11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR...

19
1 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014

Transcript of 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR...

Page 1: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

11

Construction and Facilities Support Contracts Overview

MCB Camp Lejeune & MCAS New River

CDR Scott Cloyd, CEC, USNOICC MCI East

10 April 2014

Page 2: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

Greater Sandy Run Area

Hadnot Point

Hospital Pt

Paradise Pt

Naval Hospital

Tarawa TerraceCamp

Johnson

Rifle Range

Courthouse Bay

Onslow Beach

New R

iver

Triangle Outpost Gate

Sneads Ferry Gate

Air Station Gate

Camp Devil Dog

French Creek

K Ranges

SR Ranges

Midway Park

New River Air Station

Camp Geiger

Piney Green Gate

Main Gate

MCB Camp Lejeune & MCAS New River

New River Field Office

Mainside Office

2

Wallace Creek

OICC MCI East offices

Page 3: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

OICC Acquisition

• Warrant authority– Five Contracting Officers– $10 Million

• Larger acquisitions go through NAVFAC MIDLANT’s North Carolina IPT in Norfolk, VA

• Tools– Multiple Award Construction Contracts (MACCs) – Base Operating Services (BOS) Contract– Facilities Support Contracts (FSC)– Global Contingency Contract– Stand Alone Contracts

3

Page 4: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

Current and Future Workload

• Current Workload - $2.1B– MILCON 61 contracts

– FSRM 229 contracts

• Future Workload– FY13 and prior MILCON 5 projects @ $26M

– FY14 MILCON 10 projects @ $168M

– FY15 MILCON 2 projects @ $50M

– FSRM ~$100 M/yr (FY16 sequestration returns?)

Over $240M in MILCON yet to be awarded4

Page 5: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

Construction Opportunities

5

Page 6: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

6

P No. Project Name LocationProjected Amount

($M)

Acquisition Tool

Delivery Method

Projected Award Date

1264B Birch St Improvements MCB CAMP LEJEUNE NC $2M MAC - TBD DBB 4Q14

1265B French Creek WWTP Upgrades MCB CAMP LEJEUNE NC $12M MAC – 8A DBB Reprogramming

1383B Car Wash Road MCB CAMP LEJEUNE NC $2M MOD to P1383B DBB 4Q14

1384B Scales Creek Bridge MCB CAMP LEJEUNE NC $2M MAC – Gen’l (SB) DBB 4Q14

1449 Energy Efficiency Improvements, CHB MCB CAMP LEJEUNE, NC $8M MAC – Gen’l

(SB) DBB 3Q14

OICC FY13 & Prior MILCON Projects Acquisition Tools & Milestones

OICC Total $26M

Page 7: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

7

P No. Project Name LocationProjected Amount

($M)

Acquisition Tool

Delivery Method

Projected Award Date

1349 SOF Special Ops Training Complex MCB CAMP LEJEUNE NC $23M MAC – Gen’l DBB 3Q14

726 Regional Communication Station MCAS NEW RIVER NC $20M MAC – Gen’l

BVSS 1-Step DB 4Q14

674 Corrosion Control Hangar MCAS NEW RIVER NC $13M Stand AloneBVSS 2-Step DB 3Q14

676 CH53-K Maint. Train Facility MCAS NEW RIVER NC $13M MAC – Gen’lBVSS 1-Step DB 4Q14

1391 SOF Sustainment Training Complex MCB CAMP LEJEUNE NC $29M MAC – Gen’l DBB 4Q14

1362 SOF Performance Resiliency Center MCB CAMP LEJEUNE NC $14M MAC – Gen’l DBB 4Q14

1445 Steam Plant Dentralization – CJ MCB CAMP LEJEUNE NC $3M MAC – Gen’l

BVSS 1-Step DB 3Q14

1447 Steam Plant Dentralization – HP MCB CAMP LEJEUNE NC $13M MAC – Gen’l

BVSS 1-Step DB 3Q14

1448 Steam Plant Dentralization – BEQ Nodes MCB CAMP LEJEUNE NC $19M MAC – Gen’l

BVSS 1-Step DB 3Q14

1353 Landfill, Phave IV MCB CAMP LEJEUNE NC $21M Stand AloneBVSS1-Step DBB 4Q14

OICC FY14 MILCON Projects Acquisition Tools & Milestones

OICC Total $168M

Page 8: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

8

P No. Project Name LocationProjected Amount

($M)

Acquisition Tool

Delivery Method

Projected Award Date

025 Lejeune High School MCB CAMP LEJEUNE NC $40M Stand Alone DBB 3Q15

1396 SOF Intel Ops Expansion MCB CAMP LEJEUNE NC $10M MAC Gen’l DBB 3Q15

OICC FY15 MILCON Projects Acquisition Tools & Milestones

OICC Total $50M

Page 9: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

Types of Work:

Barracks RenovationsMechanical/HVAC ReplacementsRoof Repairs/ReplacementsUtility System UpgradesDemolitionFire Protection Systems Energy ImprovementsPaving Painting

9

FSRM Programs

“Advertised and/or Awarded

in FY14”

FSRM FY14 $50M

A/E FY14$3M

FSC FY14$43M

OICC

Page 10: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

10

A/E, Multiple Award, and Service Contracts

Page 11: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

NAVFAC MIDLANT A/E Contracts

Active Contracts FirmAward Date

Expiration Date

Maximum Amount

Architectural Design and Engineering Services

HBA 02/2010 02/2015 $15M/Life

Architectural Design and Engineering Services

AECOM 02/2010 02/2015 $15M/Life

Civil Design and Engineering Services

Richard Catlin 03/2010 03/2015 $7.5M/Life

Utilities Engineering Services AECOM 03/2010 03/2015 $30M/Life

Civil Design and Engineering Services

C. Allan Bamforth, Jr.

06/2010 06/2015 $7.5M/Life

11

Indefinite Delivery Indefinite Quantity (IDIQ)

Civil IDIQ - Expected Award this year $15M/LifeArchitect IDIQ - Expected Award next year $15M/Life

Page 12: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

12

Solicitation Number

Type of ServiceNot To Exceed (NTE) Amount

N40085-13-R-5220 A/E Services for Community Support Facilities $7M

N40085-13-R-5221 A/E Services for Medical Facilities $5M

N40085-13-R-5222A/E Services for Industrial/Military Support Facilities (Camp Lejeune)

$5M

N40085-13-R-5223A/E Services for Industrial Military Support Facilities (New River & Cherry Point)

$5M

N40085-13-R-5224 A/E Services for Civil Engineering and Site Work $5M

N40085-13-R-5225 A/E Services for Utility Infrastructure $5M

N40085-13-R-5226 A/E Services for HVAC and Electrical $5M

N40085-13-R-5227 A/E Services for Facility Planning $5M

All proposals are in and selection is underway!

OICC A/E Opportunities

Page 13: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

FirmAward Date

Existing Option

Expiration Date

Maximum Amount

Remaining Capacity

DCK North America, LLC

08/16/2010 3rd Option 08/16/2014 $750M/Life$442M for

Life

Whiting-Turner Contracting Company

08/16/2010 3rd Option 08/16/2014 $750M/Life$442 M for

Life

Walbridge Aldinger Company

08/16/2010 3rd Option 08/16/2014 $750M/Life$442 M for

Life

Sundt Construction, Inc.

08/16/2010 3rd Option 08/16/2014 $750M/Life$442 M for

Life

Hardin-WGI Joint Venture

08/16/2010 3rd Option 08/16/2014 $750M/Life$442 M for

Life

Design Build MACCAwarded as Base + Option Years

13

Plenty of capacity remains. Opportunities here as a sub.

NAVFAC MIDLANT D/B MACC

Page 14: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

New MACCs Award DateMaximum Amount

Status

Mechanical Q3 FY14 $95M Acquisition Planning Phase

General Mini MACC Q3 FY14 TBD Proposals Received

HubZone Q4 FY14 TBD Acquisition Planning Phase

OICC MACC Opportunities

14

FY14 MACC Opportunities!

Page 15: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

OICC Services Contract Opportunities

15

• More than 20 contracts are in place today, but only 2 real opportunities this year:

Active ContractsAward Date

Current Option

Expiration Date

Award Amount (Including Options)

Current Contract Value

PM Gate Barriers 9/28/126 Month

Extension03/31/14 $169,660 $47,100

Service For Uninterrupted Power

02/16/10 4th Option 02/15/15 $251,100 $395,712

Page 16: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

How do I get this work?

• To be a Prime Contractor

– Register in the System for Award Management (SAM)

– Obtain a Duns & Bradstreet Number (DUNS)

• To Subcontract

– Contact any of the following (Contact listing available from OICC Small Business Officer, [email protected])

• Multiple Award Construction (MAC) Contractor• Base Operating Support Contract (BOSC) • Housing Privatization Contractor

– Meet the minimum requirements to gain access the base

16

Page 17: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

• Solicitation & Award Venues:

– Federal Business Opportunities (FedBizOpps) address – https://www.fbo.gov

– Navy Electronic Commerce Online (NECO) address – https://www.neco.navy.mil

– POC: Gary Milton, Supervisory Contract SpecialistNAVFAC MIDLANT (NC IPT), Norfolk, VA(757) 322-8258

– POC: Jerry Williams, Acquisition Director Kimberly Vallone, Small Business OfficerOICC MCI East, Camp Lejeune, NC(910) 451-2581 extension 5236 and 5289

How do I find this work?

17

Page 18: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

Take Aways…

• Still more than $2 billion currently under construction– In various stages of construction– Will complete ~$750M in next 12 months

• Record years behind us, but still significant work ahead– Approximately $200M/yr in construction (MCB CL & MCAS NR)– Size varies widely, from a few thousand to tens of millions– Many opportunities for new A/E work (selections pending)– Limited opportunities for new Service Contract work

• OICC MCI East name change in May 2014– Resident Officer in Charge of Construction (ROICC) Camp Lejeune

• Monitor NECO & FEDBizOpps

18

Page 19: 11 Construction and Facilities Support Contracts Overview MCB Camp Lejeune & MCAS New River CDR Scott Cloyd, CEC, USN OICC MCI East 10 April 2014.

19