11 T Dipole Project Cold mass integration status & plan
description
Transcript of 11 T Dipole Project Cold mass integration status & plan
11 T Dipole ProjectCold mass integration status & plan
F. Savary / TE-MSC-LMF
Cold mass integration status and plans 2
Outline• Cold mass assembly
• Short term plan• Status
• Tooling• Short term plan• Status
• Staffing
6/11/2013
Cold mass integration status and plans 3
Cold Mass Assembly
6/11/2013
Cold mass integration status and plans 4
Short term plan• “Short term” means objectives for end 2013• Develop a functional specification
• 2 months for a draft• Develop a conceptual design
• By end 2013• 3D models, a few 2D sections showing the main size, the main sub-
assemblies (Assembly Breakdown Structure), and the main interfaces• Develop a detailed plan for the construction and test of (a)
prototype(s), aiming at final technical specification for IT for series production• Schedule• Cost• Staffing• Tooling• Components
6/11/2013
Cold mass integration status and plans 5
Functional specification• Description of the 11 T dipole magnet• Description of the functional requirements
• Field strength• Field quality• …
• Definition of the physical/functional interfaces• Space contraints• Interface with cryogenics (heat exchanger tube, cooling
requirements), vacuum (beam pipe, beam screen?, …), physics (correctors, aperture, meaning e.g. straightness, …), power supply, protection, cryostat, collimator, neighbor magnet, …
6/11/2013
Cold mass integration status and plans 6
Status• So far, nothing done … at least not
significant enough to be mentioned
6/11/2013
Cold mass integration status and plans 7
After short term plan• We need a conceptual design review to
initiate the final design and engineering phase
• Needs to cover, and be consistent with• First results of short model program• Integration design, taking into account all
interfaces• In March 2014?
6/11/2013
Cold mass integration status and plans 8
Tooling
6/11/2013
Cold mass integration status and plans 9
Short term plan• Winding machine
• End January 2014 to start winding trials on racetrack, then cos(θ) coil with bare Cu-cable, and then first practice coil with insulated Cu-cable to react and impregnate (Mikko)
• Short welding press• Next week, welding of the first mechanical mock-up
• Reaction furnace• Contract launched (company GERO)• Delivery scheduled end March 2014
• Impregnation chamber• IT-3898/TE launched• Deadline for bidding on 21-06-2013
• Design winding mandrel, molds for binder curing, and for coil heat treatment
6/11/2013
Cold mass integration status and plans 106/11/2013
Status – Welding press
• Company EWM• to sent report on welding tests
carried out at their premises• to come @ CERN next week to
weld the mock-up, with equipment
Cold mass integration status and plans 11
Status winding machine
• Design work on-going (EN-MME)• Integrate 2nd spool holder
• Make it shorter (with possible return to longer configuration)
• Revamp control system• Company CERATEC (contract needs to be
placed, offer received last week)
6/11/2013
Cold mass integration status and plans 12
Staffing
6/11/2013
Cold mass integration status and plans 13
Staffing plan• Currently
• CERN staff, 2 CpC, 1 fellow + 1CpE part time soon• FSU, (very) limited contribution• EN-MME design office
• Soon• Service contracts (FC next week)• Alstom as from September 2013• Babcock Noell as from January 2014• ASG Superconductor as from May 2015
• Later (after LS1, July/August 2014)• LMF staff, and FSU
6/11/2013
Cold mass integration status and plans 14
Service contracts
6/11/2013
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
activity firmbegindate
enddate # months # of hours 1-
Sep
1-O
ct
1-N
ov
1-D
ec
1-Ja
n
1-Fe
b
1-M
ar
1-A
pr
1-M
ay
1-Ju
n
1-Ju
l
1-A
ug
1-S
ep
1-O
ct
1-N
ov
1-D
ec
1-Ja
n
1-Fe
b
1-M
ar
1-A
pr
1-M
ay
1-Ju
n
1-Ju
l
1-A
ug
1-S
ep
1-O
ct
1-N
ov
1-D
ec
1-Ja
n
1-Fe
b
1-M
ar
1-A
pr
1-M
ay
1-Ju
n
1-Ju
l
1-A
ug
1-S
ep
1-O
ct
1-N
ov
1-D
ec
11 T dipoleWP1 Cable insulation, winding, and binder curing Alstom 1-Sep-13 28-Feb-15 18 3600 WP2 Reaction heat treatment, coil instrumentation, impregnation Noell 1-Jan-14 31-Aug-15 20 3500 WP3 Construction of the collared-coil dipole ASG 1-May-15 28-Feb-16 10 2600 WP6 Active part construction for collared-coil dipole ASG 1-Nov-15 30-Apr-16 6 2100 WP9 Finishing of the cold mass assembly Alstom 1-Mar-16 31-Oct-16 8 2100