GHD | 455 Phillip Street Unit #100A Waterloo Ontario N2L 3X2 Canada | 11219983 | Report No 2 | March 5 2021 Verification Report Version 1.0 AIM Hamilton Central Composting Facility Project Identifier: 5218-7014 Blue Source Canada ULC

Transcript of 11203285-RPT-#-Draft Verification Report AIM Composting ...

Page 1: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | 455 Phillip Street Unit #100A Waterloo Ontario N2L 3X2 Canada | 11219983 | Report No 2 | March 5 2021

Verification Report Version 1.0 AIM Hamilton Central Composting Facility Project Identifier: 5218-7014

Blue Source Canada ULC

Page 2: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page i

Table of Contents

1. Third Party Verification Summary ................................................................................................ 1

2. Verification Objective and Details ................................................................................................ 2 2.1 Project Title ........................................................................................................................ 2 2.2 Project Start Date ............................................................................................................... 2 2.3 Verification Site Visit Date.................................................................................................. 2 2.4 Expected Lifetime of the Project ........................................................................................ 3 2.5 Type of GHG Emission Reduction or Removal Project ..................................................... 3 2.6 Verification of Appropriateness of the Methodology Being Used for the Project ............... 3 2.7 Legal Land Description of the Project or the Unique Latitude and Longitude ................... 3 2.8 Ownership Verification ....................................................................................................... 4 2.9 Reporting, Monitoring, and Verification Details ................................................................. 4 2.10 Level of Assurance and Verification Summary .................................................................. 4 2.11 Roles and Responsibilities ................................................................................................. 5

2.11.1 Qualifications .................................................................................................... 5 2.11.2 Contact Details ................................................................................................. 6

3. Verification Criteria ....................................................................................................................... 7 3.1 Verification Standards ........................................................................................................ 7 3.2 Verification Criteria ............................................................................................................. 7 3.3 Verification Scope .............................................................................................................. 7

3.3.1 Project Understanding ...................................................................................... 7 3.3.2 Protocol ............................................................................................................. 8 3.3.3 Geographical and Operational Boundaries ...................................................... 9 3.3.4 Reporting Period ............................................................................................... 9

3.4 Materiality ........................................................................................................................... 9

4. Verification Plan ........................................................................................................................... 9 4.1 Assessment of Risk and Magnitude of Potential Errors, Omissions or Misrepresentations..............9 4.2 Final Sampling Plan ......................................................................................................... 12 4.3 Verification Procedures .................................................................................................... 13 4.4 Methodologies Used to Assess/Verify Emissions Data ................................................... 14 4.5 Verification Schedule ....................................................................................................... 15 4.6 Working Papers ............................................................................................................... 15 4.7 Verification Findings ......................................................................................................... 15 4.8 Verification Records ......................................................................................................... 16 4.9 Facts Discovered after Verification .................................................................................. 16

5. Verification Statement ................................................................................................................ 16

6. Conflict of Interest Review ......................................................................................................... 17

7. Limitation of Liability ................................................................................................................... 18

Page 3: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page ii

Table Index Table 2.1 Emission Reductions by Source ........................................................................................ 4

Table 4.1 Risk Assessment ............................................................................................................... 9

Table 4.2 Sample Plan .................................................................................................................... 12

Table 6.1 COI Review Checklist ...................................................................................................... 18

Tables Following Text Table 1 Issues Log

Appendix Index Appendix A AIM Composting Activities Performed at Hamilton's Central Composting Facility for

Greenhouse Gas Emission Reductions, Final Report, March 2021

Appendix B Verification Plan

Page 4: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 1

1. Third Party Verification Summary

Project Proponent Information

Name of Project Proponent AIM Environmental Group Inc. (AIM)

Project Proponent Contact Name: Scott Carney Phone: 905-560-0090 Email: [email protected]

Authorized Project Contact Information

Name of Authorized Project Contact Blue Source Canada ULC

Name of Third Party Verification Organization GHD Limited

Authorized Project Contact Name: Andre Buiza, EIT Title: Carbon Solutions Analyst Phone: (403) 262-3026 x 437 Email: [email protected]

Project Report Information

Project Report Title AIM Composting Activities Performed at Hamilton's Central Composting Facility for Greenhouse Gas Emission Reductions, Final Report, March 2021

Copy of Project Report attached in Appendix A

Timing and Amount of Reductions Being Claimed

The emissions reductions of 14,305 tonnes of carbon dioxide equivalent (tCO2e) are claimed for this project during August 1, 2019 to September 30, 2020.

Emission Reductions by GHG The emissions reductions of 14,305 tCO2e for the reporting period are claimed per the following greenhouse gases accordingly:

• CO2: -183 tCO2e

• CH4: 14,972 tCO2e

• N2O: -328 tCO2e

• CO2e: -155 tCO2e

Project Report Frequency Project reports documenting emission reductions will be submitted to GHG CleanProjectsTM annually by the Authorized Project Contact on behalf of the Project Proponent.

Page 5: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 2

Third Party Information: Authorization and Sign off

Third Party Contact Name: Erik Martinez Title: Lead Verifier Phone: 519-340-4213Email: [email protected]

Verification Statement I declare that the GHG reductions claimed in the Project Report for reporting period are fair and reasonable in accordance with the verification criteria and Project Report in all material respects.

Conflict of Interest Review Presented in Section 12 of this Verification Report.

Third Party Verifier Signature:

Designate Signature Date: March 5, 2021

2. Verification Objective and Details

Blue Source Canada ULC (Blue Source) retained GHD Limited (GHD) to complete a third-partyverification of the AIM Composting Activities Performed at Hamilton's Central Composting Facility forGreenhouse Gas Emission Reductions, Final Report, March 2021 (Project Report) for the period ofAugust 1, 2019 to September 30, 2020.

GHD has prepared this Verification Report in accordance with ISO Standard ISO 14064 GreenhouseGases - Part 3: Specification with guidance for the validation and verification of greenhouse gasassertions (ISO 14064-3).

The objective of the verification is to provide Blue Source and the Canadian Standards Association(CSA) GHG CleanProjects® Registry with assurance that the Project Report emissions reductionsand the supporting reduction calculations contain no material discrepancy and was prepared inaccordance with the verification standard (ISO 14064-3) and criteria. The objective is to also confirmthat the Project Report and corresponding GHG assertion conform to the requirements andprinciples of ISO 14064-2 and are without material discrepancies.

2.1 Project Title

AIM Composting Activities Performed at Hamilton's Central Composting Facility for Greenhouse GasEmission Reductions (Project)

2.2 Project Start Date

The Project Start Date is January 10, 2006 which is accurate and representative of when the Projectbegan.

2.3 Verification Site Visit Date

GHD conducted a site visit on January 22, 2021. GHD interviewed Facility personnel to understandoperations, maintenance and downtime events during the reporting period, and regulatorycompliance. The Site Visit was conducted remotely and included a walkthrough of the facility

Page 6: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 3

operations, including all GHG emission source areas and processes. GHD interviewed Sean Van Wely during the Remote Site Assessment.

2.4 Expected Lifetime of the Project

The in-vessel composting equipment is expected to last up to 25 years from the Project start date.

2.5 Type of GHG Emission Reduction or Removal Project

This is a GHG emission reduction project classified under Sector Scope 13 – Waste Handling and Disposal for which GHD is accredited.

2.6 Verification of Appropriateness of the Methodology Being Used for the Project

The methodology applied to the Project is the Quantification Protocol for Aerobic Composting Projects (Version 1.1) (Protocol), Alberta Environment and Sustainable Resource Development (AESRD), 2008. This protocol is applicable to this Project as the AIM Hamilton Composting Facility where the Project is located, performs aerobic composting of source-separated organic waste material. In the absence of this Project the source-separated organics would have instead been sent to landfill. Blue Source has incorporated some deviations from the methodology in their GHG emission reductions calculations, as summarized in the table below. GHD verified the deviations are in accordance with the principles of ISO 14064-2 as described below.

SSR Description Conclusion P14 and B6 - Material Decomposition and Methane Collection/Destruction

The First Order Decay (FOD) Model from the Carbon Offset Emission Factors Handbook was used including default reference values instead of method identified in the compliance protocol.

As the approach is based on best available information and provides a conservative baseline, GHD determined the deviation was appropriate.

2.7 Legal Land Description of the Project or the Unique Latitude and Longitude

The verification included the emission sources from the following Facility:

AIM Hamilton Central Composting Facility 1579 Burlington Street East Hamilton, Ontario, Canada Latitude: 43° 15' 25,00" N Longitude: 79° 47' 53,84" W

GHD verified the location by completing the Site Visit on January 22, 2021.

Page 7: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 4

2.8 Ownership Verification

The Owner of the Project is the Project Proponent (AIM Environmental Group Inc.) and Blue Source owns the emission reductions associated with the Project based on an agreement between the Project Proponent and Blue Source.

2.9 Reporting, Monitoring, and Verification Details

The reporting frequency to the GHG CleanProjects® registry is intended to be every 5-years.

GHG emissions are quantified through manual compilation of organic waste, residual mass records, and diesel, natural gas and electricity consumption invoices. Weigh tickets of organic waste are generated at the scale house and recorded manually and in the Facility's computer system. The mass of residuals is also recorded with weigh scales. AIM produces summary reports for tonnages from the computer system.

Diesel, electricity, and natural gas consumption at the site are tracked through third party fuel invoices, natural gas invoices and electricity invoices, respectively.

GHD is aware that this Verification Report will be publicly posted on GHG CleanProjects®. This report has been prepared for the use of Blue Source and the CSA for this Project.

Statements from GHD's Verification Report, including the Verification Statement must reference the date of issuance of GHD's report, the applicable verification period and the associated programme for which the verification was conducted. The GHG assertion provided by GHD can be freely used by Blue Source for marketing or other purposes other than in a manner misleading to the reader. The GHD mark shall not be used by Blue Source in any way that might mislead the reader about the verification status of the organization. The GHD mark can only be used in relation to the specific time period verified by GHD.

The date and version of this Verification Report are provided on the front cover of the Report.

2.10 Level of Assurance and Verification Summary

GHD has conducted the verification to a reasonable level of assurance. The verification statement is worded in a manner to meet the requirements set forth in ISO 14064-3.

Table 2.1 presents the baseline and project emissions and emission reductions claimed for the Reporting Period.

Table 2.1 Emission Reductions by Source

Emission Source Emission Reductions (tonnes CO2e)

August 1, 2019 to September 30, 2020

B6: Material Decomposition and Methane Collection / Destruction 16,668 Baseline Emissions 16,668 P6: Processing and Composting Facility Operation 312 P16: Fuel Extraction and Processing 27

Page 8: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 5

Table 2.1 Emission Reductions by Source

Emission Source Emission Reductions (tonnes CO2e)

August 1, 2019 to September 30, 2020

P7: Processing and Composting Facility Operation –Material Treatment 341 P14: Residue Decomposition and Methane Collection / Destruction 1,683 Project Emissions 2,363 Net GHG Emission Reductions 14,305

Further, the net GHG emission reductions generated per unique vintage year are detailed below:

• 2019: 5,334 tCO2e

• 2020: 8,970 tCO2e

2.11 Roles and Responsibilities

Lead Verifier – Erik Martinez – Mr. Martinez led the verification and was responsible for developing the verification plan. Mr. Martinez reviewed the risk assessment, and reviewed raw data, data management procedures, and draft findings. Mr. Martinez prepared and signed the verification statement and verification report.

Verifier – Filzah Nasir, M.A.Sc. – Ms. Nasir assisted with the development and revisions of the verification plan and sampling plan, assisted with the development of the risk assessment, reviewed raw data, reviewed management of data quality and assisted with preparing draft findings.

Peer Reviewer – Jenn Packer, P.Eng. – Ms. Packer completed a peer review of the verification plan, risk assessment and verification report and findings.

2.11.1 Qualifications

Lead Verifier – Erik Martinez, P. Eng.

Erik is a licensed air quality engineer in Ontario with over 15 years of experience in atmospheric science, air dispersion modelling, emission inventories, and environmental compliance. Erik has a Bachelor of Applied Science in Environmental Engineering - Chemical Specialization from the University of Waterloo.

Erik has worked on numerous projects involving the measurement, estimation, and abatement of emissions. Erik has extensive experience preparing emissions inventories, and Facility GHG assessments in accordance with the ISO protocols and reporting requirements under O. Reg. 390/18. Erik has acted as the lead verifier/validator on numerous GHG assessments in Ontario and Alberta, has completed peer reviews, and acted as the Technical Expert for compliance reports, emission reduction projects and offsets under the OCE TargetGHG Program, GreenON Industries, and the Alberta Specified Gas Emitters Regulation.

Page 9: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 6

Verifier – Filzah Nasir, M.A.Sc.

Filzah has a Masters in Environmental Engineering which specialized in developing an emissions inventory and quantifying emissions of greenhouse gases and criteria air contaminants. Filzah has completed GHG verifications as a verifier for multiple jurisdictions including Ontario, Alberta, Newfoundland, and Saskatchewan. Filzah has extensive experience conducting GHG verifications for a range of sectors including electricity generation, manufacturing, iron and steel production, oil and gas production, and petroleum refining.

In addition to GHG verifications, Filzah has experience with analysis and calculation of emissions of greenhouse gases and criteria air contaminants from the implementation of climate change mitigation projects as well conducting GHG verifications for voluntary projects under the American Carbon Registry and the Ontario Centres of Validation.

Peer Reviewer – Jenn Packer

Jennifer is a Professional Engineer in Alberta and Ontario, with a Master's of Science degree in Sustainable Energy Development from the University of Calgary. Jennifer is based out of our Waterloo office and has over eight years of experience related to GHG emissions reporting and verification. Her experience as a lead verifier, peer reviewer, and technical expert includes verifications under the CleanProjects ™ Registry, Alberta Specified Gas Emitters Regulation (compliance and offset projects), Ontario Regulation 143, and the Clean Development Mechanism.

Jennifer has been involved in over 60 compliance and offset verifications, applying the ISO-14064 standard including landfill gas recovery, anaerobic digestion, biomass combustion, acid gas injection, wind power generation, composting facilities, coal and natural gas power generation, Steam Assisted Gravity Drainage (SAGD), open pit mining oil sands, heavy oil upgrading, refining and chemical processing, and natural gas processing. Jennifer has direct experience with the verification of emissions reductions projects applying the Quantification Protocol for Diversion of Biomass to Energy from Biomass Combustion Facilities including lead verifier for: Prism Farms, Pyramid Farms, C&B Farms, and the Biomass-to-Energy Offset Project Aggregation and associate verifier for the verification of Dapp Power biomass to energy.

Additionally, Jennifer has developed landfill gas generation potential projections using third order decay modeling (Scholl Canyon) and evaluation of collation potential for numerous landfill gas combustion projects. As lead author for a number of landfill gas utilization potential studies, Jennifer has extensive experience evaluating new and commercial technologies for biogas considering the site generation capacity, technology suitability and economics to provide a recommended utilization option.

2.11.2 Contact Details

Contact details for relevant Project contacts are provided in the table in Section 1.0.

Page 10: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 7

3. Verification Criteria

3.1 Verification Standards

GHD has applied ISO 14064-3 as the standard for this verification.

3.2 Verification Criteria

GHD has applied the following criteria for this verification:

• ISO 14064 Greenhouse gases – Part 1: Specification with guidance at the organization level for quantification and reporting of greenhouse gas emissions and removals, ISO, March 2006 (ISO 14064-1).

• ISO 14064 Greenhouse gases – Part 2: Specification with guidance at the project level for quantification, monitoring and reporting of greenhouse gas emission reductions or removal enhancements, ISO, March 2006 (ISO 14064-2).

• ISO 14064 Greenhouse gases – Part 3: Specification with guidance for the greenhouse gas assertions, ISO, March 2006 (ISO 14064-3).

• Quantification Protocol for Aerobic Composting Projects (Version 1.1) (Protocol), Alberta Environment and Sustainable Resource Development (AESRD), 2008.

• Carbon Offset Emission Factors Handbook (Version 1.0) (Handbook), AESRD, 2015.

• Data supporting the GHG calculations have sufficient controls to be considered fair and accurate without material discrepancy.

• Calculations supporting the GHG assertion are sufficiently accurate to be considered fair and accurate and without material discrepancy.

• There are no competing claims to the ownership of the GHG Project and the resulting emission reductions or removals.

3.3 Verification Scope

The following sections describe the scope of the Verification.

3.3.1 Project Understanding

The Project is an aerobic composting Facility that processes residential source separated organic (SSO) waste into compost. Waste is collected from local municipalities including the City of Hamilton, the Region of Halton, and the County of Simcoe.

The conditions prior to the implementation of the project consist of organic waste disposal in landfill, where it would decompose anaerobically and produce methane. This represents the baseline scenario. The project achieves GHG emission reductions through aerobic composting of the organic waste, thereby reducing methane generation in the landfill under the baseline.

Page 11: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 8

The following sources, sinks, and reservoirs (SSRs) exist for the Project:

• P6 – Processing and Composting Facility Operation

• P16 – Fuel Extraction / Processing

• P7 – Material Treatment

• P14 – Residue Decomposition and Methane Collection / Destruction

• B6 – Material Decomposition and Methane Collection / Destruction Baseline SSR Description B6 - Decomposition of Biomass and Methane Collection/ Destruction

Emissions from the disposal & decomposition of biomass in the absence of the Project; calculated based on the mass of biomass used during the reporting period using a first-order decay function with default and site-specific input parameters.

Project SSR Description P6 – Processing and Composting Facility Operation

Emissions associated with the operation of the Facility, including natural gas, diesel and electricity consumption. Calculated based on 3rd party invoices.

P16 – Fuel Extraction / Processing

Emissions from the extraction, production, refining of fossil fuels used in the project condition. Calculated based on published emission factors for fuel extraction/processing and project fuel consumption.

P7 – Material Treatment Composting emissions associated with the treatment of material on-site. Calculated based on the feedstock received and a diversion rate (i.e., a portion of the waste that would have been diverted from landfill regardless of the Project), and published emission factors.

P14 – Material Decomposition and Methane Collection/Destruction

Waste residue from the screening process is sent to a nearby landfill. Emissions are based on published emissions factors and the mass of organics in the waste residue that will undergo decomposition. This quantity is calculated based on weigh scale tickets for the total mass of the residue and an estimated percentage of organics measured periodically by a 3rd party.

GHD will assess the following GHG emission source compounds associated with the above SSRs:

• Carbon dioxide (CO2)

• Methane (CH4)

• Nitrous Oxide (N2O)

3.3.2 Protocol

• Quantification Protocol for Aerobic Composting Projects (Version 1.1) (Protocol), Alberta Environment and Sustainable Resource Development (AESRD), 2008.

It is noted that GHD identified the Compliance Protocol currently being applied to the project is outdated (December 2008) as it has been replaced by the "Quantification Protocol for Aerobic Composting" Version 3.0 dated September 7, 2018. Blue Source has clarified that Version 1.1 of the

Page 12: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 9

protocol is used in order to maintain methodological consistency with previous submissions, in accordance with ISO 14064-2 Section A.2.4. Where external methods such as the First Order Decay (FOD) model or externally sourced emission factors are used if sufficient justification is provided and the approach is conservative or increases accuracy of the calculations. Use of the FOD model is also consistent with version 3.0 of the Composting Protocol.

3.3.3 Geographical and Operational Boundaries

The verification included the emission sources from the following Facility:

AIM Hamilton Central Composting Facility 1579 Burlington Street East Hamilton, Ontario, Canada Latitude: 43° 15' 25,00" N Longitude: 79° 47' 53,84" W

3.3.4 Reporting Period

The reporting period is between August 1, 2019 and September 30, 2020.

3.4 Materiality

Quantitative materiality for this verification is set at plus or minus 5 percent of the reported emissions. An individual error, omission, misstatement or the aggregate effect of discrete errors, omissions, or misstatements may be considered material.

4. Verification Plan

GHD developed a Verification Plan including a Sampling Plan based on a review of the data provided. GHD's Verification Plan was revised, as required, throughout the course of the verification to address questions or initial concerns with data originally provided. The Verification Plan is provided in Attachment B.

4.1 Assessment of Risk and Magnitude of Potential Errors, Omissions or Misrepresentations

Based on GHD's review of the Facility operations, GHD prepared Table 4.1, which summarizes the potential risk and magnitude of potential errors, omissions, or misrepresentations.

Table 4.1 Risk Assessment

Potential Risk Area Percentage of Emissions (%)

Risk Type (Inherent, Control, Detection)

Risk Level (High, Medium, Low)

Justification

Baseline Scenario B6: Material Decomposition and

100% of BE Inherent Low Complexity of calculations was low and tonnages were tracked

Page 13: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 10

Potential Risk Area Percentage of Emissions (%)

Risk Type (Inherent, Control, Detection)

Risk Level (High, Medium, Low)

Justification

Methane Collection / Destruction

by weigh scale, which would allow for a low inherent risk.

Control Medium Emissions were based on a provincial average landfill gas capture rate, resulting in a medium control risk.

Detection Medium The allowable detection risk was high/medium; however, GHD reviewed all weigh scale data available, lowering the detection risk to medium.

Project Scenario P6: Processing and Composting Facility Operation – Electricity Consumption

13.2% of PE Inherent Low Complexity of calculations was low.

Control Low Emissions were based on consumption from 3rd party invoices providing for low control risk.

Detection Low GHD reviewed all electricity invoices for the reporting period, allowing for a low detection risk.

P6: Processing and Composting Facility Operation – Diesel Consumption

Inherent Low Complexity of calculations was low.

Control Medium Emissions were based on fuel delivery, which does not accurately reflect consumption. Therefore, the control risk was set to medium, as there was a potential for the consumption quantity to be different than the delivered quantity.

Detection Medium/ Low

The allowable detection risk was high; however, GHD reviewed all data available, lowering the detection risk.

P6: Processing and Composting Facility Operations – Natural Gas Consumption

Inherent Low Complexity of calculations was low.

Control Low Emissions were based on consumption from 3rd party invoices providing for low control risk.

Detection Low GHD reviewed all natural gas invoices for the reporting period allowing for a low detection risk.

P16: Fuel Extraction and Processing –

1.1% of PE Inherent Low Complexity of calculations was low.

Page 14: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 11

Potential Risk Area Percentage of Emissions (%)

Risk Type (Inherent, Control, Detection)

Risk Level (High, Medium, Low)

Justification

Diesel Fuel Control Medium Emissions were based on fuel delivery, which does not accurately reflect consumption. Therefore the control risk was set to medium, as there was a potential for the consumption quantity to be different than the delivered quantity.

Detection Medium/ Low

The allowable detection risk was high; however, GHD reviewed all data available, lowering the detection risk.

P16: Fuel Extraction and Processing – Natural Gas

Inherent Low Complexity of calculations was low.

Control Low Emissions were based on consumption from 3rd party invoices providing for low control risk.

Detection Low GHD reviewed all natural gas invoices for the reporting period allowing for a low detection risk.

P7: Material Treatment 14.4% of PE Inherent Low Complexity of calculations was low and tonnages were tracked by weigh scale, which allow for a low inherent risk.

Control Low Emissions were based on prescribed emission factors.

Detection Medium The allowable detection risk was high; however, GHD reviewed all weigh scale data available, lowering the detection risk.

P14: Residue Decomposition and Methane Collection / Destruction

71.2% of PE Inherent Low Complexity of calculations was low and tonnages were tracked by weigh scale, which would allow for a low inherent risk.

Control Low Emissions were based on prescribed emission factors.

Detection Medium The allowable detection risk was high; however, GHD reviewed all weigh scale data available, lowering the detection risk.

Page 15: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 12

Potential Risk Area Percentage of Emissions (%)

Risk Type (Inherent, Control, Detection)

Risk Level (High, Medium, Low)

Justification

General Data Management Systems

N/A Inherent Medium Moderate complexity in data management, given numerous sources of data likely collected by multiple employees.

Control Medium/ Low

Data sources are predominantly weigh scale data and invoices used for accounting, however the numerous data sources increased the control risk.

Detection Medium/ Low

GHD reviewed all data available to reduce the risk that a material error went undetected.

4.2 Final Sampling Plan

GHD developed a Sampling Plan based on GHD's review of the verification criteria. GHD's Sampling Plans are dynamic and the Sampling Plan was revised, as required, throughout the course of the verification.

Table 4.2 summarizes the final sampling plan of material sources.

Table 4.2 Sample Plan

Data/Information Description

Percentage of Emissions (%)

Data/Information Source

Collection Frequency

Sample size/Action

Baseline Emissions (BE) B6: Material Decomposition and Methane Collection / Destruction

100% of BE • Waste feedstock tonnages from scale records

• Percentage leaf and yard waste

Daily Daily scale tonnage records for the reporting period

Project Emissions (PE) P6: Processing and Composting Facility Operation – Electricity Consumption

13.2% of PE

• Third party electricity invoices

Monthly All invoices for reporting period

• Source of Emission factors

One-time National Inventory Report (Environment Canada 2020)

P6: Processing and Composting Facility Operation – Diesel Consumption

• Fuel purchases from fleet records and invoices

Multiple Total purchased fuel records for reporting period

• Source of Emission factors

One-time National Inventory Report (Environment Canada 2020)

Page 16: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 13

Table 4.2 Sample Plan

Data/Information Description

Percentage of Emissions (%)

Data/Information Source

Collection Frequency

Sample size/Action

P6: Processing and Composting Facility Operation – Natural Gas Consumption

• Third party natural gas invoices

Monthly All invoices for reporting period

• Source of Emission factors

One-time National Inventory Report (Environment Canada 2020)

P16: Fuel Extraction and Processing – Diesel Fuel

1.1% of PE

• Fuel purchases from fleet records and invoices

Multiple Total purchased fuel records for reporting period

• Source of emission factors

One time Carbon Offset Emission Factor Handbook (AESRD, 2015)

P16: Fuel Extraction and Processing – Natural Gas

• Third party natural gas invoices

Monthly All invoices for reporting period

• Source of emission factors

One time Carbon Offset Emission Factor Handbook (AESRD, 2015)

P7: Material Treatment

14.4% of PE • Waste feedstock tonnages from scale records

Daily Daily scale tonnage records for the reporting period

P14: Residue Decomposition and Methane Collection / Destruction

71.2% of PE • Waste feedstock tonnages from scale records

Daily Daily scale tonnage records for the reporting period

• Residuals bin tonnages from scale records

As Received

Daily scale tonnage records for residuals for the reporting period

General Operations Overview

N/A • Reviewed facility operations and emission sources

N/A N/A

Back up of data acquisition systems

N/A • General Data Management System

• Document retention policy

N/A Reviewed frequency of data backup and interviewed site personnel

4.3 Verification Procedures

GHD used the verification procedures detailed in the Verification Plan to assess the following:

• Accuracy and completeness of annual GHG emissions

• Uncertainty of external data sources used

• Emission assumptions

• Accuracy of emission calculations

Page 17: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 14

• Potential magnitude of errors and omissions

To sustain a risk-based assessment, the GHD Project Team identified and determined risks related to GHG sink and source emissions during both the desk reviews and the follow-up interviews. The GHD Project Team particularly focused on the accuracy and completeness of provided information. The components of the document review and follow-up interviews are detailed below.

4.4 Methodologies Used to Assess/Verify Emissions Data

GHD used the verification procedures detailed in the Verification Plan to assess the following:

• Document Review:

- Review of data and information to confirm the correctness and completeness of presented information

- Cross-checks between information provided in the methodology and information from independent background investigations

- Determine sensitivity and magnitude analysis for parameters that may be the largest sources of error

• Follow-up Interviews:

- Via video-conferencing (Remote Site Assessment)

- Via telephone

- Via email

• Interviews with Facility personnel to:

- Cross-check information provided

- Test the correctness of critical formulae and calculations

- Review data management and recording procedures

The document review shall establish to what degree the presented documentation meets the verification standards and criteria.

The GHD Project Team's document review during the verification process shall comprise, but not be limited to, an evaluation of whether or not:

• The documentation's completeness and comprehensiveness and whether the structure and verification criteria and its associated guidance were followed.

• The monitoring methodologies are justified and appropriate for the specific facility.

• The assumptions for the emission calculation are conservative and appropriate.

• The reporting methodology clearly identifies the frequency of and responsibility and authority for monitoring, measurement, and data recording activities and sufficiently describes quality control/quality assurance/management control procedures.

Page 18: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 15

4.5 Verification Schedule

The following details the schedule of GHD's verification, identifying the dates of key tasks and completion of major milestones:

• Project award and kick-off call – December 9, 2020

• Initial document request – December 9, 2020

• Issue Verification Plan – January 8, 2021

• Site Visit – January 22, 2021

• Submit issues log to Blue Source and opportunity for Blue Source to address issues and, if required, revise project report(s) – February 18, 2021, and as-needed throughout the verification

• Issue Draft Verification Report and Statement – March 2, 2021

• Issue Final Verification Report – March 5, 2021

4.6 Working Papers

Detailed working papers are available upon request.

4.7 Verification Findings

GHD has reviewed the provided documents and did not find any material discrepancies. GHD has concluded that the reporting period assertion emission reduction has been compiled consistent with the requirements of verification criteria. GHD has cross-checked the following:

• GHD reviewed the project calculations against the Project Report.

• GHD noted the following after reviewing Blue Source's quantification methodology and calculations:

­ The Ontario Electricity Grid Consumption Intensity used in the Calculator did not match the Grid consumption Emission Factor in Table A13-7 of the 2020 NIR. The emission factor was updated by Blue Source.

­ The September Outbound Residue used in the calculations was 62.33 tonnes versus the raw data provided indicating a net tonnage of 47.7 tonnes. Blue Source corrected the data input.

­ Several data inputs for the Mass of Compostable Residue were not multiplied by average percent of compost in the residue. Blue Source revised the calculations and corrected the issue.

­ GHD reviewed the LFG collection efficiency used by Blue Source from 2015. It is recommended that Blue Source continue to review and update this estimate during future reporting periods.

• GHD recalculated the avoided baseline emissions and project emissions from sampling data for the reporting period and did not identify any discrepancies.

GHD's findings associated with the verification of the Project are detailed in Attachment A.

Page 19: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 16

4.8 Verification Records

Records obtained or created during the verification are maintained indefinitely.

4.9 Facts Discovered after Verification

Not currently applicable.

5. Verification StatementGHD directs this Verification Report and Statement to Blue Source. The objective of this Project was for GHD (as the third-party) to undertake a GHG verification of the Project to a reasonable level of assurance regarding the AIM Composting Activities Performed at Hamilton's Central Composting Facility for Greenhouse Gas Emission Reductions the Project Report, Final Report, March 2021. The GHG verification covers the reporting period of August 1, 2019 to September 30, 2020, with the asserted emission reduction (or removal enhancement) of 100,669 tCO2e, broken down by applicable GHGs as follows:

• CO2: -183 tCO2e

• CH4: 14,971 tCO2e

• N2O: -328 tCO2e

• CO2e: -155 tCO2e

• Total Net GHG Emission Reductions: 14,305 tCO2e

Further, the net GHG emission reductions generated per unique vintage year are detailed below:

• 2019: 5,334 tCO2e

• 2020: 8,970 tCO2e

Applicable Verification Standards and Criteria

GHD has applied ISO 14064-3 as the standard for this verification.

GHD has applied the following criteria for this verification:

• ISO 14064 Greenhouse gases – Part 1: Specification with guidance at the organization level forquantification and reporting of greenhouse gas emissions and removals, ISO, March 2006(ISO 14064-1).

• ISO 14064 Greenhouse gases – Part 2: Specification with guidance at the project level forquantification, monitoring and reporting of greenhouse gas emission reductions or removalenhancements, ISO, March 2006 (ISO 14064-2).

• ISO 14064 Greenhouse gases – Part 3: Specification with guidance for the greenhouse gasassertions, ISO, March 2006 (ISO 14064-3).

• Quantification Protocol for Aerobic Composting Projects (Version 1.1) (Protocol), AlbertaEnvironment and Sustainable Resource Development (AESRD), 2008.

Page 20: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 17

• Carbon Offset Emission Factors Handbook (Version 1.0) (Handbook), AESRD, 2015.

Conclusion

GHD's responsibility is to express a conclusion on the GHG verification based on the Project Report and associated evidence we have obtained compared to the description of the Project in the Project Plan. The verification report includes the techniques and processes used to test the GHG information and associated assertions, along with any additional information used in verification. GHD identified through the verification that the Project contains some deviations from the applicable Protocol. GHD determined that these deviations are appropriate, accurate, conservative, and representative of the Project operations and associated monitoring.

Verification Statement Conclusion: Positive

In GHD's opinion, the greenhouse gas emission reductions and removal enhancements stated in the Project Report for the period to August 1, 2019 to September 30, 2020 (inclusive) are a fair and reasonable representation of the project's GHG emission reductions in accordance with the verification standard, criteria, and AIM Composting Activities Performed at Hamilton's Central Composting Facility for Greenhouse Gas Emission Reductions, Final Report, March 2021, in all material respects.

This independent reasonable verification statement is intended for Blue Source and the CSA GHG CleanProjects® Registry.

GHD Limited

Lead Verifier: Erik Martinez

Date: March 5, 2021

6. Conflict of Interest Review

Prior to commencing the work, GHD conducted an internal conflict of interest (COI) check todetermine the potential for a COI in providing verification services to Blue Source for the Project. NoCOI was identified within GHD. Table 6.1 presents the checklist that GHD used to assess COI anddocuments the results of the COI review process, in accordance with ISO 14064-3 and CSA GHGClean Projects Registry requirements.

In the event that a COI is identified, GHD has internal procedures for mitigating the conflict(s),whether actual or perceived, which include the development of a mitigation plan and project teamchanges, as required, as well as GHG Assurance Services Manager and Principal review andapproval processes. The verification project team members may be isolated from the conflicting staffwithin the company through office location, or other information barriers within an office.

Page 21: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 18

Table 6.1 COI Review Checklist

COI Requirement Yes No Details of GHD's Review

Independence Remain independent of the activity being verified, and free from bias and conflict of interest. Maintain objectivity throughout the verification to ensure that the findings and conclusions will be based on objective evidence generated during the verification.

GHD assessed COI at the outset of the verification through internal procedures, as per ISO 14064 and internal ISO9001 Quality System requirements. GHD's peer reviewer for the Project was not involved in verification activities and provided an independent assessment and opinion of the verification process, findings, and statement.

Ethical conduct Demonstrate ethical conduct through trust, integrity, confidentiality and discretion throughout the verification process.

GHD maintained ethical conduct throughout the verification process, in accordance with our professional standards and client service model.

Fair presentation Reflect truthfully and accurately verification activities, findings, conclusions and reports. Report significant obstacles encountered during the verification process, as well as unresolved, diverging opinions among verifiers, the responsible party and the client.

GHD's verification report is a truthful representation of the verification activities, findings, and statement conducted for the Project. GHD documented all findings observed throughout the course of the verification in the Issues Log, which is provided as Table 1.

Due professional care Exercise due professional care and judgment in accordance with the importance of the task performed and the confidence placed by clients and intended users. Have the necessary skills and competences to undertake the verification.

GHD maintains high standards of quality and professional judgement through our ISO 9001 certified Quality System. In accordance with ISO 14064, GHD reviews the competencies of GHG Assurance Services team members annually, and an assessment of competency requirements of project team members are made at the outset of all verification activities.

7. Limitation of Liability

Because of the inherent limitations in any internal control structure, it is possible that fraud, error, ornon-compliance with laws and regulations may occur and not be detected. Further, the verificationwas not designed to detect all weakness or errors in internal controls so far as they relate to therequirements set out above, as the verification has not been performed continuously throughout theperiod, and the procedures performed on the relevant internal controls were on a test basis. Anyprojection of the evaluation of control procedures to future periods is subject to the risk that theprocedures may become inadequate because of changes in conditions, or that the degree ofcompliance with them may deteriorate.

The verification opinion expressed in this report has been formed on the above basis.

GHD's review of the Emissions Report claimed included only the information discussed above. Whilethe review included observation of the systems used for determination of the claimed Emissions

Page 22: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2) | Page 19

Report, GHD did not conduct any direct field measurements and has relied on the primary measurement data and records provided by Blue Source and AIM as being reliable and accurate. No other information was provided to GHD or incorporated into this review. GHD assumes no responsibility or liability for the information with which it has been provided by others.

The information and opinions rendered in this report are exclusively for use by Blue Source. GHD will not distribute or publish this report without Blue Source's consent except as required by law or court order. The information and opinions expressed in this report are given in response to a limited assignment and should only be evaluated and implemented in connection with that assignment. GHD accepts responsibility for the competent performance of its duties in executing the assignment and preparing this report in accordance with the normal standards of the profession, but disclaims any responsibility for consequential damages.

All of Which is Respectfully Submitted,

GHD

Erik Martinez, Lead Verifier

Jennifer Packer, Peer Reviewer

Page 23: 11203285-RPT-#-Draft Verification Report AIM Composting ...

Table 1

Issues Log AIM Composting Facility GHG Verification

Blue Source Canada

Page 1 of 1

Version No. Issue Date Response DateVersion 1 February 18, 2021 February 18, 2021

February 19, 2021Version 2 February 26, 2021 March 1, 2021

Issue No. Issues Log Response Status

1

The Ontario Electricity Grid Consumption Intensity used in the Calculator does not match the Grid consumption Emission Factor in Table A13-7 of the 2020 NIR. Please review and update, if necessary.

Updated Closed

2

The September Outbound Residue used in the calculations is 62.33 tonnes. The raw data provided indicates a net tonnage of 47.7 tonnes. Please review and clarify the discrepancy or update if necessary.

Updated Closed

3

In the tab "Ref_Residue Summary", the Mass of Compostable Residue is calculated by multiplying the mass of outbound residue sent to landfill by the average percent of compost in the residue (44.4%). However, several months were not multiplied by this factor. For example, December 2019, March 2020, June 2020, and September 2020. Please clarify.

Updated Closed

4Please provide copies of the weigh scale calibration certificate(s) for the crediting period.

Provided Closed

5

A minor typo was identified in the May 2020 Outbound Residue: 612.52 tonnes entered versus 612.62 tonnes from the raw feedstock data.

Updated Closed

6

Please provide more local context on OPR Table 7 Barriers Assessment of Baseline Alternative Scenarios for Alternative Scenario 2. For example, confirm that the City of Hamilton landfill previously accepted and landfilled the organic waste prior to the Project start date in 2006 and did not have any organic landfill bans in place. Please provide any supporting documentation, if available.

Prior to the initiation of the Project, organic waste would have been accepted at the landfill. There are no municipal, provincial, or national directives, bylaws, or laws mandating the diversion of organic waste from landfills. There are also no municipal, provincial or national directives, bylaws or laws that prohibit the disposal of organics into landfills. The methodology assumes 20% of organics would have been disposed of in the baseline condition or prior to the initiation of the Project. Bylaw No. 09-068 pertains to Waste Management in Hamilton: http://www2.hamilton.ca/NR/rdonlyres/12A7DDE0-B9AF-4D16-82A9-168FB2F6C545/0/09067.pdf

Closed

GHD 11219983 (2)

Page 24: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2)

Appendices

Page 25: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2)

Appendix A AIM Composting Activities Performed at Hamilton’s Central Composting Facility

for Greenhouse Gas Emission Reductions, Final Report, March 2021

Page 26: 11203285-RPT-#-Draft Verification Report AIM Composting ...

March 2021 Final Report

Prepared By: Blue Source Canada ULC (Authorized Project Contact) 1605 – 840 7th Ave SW Calgary, Alberta T2P 3G2 T: (403) 262-3026 www.bluesource.com

AIM_OPR_V1.3_03012021.DOCX

Page 27: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada ii

1 Table of Contents 1. Introduction ................................................................................................................................. 1

1.1 Project Purpose / Objective .......................................................................................................... 2

1.2 Expected Lifetime of Project ......................................................................................................... 2

1.3 Type of Greenhouse Gas Emissions Reduced ............................................................................... 2

1.4 Location ......................................................................................................................................... 2

1.5 Quantification Flexibility Mechanisms .......................................................................................... 3

1.6 Other Methodology Changes ........................................................................................................ 3

1.7 Conditions prior to project initiation ............................................................................................ 4

1.8 Description of how GHG Reductions are achieved ....................................................................... 5

1.9 Project technologies, services, and expected level of activity ...................................................... 5

1.10 Total GHG emission reductions and removal enhancements ...................................................... 7

2. Review of Project Consistency with ISO-14064 Part 2 Principles ................................................... 7

2.1 Relevance ...................................................................................................................................... 7

2.2 Completeness ................................................................................................................................ 7

2.3 Consistency ................................................................................................................................... 8

2.4 Accuracy ........................................................................................................................................ 8

2.5 Transparency ................................................................................................................................. 8

2.6 Conservativeness .......................................................................................................................... 8

3. Offset Project Eligibility ................................................................................................................ 8

3.1 Project Area Eligibility ................................................................................................................... 9

3.2 Identification of risks ..................................................................................................................... 9

3.3 Roles and responsibilities ............................................................................................................ 10

3.4 Reporting period ......................................................................................................................... 10

3.5 Summary of Environmental Impact Assessment ........................................................................ 10

3.6 Stakeholder Consultations .......................................................................................................... 10

3.7 Detailed Chronological Plan ........................................................................................................ 11

4 Inventory of Sources and Sinks ................................................................................................... 11

4.1 Quantification of estimated GHG emissions/removals .............................................................. 14

4.1.1 Quantification of sources and sinks .................................................................................... 15

Page 28: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada iii

4.1.2 List of Assumptions ............................................................................................................. 20

5. Selection and Justification of the Baseline Scenario .................................................................... 21

6. Quantification Methodology ...................................................................................................... 23

6.1 Baseline Emissions Quantification Methodology ....................................................................... 23

6.2 Project Emissions Quantification Methodology ......................................................................... 23

7. Monitoring Plan ......................................................................................................................... 24

8 Data Information Management System and Records .................................................................. 27

8.1 Data Management and QA/QC at the AIM Central Composting Facility .................................... 27

8.2 Data Management and QA/QC at Bluesource ............................................................................ 27

8.2.1 Back-up Procedures at Bluesource ..................................................................................... 27

8.2.2 Document Retention Policy at Bluesource ......................................................................... 28

9 Reporting and Verification Details .............................................................................................. 28

10 Statement of Senior Review ....................................................................................................... 28

11 Works Cited ................................................................................................................................ 29

List of Figures and Tables

Figure 1: Aerial photograph of AIM’s Central Composting Facility .............................................................. 2 Figure 2: AIM’s Central Composting Facility (the Project) location within Hamilton .................................. 3 Figure 3: Baseline and Project condition ..................................................................................................... 4 Figure 4. CCF Process Flow ............................................................................................................................ 6 Figure 5. Overhead filling of Tunnel (Phase 1 & 2) ....................................................................................... 6 Figure 6. Project Element Life Cycle Diagram ............................................................................................. 12 Figure 7. Baseline Element Life Cycle Diagram ........................................................................................... 13

Table 1: Annual and Total GHG Emission Reductions for the Project .......................................................... 7 Table 2. Inclusion and Exclusion of Sources, Sinks and Removals of GHG emissions, extracted from the Protocol ....................................................................................................................................................... 15 Table 3. Emission Factors used in the Project ............................................................................................ 18 Table 4. Global Warming Potential, 2007 IPCC ........................................................................................... 19 Table 5. Landfill Design parameters ............................................................................................................ 19 Table 6. List of Assumptions ....................................................................................................................... 20 Table 7. Barriers Assessment of Baseline Alternative Scenarios ................................................................ 21 Table 8. Monitoring Plan ............................................................................................................................. 25

Page 29: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 1

1. Introduction The AIM Environmental Group Inc. (‘AIM’) Hamilton Central Composting Facility (CCF) is an aerobic composting project located in the city of Hamilton, Ontario (‘the Project’). The Project sources Residential Source Separated Organics (SSO) from the City of Hamilton. The Project is owned and operated by AIM Environmental Group Inc.

The opportunity for generating carbon offsets with the Project arises from the direct reduction of greenhouse gas (GHG) emissions due to the avoidance of methane emitted from the decomposition of organic wastes in landfills. The credits created from this Project are registered on the CSA CleanProjects Registry where they will be verified and serialized as VERRs (verified emission reductions/removals). For this reporting period, covering August 1, 2019 – September 30, 2020, the Project created 14,305 tonnes of CO2e reductions.

Methane is a GHG with a 100-year global warming potential 25 times that of carbon dioxide and is passively emitted from the disposal of waste biomass in landfills or other oxygen-free conditions where the organic waste undergoes anaerobic decomposition. The diversion of organic waste away from an anaerobic storage site, such as a landfill, to a composting facility avoids the formation of excess methane gas by creating aerobic conditions by which the waste undergoes decomposition. The diversion of waste for composting also creates the added benefit of reducing the spatial stresses on near capacity landfills.

AIM is an expert in the design and operation of organics processing and material recovery facilities. AIM works with several local, national, and international partners to provide solutions for environmental concerns. AIM operates some of the largest compost facilities in North America and works to meet the waste management challenges of Canadian municipalities.

The Project facility in Hamilton is a state of the art composting facility that uses a feedstock of residential SSO, collected from nearby municipalities. The facility was commissioned in January 2006. The composting process utilizes phased in-vessel tunnel technology using an aerated and temperature controlled indoor static pile system. Following the composting stage, the material is screened and the finished compost is moved to the curing stage for maturation in an indoor windrow system. To maximize odor control, negative air pressure is maintained at the plant floor and all exhaust runs through a woodchip bio-filter before being released to the atmosphere.

The methodology used in the reporting period is the Quantification Protocol for Aerobic Composting Projects (version 1.1, December 2008) (the ‘Protocol’) published by Alberta Environment and Parks. Although version 3.0 of the Protocol was released in September 2018, the Project will continue to use version 1.1 of the Protocol for consistency. There were no major changes in the newer version of the Protocol that would materially change the additionality or quantification methodology for this Project.

Page 30: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 2

1.1 Project Purpose / Objective The Project’s purpose is to create valuable compost products for horticultural and agricultural needs from the composting of residential source separated organics.

Primary GHG reductions are achieved through the diversion of waste and resulting avoidance of methane (CH4), a potent GHG that would have been generated at landfills through anaerobic degradation of the municipal solid waste (MSW).

1.2 Expected Lifetime of Project The in-vessel composting equipment is expected to last up to 25 years.

1.3 Type of Greenhouse Gas Emissions Reduced The Project involves emission sources and sinks that concern the following greenhouse gas species:

1) Carbon dioxide; 2) Methane; and 3) Nitrous oxide.

1.4 Location The Project is located in Hamilton, Ontario Canada at 1579 Burlington Street East.

Latitude: 43° 15’ 29.934’’ N;

Longitude: 79° 47’ 50.7408’’ W.

Figure 1 illustrates AIM’s Central Composting Facility site, and Figure 2 shows this location within the city of Hamilton.

Figure 1: Aerial photograph of AIM’s Central Composting Facility

Page 31: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 3

Figure 2: AIM’s Central Composting Facility (the Project) location within Hamilton

1.5 Quantification Flexibility Mechanisms No flexibility mechanisms have been used in this reporting period.

1.6 Other Methodology Changes A number of improvements have been made to the Project to increase the accuracy and rigour since the original reporting period. These changes have been noted in this section for transparency.

1. In 2014 the 100-year global warming potentials were updated to reflect the latest published values by the Intergovernmental Panel on Climate Change (IPCC) and used in Canada’s National Inventory Report. This impacted the GHG assertion significantly due to the increase in the 100-year GWP for methane from 21 to 25 and the fact that the Project’s GHG emission reductions are based solely on avoided methane from landfilling.

2. For the 2015 reporting period, the landfill avoidance methodology was updated to align with current best practices in greenhouse gas accounting and the latest calculation methodology accepted by the Alberta Emission Offset System (AEOS). This method can be found in the Alberta Carbon Offset Emission Factors Handbook, (Version 1.0, March 2015) and employs the first order decay Scholl-Canyon Model.

Page 32: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 4

3. Prior to this reporting period, the AIM CCF accepted waste that would have otherwise gone to the City of Hamilton, Region of Halton, and County of Simcoe landfills. The facility was shut down from July 2018 – February 2019 due to odour complaints. Starting in February 2019, the operations of the composting facility have been changed to only divert organics from the City of Hamilton, which consequently lowers the emission reductions generated during this reporting period compared to historical emission reductions.

1.7 Conditions prior to project initiation Prior to the start-up of the AIM CCF, the organic waste used by the Project would have been sent for disposal at landfills. As the organic waste is generally sourced from the City of Hamilton it is likely the waste would have ended up in the municipal landfill site for the City of Hamilton.

The creation of a market for organic waste has led to local initiatives to separate and collect residential SSO for sale to third party suppliers that then distribute the SSO fuel to end users. As such, had the Project not been initiated by AIM Environmental Group, the SSO would have decomposed anaerobically in a landfill to form methane emissions. However, according to the Protocol, it is required to assume a portion of the waste would have been diverted from landfill regardless of the Project specific factors, in order to account for the adoption of composting practices provincially. The suggested value for this pre-existing diversion rate is 20%, which is applied for the Project’s offset volume calculations.

Currently, the Ontario Waste Diversion Act has no regulation targeting the diversion of SSO. However, Ontario Regulation 101/94, S.13 requires any municipality with a population over 50,000 to establish and operate a leaf and yard (L&Y) waste system, including collection throughout the municipality. The City of Hamilton has a population greater than 50,000, and therefore is required to collect L&Y waste under this regulation. The Project has not accepted L&Y waste from the City of Hamilton for this reporting period.

Figure 3 below illustrates the organic waste uses before and after the implementation of the Project.

Figure 3: Baseline and Project condition

80% of Residential

Organic Waste

Landfill

Anaerobic Decomposition

Pre-Project Condition

Residential Organic Waste

Sorting and Separation of

Organic Waste

Project Condition

Third Party delivery of SSO

SSO Decomposition

at AIM CCF

Composting

Page 33: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 5

1.8 Description of how GHG Reductions are achieved The Project results in a reduction in greenhouse gas emissions through the avoidance of methane generated from anaerobic decomposition of the organic waste at a landfill.

Currently, the organic waste used in AIM’s CCF is supplied from residential waste obtained from the city of Hamilton. If AIM had not provided a market value for this organic waste it would not have been diverted from landfill and would have undergone through anaerobic decomposition.

1.9 Project technologies, services, and expected level of activity The Project results in a reduction in greenhouse gas emissions through the avoidance of methane generated from anaerobic decomposition of the organic waste at a landfill.

Currently, the organic waste used in AIM’s CCF is supplied from residential waste obtained from the city of Hamilton. If AIM had not provided a market value for this organic waste it would not have been diverted from landfill and would have undergone through anaerobic decomposition.

The Project utilizes a completely sealed composting process known as an “in-tunnel” system. The processing system is an in-vessel aerated static pile, with a processing capacity of 70,000 tonnes per year of the residential source separated organics feedstock. The CCF process consists of three phases for a total duration of 45-60 days: Phase 1 and 2 are in-tunnel phases over 21-28 days, Phase 3 is a windrow maturation phase lasting 20-40 days. A process flow diagram is shown in Figure 4.

The first step in the Project’s process is the receiving and pre-treatment of the SSO. Pre-treatment involves visual inspection, mixing and shredding, metal removal using a magnetic belt, and moisture addition. Following treatment, the feedstock is loaded into the Phase 1 tunnel by overhead filling in an even layer, as shown in Figure 5. The material remains in the Phase 1 tunnel for 10 to 14 days to begin the decomposition process. The tunnel has an aerated floor, heating, and sprinkler systems to ensure optimal conditions for decomposition. Next, the material is moved into the Phase 2 tunnel for the second composting phase, lasting 7 to 10 days.

Following the second composting phase, the material is screened to remove residual contaminants such as plastic or stones (removed by wind-sifter) and remaining metal contaminants (removed by magnetic belt). Waste residue is sent to a nearby landfill. Finished compost (<10mm) is transported to Phase 3 for maturation by a conveyor system; material that is >10mm is sent back to Phase 1 for reprocessing. Maturation is completed in windrows, where the material can breakdown in the presence of oxygen. The entire composting process is monitored and controlled by a computer-based control system to ensure optimal conditions during composting and maturation of the organic waste.

The Project facility produces compost that achieves Ontario’s highest level of compost quality, known as “Grade A Unrestricted” compost. The compost is high in nutrients and moisture retention, and can be used for ideal soil structure and plant growth. The end products provided from the Project compost are topsoil production, soil structure enhancer, fertilizer, bio-fuel, and specialty products such as kitty litter.

Page 34: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 6

Figure 4. CCF Process Flow

Figure 5. Overhead filling of Tunnel (Phase 1 & 2)

Page 35: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 7

1.10 Total GHG emission reductions and removal enhancements Table 1 below highlights the total GHG emission reductions for the Project separated by vintage year.

Table 1: Annual and Total GHG Emission Reductions for the Project

Vintage Year CO2 (t CO2e) CH4 (t CO2e) N2O (t CO2e) CO2e (t CO2e) Total (t CO2e)

2019 (Aug 1 – Dec 31)

-61 5,566 -113 -56 5,334

2020 (Jan 1 – Sep 30)

-121 9,405 -213 -99 8,970

TOTAL -182 14,971 -327 -155 14,3050F

1

The total GHG emission reductions attributable to the Project for the period August 1, 2019 – September 30, 2020 are 14,305 tonnes of CO2 equivalent.

2. Review of Project Consistency with ISO-14064 Part 2 Principles

2.1 Relevance

The methodology referenced in quantifying GHG emission reductions from the Project was developed and approved under the Alberta Emissions Offset System, regulated under the Province’s Climate Change and Emissions Management Act (2003) The Alberta Quantification Protocol for Aerobic Composting Projects (Version 1.1, December 2008) (the Protocol) was developed following the ISO 14064-2 standard as required under the Alberta offset protocol development process. Additionally, the protocol development process included a multi-step stakeholder review process consisting of a technical expert review, a broader stakeholder review process and a public posting period, all of which were managed by the Government of Alberta. The Alberta Quantification Protocol for Aerobic Composting Projects (Version 1.1, December 2008) is a well-established quantification protocol applicable to composting projects in Canada.

2.2 Completeness

The Project scope is consistent with the Protocol, with GHG emission reductions arising from the diversion of organic wastes from landfill and the avoidance of the methane emissions that would have occurred

1 The total emission values may not exactly add up when summing the contributions of the totals of each gas component. The offset claim for each year is rounded down.

Page 36: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 8

from the anaerobic (oxygen-free) decomposition of these residues in landfill quantified under the protocol.

2.3 Consistency

The Protocol used in the quantification of GHG reductions is appropriate for AIM’s CCF. The Aerobic Composing Protocol is consistent in its application of functional equivalence between the baseline and project condition. The quantity of organic waste to be collected and disposed of in the baseline scenario is functionally equivalent to the organic waste being composted in the project scenario. The average landfill gas capture rate is applied consistently between the baseline and project scenarios.

2.4 Accuracy

Accuracy is ensured by using actual measurement and monitoring wherever possible. Bias and uncertainties in quantification were limited through the use of utility meter readings (electricity and natural gas), fuel invoices (diesel gas) and from the AIM Hamilton CCF Yearly Summary Report (Organic Feedstock) in combination with using the most relevant electricity consumption emission factor for Ontario and up to date emission factors from Environment Canada. The landfill gas capture rates are calculated using reasonable assumptions based on available data from the landfill operations in Ontario.

2.5 Transparency

Data collection, monitoring, and quantification approaches are summarized in this report. The annual emission reduction claims are also summarized in this document to support the transparency of the GHG emission reduction assertion. In addition to this report, the quantification tool provided to the verifier, sources all data inputs and therefore all inputs are traceable back to the original source of data.

2.6 Conservativeness

The calculations used are considered conservative for a number of reasons. The baseline emissions were calculated using the first order decay Scholl-Canyon Model. This methodology is found in the Alberta Carbon Offset Emission Factors Handbook, (Version 1.0, March 2015) and is more conservative and accurate than the methodology provided in the Protocol. In the baseline scenario, the 20% waste diversion rate from the Protocol was applied, and the leaf and yard waste from Hamilton was also not considered for the baseline emissions calculation. The project scenario emissions include all applicable sources and sinks from the Protocol. For any parameters with a level of uncertainty, assumptions were made to strive for a balance between conservativeness and accuracy.

3. Offset Project Eligibility The project is eligible to create emission reductions as follows:

The GHG emission reduction assertion was quantified using a quantification methodology considered to be industry best practice guidance (Alberta Environment, December 2008);

Page 37: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 9

The quantification protocol referenced was developed in accordance with the ISO 14064-2 standard, as required by the GHG Clean Projects® Registry;

The GHG assertion has been verified by an independent third-party; The surrounding municipalities are not subject to any regulations requiring composting or any

other use of residential organic waste in Ontario; The project is not currently subject to any climate change or emissions management legislation in

the province of Ontario or Federally in Canada; Potential GHG emission reductions generated by this project are not listed on any other GHG

reduction registry in Canada or internationally; The project has not received any public funds in exchange for GHG emission reductions (e.g.

offsets) resulting from this project; and All environmental attributes generated by the project, including any GHG emission reduction

benefits, are owned solely by AIM Environmental Group Inc. The Project is not generating any other environmental attributes, credits or benefits.

While Ontario Regulation 232/98, S.15 regulates the collection and use of landfill gas for all new landfills and landfills exceeding the size of 1.5 million cubic meters1F

2 (“large landfill”), this does not impact the eligibility of the Project to generate offset credits, as the activity of composting diverted landfill waste remains unregulated. However, this regulation does apply to the baseline emission source as the landfill gas could be required to be captured and collected. As the level of landfill gas capture efficiency is not regulated, the most recent average landfill gas capture efficiency published by the Ontario Waste Management Association (OWMA) is applied.

3.1 Project Area Eligibility

Emission reduction activities occur where sector and legal additionality are met. The project applies the same baseline sources and sinks, and the monitoring methodology closely follows the Protocol unless otherwise specified.

3.2 Identification of risks Key market risks related to AIM’s CCF include both maintaining a high quality, marketable end-product and meeting future regulations. The CCF receives SSO from surrounding regions, and therefore the variability of their feedstock depends on the variability of residential waste available at any time. Future regulations in Ontario could impact the operations of AIM’s facility and their eligibility for offset credits. Going forward, it is important to monitor solid waste related laws and regulations in Ontario, as these could impact offset eligibility and alternative end-use of residential wastes.

Risks associated with the quantification of emission reductions from the Project include monitoring and testing equipment failure, however these risks are mitigated by regular checks and maintenance by on

2 Ontario, Ministry of the Environment (2011). O. Reg. 232/98: Landfilling Sites. Retrieved from: https://www.ontario.ca/laws/regulation/980232

Page 38: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 10

site staff. Weigh scales are calibrated in accordance with best practices. In addition, compost is sent off-site for lab analysis by an independent third-party to ensure compost quality standards are met. Risks associated with the quantification of GHG emission reductions from this project have also been assessed by the third party verifier. The composting of organic waste and resulting diversion of waste from a landfill results in a permanent GHG emission reduction since the composting process cannot be reversed. This project type does not involve biological or geological sequestration-related risks.

3.3 Roles and responsibilities

Project Proponent: AIM Environmental Group Address: 419-1100 S Service Rd, Stoney Creek, ON L8E 0C5 Contact: Scott Carney Phone: (905) 560-0090 Fax: (905) 560-0099 Email: [email protected]

Authorized Project Contact: Blue Source Canada ULC Address: Suite 1605, 840 7th Avenue SW, Calgary, Alberta T2P 3G2 Contact: Andre Buiza Phone: (403) 262-3026 ext 437 Fax: (403) 269-3024 Email: [email protected]

Project Verifier: GHD Address: 455 Phillip Street Waterloo, Ontario Contact: Erik Martinez email: [email protected]

3.4 Reporting period

For the purposes of this project report, the carbon dioxide equivalent VERRs are claimed for activities from August 1, 2019 to September 30, 2020.

3.5 Summary of Environmental Impact Assessment

An environmental impact assessment was not required for this project.

3.6 Stakeholder Consultations Stakeholder consultations were not required for this project. The protocol was, however, developed following a transparent consultation process with industry stakeholders to ensure the relevance, accuracy, conservativeness, consistency, and transparency of the protocol.

Page 39: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 11

3.7 Detailed Chronological Plan

The Project facility was completed in January 2006. The Project was listed on the CSA CleanProjects Registry in June 2011 for actions beginning in January 2006. The first project reporting period spanned January 10, 2006 to December 13, 2009. The most recent reporting period covers January 1, 2016 – July 31, 2019. The current reporting period covers August 1, 2019 – September 30, 2020.

4 Inventory of Sources and Sinks The Protocol contains a list of baseline and project sources, sinks and removals (SSRs) that are deemed applicable for projects developed according to the Protocol. Figure 6 and Figure 7 highlight the SSRs in the project and baseline lifecycle respectively.

Page 40: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 12

Figure 6. Project Element Life Cycle Diagram

Page 41: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 13

Figure 7. Baseline Element Life Cycle Diagram

Page 42: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 14

4.1 Quantification of estimated GHG emissions/removals The following equations serve as the basis for calculating the emission reductions from the comparison of the baseline and project conditions as per the Project Protocol:

Where the following SSRs have been considered applicable to the project:

Emissions Baseline = sum of the emissions under the baseline condition:

1. Emissions Decomposition and Methane Collection / Destruction = emissions under SS B6 Material Decomposition and Methane Collection / Destruction

Emissions Project = emissions under the project condition:

1. Emissions Facility Operation = emissions under SS P6 Facility and Composting Facility Operation. 2. Emissions Material Treatment = emissions under SS P7 Material Treatment 3. Emissions Residue Decomposition and Methane Collection = SS P14 Reside Decomposition and Methane

Collection / Destruction 4. Emissions Fuel Extraction / Processing = emissions under SS P16 Fuel Extraction and Processing

No SSRs included in the Protocol’s quantification methodology were excluded from quantification.

Emission Reductions = Emissions Baseline - Emissions Project

Emissions Project = Emissions Facility Operation + Emissions Material Treatment + Emissions Residue Decomposition and Methane Collection + Emissions Fuel Extraction and Processing

Emissions Baseline = Emissions Decomposition and Methane Collection / Destruction

Page 43: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 15

4.1.1 Quantification of sources and sinks Table 1 below, provides a summary of the SSRs included and excluded from quantification as defined in the Protocol, (Alberta Environment, December 2008). It should be noted that the inclusion/exclusion of SSRs and related justifications are generic and were not modified for this specific project.

Table 2. Inclusion and Exclusion of Sources, Sinks and Removals of GHG emissions, extracted from the Protocol

Identified SS Include or Exclude from

Quantification Justification for Exclusion

P1 Organic Residue Generation Exclude

Excluded as the generation of residues is not impacted by the implementation of the project and as such the baseline and project conditions will be functionally equivalent. B1 Residue Generation

P2 Source Separation Exclude Excluded as this is a manual process with negligible related emissions of greenhouse gases.

P3 Collection and Transportation Exclude

Excluded as the emissions from transportation are likely functionally equivalent to the baseline scenario. B2 Collection and Transportation

P4 Off-Site Residue Processing Exclude Excluded as the emissions from off-site processing are a component of an integrated waste management plan and would therefore be functionally equivalent to the baseline scenario.

P5 Transportation Exclude Excluded as the emissions from transportation are likely functionally equivalent to the baseline scenario.

P15 Electricity Usage Exclude

Excluded as these SS’s are not relevant to the project as the emissions from these practices are covered under proposed greenhouse gas regulations. B7 Electricity Usage

P16 Fuel Extraction / Processing Include N/A

B8 Fuel Extraction / Processing Exclude Excluded as there is no fossil fuel usage being considered in the baseline and these emissions are therefore not relevant to the project.

P17 Fuel Delivery Exclude Excluded as these SS’s are not relevant to the project as the emissions from these practices are covered under proposed greenhouse gas regulations. B9 Fuel Delivery Exclude

P6 Processing and Composting Facility Operation

Include N/A

P7 Material Treatment Include N/A

Page 44: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 16

Identified SS Include or Exclude from

Quantification Justification for Exclusion

P8 Compost Handling Exclude Excluded as emissions under these SS’s are included in P6 Processing and Composting Facility Operation as these processes are typically part of the integrated site operations. P11 Residue Handling Exclude

B3 Residue Processing Exclude Excluded as emissions are only in baseline condition and thus would only serve to increase the quantity of emissions reductions achieved. As these emissions are difficult to calculate with any certainty, it is conservative to exclude them.

P9 Compost Transportation Exclude Excluded as the emissions from transportation are likely functionally equivalent to the baseline scenario.

P10 Compost Utilization Exclude

Excluded as the sequestration of carbon is difficult to quantify without knowing the end-point for the compost. Further, the emissions of methane and nitrous oxide are negligible given the standard of compost required under the protocol.

P12 Residue Transportation Exclude

Excluded as the emissions from transportation are likely functionally equivalent to the baseline scenario. B4 Residue Transportation

P13 Residue Disposal Exclude

Excluded as the emissions from residue disposal operations are likely functionally equivalent to the baseline scenario. B5 Material Disposal

P14 Residue Decomposition and Methane Collection / Destruction

Include N/A

B6 Material Decomposition and Methane Collection / Destruction

Include N/A

P18 Development of Site Exclude Emissions from site development are not material given the long project life, and the minimal site development typically required.

B10 Development of Site Exclude Emissions from site development are not material for the baseline condition given the minimal site development typically required.

P19 Building Equipment Exclude Emissions from building equipment are not material given the long project life, and the minimal building equipment typically required.

Page 45: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 17

Identified SS Include or Exclude from

Quantification Justification for Exclusion

B11 Building Equipment Exclude Emissions from building equipment are not material for the baseline condition given the minimal building equipment typically required.

P20 Transportation of Equipment Exclude Emissions from transportation of equipment are not material given the long project life, and the minimal transportation of equipment typically required.

B12 Transportation of Equipment Exclude Emissions from transportation of equipment are not material for the baseline condition given the minimal transportation of equipment typically required.

P21 Construction on Site Exclude Emissions from construction on site are not material given the long project life, and the minimal construction on site typically required.

B13 Construction on Site Exclude Emissions from construction on site are not material for the baseline condition given the minimal construction on site typically required.

P22 Testing of Equipment Exclude Emissions from the testing of equipment are not material given the long project life, and the minimal testing of equipment typically required.

B14 Testing of Equipment Exclude Emissions from the testing of equipment are not material for the baseline condition given the minimal testing of equipment typically required.

P23 Site Decommissioning Exclude Emissions from decommissioning are not material given the long project life, and the minimal decommissioning typically required.

B15 Site Decommissioning Exclude Emissions from decommissioning are not material for the baseline condition given the minimal decommissioning typically required.

Page 46: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 18

Table 2 below summarizes the emission factors used in the Project.

Table 3. Emission Factors used in the Project

Parameter Relevant SS

CO2 Emission Factor

CH4 Emission Factor

N2O Emission Factor

Emission Factor Source

Natural gas combustion (EFNG)

P6 1888 g/m3 0.037 g/m3 0.034 g/m3

National Inventory Report 1990-2017, Part 2, Annex 6, 2019, Table A6-1, Page 220; value for Ontario

Natural gas extraction (NGEX) P16 43 g/ m3 2.3 g/m3 0.004 g/ m3

Carbon Offset Emission Factors Handbook (v1.0, 2015)

Natural gas processing (NGP)

P16 9 g/ m3 0.3 g/m3 0.003 g/ m3

Diesel gas combustion (EFDG) P6 2681 g/L 0.133 g/L 0.4 g/L

National Inventory Report 1990-2017, Part 2, Annex 6, 2019, Table A6-1, Page 220; value for Ontario

Diesel production (EFDG,XP) P16 0.138 kg/L 0.0109

kg/L 0.000004 kg/L Carbon Offset Emission Factors Handbook (v1.0, 2015)

Ontario Electricity Grid Consumption Intensity

P6 30g/kWh n/a n/a

National Inventory Report 1990-2018, Part 3, 2020, Table A13-7 Page 66; value for Ontario

Page 47: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 19

Composting Material Treatment (EFcomp)

P7 n/a; biogenic

0.03 kg/tonne 0.06kg/tonne

2006 IPCC Guidelines for National Greenhouse Gas Inventories. Volume 5, Chapter 4: Biological Treatment of Solid Waste

Table 3 highlights the global warming potentials used for this Project, applied to the vintage year being quantified. Table 4 summarizes the landfill design parameters used in the baseline calculations for emission source/sink B6.

Table 4. Global Warming Potential, 2007 IPCC

Greenhouse Gas Species: Carbon Dioxide

(CO2) Methane

(CH4) Nitrous Oxide

(N2O) Global Warming Potential VY 2016: 1 25 298

Table 5. Landfill Design parameters

Parameter Methane

Correction Factor

Degradable Organic Carbon

Fraction of DOC

Dissimilated

Methane Landfill

Gas Fraction

Fraction of

Methane Recovery

Oxidation Factor

Methane Generation

Potential

Landfill Decay Rate (yr-1)

Notation MCF DOC DOCf F R Ox Lo k

Ontario 1.00 0.21 0.50 0.50 0.323 0.10 0.0700 0.0367

MCF – assigned value of 1.0 as all landfills would have been managed and operated in anaerobic conditions

DOC – as detailed information about the landfill waste composition is not available, the Ontario value from the 2016 NIR was used.

DOCf – The baseline scenario considers that without the activity of the Project, there would be no demand for the organic waste other than the baseline adjustment of 20% diversion activity would occur at the landfill, which is accounted for elsewhere. Therefore, the default DOCf of 0.5 was used.

F – the fraction of methane in landfill gas production was the default value in the Handbook

R – a value of 32.3% was used, as it is the average percentage of landfill gas captured in Ontario according to a recent report by the OWMA2F

3. The organic waste used in the AIM composting facility would have otherwise been landfilled in Ontario. The Ontario Regulation requiring large landfills to capture landfill gas does not specify a landfill gas capture efficiency requirement. There is no data available for specific

3 OWMA. Greenhouse Gas Emissions and the Ontario Waste Management Industry. Retrieved from: http://www.owma.org/Portals/2/Cover_Page_Image/OWMA%20GHG%20Report%20December%202015.pdf

Page 48: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 20

landfill gas capture efficiency, and as the waste is coming from multiple regions in Ontario, it is considered appropriate to use the Ontario average value.

Lₒ – the Lₒ value for Ontario was calculated using the given equation and outlined further in this section.

PCPN – annual precipitation data from the Environment Canada 30-year Climate Normal using the historic average normal value from 1981-2010.

K – the k-value was calculated using the recommended equation from the 2015 Alberta Carbon Offset Emission Factors Handbook, Version 1.0: k=0.00003*PCPN + 0.01

4.1.2 List of Assumptions The following assumptions were made to complete the quantification:

Table 6. List of Assumptions Assumption Description Source/Sink

Impact Justification

Ontario landfills

The landfill parameters for the Project are assumed to be similar to an average landfill in Ontario in terms of landfill gas capture.

SS B6 & P14 The Ontario landfill regulation does not require a minimum gas capture percent and little landfill specific efficiency data is available. The Ontario average assumption has been used since the Offset Project Design and has been updated to 2015 values. A report issued by the OWMA in December 2015 estimates that only 4 out of 12.4 Mt of gas is currently captured.

Material Treatment Emissions

The emissions factors related to composting treatment from the IPCC 2006 report3F

4 include a large range of default emission values. The lower end of this range was used for the AIM facility.

SS P7 The AIM facility uses state of the art technologies with well aerated composting processes. The IPCC values apply to a range of composting and anaerobic digestion systems. It is noted in the report that poorly working composts are likely to produce more CH4 and N2O emissions. The emissions of CH4 and N2O can occur in anaerobic sections of the compost but will be oxidised in aerobic sections. Due to the high quality aeration practices at AIM, along with process temperature and oxygen monitoring, it is assumed that the CH4 and N2O emissions relating to composting treatment are

4 International Panel on Climate Change (IPCC). 2006. 2006 IPCC Guidelines for National Greenhouse Gas Inventories. Chapter 4: Biological Treatment of Solid Waste. Retrieved from: http://www.ipcc-nggip.iges.or.jp/public/2006gl/pdf/5_Volume5/V5_4_Ch4_Bio_Treat.pdf

Page 49: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 21

Assumption Description Source/Sink Impact

Justification

minimized, and the lower end of the IPCC ranges for emissions were used.

5. Selection and Justification of the Baseline Scenario Three baseline scenarios were evaluated for the Project. These scenarios and the relevant barriers affecting each of these scenarios are summarized in Table 6 below.

Table 7. Barriers Assessment of Baseline Alternative Scenarios

Baseline Scenario Alternatives Relevant Barriers

Alternative 1: Anaerobic Digestion of Organic Waste

Financial/Economic: Developing an anaerobic digestion project would require significant investments for capital expenditure and operation. Institutional: An anaerobic digestion facility would require expertise and specialized training of personal. The operation and maintenance of such a facility is challenging and costly.

New Technology: An anaerobic digestion facility would require extensive research and development efforts. The anaerobic digestion process produces strong odours, which are undesirable in an urban area. The anaerobic digestion process also takes much longer than aerobic composting and requires additional heating requirements.

Alternative 2: Landfilling of organic waste

Financial/Economic: Disposal of waste in a landfill is the most common disposal method nationally. Prior to the initiation of the Project, organic waste was disposed in the landfill. No major infrastructure investment would be required and is therefore a viable alternative. Legal: The disposal of waste material in landfills is compliant with all legal regulatory requirements. There are no municipal bylaws mandating the diversion of organic waste from landfills, and prohibiting organic waste from being accepted in landfills.

Institutional: This scenario would not require any major additional training for operation of existing landfills. Landfill operations are well understood and already underway.

Alternative 3: Waste to Energy Project through Incineration of Organic Waste

Financial/Economic: Developing a waste to energy project would require significant investments for capital expenditure and operation. Institutional: An incineration facility would require expertise and specialized training of personal. The operation and maintenance of such a facility is challenging and costly.

Page 50: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 22

New Technology: Waste to Energy Incineration projects are not commonplace in Ontario or Canada. Such a facility would require extensive research and development efforts. Also, as the waste being sent to AIM’s CCF is residential SSO, it will likely have a low calorific value and a high moisture content, and therefore not be suitable for incineration.

Based on the barriers test above, BASELINE SCENARIO ALTERNATIVE 2 is considered the most likely baseline scenario.

The baseline scenario is defined as the use of the pre-existing landfills for the disposal of municipal solid organic waste.

The baseline requires an adjustment as it is likely that some of the waste sent to AIM’s CCF would have been diverted from landfills regardless of AIM’s operations. The Aerobic Composting Protocol prescribes a baseline adjustment assuming a diversion rate of 20%. As a result, 20% of the total organic waste is subtracted prior to calculating the baseline emissions.

The baseline condition must also consider landfill gas capture practices in Ontario. Ontario Regulations require landfill gas capture for large landfills. However, not all landfills required to capture gas under Regulation are currently doing so. Secondly, for landfills that do capture gas, no efficiency criteria is set by the Regulation, and little data exists as to the actual capture rate of specific landfills. Therefore, the average Ontario landfill gas capture rate of 32.3% as reported by the OWMA, is assumed.

The Project will reduce GHG emissions from the Baseline condition described here. These emissions reductions are obtained at AIM’s CCF, and are a direct result of voluntary and additional activities by AIM Environmental Group.

Page 51: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource 23

6. Quantification Methodology

6.1 Baseline Emissions Quantification Methodology

SS B6 Quantification of the Baseline Emissions from Material Decomposition and Methane Collection/Destruction

The methane generation potential of waste streams disposed of in a landfill is determined using the First Order Decay (FOD) Methane Quantification Model from the Carbon Offset Emission Factors Handbook (Version 1.0, March 2015).

𝑄𝑄CH4,𝑡𝑡 = ��k × (𝑀𝑀𝐴𝐴𝐴𝐴) × 𝐿𝐿𝐿𝐿 × 𝑒𝑒−𝑘𝑘(𝑡𝑡−1) × (1 − 𝑅𝑅�𝑡𝑡=40

𝑡𝑡=1

× (1 − 𝑂𝑂𝑂𝑂)

Inputs to this equation are summarized in Table 4.

6.2 Project Emissions Quantification Methodology

Emissions Facility Operations = emissions under SS P6 Processing and Composting Facility Operation

Emissions Facility Operations = (Vol. Fuel i * EF Fuel I CO2); (Vol. Fuel i * EF Fuel I CH4); (Vol. Fuel i * EF Fuel I N2O); (EC * EFGRID, CO2e)

Where:

Fuel i = Natural Gas, Diesel Gas EF Fuel = Fuel i Combustion Emissions Factor EC = Facility Electricity Consumption EFGRID = Ontario Electricity Grid consumption factor, 30g/kWh

Emissions Material Treatment = emissions under SS P7 Material Treatment

Emissions Material Treatment = (Mass Composting Material * EF COMP., CH4); (Mass Composting Material * EF COMP., N2O)

Where:

Emissions Baseline = Emissions Decomposition and Methane Collection / Destruction

Emissions Project = Emissions Facility Operation + Emissions Material Treatment + Emissions Residue Decomposition and Methane Collection + Emissions Fuel Extraction and Processing

Page 52: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource 24

Mass Composting Material = mass of organic waste that goes through AIM’s Facility EF COMP = emission factors related to the biological treatment of waste (refer to Table 2)

Emissions Decomposition and Methane Collection/Destruction = emissions under SS P14 Residue Decomposition and Methane Collection/Destruction

The methane generation potential of waste streams disposed of in a landfill is determined using the First Order Decay (FOD) Methane Quantification Model from the Carbon Offset Emission Factors Handbook (Version 1.0, March 2015). As there is no CH4 collection and destruction system in place at the composting facility, the capture of CH4 is zero and not included in the calculation.

𝑄𝑄CH4,𝑡𝑡 = ��k × (𝑀𝑀𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟) × 𝐿𝐿𝐿𝐿 × 𝑒𝑒−𝑘𝑘(𝑡𝑡−1) × (1 − 𝑅𝑅�𝑡𝑡=40

𝑡𝑡=1

× (1 − 𝑂𝑂𝑂𝑂)

Inputs to this equation are summarized in Table 4, where:

Mresc = the mass of residue that will undergo decomposition is equal to 44.4% of the total residue mass as determined by Plastics lab testing results provided by AIM.

Emissions Fuel Extraction and Processing = (Vol. Fuel i * EF Fuel I CO2); (Vol. Fuel i * EF Fuel I CH4); (Vol. Fuel i * EF Fuel I N2O)

Where:

Fuel i = Natural Gas, Diesel Gas EF Fuel = Fuel Extraction, Processing or Production Emissions Factor

7. Monitoring Plan In general, the data control processes employed for this Project consist of manual or metered data capture and reporting, and manual entry of monthly totals or average values into a Quantification Calculator that was originally developed for the quantification of GHG reductions according to the Protocol. The primary methods of data collection are the reconciliation of monthly natural gas utility bills, electricity invoices, diesel sales receipts, and weight tickets for organic waste deliveries. Table 7 summarizes the data monitoring and collection procedures for the primary data required for the quantification methodology. The mass of organic waste is recorded on weight scale tickets for every load coming into the facility and going out of the facility on a daily basis. The information is verified daily against an excel spreadsheet. The paper tickets are stored for a minimum of 7 years by type and source. All tickets are verified monthly for any errors.

Page 53: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource 25

Table 8. Monitoring Plan

SSR identifier or name

Data parameter

Estimation, modeling,

measurement or calculation approaches

Data Recording

Data unit Sources/Origin Monitoring frequency

Description and justification of

monitoring method

Uncertainty Deviation from

the Protocol

B6, P7 Quantity of Source Separated Organics Received

Monthly summary of measured weight from scale tickets

Scale Tickets record per load weight

Tonnes AIM Scale Ticket Records

Per load as delivered

This represents the highest frequency of data collection available.

Uncertainty surrounding this measurement is low, as weigh scales are calibrated according to best practices and all trucks are weighed in.

None

P6, P16 Natural Gas Consumption

Natural Gas Utility Bills

Continuous metering of natural gas volumes by the utility meter

Cubic metres

Union Gas Bills Continuous Natural gas meter is maintained by the gas utility and is subject to Government of Canada measurement requirements.

Uncertainty Is low for the volumes of natural gas as this data originates from reliable sources.

None

Diesel Consumption

Fuel Invoices Volume of fuel delivered per load indicated on Fuel invoices

Litres Fuels Inc. Invoices

Per load as delivered

Fuel consumption varies over time depending on equipment use and other factors. Fuel invoices are the most reliable

Uncertainly is low as the data is considered to be reliable.

None

Page 54: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource 26

source to monitor fuel consumption.

P6 Electricity Consumption

Monthly Electricity Invoices

Sub-Meter for CCF Portion of Monthly Electricity Invoices (also includes office building)

kWh Electricity Invoices

Continuous Electricity sub-meter is maintained by the gas utility and is subject to Government of Canada measurement requirements.

Uncertainty Is low for the metered electricity as this data originates from reliable sources.

None

P14 Residue Sent to Landfill

Monthly summary of measured weight from scale tickets

Scale Tickets record per load weight

Tonnes AIM Scale Ticket Records

Per load as delivered

This represents the highest frequency of data collection available.

Uncertainty surrounding this measurement is low, as weigh scales are calibrated according to best practices and all trucks are weighed in.

None

Page 55: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 27

8 Data Information Management System and Records

8.1 Data Management and QA/QC at the AIM Central Composting Facility The quantification of the mass of organic waste for composting is completely manual and is based on monthly reconciliation of weigh tickets of organic waste received. A summary of deliveries is provided by AIM. The natural gas, diesel, and electricity consumption due to onsite activities are provided by utility bills, fuel invoices, and summarized electricity invoices, respectfully. Manual checking will be conducted on an annual basis by a third-party and will consist of:

• Reconciliation of values in the calculator with hard copy records of electronic data; • Comparison with data from other time periods to identify any major discrepancies; and • Recalculation of selected values to ensure that the Calculator remains accurate.

8.2 Data Management and QA/QC at Bluesource Blue Source Canada ULC (Bluesource) holds itself to the highest professional and ethical standards. Staff all have experience in working on GHG projects and/or training in the use of ISO14064-2. Junior staff members are mentored closely until their level of competence is deemed sufficient for them to work more independently. This experience and training help to ensure that errors and omissions are minimised and that project documentation is compiled in accordance with the principles of relevance, completeness, consistency, accuracy, transparency and conservativeness. Bluesource operates a rigorous internal QA/QC process that is built around the principle of senior review. The quantification calculator, for example, will be checked for:

• Transcription errors/omissions • Correctly functioning links/formulas in spreadsheets • Correct and transparent referencing of data sources • Justification of assumptions

Issues are recorded in Bluesource’s QA/QC checklist for the project (and, as necessary, embedded into the reviewed version of the documents and/or calculator) and these will be corrected before these are sent to the third-party verifier. Staff sign an “Attestation of Quality Assurance and Quality Control” to document that the QA/QC process was followed. This QA/QC process is kept under constant review.

8.2.1 Back-up Procedures at Bluesource Electronic data is backed up by Bluesource’s IT service provider, Calitso. A copy of the current back-up procedure is provided as Appendix A.

Page 56: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 28

8.2.2 Document Retention Policy at Bluesource Bluesource operates a documentation retention policy, which all staff must abide by as a condition of their employment. A copy of this document retention policy is provided as Appendix B.

9 Reporting and Verification Details This report has been prepared in accordance with ISO 14064-2 and GHG CleanProjectsTM requirements.

The verifier, GHD Limited, is an independent third-party. Contact details for the verifier have been included in Section 3.3 of this report.

An acceptable verification standard (e.g., ISO14064-3) has been be used and the verifier was vetted to ensure technical competence with this project type. The verifier was engaged to provide a reasonable level of assurance.

10 Statement of Senior Review This offset project plan was prepared by Andre Buiza, Carbon Solutions Analyst, Bluesource Canada and senior reviewed by Tooraj Moulai, Director of Engineering & Technical Services, Bluesource Canada. Although care has been taken in preparing this document, it cannot be guaranteed to be free of errors or omissions.

Prepared by:

Senior reviewed by:

Andre Buiza 01/19/2021

Tooraj Moulai 01/20/2021

Page 57: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHG Report – AIM Central Composting Facility Project March 2021

Prepared by Bluesource Canada 29

11 Works Cited AIM Environmental Group. (nd). Hamilton Centralized Composting Facility. Retrieved from:

http://www.compost.org/conf2006/8BestManagementPractices/CCFPresentation.pdf Alberta Environment. (December 2007). Quantification Protocol for Aerobic Composting Projects, v1.1.

Edmonton: Alberta Environment. Environment Canada. (2019). National Inventory Report,1990-2017Part 2. Environment Canada. Environment Canada. (2020). National Inventory Report,1990-2018 Part 3. Environment Canada. Government of Alberta. (March 2015). Carbon Offset Emission Factors Handbook, version 1.0.

Edmonton: Government of Alberta. Ontario, Ministry of the Environment (2011). O. Reg. 101/94: Recycling and Composting of Municipal

Waste. Retrieved from: https://www.ontario.ca/laws/regulation/940101 Ontario, Ministry of the Environment (2011). O. Reg. 232/98: Landfilling Sites. Retrieved from:

https://www.ontario.ca/laws/regulation/980232 Ontario Waste Management Authority (OWMA). (2015) Greenhouse Gas Emissions and the Ontario

Waste Management Industry. Retrieved from: http://www.owma.org/Portals/2/Cover_Page_Image/OWMA%20GHG%20Report%20December%202015.pdf

Page 58: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD | Verification Report | 11219983 (2)

Appendix B Verification Plan

Page 59: 11203285-RPT-#-Draft Verification Report AIM Composting ...

GHD 455 Phillip Street Unit #100A Waterloo Ontario N2L 3X2 Canada T 519 884 0510 F 519 884 0525 W www.ghd.com

January 8, 2021 Reference No. 11219983 Revised February 26, 2021 Mr. Tooraj Moulai Director of Engineering & Technical Services Blue Source Canada ULC 840 7th Ave SW, Suite 1605 Calgary, Alberta T2P 3G2 Dear Mr. Moulai: Re: Verification Plan

Verification Services for AIM Hamilton Central Composting Facility, Hamilton, Ontario (Project Identifier: 5218-7014) CSA Clean Projects Registry

1. Introduction

Blue Source Canada ULC (Blue Source) retained GHD Limited (GHD) to conduct a verification of the AIM Hamilton Central Composting Facility (Facility) Canadian Standards Association (CSA) Clean Projects Registry GHG Emissions Report (Report) for the reporting period of August 1, 2019 and September 30, 2020. The Facility is located in Hamilton, Ontario and activities consist of aerobic composting activities. The verification will be conducted in general accordance with ISO 14064 – Greenhouse Gases standards (ISO 14064), as required by the CSA Clean Projects Registry program.

GHD prepared this Verification Plan in accordance with ISO Standard ISO 14064 Greenhouse gases Part 3: Specification with guidance for the validation and verification of greenhouse gas assertions (ISO 14064-3).

2. Verification Objective

The objective of the verification is to provide Blue Source and CSA with assurance that the Clean Projects Registry Emissions Report contains no material discrepancy and is prepared in general accordance with ISO 14064.

3. Level of Assurance

The verification will be conducted to a reasonable level of assurance. If a verification statement is provided, it will be worded in a manner to meet the requirements set forth by ISO 14064 and CSA.

Page 60: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 2

4. Verification Standards

For the verification, GHD will apply ISO 14064-3 as the standard.

5. Verification Criteria

For this verification, GHD applied the following criteria:

• ISO 14064 Greenhouse gases – Part 1: Specification with guidance at the organization level for quantification and reporting of greenhouse gas emissions and removals, ISO, March 2006 (ISO 14064-1)

• ISO 14064 Greenhouse gases – Part 2: Specification with guidance at the project level for quantification, monitoring and reporting of greenhouse gas emission reductions or removal enhancements, ISO, March 2006 (ISO 14064-2)

• ISO 14064 Greenhouse gases – Part 3: Specification with guidance for the greenhouse gas assertions, ISO, March 2006 (ISO 14064-3)

• Quantification Protocol for Aerobic Composting Projects (Version 1.1) (Protocol), Alberta Environment and Sustainable Resource Development (AESRD), 2008

6. Review Team

6.1 Roles and Responsibilities

Lead Verifier – Erik Martinez, P.Eng. – Mr. Martinez will lead the verification and is responsible for developing the verification plan. Mr. Martinez will review the risk assessment, raw data, data management procedures, and draft findings. Mr. Martinez will prepare and sign the verification statement and verification report.

Verifier – Filzah Nasir, M.A.Sc. – Ms. Nasir will aid in the development and revision of the verification plan and sample plan, develop a risk assessment, review raw data, review management of data quality and prepare draft findings.

Peer Reviewer – Jenn Packer, P.Eng. –Ms. Packer will complete a peer review of the verification plan, risk assessment and verification report and findings.

6.2 Qualifications

Lead Verifier – Erik Martinez, P. Eng.

Erik is a licensed air quality engineer in Ontario with over 15 years of experience in atmospheric science, air dispersion modelling, emission inventories, and environmental compliance. Erik has a Bachelor of Applied Science in Environmental Engineering - Chemical Specialization from the University of Waterloo.

Page 61: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 3

Erik has worked on numerous projects involving the measurement, estimation, and abatement of emissions. Erik has extensive experience preparing emissions inventories, and Facility GHG assessments in accordance with the ISO protocols and reporting requirements under O. Reg. 143/16. Erik has acted as the lead verifier/validator on numerous GHG assessments in Ontario and has completed peer reviews and acted as the Technical Expert for compliance reports, emission reduction projects and offsets under the OCE TargetGHG Program, GreenON Industries, and the Alberta Specified Gas Emitters Regulation.

Verifier – Filzah Nasir, M.A.Sc.

Filzah has a Masters in Environmental Engineering which specialized in developing an emissions inventory and quantifying emissions of greenhouse gases and criteria air contaminants. Filzah has completed GHG verifications as a verifier for multiple jurisdictions including Ontario, Alberta, Newfoundland, and Saskatchewan. Filzah has extensive experience conducting GHG verifications for a range of sectors including electricity generation, manufacturing, iron and steel production, oil and gas production, and petroleum refining.

In addition to GHG verifications, Filzah has experience with analysis and calculation of emissions of greenhouse gases and criteria air contaminants from the implementation of climate change mitigation projects as well conducting GHG verifications for voluntary projects under the American Carbon Registry and the Ontario Centres of Validation.

Peer Reviewer – Jenn Packer

Jennifer is a Professional Engineer in Alberta and Ontario, with a Master's of Science degree in Sustainable Energy Development from the University of Calgary. Jennifer is based out of our Waterloo office and has over eight years of experience related to GHG emissions reporting and verification. Her experience as a lead verifier, peer reviewer, and technical expert includes verifications under the CleanProjects ™ Registry, Alberta Specified Gas Emitters Regulation (compliance and offset projects), Ontario Regulation 143, and the Clean Development Mechanism.

Jennifer has been involved in over 60 compliance and offset verifications, applying the ISO-14064 standard including landfill gas recovery, anaerobic digestion, biomass combustion, acid gas injection, wind power generation, composting facilities, coal and natural gas power generation, Steam Assisted Gravity Drainage (SAGD), open pit mining oil sands, heavy oil upgrading, refining and chemical processing, and natural gas processing. Jennifer has direct experience with the verification of emissions reductions projects applying the Quantification Protocol for Diversion of Biomass to Energy from Biomass Combustion Facilities including.

7. Project Understanding

The Facility processes source separated organic waste into compost through an aerobic in-vessel tunnel process. Waste is collected from the City of Hamilton, Region of Halton, and the County of Simcoe, as

Page 62: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 4

well as other Ontario municipalities in the region. The AIM Central Composting Facility (Project) uses the Quantification Protocol for Aerobic Composting Projects (Version 1.1).

8. Verification Scope

8.1 Facility Emission Sources

The conditions prior to the implementation of the project consist of organic waste disposal in landfill, where it would decompose anaerobically and produce methane (CH4). This represents the baseline scenario. The project achieves GHG emission reductions through aerobic composting of the organic waste, thereby reducing methane generation in the landfill under the baseline.

The following Facility emission sources, sinks, and reservoirs are associated with the Project:

• Fuel Extraction/Processing

• Processing and Composting Facility Operation

• Material Treatment

• Residue Decomposition and Methane Collection/Destruction

• Material Decomposition and Methane Collection/Destruction

8.2 Geographical and Organizational Boundaries

The verification included the emission sources from the following Facility:

AIM Hamilton Central Composting Facility 1579 Burlington Street East Hamilton, Ontario, Canada Latitude: 43° 15' 25,00" N Longitude: 79° 47' 53,84" W

8.3 Reporting Period

The reporting period is between August 1, 2019 and September 30, 2020.

8.4 Use of this Report

This report has been prepared for the use of Blue Source and CSA.

Page 63: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 5

9. Verification Schedule

The following details the schedule of GHD's verification, identifying the dates of key tasks and completion of major milestones:

• Project award and kick-off call – December 9, 2020

• Initial document request – December 9, 2020

• Issue Verification Plan – January 8, 2021

• Site Visit – January 2021

• Submit issues log to Blue Source and opportunity for Blue Source to address issues and, if required, revise project report(s) – Week of February 18, 2021 and as-needed throughout verification process

• Issue Draft Verification Report and Statement – February 26, 2021

• Issue Final Verification Report – Week of March 1, 2021

10. Assessment of Risk and Magnitude of Potential Errors, Omissions or Misrepresentations

Based on GHD's initial review of the Facility operations, the following table summarizes the potential risk and magnitude of potential errors, omissions or misrepresentations, as currently known.

• During the review, any new risks or material concerns that could potentially lead to errors, omissions and misrepresentations will be identified, reviewed and assessed.

Potential Risk Area Percentage of Emissions (%)

Risk Type (Inherent, Control, Detection)

Risk Level (High, Medium, Low)

Justification

Baseline Scenario

B6: Material Decomposition and Methane Collection / Destruction – Organic Waste Tonnage

100% of BE Inherent High Complexity of calculations is low and tonnages are tracked by weigh scale, which allows for a low inherent risk. High magnitude source of emissions.

Control Medium Emissions are based on a provincial average landfill gas capture rate, resulting in a medium control risk.

Detection Medium The allowable detection risk is low; GHD will review all material tonnage and weigh scale data available, lowering the detection risk to medium.

Page 64: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 6

Potential Risk Area Percentage of Emissions (%)

Risk Type (Inherent, Control, Detection)

Risk Level (High, Medium, Low)

Justification

Project Scenario

P6: Processing and Composting Facility Operation – Electricity Consumption

~12% of PE

Inherent Low Complexity of calculations is low.

Control Low Emissions are based on consumption from 3rd party invoices providing for low control risk.

Detection Low GHD will review electricity invoices for the reporting period, allowing for a low detection risk.

P6: Processing and Composting Facility Operation – Diesel Consumption

Inherent Low Complexity of calculations was low.

Control Medium Emissions are based on fuel delivery, which does not accurately reflect consumption. Therefore the control risk is set to medium, as there was a potential for the consumption quantity to be different than the delivered quantity.

Detection Medium/ Low

The allowable detection risk is high; however, GHD will review all data available for the reporting period, lowering the detection risk.

P6: Processing and Composting Facility Operations – Natural Gas Consumption

Inherent Low Complexity of calculations is low.

Control Low Emissions are based on consumption from 3rd party invoices providing for low control risk.

Detection Low GHD will review natural gas invoices for the reporting period, lowering the detection risk to low.

P16: Processing and Composting Facility Operation – Diesel Fuel Extraction and Production

~1% of PE Inherent Low Complexity of calculations is low.

Control Medium Emissions are based on fuel delivery, which does not accurately reflect consumption. Therefore the control risk is set to medium, as there was a potential for the consumption quantity to be different than the delivered quantity.

Detection Medium/ Low

The allowable detection risk is high; however, GHD will review all data available for the reporting period, lowering the detection risk.

Page 65: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 7

Potential Risk Area Percentage of Emissions (%)

Risk Type (Inherent, Control, Detection)

Risk Level (High, Medium, Low)

Justification

P16: Processing and Composting Facility Operation – Natural Gas Extraction and Production

Inherent Low Complexity of calculations is low.

Control Low Emissions were based on consumption from 3rd party invoices providing for low control risk.

Detection Low GHD will review natural gas invoices for the reporting period, lowering the detection risk to low.

P7: Processing and Composting Facility Operation – Material Treatment

~20% of PE Inherent Medium Complexity of calculations is low and tonnages are tracked by internal weigh scale, which allow for a medium inherent risk.

Control Low Emissions were based on prescribed emission factors.

Detection Medium GHD will review all weigh scale data available, lowering the detection risk, lowering the detection risk to medium.

P14: Residue Decomposition and Methane Collection / Destruction – Organic Waste Tonnage

~66% of PE Inherent High Complexity of calculations is low and tonnages are tracked by internal weigh scale, and this is a large source of emissions. The inherent risk is high.

Control Low Emissions are calculated based on prescribed emission factors.

Detection Medium GHD will review all material tonnage and weigh scale data available, lowering the detection risk to medium.

General Data Management Systems

N/A Inherent Medium Moderate complexity in data management, given numerous sources of data likely collected by multiple employees.

Control Medium/ Low

Data sources are likely predominantly invoices used for accounting, however the numerous data sources increased the control risk.

Detection Medium/ Low

GHD will review all data available to reduce the risk that a material error went undetected.

Page 66: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 8

11. Sampling Plan

GHD has developed a sampling plan based on review of the objectives, criteria, scope, and level of assurance detailed above. The sampling plan is dynamic and will be revised, as required, throughout the course of the verification. The following table summarizes the sampling plan:

Data/Information Description

Percentage of Emissions (%)

Data/Information Source

Collection Frequency

Sample size/Action

Baseline Emissions (BE)

B6: Material Decomposition and Methane Collection / Destruction – Organic Waste Tonnage

100% of BE • Waste feedstock tonnages from scale records

Daily Daily scale tonnage records for the reporting period

Project Emissions (PE)

P6: Processing and Composting Facility Operation – Electricity Consumption

~12% of PE • Third party electricity invoices

Monthly All invoices for the reporting period

• Source of Emission factors

N/A National Inventory Report (Environment Canada 2016)

P6: Processing and Composting Facility Operation – Diesel Consumption

• Fuel purchases from fleet records and invoices

Multiple Total purchased fuel for the reporting period

• Source of emission factors

N/A Emission Factor Handbook (AESRD, 2015)

P6: Processing and Composting Facility Operation – Natural Gas Consumption

• Third party natural gas invoices

Monthly All invoices for the reporting period

• Source of emission factors

N/A National Inventory Report (Environment Canada 2016)

P16: Processing and Composting Facility Operation – Diesel Fuel Extraction and Production

~1% of PE • Fuel purchases from fleet records and invoices

Multiple Total purchased fuel for the reporting period

• Source of emission factors

N/A Emission Factor Handbook (AESRD, 2015)

P16: Processing and Composting Facility Operation – Natural Gas Extraction and Production

• Third party natural gas invoices

Monthly All invoices for the reporting period

• Source of emission factors

N/A Emission Factor Handbook (AESRD, 2015)

Page 67: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 9

Data/Information Description

Percentage of Emissions (%)

Data/Information Source

Collection Frequency

Sample size/Action

P7: Processing and Composting Facility Operation – Material Treatment

~20% of PE • Waste feedstock tonnages from scale records

Daily Daily scale tonnage records for the reporting period

P14: Residue Decomposition and Methane Collection / Destruction – Organic Waste Tonnage

~66% of PE • Waste feedstock tonnages from scale records

Daily Daily scale tonnage records for the reporting period

• Residuals bin tonnages from third party invoices

As Received

As received tonnage records for residuals bin removal for the reporting period

General

Operations Overview N/A • Review of facility operations and emission sources

N/A N/A

Back up of data acquisition systems

N/A • General Data Management System

• Document retention policy

N/A Review frequency of data backup and interview site personnel

12. Quantitative Testing

Quantitative data or raw data will be made available to GHD. GHD will evaluate annual GHG emission calculation methodologies.

13. Materiality Level

Materiality for this verification has been set at 5 percent. A series of discrete errors, omissions or misrepresentations or individual or a series of qualitative factors, when aggregated, may be considered material.

14. Verification Procedures

The review procedures used in this verification will be used to assess the following:

1. Accuracy and completeness of annual GHG emissions

2. Uncertainty of external data sources used

Page 68: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 10

3. Emission assumptions

4. Accuracy of emission calculations

5. Potential magnitude of errors and omissions

To sustain a risk-based assessment, the GHD Project Team will identify and determine risks related to annual GHG emissions during both the desk reviews and the follow-up interviews. The GHD Project Team will particularly focus on the accuracy and completeness of provided information. The components of the document review and follow-up interviews are:

• Document Review:

- Review of data and information to confirm the correctness and completeness of presented information.

- Cross-checks between information provided in the project plan and information from independent background investigations.

- Determine sensitivity and magnitude analysis for parameters that may be the largest sources of error.

- Comparison of emission offsets from those of previous reporting year(s), as applicable.

• Follow-up Interviews:

- Via telephone

- Via email

The GHD Project Team will interview the project personnel in order to:

• Cross-check information provided

• Compare with projects or technologies that have similar or comparable characteristics

• Review data management and recording procedures

• Test the correctness of critical formulae and calculations

• Witness and compare with similar projects in the jurisdiction

The document review shall establish to what degree the presented GHG Emissions Report documentation meets the verification standards and criteria.

The GHD Project Team's document review during the verification process shall comprise, but not be limited to, an evaluation of the following:

• The documentation is complete and comprehensive and follows the structure and criteria given in the criteria.

• Baseline and monitoring methodologies are justified and appropriate.

Page 69: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 11

• The calculation of GHG offsets is appropriate and uses conservative assumptions for estimating GHG offsets.

• The GHG information system and its controls are sufficiently robust to minimize the potential for errors, omissions, or misrepresentations.

• The project meets the quantification protocol eligibility criteria.

Site Visits

As of the preparation of this verification plan, the Government of Canada has imposed travel restrictions due to the COVID-19 pandemic. GHD has also implemented enhanced safety procedures to protect workers, including deferring in-person site visits if required. Therefore it has been determined that due to the severity of the pandemic that in-person site visits will not be feasible due to travel restrictions and GHD safety procedures.

On March 23, 2020, the ANSI National Accreditation Body (ANAB) published Heads Up Issue 1 (https://anab.qualtraxcloud.com/ShowDocument.aspx?ID=17626) which documents their support for the use of information and communication technology (ICT) in conducting audits to a reasonable level of assurance, in accordance with IAF Mandatory Document for the Use of Information and Communication Technology for Auditing/Assessment Purposes (IAF MD 4:2018).

Virtual/remote site visits may be conducted through the use of ICT teleconferencing services that include audio, video and data sharing capabilities (e.g., Webex, Microsoft Teams, Skype or equivalent), in accordance with ANAB Heads Up Issue 1 and IAF MD 4:2018. Other ICT examples include recording of information and evidence by means of still video, video or audio recordings; provision of visual/audio access to remote or potentially hazardous locations; and/or assessment of documents and records by remote access.

It is GHD's opinion that ICT may be used to complete the Site Visit requirement for this verification, as GHD has in‑depth experience conducting GHG verifications for aerobic composting projects, giving GHD familiarity with emissions sources for this sector. In addition, the Facility's emission sources (fuel combustion) are low complexity with established calculation methodologies and emissions can be verified using generated internal and third-party data. GHD further has completed an in-person site visit in 2019 as part of the 2016-2019 reporting period verification.

No major changes have occurred at the Facility since this in-person site visit.

The decision to conduct the site visit using ICT is permissible if, after performing a documented risk assessment, the verifier (GHD) and Blue Source/AIM mutually agree. The agreement shall be documented in writing (e.g., via email) and will specify the proposed ICT method, and assurances that the proposed/chosen ICT method meets the information security, data protection measures and confidentiality requirements of both parties. The parties will not agree to the use of an ICT method which either party does not have the necessary infrastructure to support. Throughout the entire verification process,

Page 70: 11203285-RPT-#-Draft Verification Report AIM Composting ...

11219983-LTR-2-Moulai-AIM Verification Plan 12

including use of ICT for a remote Site Visit, GHD will abide by the confidentiality procedures detailed in GHD's Verification Proposal.

Based on the current COVID-19 pandemic safety precautions, GHD proposes to utilize ICT as a potential alternative to an in-person site visit to gain an understanding of the Facility operations, data management systems and procedures, and to determine the presence of key meters/scales, as documented above.

The Site Visits/remote site assessments will generally adhere to the following agenda. Deviations from the proposed agenda may be necessary to respond to data gaps and or issues identified during the verification process:

• Opening Meeting - Introduction and sign in, safety review, and overview of verification process and expectations (key personnel need to be present).

• Overview of production processes at the Facility, including description of key emission sources and a facility walkthrough.

• Review of meter calibration certificates and accuracy specifications for key meters.

• Interviews with key personnel and review of data acquisition process from meter through distributed control system or transcription and data entry, as applicable.

• Closing Meeting – Review issues identified and next steps.

15. Closure

The Verification Plan is considered to be a dynamic document that will require modification and adaptation to conditions as encountered during the completion of the Verification process. GHD will communicate the changes to the verification plan with Blue Source throughout the verification.

All of which is respectfully submitted,

GHD

Erik Martinez, Lead Verifier

EM/lj/2

cc: Filzah Nasir, GHD

Page 71: 11203285-RPT-#-Draft Verification Report AIM Composting ...

Erik Martinez [email protected] 519.340.4213

Jennifer Packer [email protected] 519.884.0510