QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES
GUIDELINES AND SUPPORTING DOCUMENTS FOR IMPLEMENTATION OF POLICIES AND PROCEDURES TO ENSURE THAT ALL ROAD, BRIDGE AND UTILITY DESIGN SUBMITTALS TO THE DESIGN SECTION MEET MUNICIPALITY OF ABU DHABI CITY QUALITY STANDARDS.
Content
1 Quality Assurance Plan 4
1.1 Introduction 6
1.2 Quality Assurance Form 8
1.3 Design Completion Certificates 10
1.4 Design Review Checklists 12
1.5 Submittals for Roads, Structures & Utilities 14
2 Quality Control Plan 16
3 Consultant Evaluation 20
3.1 Introduction 22
3.2 Design Submittal Evaluation 24
3.3 Rating Definitions 26
3.4 How the ADM Reviewers Evaluate the Submittal 28
Appendix 30
Form 1 32
Quality Assurance Form 32
Form 2 33
Design Completion Certificates 33
Form 3 34
Consultant Evaluation Form 34
Checklists 36
Checklist No. 1 – Plans to be submitted at Each Stage 36
Checklist No.2 - CIVIL – (Conceptual Design Stage) 38
Checklist No.3 – CIVIL – (Preliminary Design Stage) 40
Checklist No.4 – CIVIL (For all stages) 41
Checklist No.5 – CIVIL (for all stages) 42
Checklist No.6 – Structures (Concept Design Stage) 50
Checklist No.7 – Structures (Approval in Principle Report) 54
Checklist No.8 – Structures (Preliminary Design Stage) 61
Checklist No.9 – Structures (Detailed Design/Final Design Stage) 62
Checklist No.10 – Structural Drawings for all Stages 63
Checklist No.11 – Utilities (For Concept Design Stage) 66
Checklist No.12 – Utilities (Preliminary Design Stage) 67
Checklist No.13 – Utilities (For all stages) 68
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
6
1.1 Introduction
The purpose of these
procedures is to
enable consultants to
demonstrate to the
Municipality of Abu
Dhabi City (ADM) that
they are incorporating
effective quality control
measures into the
design process.
The increased awareness and
documentation from following
these procedures will provide ADM
with heightened confidence in the
quality of design submittals and
promote uniformity, consistency,
and reduced review time, resulting
in quicker turnaround times for
design submittals.
These procedures are not intended
to replace the quality control
measures that are currently in use,
but rather to promote awareness
regarding the importance of
quality control throughout the
design process. Computation
sheets and drawings must still be
initialled by the designer and the
checker, as per current practice,
and the review of items should still
be carried out independently by
qualified assessors.
8
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
The project manager must
complete the Quality Assurance
Form (Form 1) and include it
with each submittal stage. The
consultant’s reviewer must sign
the form and type his name below
the signature line. The item blank
will generally correspond to the
appropriate checklist in Appendix,
which must be completed by the
reviewer. If any numbered items
are not applicable for a specific
project, they should be marked
with a “N/A” (Not Applicable) in
the reviewer space. When items to
be reviewed do not correspond to
a number in the checklist, a short
description should be included in
the item space.
The Quality Assurance Form must
be signed by the designer and the
consultant’s reviewer, and then
approved by a professional or
qualified engineer. Prior to each
submittal, the project manager
must review the plans to ensure
consistency between sheets,
completeness and overall content.
This will include verifying that
the proper number of plans and
items, such as construction cost
estimates, are included with the
submittal. The project manager
should submit a design review log
sheet that includes all comments,
which will confirm that all
requested revisions from previous
submittals have been made or
communicated.
Providing the name and the
contact details of the consultant’s
project manager is important for
future communication between
him and the ADM project manager.
Telephone conversations are
encouraged to clarify items or
answer questions during the review
process. The remarks section can
also be used to list any requested
revisions that were not made with
an acceptable reason; however, the
project manager is encouraged to
discuss these items with the ADM
reviewer prior to the submittal.
1.2 Quality Assurance Form
10
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
1.3 Design Completion Certificates
Similar to the Quality Assurance
Form, the Design Completion
Certificates Form must be
completed and signed by the
project manager, the designer
and the verifier to certify that
the consultant has used his
professional skill and care to
produce the submittal.
This form is to be submitted at
each design stage. Refer to Form 2
of the appendices for the form and
the certificate.
12
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
The Municipality of Abu Dhabi City Roads Design Section has prepared these checklists to serve as guidelines for design consultants during the design review process and to submit to ADM as part of each design submittal. ADM expects consultants to use design review checklists for all design submittals. Care must be taken to ensure that the checklists cover the most critical aspects and considerations of a design. The consultant’s reviewer must sign the applicable checklists and type his name at the bottom.
For design review checking to be effective, the reviewer must be an individual with in-depth knowledge of the relevant discipline. It is also important that he not be the creator of the calculation or drawing being checked. This enables the ADM reviewer to bring an impartial perspective to the review, helping to ensure that the intentions of the designer are accurately conveyed to the calculations and drawings.
The size of the project will dictate how much information is contained on each drawing. More than one drawing checklist may have to be applied to check a single drawing, if it contains more than one design discipline. For example, under
certain circumstances, a single drawing may contain utilities, existing conditions and proposed plans. In this case, each of the three relevant checklists would be applied to the drawing. In other cases, a single checklist may have to be applied to several drawings.
In order to ensure the accuracy of calculations, calculation checking should be a two-step process. The first step is to verify the validity of all assumptions, given parameters, and formulation. The second step is checking the numerical values for accuracy.
The purpose of checking is to ensure that everything is accurate and consistent, and that each drawing properly and adequately relates to the others in the set, reflects the design analysis, uses the current standards of presentation, and provides all details needed for construction. All design review checklists for common design elements can be found in the appendices. It should be noted that these samples are not comprehensive, and ADM expects consultants’ reviews, prior to submittal, to be more thorough and exacting, when and where required.
1.4 Design Review Checklists
14
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
15
Bridges and HighwayStructures
5. Conceptual Design Stage
(10%); Checklist No.1
and Checklist No.10
(Design Drawings), the
conceptualisation of
solutions and development
of alternative concepts is
outlined in Checklist No.6
(Concept Design Report)
6. Preliminary Design Stage
(60%); Consultant will use
the Approval in Principle
(AIP) document for selected
alternative based on ADM’s
structural design guidelines
and criterion mentioned in
Checklist No.7 (Approval
in Principle) for ADM’s
approval. Checklist No.1,
Checklist No.10 (Design
Drawings) and Checklist
No.8 (Preliminary Design)
7. Detailed Design/Final
Design (100%); Checklist
No.1 and Checklist No.10
(Design Drawings), Checklist
No.7 (Updated Approval in
Principle), Checklist No.9
(Detailed Design/Final Design)
Utilities
8. Conceptual Design Stage
(20%); Checklist No.1 and
Checklist No.11 (Design
Concept Report)
9. Preliminary Design Stage
(30%); Complete Design –
Checklist No.1, Checklist
No.12 (Preliminary Design
Report) and Checklist No.13
(Drawings)
10. Detailed Design/Final Design
(50%); Complete Design –
Checklist No.1, Checklist
No.12 and Checklist No.13
These checklists are meant to
be used as guides and are not
all-inclusive. Their purpose is to
provide a minimum acceptable
list of items that are to be
independently reviewed prior to
submittal; the consultant may
propose additional items to be
checked in the development of
the design for approval. With the
completion of each design stage,
the consultant is required to make
a formal presentation to ADM,
describing the work completed and
the details of the design itself.
All checklist forms can be found
in the appendices. Checklist No.1
details the plans to be submitted
at each stage. It should be
seen as a guide for consultants,
although the ADM project
manager or reviewer may request
additional drawings at any stage.
Consultants are not required to
submit a complete set of drawings
at every stage, but rather only to
submit those required by ADM for
the particular design stage.
Design Review Checklists should
be used for all stages of the design
process, as follows:
Roads
1. Pre-Study Stage (10%)
2. Conceptual Design Stage
(30%); Checklist No.1,
Checklist No.2 (Design
Concept Report)
3. Preliminary Design Stage
(60%); Checklist No.1,
Checklist No.3 (Preliminary
Design Report), Checklist
No.4 and Checklist No.5
(All Drawings)
4. Detailed Design/Final Design
(100%); Checklist No.1,
Checklist No.4 and Checklist
No.5
1.5 Submittals for Roads, Structures & Utilities
18
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
2.0 Quality Control Plan
Consultants bear full responsibility for the accuracy, completeness, consistency and uniformity of their plans, calculations, and related documents furnished under the scope of services. To help ensure that accuracy and completeness, ADM requires consultants to implement and follow a quality control plan.
A meaningful quality control plan must be in place before design work begins, and must remain in effect throughout the duration of the design contract. At a minimum, a functional quality control plan establishes processes to ensure the following:
• All final plans and calculations are checked, back-checked, verified and approved. Checking should be done independently by a second party. The assessor must be an experienced engineer who has not participated in the production of the design plans. Check prints of all drawings and calculations are to be maintained for a minimum of seven years from the completion of a design contract.
• All related correspondence and memoranda are received by authorised persons and maintained in the project files within an established document control system.
• Cross-checking has been carried out to avoid any mismatch and/or discrepancy between the documents (e.g. profiles match plans, drawings match specifications and BOQ, etc.).
• Overall appearance, format and content of the deliverables correspond to the expectations of ADM.
The consultant is expected to perform an internal quality control review of deliverables at all stages of design completion. These reviews are to be carried out by experienced engineers in the relevant disciplines. The purpose of these reviews is to satisfy the consultant that deliverables are of a quality that is acceptable to ADM and to the consultant itself. ADM may request that the consultant update its quality control plan at any stage of the design process, in order to enhance its functionality.
22
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
3.1 Introduction
To monitor the quality of
deliverables prepared by
consulting firms and to
evaluate the performance
of consultants at each
design stage, ADM project
managers must complete
consultant evaluation
forms, and provide a
copy of each evaluation
to the consultant for their
records and necessary
corrective actions.
The consultant has the right to
question any or all of the ratings.
The results of evaluations will be
referenced by ADM when selecting
consultants for future projects.
24
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
3.2 Design Submittal Evaluation
The blank Consultant Evaluation
Form (Form 3) must be attached
to all submittals of plans and/or
reports to be reviewed.
ADM project managers use this
form when a consultant makes a
submittal. He must complete the
general project information and the
coordination team rating items. On
the middle left of the evaluation
form, the project manager indicates
the type of plans and/or reports that
have been submitted. Items to be
rated are located on the right of the
evaluation form. The ADM reviewer
rates the items found in the middle
right, under “ADM Reviewer’s
Rating Items”.
The rating to be used is found at
the lower right of the evaluation
form. At the very bottom of
the form is the final area to be
completed by the reviewer. In this
area, the reviewer can indicate
what plans and/or reports are to be
submitted next. The last line on the
form is for the reviewer to sign and
date the completed evaluation.
26
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
3.3 Rating Definitions
The review of each submittal will
be performed by ADM, providing
the consultant with a clear
understanding of how the quality
of work is being perceived by ADM
as the project progresses. The
review of completed evaluations
is extremely important to the
consultant’s project manager
because the evaluation reflects
the comments within the reviewed
plans and/or reports. If the
consultant has any questions
regarding the given rating, the
ADM reviewer must answer these
questions.
The ratings range from a high
of 5 to a low of 1. A rating of
3, 2, or 1 indicates that the
reviewer assessed the item under
consideration as not satisfactory.
The general interpretations of the
ratings are as follows:
5. Excellent: Consultant performed beyond expectations; submittal approved with very minor comments.
4. Good: Several revisions required; submittal approved with comments to be incorporated in next stage.
3. Average: Many revisions required, mostly minor but several major comments; submittal returned for revision and resubmittal.
2. Poor: Many major comments; submittal not accepted.
1. Unsatisfactory: Full of mistakes and major comments, poor document quality; submittal not accepted and returned to consultant with notice of concern from ADM.
28
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
29
4. Plan/Report Quality: All
material submitted at each
stage of development, such as
plans, Design Summary Report
(DSR), design computations,
special provisions, and any
other supporting material, will
be evaluated. Ratings will be
based on presentation, legibility,
structure and print quality.
5. Engineering Judgement: The
rating of this item is subjective
to the evaluator. If it is felt that
good or poor judgement was
used, this will be reflected in
the given rating. Engineering
Judgement will be evaluated
for areas such as value
engineering, rehabilitation
options, project constructability,
selection of construction
materials, and maintenance of
traffic scheme.
6. Documentation of Work:
This item will be rated based
on how well each design
decision is documented, or if
the decisions were documented
at all. The majority of the
documentation will be found in
the Design Summary Report,
but documentation may also be
found elsewhere.
7. Procedure/Standard
Compliance: This category
will evaluate how well the
consultant is familiar with local
policies, and will consider
how well the consultant uses
the available standards and
guidelines, as well as whether
the standards and guidelines
were effectively implemented
in the design. This category
will also evaluate how well the
consultant follows established
procedures for specific
items, including foundation
reviews, final plans submittal
memorandum to the Contract
Section, etc.
8. Quality Assurance: The ADM
reviewer will rate this category
based upon the consultant’s
compliance with the Quality
Assurance Guidelines. Design
computations should be
initialled by both the design
engineer and a second
engineer, who has reviewed
the design engineer’s work.
This item rating is intended to
monitor how well the consultant
has performed the evaluation of
checks and balances required
for quality assurance, including
the submittal of the Quality
Assurance Evaluation Form.
9. Cooperation: This rating
is based on how well the
consultant cooperates with
the ADM reviewer when
changes are required and
requested. Willingness to attend
meetings, timely response
to ADM’s queries, and ease
of participation for project
development will also be
reflected in this category.
Form 3 illustrates the items to be
evaluated at each project stage.
The following briefly describes
each item:
1. Design Concept: The
consultant’s submittal will be
evaluated on the completeness
of the proposed design concept.
The term completeness
encompasses how well the
consultant has thought through
all of the necessary factors that
result in the best possible design.
If certain items omitted from the
design concept are detrimental to
the design, a lower rating will be
issued. The evaluation will also
consider how well the consultant
addressed any encountered
obstacle that was not foreseen
at the time of completion of the
Engineer’s Report.
2. Critical Design Elements:
Failure to satisfactorily address
all applicable design criteria will
result in a rating no higher than 3.
3. Calculations: The operations
of mathematical computations
and deletions and/or additions
to the computations are
areas of scrutiny. With the
implementation of the Quality
Assurance Program, how
well the computations were
executed will not be examined
as thoroughly as in the past.
However, spot-checking will
occur and the rating of this item
will reflect the spot-checking.
The scoring will be as follows:
a. A major error is defined as
an error originating from the
computations that would result
in a significant design change.
b. A minor error is one that would
pose no significant change to
any element of the design. If
computations are not submitted
because of the nature of the
submittal or because they are not
warranted, this item will not be
rated. If the reviewer believes that
some computations were needed
but failed to be submitted, the
reviewer will not rate this category
on this basis alone; this would be
addressed in the Documentation
of Work item, thereby avoiding
double penalties.
3.4 How ADM Reviewers Evaluate Submittals
32
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
33
Form 1Quality Assurance Form
Form 2Design Completion Certificates
ADM Quality Assurance Form(Consultant to complete this section)
Consultant:
Project No.:
Project Description:
Submittal Stage:
This submittal has been reviewed with regard to consistency, completeness, and overall content prior to
submittal by , Project Manager, on _ , 2011, telephone number __________
(Reviewer to complete this section)
The submittal described above has been reviewed for quality in accordance with ADM Quality Control and
Quality Assurance Procedures
The consultant is responsible for checking all of their work as outlined in ADM Quality Control and Quality
Assurance Procedures. The table shown below indicates which of the reviewer’s personnel has reviewed
which checklist.
Checklist No. Designer Reviewer Approved By Date
Please insert the following as part of the submission:
Design Revision Log
NOC’s Status
Design Certificate
Form of Certificate to be used by the Designer for certifying the design of the Works in accordance with the
Client’s requirements.
WE CERTIFY THAT -
1. We have used reasonable professional skill and care in preparation of the Design Data for ………. Design listed below which:
(a) Satisfy the Employer’s Requirements, the Contractor’s Proposals, and the following:(List, if any, the changes covered by any Change Certificate received and countersigned by the Employer’s Agent); and
(b) Comply with the design requirements of the Contract; and
2. We have used reasonable professional skill and care in translating the Design Data into safe design and drawings whose unique numbers is listed below.
3. The Design Data where used as part of the Temporary Works will have no adverse effect on the Permanent Works; and
4. Where required a Safety Audit Certificate for Stage *[2] *[3] is attached.
LIST OF DESIGN DATADesigner Name: ............................………………........…Signed: ..........................…………………........ Date: ...........................……………….......….
Verifier Name: ............................………………........…Signed: ..........................…………………........ Date: ............................……………….......….
Project Manager/ ApproverName: ............................………………........…Signed: ..........................…………………........ Date: ...........................……………….......….
34
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
Form 3Consultant Evaluation Form
Project No.: Contract: Location:
Work Type:
Consultant:
Consultant Project Manager:
Description:
Submittal Stage:
Reviewer’s Rating Items Score
Design Concept __
Critical Design Elements __
Calculations __
Plan/Report Quality __
Value Engineering / Engineering Judgment __
Documentation of Work __
Procedure Compliance __
Quality Assurance __
Scheduling / Cooperation __
Included With This Submittals Are:
Markups of:
Computations: __
Cost Estimate: __
Quantities: __
Q.A. Form: __
Other: Remarks
ADM Reviewer’s Signature: Date:
ADM Reviewer’s Printed Name and Phone Number
5 = Excellent 4 = Good 3 = Marginal 2 = Poor 1 = unsatisfactory
36
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
37
2.0 STRUCTURAL
2.1 S0 – List of Drawings X X X
2.2 S1 – General and Design Notes X X X
2.3 S2 – Site Location and Bore Holes Location Plans X X X
2.4 S3 – General Arrangement Drawings X X X
2.5 S4 – Dimensional Details X X
2.6 S5 – Bearings and Expansion Joints Details X X
2.7 S6 – Reinforcement and Post Tensioning Details X
2.8 S7 – Miscellaneous Details X X X
3.0 UTILITIES
3.1 U1 – Existing Condition X X X
3.2 U2 – Utility Plans X X X
3.3 U3 – Service Reservations and Duct Plans X X X
3.4U4 – Miscellaneous Utilities Details, Compliance with ADM and other stakeholders’(i.e. UPC, DOT, PRFD, etc.) guidelines and criteria are specified
X
3.1 ELECTRICAL
3..1.1E1 - Electrical, Lighting, / CCTV Plan , Scada System and Lightning Protection if it is required.
X X X
3.1.2 E2 - Decorative Lighting or not decorative Plan X X X
3.1.2 E3 - Lighting Plan for Miscellaneous Roadway Structures X X X
3.1.3 E4 - Lighting Plan for Miscellaneous Other Facilities X X
3.2 MECHANICAL
3.2.1 M1 - Mechanical Services for Pedestrian Underpass, Bridges X X X
3.2.2M2 - Mechanical Services for Stormwater, Fountains and Fire Protection
X X X
3.2.3M3 - Mechanical Services for Miscellaneous Facilities and Scada System
X X
ChecklistsChecklist No. 1 – Plans to be submitted at Each Stage
Item No
Drawings to be submitted Conceptual
Design StagePreliminary
Design StageDetailed/ Final Design Stage
1.0 CIVIL
1.1 G1- Location Plan X X X
1.2 G2 – List of Drawings X X X
1.3 C1 – Typical Cross Sections X X X
1.4 C2 - Existing Conditions X X X
1.5 C3 – General Plan and Profiles X X X
1.6 C4 – Design Detail Plans X
1.7 C5 – Grading Plans X
1.8 C6 – Proposed Plans X X X
1.9C7 – Survey Control and Alignment
PlansX X
1.10 C8 – Ramp Terminal Details X
1.11C9 – Maintenance of Traffic and
Construction StagingX X
1.12C10 – Traffic Control Devices – Signs
and Pavement MarkingsX X
1.13 C11 – Miscellaneous Details X
38
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
39
ChecklistsChecklist No.2 - CIVIL – (Conceptual Design Stage)
Item No Document Type:Design Concept Report
(DCR) and Alternative Design Concepts
Item to be Checked Y N N/A Remarks
1 The scope of work is clearly defined
2 All applicable codes and standards are specified
3Compliance with ADM and other stakeholders’(i.e. UPC, DOT, PRFD, etc.) guidelines and criteria are specified
4
Survey and geotechnical investigation requirements and methods are defined (i.e. coordinate system, datum, benchmarks, soil investigation requirements for compaction and structures)
5 Existing site data
6Roadway classifications, design vehicle, design/posted speed are specified.
7Horizontal curve radius, normal cross slope, maximum super elevation (SE), SE transition, curve widening requirements are specified
8Typical cross section details; lane width, number of lanes, shoulder width, sidewalk and median widths, landscape zone and bikeway dimensions (if applicable), parking dimensions
9 Horizontal and vertical sight distance computation
Item No Document Type:Design Concept Report
(DCR) and Alternative Design Concepts
Item to be Checked Y N N/A Remarks
10 Vertical grades, K values, vertical clearance are specified
11 DOT’s circular for parking demand rates
12 Kerb/barrier parameters and clear zone are specified
13Bus/taxi stop requirements, geometric details and proposed locations
14 Tram routes and dimensions (if applicable)
15 Roundabout geometric details (if applicable)
16Interchange alternatives (if applicable); pros and cons of each alternative, interchange spacing, ramp terminal computation, etc.
17 Pavement design parameters and formula
40
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
41
ChecklistsChecklist No.3 – CIVIL – (Preliminary Design Stage)
ChecklistsChecklist No.4 – CIVIL (For all stages)
Item No
Document Type:Preliminary Design
Report (PDR)
Item to be Checked Y N N/A Remarks
1 NOI’s (Notice of Intent) sent to consultants and authorities
2Liaison with the other stakeholders; minutes of coordination meetings held, design review log, critical issues, etc.
3Detailed Site Data; survey and investigation results, and information received from consultants and agencies. In depth analysis of the data.
4Traffic Impact Study (TIS) report and findings; average daily traffic (ADT), existing and proposed traffic circulation, parking demand/supply, existing and proposed pedestrian and bike paths, access/egress details, weaving analysis, etc.
5 Detailed cross sections (including existing and proposed service corridors)
6 Design progress report on the selected alternative by the Department
7 Approval of ADM and/or other stakeholders for the design items departing from standards
8Feasibility Study (FS) - Preliminary engineering calculations according to FS IRI ADM requirements.
9 Value Engineering (VE) proposals including MEP Services
10Constructability issues and solutions (i.e. excavation limits for tunnels, availability of detour areas, existing utility constraints, etc.) based on IRI ADM Sustainability Guideline
11Proposed location of critical utilities and structures (i.e. substations, pump stations…etc), and coordination with relevant agencies
12 Proposed guide sign locations and destination names (if applicable)
13 Cost Estimate
Item No
Document Type: All Drawings
Item to be Checked Y N N/A Remarks
1 Correctness of line weights, lettering sizes, and style
2 Correctness spelling, punctuation, and grammar
3 Details are clear and easy to read
4Title block has correct formats; project name and number, Department name, consultant name, signature boxes (design/review/approve), drawing title and number
5 Drawing title and number is consistent with the “List of Drawings”
6Consistency of project title and identification with specifications, the Bill of Quantities, and other Contract Documents
7 North arrow, street names, sector names, plot numbers, directions are shown
8 Location map (if needed) is accurate and proper area is highlighted
9Legend is included (if needed) and representing the elements on the drawing (i.e. no unnecessary legend)
10 Notes referring to standards and/or other drawings are accurate
11 Match lines are consistent with referenced drawings
12 Drawing is on accurate coordinate system; Northing and Easting gridlines are accurate
13 Limit of construction (LOC) is shown
14 Symbols and abbreviations are matching with the typical details
42
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
43
ChecklistsChecklist No.5 – CIVIL (for all stages)
Item No
Document Type:Drawings Specific to Each
Discipline
Item to be Checked Y N N/A Remarks
1.0 G1 – Location Plan
1.1 Scale is correct (as per ADM Consultant Procedure Manual)
1.2Existing and future developments in the vicinity of the project is shown
1.3 Traffic directions and destinations are shown
2.0 G2 – List of Drawings
2.1Drawing sequence, numbering and titles are as per ADM Consultant Procedure Manual
2.2Drawing number and title shown in the list is consistent with the information on the drawings
2.3 Amendments are shown (i.e. addendum, revision, deletion)
3.0 C1 – Typical Cross Sections
3.1All typical sections in the project are shown; check the cross section against the plan view
3.2 Typical section is as per the approved design criteria
Item No
Document Type:Drawings Specific to Each
Discipline
Item to be Checked Y N N/A Remarks
3.3Pavement section is designed as per the pavement calculation which is reviewed and approved by the Department
3.4Kerbs, barriers, pavement type, geometric details, cross slope/SE, definitions (i.e.lane, aux. Lane, median, shoulder, sidewalk, landscape, SR,etc.), centerline are properly shown.
3.5The limits (from/to station) should represent the correct typical section, any transition section should be shown seperately; check the stationing against the proposed plans
3.6 Side slopes, toe/top of slope are shown
3.7 Limit of construction, plot/building lines are shown
3.8The section contains the proposed improvement and removal of existing features; identifies all payment items
4.0 C2 – Existing Conditions
4.1 Existing centreline and road names are shown
4.2 Existing service reservation and surface utility features are shown
4.3Existing buildings/plots, trees, and other structures (i.e. seawall, bridge, etc.) are shown
4.4 Existing traffic directions/circulation and destinations are shown
44
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
45
ChecklistsChecklist No.5 – CIVIL (for all stages)
Item No
Document Type:Drawings Specific to Each
Discipline
Item to be Checked Y N N/A Remarks
5.0 C3 – General Plan and Profiles
5.1 All roadway paving types are hatched on the plan
5.2 Paving types are matching with the typical cross sections
5.3Service reservation (existing to remain and proposed) is shown on the plan
5.4 Kerb/barrier types are shown on the plan
5.5Existing and proposed structures (i.e. bridges, wingwalls, outfall structure, lifting station, etc.) are shown on the plan
5.6Cross section locations to be shown on the plan and shall be consistent with C1 series drawings
5.7All removals are shown on the plan, and materials to be salvaged are covered by notes or specifications
5.8 Check existing ground elevations against the survey data
5.9Vertical alignment calculations are as per the approved design criteria; i.e. minimum grade for proper drainage, K values, cross slope and superelevation, vertical sight distance, etc.
5.10Compare vertical alignment data against calculations and design software output
Item No
Document Type:Drawings Specific to Each
Discipline
Item to be Checked Y N N/A Remarks
5.11Structures (i.e. bridges, tunnels, walls) and major utilities (i.e. pipelines, power lines) are shown on profile with the vertical clearance information
5.12Locations of crossing and intersecting roads shown on the profile and proposed elevations are matching with crossing and intersecting roads’ elevations
6.0 C4 – Design Detail Plans
6.1 Project specific details as required by the Department
7.0 C5 – Grading Plans
7.1Grading plans prepared for all intersections and merging/diverging roads; i.e. roundabouts, signalized/unsignalized intersections, T-junctions, ramp terminals, etc.
7.2 Grading plan is matching with the profile(s) and typical section
7.3Roadway drainage is properly maintained with the proposed grading plan
7.4Finish-grade elevations are specified at 10 -meter intervals at the roadway centerline, curb lines, and at geometric break points. The intervals shall be reduced as needed.
7.5Grading plans for roundabouts are as per AASHTO and other international desing guidelines for roundabouts
8.0 C6 – Proposed Plans
46
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
47
ChecklistsChecklist No.5 – CIVIL (for all stages)
Item No
Document Type:Drawings Specific to
Each Discipline
Item to be Checked Y N N/A Remarks
8.1Centerline / reference line information is shown (i.e. centerline name, stationing every 100m, POB/POE, CT/TC/CTC, any stationing equation)
8.2All dimensions are shown; widths, radius, tapers, transitions, island nose locations (Station/Offset), begin/end kerbs and barriers, etc.
8.3All geometric details are as per the approved design criteria by the Department
8.4 Traffic circulation/directions are shown
8.5 Service reservation corridor is shown
8.6Location of structures (i.e. bridges, tunnels, walls) and major utilities (i.e. pipelines, power lines) are shown
8.7 Work to be done by others is properly annotated
8.8 Limits of construction cover entire area of construction
9.0 C7 – Survey Control and Alignment Plans
9.1All control points are approved by ADM/TPD, and checked/verified by the Consultant by setting up traverse
9.2Coordinate system and datum are as per the approved design criteria by the Department
Item No
Document Type:Drawings Specific to
Each Discipline
Item to be Checked Y N N/A Remarks
9.3Horizontal alignment calculations and data are as per the approved design criteria by the Department
9.4Alignment calculations and design software output is matching with the alignment data on the drawings
9.5Alignment data and curve data information is matching with the geometry on the plan
9.6 Horizontal sight distance is checked
9.7 Numbering for alignment points and curves to sequential and not repeated
10.0 C8 – Ramp Terminal Details
10.1Exit and entrance ramp terminal details (acceleration/deceleration length, auxiliary lane, taper lengths, weaving distance) are as per the approved design criteria by the Department and other international standards (i.e.AASHTO)
10.2Ramp terminal geometry is matching with the horizontal alignment data (i.e. no kinks or mismatch coordinates)
11.0 C9 – Maintenance of Traffic and Construction Staging
11.1 Check constructability of the project with the proposed detour
11.2Maintenance of traffic and construction staging has been reviewed and coordinated with the other stakeholders (AD Traffic Police, DOT, utility agencies), and verify any necessary permits and licenses have been obtained
48
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
49
ChecklistsChecklist No.5 – CIVIL (for all stages)
Item No
Document Type:Drawings Specific to
Each Discipline
Item to be Checked Y N N/A Remarks
11.3Access to sectors, plots, pedestrian paths have been maintained at all times during construction
11.4 Alternative routes proposed for the drivers with adequate signage
11.5 Transition between construction stages is adequately addressed
11.6All temporary works are properly labelled as such and that descriptions match the pay items
11.7Safety has been considered by all means; i.e. proper lane drops, proper signage and marking, additional traffic control devices such as crush cushions and portable VMS (variable message signs) have been proposed
12.0 C10 – Traffic Control Devices – Signs and Pavement Markings
12.1Traffic signs and pavement markings are as per ADM’s Traffic Control Devices Manual and approved design criteria by the Department (i.e. all signs and markings are as per the approved design speeds and roadway classifications)
Item No
Document Type:Drawings Specific to
Each Discipline
Item to be Checked Y N N/A Remarks
12.2Existing structures and utilities are considered while locating the proposed signs in order to avoid any obstruction to signs.
12.3 Pedestrian walkways and bikeways are not interrupted by the signs
12.4Proposed pavement marking is tieing in with the existing pavement marking properly (i.e. no kinks, no sudden change in width and type)
12.5Signs and pavement markings has been reviewed and coordinated with the other stakeholders (AD Traffic Police, DOT)
12.6Safety has been considered by all means; i.e. proper lane drops, proper signage and marking, additional traffic control devices such as crush cushions, etc.
13.0 C11 – Miscellaneous Details
13.1 Project specific details as required by the Department
50
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
51
ChecklistsChecklist No.6 – Structures (Concept Design Stage)
Item No
Document Type: Concept Design Stage
Item to be Checked Y N N/A Remarks
1.0 General
1.1 ADM Structural Design Guidelines Adopted
1.2 Applicable Codes and Standards Adopted
1.3 Purpose/Function of the Structure Identified
1.4 ADM IRI Sustainability Guideline
2.0 Roadway Design Features
2.1Horizontal Clearances, Vertical Clearances. Existing Restrictions, Typical Cross Sections etc. considered
3.0 Geotechnical Investigation
3.1 Available Information and Recommendations
4.0 Selection of Structural Elements
4.1 Span Arrangement
Item No
Document Type: Concept Design Stage
Item to be Checked Y N N/A Remarks
4.2 Typical Cross Section
4.3 Initial Dimensions
4.4 Type of Hand/ Traffic Railing
4.5 Type of Superstructure
4.6 Articulation Arrangement /Type of Bearings/Type of Expansion Joints
4.7 Type of Abutment, Pier, Foundation
4.8 Type of Retaining wall
4.9 Signage Structures
4.10 Protection Structures
4.11 Other Structures
5.0 Selection of Materials
52
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
53
ChecklistsChecklist No.6 – Structures (Concept Design Stage)
Item No
Document Type: Concept Design Stage
Item to be Checked Y N N/A Remarks
5.1 Concrete, Reinforcement Steel, Pre stressing Steel, Structural Steel
6.0 Design Considerations
6.1 Design Specifications
6.2 Service Life
6.3 Durability Considerations
6.4 Analysis and Design Methodology
6.5 Construction Sequence
6.6Operational Considerations Crack Sensitivity (Gas Tightness/Liquid Retaining) Vibration, Wind and Fire Sensitivity
6.7 Permanent Loads
6.8 Live Loads
6.9 Other Loads
6.10 Deflection/Camber (Vertical/Incremental/Lateral)
7.0 Other Considerations
7.1 Structure Drainage and Stormwater Systems
7.2Lighting System over and under Structure Compliance with ADM and other stakeholders’(i.e. UPC, DOT, PRFD, etc.) guidelines and criteria are specified
7.3Existing Site Condition/ Constructability and IRI ADM Sustainability Guideline
7.4 Proposed Arrangements for Maintenance and Inspection
7.5 Utilities Carried through or Affected by the Structure
7.6Environmental & IRI ADM Sustainability Guideline & Environmental &Considerations
7.7 Risk and Hazards Considerations
7.8 Execution of Work, Traffic Management and Utilities Diversion
7.9 Coordination with all Concerned Authorities and Any Special Conditions
7.10 Time (Design, Coordination and Execution)
7.11 Cost (Initial, Final and Maintenance)
54
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
55
ChecklistsChecklist No.7 – Structures (Approval in Principle Report)
Item No
Document Type:Approval in
Principle (AIP)
Item to be Checked Y N N/A Remarks
1.0 General
1.1 ADM Structural Design Guidelines
1.2 Applicable Codes and Standards and Other References
1.3 Design Verification Process
2.0 Architectural/ Aesthetics
2.1 Overall Scheme
2.2Pedestrian/ Traffic Railing, Pier, Abutment, Retaining Wall, Movement Joints, Drainage System etc.
3.0 Roadway Design Features
3.1 Proposed Horizontal and Vertical Clearances and Existing Restrictions
3.2Proposed Geometric Design (Typical Cross Sections, Type of Road, Permitted Speed etc.)
4.0 Geotechnical Information
Item No
Document Type:Approval in
Principle (AIP)
Item to be Checked Y N N/A Remarks
4.1 Available Information
4.2 Acceptance of Recommendations of the Geotechnical Report
5.0 Description of Structure
5.1 Pedestrian/ Traffic Railing
5.2 Superstructure
5.3 Sub Structure
5.4 Articulation Arrangement
5.5 Foundation
5.6 Others
6.0 Materials
6.1 Concrete
56
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
57
ChecklistsChecklist No.7 – Structures (Approval in Principle Report)
Item No
Document Type:Approval in
Principle (AIP)
Item to be Checked Y N N/A Remarks
6.2 Reinforcement
6.3 Pre-stressing Strands
6.4 Structural Steel
7.0 Durability Considerations
7.1 Concrete Strength/ Steel grade
7.2 Minimum Concrete Cover
7.3 Concrete Crack Control
7.4 Concrete and Steel work protection
7.5 Concrete Surface Finish
7.6 Waterproofing
7.7 Other Durability Considerations
Item No
Document Type:Approval in
Principle (AIP)
Item to be Checked Y N N/A Remarks
8.0 Structural Design
8.1 Design Specifications
8.2 Service Life
8.3 Structural Analysis and design Methodology
8.4 Construction Methodology
8.5Operational Considerations Crack Sensitivity (Gas tightness/Liquid and retaining) Vibration, Wind and Fire Sensitivity
8.6 Load Modifier, Load Factor , Resistance Factors etc.
8.7 Permanent Loads
8.8 Dead Load
8.9 Superimposed Load
8.10 Utilities Load
58
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
59
ChecklistsChecklist No.7 – Structures (Approval in Principle Report)
Item No
Document Type:Approval in
Principle (AIP)
Item to be Checked Y N N/A Remarks
8.11 Live Loads
8.12 Pedestrian Live Load
8.13 Vehicular Live Load including Dynamic, Centrifugal and Braking Effects
8.14 Exceptional Abnormal Load
8.15 Rail Transit Load
8.16 Live Load Surcharge
8.17 Vehicular Collision Load
8.18 Earth Load
8.19 Earth Fill
8.20 Earth Pressure (Earth pressure coefficients)
8.21 Water Load/ Uplift Load
Item No
Document Type:Approval in
Principle (AIP)
Item to be Checked Y N N/A Remarks
8.22 Temperature, Shrinkage, Settlement
8.23 Friction Force
8.24 Vessel Collision Load
8.25 Other Loads
8.26 Wind load
8.27 Earthquake load
8.28 Fatigue
8.29 Plant and equipment load
8.30 Construction Load
8.31 Any Special loading not covered above
8.32 Deflection/ Camber (Vertical/incremental/Lateral)
60
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
61
ChecklistsChecklist No.7 – Structures (Approval in Principle Report)
ChecklistsChecklist No.8 – Structures (Preliminary Design Stage)
Item No
Document Type:Approval in
Principle (AIP)
Item to be Checked Y N N/A Remarks
9.0 Other Considerations
9.1Structure Drainage System Compliance with ADM and other stakeholders’ (i.e. UPC, DOT, PRFD, etc.) guidelines and criteria are specified
9.2Lighting system on and under structure Compliance with ADM and other stakeholders’(i.e. UPC, DOT, PRFD, etc.) guidelines and criteria are specified
9.3 Farthing and Stray Currents requirements
9.4 Existing Site Condition
9.5 Proposed arrangements for Maintenance and Inspection
9.6Utilities Carried Through or Affected by the Structure Compliance with ADM and other stakeholders’(i.e. UPC, DOT, PRFD, etc.) guidelines and criteria are specified
9.7 Environmental & IRI ADM Sustainability Guideline considerations
9.8 Risk and Hazards considerations
9.9 Execution of work, Traffic Management and Utilities Diversion
9.10 Coordination with all Concerned Authorities and any Special Conditions
Item No
Document Type:Preliminary Design
Stage
Item to be Checked Y N N/A Remarks
1 Updated Approval in Principle (AIP) Report
2 Compliance of AIP to the Preliminary Design
3 Architectural Plans
4 Applicable Roadway/ Utilities Design Plans
5 Structural Design Drawings
6 Structural Design Calculations
7 Geotechnical Report
8 Bill of Quantities
9 Construction Specifications
10 Design Verification Report
62
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
63
ChecklistsChecklist No.9 – Structures (Detailed Design/Final Design Stage)
Item No
Document Type:Detailed/ Final Design Stage
Item to be Checked Y N N/A Remarks
1 Final Approval in Principle (AIP) Report
2 Durability Report
3 Compliance of AIP to the Final Design
4 Final Architectural Plans
5 Final Applicable Roadway/ Utilities Design Plans
6 Final Structural Design Drawings
7 Final Structural Design Calculations
8 Final Geotechnical Report
9 Bill of Quantities
10 Construction Specifications
11 Design Verification Report
12 Any Other Relevant Details not Stated Above
ChecklistsChecklist No.10 – Structural Drawings for all Stages
Item No
Document Type:Drawings Specific to
Each Discipline
Item to be Checked Y N N/A Remarks
1.0 S0 – List of Drawings
2.0 S1 – General and Design Notes
2.1Design criteria, necessary information and assumptions to develop design drawings.
2.2Notes common to all structures such as design code, basic loading values, surface finish etc.
2.3Notes specific to a particular structure e.g. bridges, underpass, concrete structures, steel structures etc. as applicable.
2.4Unless otherwise covered above, each drawing may have specific notes related to that particular drawing.
3.0 S2 – Site Location and Bore Holes Location Plans
3.1 Project location, existing and future developments in the vicinity of the project.
3.2 Project location Plan
3.3 Existing site conditions and bore holes location Plans.
3.4Proposed Structure location with project key plan highlighting structure location including.
64
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
65
ChecklistsChecklist No.10 – Structural Drawings for all Stages
ChecklistsChecklist No.10 – Structural Drawings for all Stages
Item No
Document Type:Drawings Specific to
Each Discipline
Item to be Checked Y N N/A Remarks
4.0 S3 – General Arrangement Drawings
4.1 Architectural drawings
4.2Structure plan, elevation and typical cross sections showing Span arrangement and types of structural elements.
4.3 Setting out details, key levels, Clearance envelope, and radius of curves*
4.4 Bore holes location and bore log details.*
4.5Existing/ proposed utilities crossing or affecting structures, deck drainage, lightings and other necessary features.
4.6 Construction sequence
5.0 S4 – Dimensional Details*
5.1 Foundation including footing and pile caps
5.2 Substructure elements
5.3 Superstructure elements
5.4 Box structures
5.5 Retaining walls
5.6 Other Structures
6.0 S5 – Bearings & Expansion joints Details*
Item No
Document Type:Drawings Specific to
Each Discipline
Item to be Checked Y N N/A Remarks
7.0 S6 – Reinforcement and Post tensioning Details*
7.1 Foundation including footing and pile caps
7.2 Substructure elements
7.3 Superstructure elements
7.4 Box structures
7.5 Retaining walls
7.6 Other Structures
7.7 Bar cutting and bending schedules
8.0 S7 – Miscellaneous Details
8.1 Waterproofing.
8.2 Joints.
8.3 Drainage and structure lightings.
8.4 Wearing course. Curbs, Sidewalks, and pedestrian and traffic railings.
8.5 Surface protection.
8.6 Other necessary details.
*Not required for submission of Concept Design stage.
*Except S6, all above drawings are required for submission of Preliminary Design Stage. However
approximate quantities of steel with bar diameter is required for pricing purposes.
* Detailed drawings of S0, S1 to S7 are required for submission of detailed design/ Final Design Stage.
66
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
67
ChecklistsChecklist No.11 – Utilities (For Concept Design Stage)
ChecklistsChecklist No.12 – Utilities (Preliminary Design Stage)
Item No
Document Type: All Drawings
Item to be Checked Y N N/A Remarks
1
Sustainability Strategy: to follow Estidama requirement for 2 Pearl rating for the Building Areas and will implement accordingly in our Design IRI ADM Sustainability Guideline for mentioned areas but not limited because the proposed HVAC (A/C) shall be VRF (VRV) System or equivalent
2 The Parking Garage: to coordinate with CD the Induction Fan system
3Plumbing: design according to the last version of ADM implemented standard for materials.
4All temporary works are properly labelled as such and that descriptions match the pay items
4
Electrical Systems based on :
a- Electrical Power: A breakdown (calculations) required for Total Load of the project such as electrical power and LED Lighting or equivalent using ADM Specification and Standard.
b- CCTV and Security ( control access)Systems will be provided
c- Elevators (Elec. Or Hyd.)
d- Fire Alarm System
e- Scada System
f- Lightning Protection if it is required.
More over, study the possibility to provide gas line .
Item No
Document Type: All Drawings
Item to be Checked Y N N/A Remarks
1 Submittal form filled, stamped & singed
2 Letter from consultant stamped & singed
3 Key plan (show the location of project).
4 Proposed roads layout
5 Existing roads layout
6 Existing roads lighting services.
7 Existing roads lighting poles with mention height and luminaries.
8 Watts and type as per standard legend
9 Existing cable with size and circuits
10 Existing feeder pillar location
11 Existing roads lighting ducts
12 Estimated cost
13 Total proposed roads length.
14 Existing substations location
15 Height of poles (Columns)
16 Pole spacing.
68
QUALITY CONTROL & QUALITY ASSURANCE PROCEDURES 2011 EDITION | MUNICIPALITY OF ABU DHABI CITY
ChecklistsChecklist No.13 – Utilities (For all stages)
Item No
Document Type: All Drawings
Item to be Checked Y N N/A Remarks
1 Submittal form filled, stamped & singed.
2 Key plan (show the location of project).
3 Four set of color drawing
4 CD digital copy as drawing index layout.
5 Bill of Quantities
6 Existing & proposed substation with location & number
7 DEWA overhead lines (Proposed).
8 Details for DEWA overhead with lighting poles section & profile
9Single line diagram with each circuit load & total load for FP. Voltage drop on each circuitmaximum 4% to be show.
10 Under bridge lighting & design calculation
11 Tunnel lighting drawing & design calculation
12 Roads lighting design calculation
13 Prepare a schedule of work.
14 Copy of Updates/new standards from the Consultant implemented for the designQUALITY CONTROL & QUALITY ASSURANCE PROCEDURES
2011 EDITION