Claus Iversen
2008 – til i dag, Construction Manager, D&R and Marine Works, Femern A/S
2005 – 2008 Construction Manager, Bosphorus, Istanbul, The Marmaray Project, Immersed Tunnel
1995 – 2001 Contract Director, D&RØresundskonsortiet, DK
1975 – 1995, Danish Hydraulic InstituteMarine Works
CIV 210. september 2015
![Page 2: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/2.jpg)
20-11-2015
2
CIV
CIV
![Page 3: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/3.jpg)
20-11-2015
3
Øresund tunnelfabrikNordhavn, København
10. september 20155
10. september 2015CIV
![Page 4: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/4.jpg)
20-11-2015
4
10. september 2015CIV
The Marmaray Project
• Total length of CR-Project app. 77 km:– At grade, European side 19.6 km – At grade, Asian side 43.4 km– Bored tunnels 12.2 km– Immersed tube tunnel 1.4 km
10. september 2015CIV 8From Halkali to Gebze
![Page 5: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/5.jpg)
20-11-2015
5
The Background (1860)
10. september 2015CIV 9
Gravet ned i havbunden
10. september 2015CIV 10
![Page 6: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/6.jpg)
20-11-2015
6
Dredging Works
CIV 11
Contaminated soil: 120.000 m3 Clean soil: 1.000.000 m3
Stone backfill: 130.000 m3 Soil backfill: 800.000 m3
Immersed Tunnel Yard
10. september 2015CIV 12
![Page 7: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/7.jpg)
20-11-2015
7
Tuzla Construction Yard
10. september 2015CIV 13
![Page 8: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/8.jpg)
20-11-2015
8
![Page 9: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/9.jpg)
20-11-2015
9
10. september 2015CIV 17
![Page 10: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/10.jpg)
20-11-2015
10
Elements, today, E4 – E1
10. september 2015CIV 20
![Page 11: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/11.jpg)
20-11-2015
11
Bosphorus, Marine Works
10. september 2015CIV 22
![Page 12: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/12.jpg)
20-11-2015
12
![Page 13: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/13.jpg)
20-11-2015
13
Nedsænket på et tunnelfundament
10. september 2015CIV 25
Tunnelfundament
CIV10. september 2015
26
![Page 14: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/14.jpg)
20-11-2015
14
Bosphorus, Marine Works
10. september 2015CIV 27
![Page 15: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/15.jpg)
20-11-2015
15
Immersion Barge
10. september 2015CIV 29
CIV 30
Preparing element for immersion
10. september 2015
![Page 16: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/16.jpg)
20-11-2015
16
Sænkning af elementer
CIV10. september 2015
31
Monteringsudstyr oven på elementerne
CIV 3210. september 2015
![Page 17: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/17.jpg)
20-11-2015
17
Sammenkobling mellem tunnelelement ogsænkepram
CIV10. september 2015
33
Indvendigt udstyr i elementerne
CIV10. september 2015
34
![Page 18: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/18.jpg)
20-11-2015
18
Inside Element 7, today
10. september 2015CIV 35
Tunnelelement klart til nedsænkning
CIV10. september 2015
36
![Page 19: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/19.jpg)
20-11-2015
19
CIV
Wirer så tykke som håndled
Udstyr i kontrolrummet
CIV 3810. september 2015
![Page 20: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/20.jpg)
20-11-2015
20
10. september 2015CIV
Tunnelportal og ramper
40
![Page 21: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/21.jpg)
20-11-2015
21
10. september 2015CIV 41
10. september 2015CIV 42
![Page 22: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/22.jpg)
20-11-2015
22
10. september 2015CIV 43
![Page 23: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –](https://reader033.fdocuments.in/reader033/viewer/2022053117/609819e1bd39e11e592b2a74/html5/thumbnails/23.jpg)
20-11-2015
23