inals are non-polarity.)

Chiller can be operated by the follow

ing five type signal.

TE

RM

INA

L ST

RIP

S IN

TH

E C

ON

TR

OL P

AN

EL

L3

L2

L1

PE

CE

: 3PH

50Hz 400V

UL : 3P

H 60H

z 208V, 460VT

O P

OW

ER

SO

UR

CE

CM

S(A

C24V

)

TG

2Y

31

OP

EN

CLO

SE

OP

EN

CLO

SE

PO

TI 135 O

HM

+--

CV

PD

C4-20m

A

CA

SE

OF

ST

EA

MC

ON

TR

OL V

ALV

E M

OT

OR

(FIE

LD S

UP

PLY

)

CA

SE

OF

ST

EA

MC

ON

TR

OL V

ALV

EP

OS

ITIO

NE

R(F

IELD

SU

PP

LY)

(1) Should be w

ork the electric wiring connection by license holder.

(2) Use steel conduit for electric w

iring between field electric supply and control panel of the chiller.

(3) Field w

iring connections are all low voltage w

ithout supply voltage.

24

General remarks on piping work

T : Thermometer

: Trap

P : Pressure gauge F : Flow meter : Water pump : Strainer : Valve : Valve : Thermostat

SteamShut-OFFValve

HC C

By-passvalve

SupplyHeader

ReturnHeader

Chilled waterPump(Primary)

Chilled waterPump(Secondary)

SteamControlValve

To Boiler

CoolingWater pump

Cooling waterThermostat

WaterSupply

SafetyValve

BleederValve

BypassVALVE

To Drain ditch

Reducing Valve

Main Steam Piping

CheckValve

R

In order to prevent freezing up of chilled water during diluting operation of the chiller, continue the operation of the chilled water pumps and air-conditioner until the diluting operatio will be completed.

MV

F

Air Conditioner

T

T

T

T

P

P

P

P

PP

Typical piping diagram (NK)

Figuare 19. Typical piping diagram

1. Work outside the area surrounded by this line shall have to be

executed at the expense of the owner.

2. Refer to the external dimensions diagrams and specification tables for

pipe connections and diameters.

3. Standard supply steam press. is 784kPa gauge. A reducing valve and

safety valve which blows at 980 kPa gauge should be located near the

machine as in above diagram if the supply pressure is higher than

784 kPa gauge.

A pipe should be extended from this safety valve to release excess

steam outdoor.

4. Even if a reducing valve is not required, a strainer, pressure gauge and

drain trap should be provided for each machine near the steam inlet.

5. The back pressure in the steam drain line should be limited to less

than 49kPa gauge.

6. Determine the locations of the chilled water pumps and cooling water

pumps in due consideration of the pump's hydrostatic head and lift.

The machine should not be subject to a pressure larger than 784 kPa

gauge at any water headers.

7. Concerning the temperature control of cooling water, refer to

"control method of cooling water temperature".

8. Provide a thermometer and a pressure gauge at the outlet and

inlet of cooling water and chilled water.

9. Provide an air vent in each of the chilled and cooling water line at

a point higher than the headers for chilled water and cooling water.

10. Lay pipe from the cover of the evaporator and absorber to the

drain ditch.

11. Provide a bleeder in the cooling water line for control of water

quality.

12. Be sure to provide the shut-off valve to prevent the steam flow into

the chiller during shut-down. and in case that two or more chillers

are installed, provide the automatic shut-off valve.

(The terminals sending open / close signal to steam shut-off valve

are furnished in control panel of the chiller.)

13. Be sure to design the location of cooling tower to prevent

contaminatin of cooling water by exhaust gas from flues.

25

Insulatuon (NK)

Figure 20. Insulation of NK

75 mm thick insulator for hot surfaces

50 mm thick insulator for hot surfaces

30 mm thick insulator for hot surfaces

50 mm thick insulator for cold surfaces

30 mm thick insulator for cold surfaces

Model 75mm 50mm 30mm 50mm 30mmTSA-NK-11TSA-NK-12TSA-NK-13TSA-NK-21TSA-NK-22TSA-NK-31TSA-NK-32TSA-NK-41TSA-NK-42TSA-NK-51TSA-NK-52TSA-NK-53TSA-NK-61

3.34.64.64.66.66.67.27.28.48.410.511.710.5

1.92.72.73.13.94.44.44.64.64.44.95.35.9

4.55.45.76.97.68.99.2

10.711.112.913.414.416.8

4.05.55.56.17.68.58.59.99.9

13.815.016.117.5

0.40.40.40.50.50.70.70.70.71.11.11.11.2

Hot surfaceinsulation(m2)

Cold surfaceinsulation(m2)

Evaporator Cover

Refrigerant pump

Do Not Cold InsulateThe Motor ofRefrigerant pump

Evaporator cover and high generator coverand high temperature heat reclaim coverare removal construction

High Generator Cover

High Temperature Haet Reclaim Cover

(SQ METER)

NOTICE

3. Use non-combustible insulation material.

1. The total area includes the area of pipes in the chiller.

2. The chiller / heater is coated with rust preventive before delivery,but is not provided with finish paint.

26

Rupture disk mounting

Mounting instructions of rupture disk1. Apply the teflon paste (Part code:814-2-3701-002-00)

to both sides of gasket slightly as shown in fig. 2In order to avoid leakage, don't apply too much teflon paste.

2. The gasket (Part code:814-2-2101-678-00-0 Should be used asindicated in FIG, 3.

3. Attach the upper flange exactly parallel to the lower flange.

4. A torque wrench should be used for tightening bolts equally and theappropriate torque is shown in fig.3 in disregard of the torquetable in the manufacture's installation instructions.Read the Manufacture's installation instructions before assembling.

5. Tighten up the bolts by a torque wrench in a periodical maintenance.6. The used gasket should not be applied again.7. Leak test should be conducted by bubble test.

Figure 21. Piping of rupture disk

3/16

1/8

2 inchdisk

3 inchdisk

4 inchdisk

A

B

C

(mm)

(mm)

(mm)

C B

A

Pipe

Pipe

Flange

Flange

High tension nut

High tension bolt

To tank

From chiller / heater

Teflon paste

Safety head

: Scope of supply by SANYO

Rupture disk

Safety head

Teflon paste

Gasket

Cap screw

Discharge piping

Rupture disk

Vent piping

Drain

Tank

Support

Chiller /Heater

Above 1m3

⋅ MATERIAL : T/#9090-OR⋅ ANSI CLASS 150 LBS⋅ PART NAME : PKG, GASKET FOR RUPTURE DISK⋅ PART CODE : 814-2-2101-675-00-0 : 2 INCH

814-2-2101-677-00-0 : 3 INC814-2-2101-678-00-0 ; 4 INCH

CAP SCREW

(HEXAGON SOCKET HEAD)

BOLTING CAP SCREWTORQUE (HEXAGON SOCKET HEAD)(N•m)

104.9

85.9

69.9

26

136.7

120.7

101.6

41

149.4

174.6

127.0

76

Absorption

27

Precautions for installation (NK)

1. Please keep local regulation at installation.

2. The chiller shall be installed in indoor.

3. Please install the chiller on the floor of heavy duty construction.

4. Please keep service maintenance space as shown dimensions drawing.5. Don´t install at many dust area.6. If necessary, please attach antivibrator.7. Please install control panel to avoid the direct rays of the sun. If the control panel is exposed to the direct rays of the sun,

it is difficult to show the display.8. Don´t install near exhaust gas port, deodorizer´s port and ventilation port.9. Please use the shackle, when the chiller is lift by wire.

In this case, please insert the shackle to the hole of the lower shell.10. Don´t fall down side-ways.11. Please keep delivery space for smooth installation.12. Take care the impact or fallen.13. In case of separate shipping, please assemble and weld by license holder. Please refer to the manuals.14. Should be work the electric wiring connection by license holder.15. Use steel conduit for electric wiring between field electric supply and control penel of the chiller.15. Use steel conduit for electric wiring between field electric supply and control panel of the chiller.16. Please connect the operation signal wires from the chiller to the chilled water pump and cooling water pump.

Each pump is operated by chiller signal automatically.Please connect interlock wire of each pump to the chiller.

17. In case of using remote signal, please don´t install at parallel with power line.18. Please connect earth line. Don´t connect the earth wire to gas pipe and water pipe, etc.19. Please wear the glasses and gloves when handling the solution.

Precautions for use (NK)

1. Installation and operation.Before installing and operating this chiller, you should read manual(s).

2. WARNING

Don´t store or use gasoline, thinner or other flammable vapors, liquids and materials in the vicinity of chiller.

3. Machine room.

Please keep the machine room temperature between 5°C(41°F) and 40°C(104°F), for protection of the solution crystalization during chiller shutdown.Please keep the humidity in the machine room whithin 90%.Please keep the service maintenance space as shown dimensions drawing.

4. Purging.Be sure not to leak the air into the chiller at any cases.(Refer to the manuals.)The chiller has Paladium cell for auto purge system, there for don´t turn off the main supply power to chiller during chiller shut down, too.

5. Pumps and Air hundling units.Operate the chilled water pump(s) and air handling unit(s) during dilution cycle operation of the chiller.During the chilld water pump(s) operation. never stop the cooling water pump(s) by manual.

6. Winter seasonIn winter, Don´t freeze the chilled and cooling waters in the pipe line during chiller shut down.When the cooling water pump(s) operate for freeze protection of cooling water, please operate chilled water pump(s) simultaneouly.

7. Service maintenanceIt is necessary to check on the chiller periodically.Please contact to service agent.

8. In case to give serious infliction by chiller´s trouble, please install stand by chiller.