Transcript of 11-2010-K-G-SPC-2210-TOC_Rev-B
2x600 MW Long Phu 1 EPC RFP Document
EPC REQUEST FOR PROPOSAL11/2010-K-G-SPC-2210
GENERAL TABLE OF CONTENTS:
VOLUME-I [1 BOOK]
: BIDDING PROCEDURE
VOLUME-II[11 BOOKS]
: TECHNICAL SPECIFICATION / SCOPE OF WORK
VOLUME-III[1 BOOK]
: CONDITIONS OF CONTRACT
VOLUME-IV[3 BOOK]
: BID PROPOSAL SHEETS / BIDDING FORMS [TECHNICAL & GENERAL]
VOLUME-V[1 BOOK]
: BID PROPOSAL SHEETS / BIDDING FORMS [PRICE]
(document.doc) TOC : 1
2x600 MW Long Phu 1 EPC RFP Document
CONTENTS
VOLUME-I : BIDDING PROCEDURE
SECTION-I : INVITATION FOR BID
SECTION-II : BIDDING PROCEDURE
II.1 INSTRUCTION TO BIDDER
II.2 BID DATA SHEET
II.3 EVALUATION AND QUALIFICATION CRITERIA
II.4 BIDDING FORMS
ANNEXURES DESCRIPTION
ANNEXURE-1 TASK ALLOCATION IN CONSORTIUM
ANNEXURE-2 TECHNICAL EVALUATION TABLE
(document.doc) TOC : 2
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-I
SECTION-II : BIDDING PROCEDURE
SUB-SECTION II.1 INSTRUCTION TO BIDDER
PART NO. DESCRIPTION
DEFINITIONS AND ABBREVIATIONA. GENERAL
1. Introduction
2. Eligibility and Qualification of Bidders
3. Eligible Plant, Equipment and Services
4. Bidding Cost
5. Request for Proposal Documents and clarification
6. Amendment of Request for Proposal Document
B. PREPARATION OF PROPOSAL
7. Language used in Proposal
8. Document comprising the Proposal
9. Bid Application Form
10. Alternative Proposal
11. Document establishing the eligibility of Plant and Services
12. Documents establishing the Eligibility and Qualification of the Bidder
13. Document establishing the Conformity of the Plant and Services
14. Technical Proposal, Subcontractors
15. Financing arrangement Proposal
16. Proposal Price and Discount
17. Currencies of Proposal
18. Period of validity of Proposal
19. Bid Bond: N/A
20. Format and signing of Proposal
C. SUBMISSION OF PROPOSAL
21. Submission, sealing and marking of the Proposal
(document.doc) TOC : 3
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-I
SECTION-II : BIDDING PROCEDURE
SUB-SECTION II.1 INSTRUCTION TO BIDDER
PART NO. DESCRIPTION
C. SUBMISSION OF PROPOSAL (CONT’D)
22. Deadline for Submission of Proposal
23. Late Proposal Error: Reference source not found
24. Withdrawal, Substitution, and Modification of Proposal
D. PROPOSAL OPENING AND EVALUATION
25. Proposal opening
26. Confidentiality
27. Clarification of Proposal
28. Deviation, Reservation, and Omission
29. Preliminary examination of Proposal
30. Determination of Responsiveness of the Proposal
31. Eligibility and Qualification of the Bidder
32. Correction of arithmetical errors
33. Nonmaterial Nonconformities
34. Conversion to single currency
35. Margin of preference
36. Technical evaluation
37. Financing arrangement evaluation
38. Commercial evaluation
39. Adjustment of Deviation
E. CONTRACT AWARD
40. Contract negotiation and Award Criteria
41. Owner’s right to accept and reject Proposal
42. Contract negotiation and finalization
43. Signing of contract
(document.doc) TOC : 4
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-I
SECTION-II : BIDDING PROCEDURE
SUB-SECTION II.1 INSTRUCTION TO BIDDER
PART NO. DESCRIPTION
E. CONTRACT AWARD (CONT’D)
44. Performance bond
45. Bidding petitions
46. Handling of violation in bidding process
47. Changing the Bidder Participoation Status/Name
(document.doc) TOC : 5
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-I
SECTION-II : BIDDING PROCEDURE
SUB-SECTION II.2 BID DATA SHEET
CLAUSE NO. DESCRIPTION
A GENERAL
B PREPARATION OF BID
C SUBMISSION OF PROPOSAL
D PROPOSAL OPENING AND EVALUATION
E CONTRACT AWARD
(document.doc) TOC : 6
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-I
SECTION-II : BIDDING PROCEDURE
SUB-SECTION II.3 EVALUATION AND QUALIFICATION CRITERIA
CLAUSE NO. DESCRIPTION
1.0 INTRODUCTION
2.0 DETAILS OF TENDER
3.0 THE PROJECT
4.0 THE SITE
5.0 SCOPE OF WORK
6.0 COMPLETION SCHEDULE
7.0 QUALIFICATION OF BIDDER
8.0 GENERAL INSTRUCTIONS AND ADDRESS OF CORRESPONDENCES
(document.doc) TOC : 7
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-I
SECTION-II : BIDDING PROCEDURE
SUB-SECTION II.4 BIDDING FORMS
FORM NO. DESCRIPTION
Form No 1 Bid Application Form
Form No 2 Power of Attorney
Form No 3 Consortium Agreement
Form No 4 Breakdown Price of Plant to be Supplied from within Vietnam
Form No 5 Breakdown Price of Plant to be Supplied from Abroad
Form No 6 Breakdown Price of Plant Imported from Abroad and are Selling in Vietnam
Form No 7 List of Main Construction Machine and Equipment
Form No 8 List of Equipment, Testing Laboratory at Site
Form No 9 Organization chart and List of Foreign Expert and Technical Engineers in Project Team
Form No 10 Current Contracts in Implementation of the Bidder
Form No 11 List of Similar Contracts done by the Bidder
Form No 12 List of Main Subcontractors/Suppliers
Form No 13 Plant Performance Guarantees
Form No 14 Financial Data
Form No 15 Bid Bond
Form No 16 List of Mandatory Spare Parts
Form No 17 List of Recommended Spare Parts
Form No 18 Commercial Deviations
Form No 19 Technical Deviations
Form No 20 List of ECA-Backed Projects executed in Period 2005-2009
Form No 21 General Summary of Total Debt Financing
(document.doc) TOC : 8
2x600 MW Long Phu 1 EPC RFP Document
CONTENTS
VOLUME-II TECHNICAL SPECIFICATION / SCOPE OF WORK
[BOOK-1]
VOLUME II-A : LEAD SPECIFICATION
VOLUME II-B : SPECIFICATIONS FOR STEAM GENERATOR & AUXILIARIES
VOLUME II-C : SPECIFICATIONS FOR TURBINE-GENERATOR, AUXILIARIES & OTHER FEED CYCLE EQUIPMENT
VOLUME II-D : SPECIFICATIONS FOR POWER CYCLE & OTHER PIPING, VALVES & SPECIALTIES
[BOOK-2]
VOLUME II-E : SPECIFICATIONS FOR CONTROLS & INSTRUMENTATION
VOLUME II-F/1 : SPECIFICATIONS FOR ELECTRICAL EQUIPMENT & (UPTO SEC-1) ACCESSORIES
[BOOK-3]
VOLUME II-F/1 & : SPECIFICATIONS FOR ELECTRICAL EQUIPMENT & VOLUME II-F/2 ACCESSORIES
[BOOK-4]
VOLUME II-G/1 : GENERAL SPECIFICATION AND DESIGN CRITERIA FOR CIVIL AND STRUCTURAL WORK
VOLUME II-G/2 GENERAL SPECIFICATION AND DESIGN CRITERIA FOR ARCHITECTURAL WORK
VOLUME II-G/3 TECHNICAL SPECIFICATION FOR CIVIL, STRUCTURAL AND ARCHITECTURAL WORK
VOLUME II-G/4 ANNEXURES (UPTO SOIL RESISTIVITY TEST)
[BOOK-5]
VOLUME II-G/4 ANNEXURES (POWER BLOCK ONWARDS)
[BOOK-6]
(document.doc) TOC : 9
2x600 MW Long Phu 1 EPC RFP Document
VOLUME II-H : SPECIFICATIONS FOR MAIN & AUXILIARY COOLING WATER SYSTEMS & ACCESSORIES
VOLUME II-I : SPECIFICATIONS FOR AUXILIARY SYSTEMS VIZ., PLANT WATER SYSTEM, FGD SYSTEM, COMPRESSED AIR SYSTEM, FIRE PROTECTION SYSTEM, LP PIPING & VALVES ETC.
VOLUME II-J : SPECIFICATIONS FOR SUMP PUMPS, MISCELLANEOUS CRANES & HOISTS, ELEVATORS AND LABORATORY EQUIPMENT
VOLUME : II-K : SPECIFICATIONS FOR COAL HANDLING, ASH HANDLING, WATER & EFFLUENT TREATMENT, VENTILATION & AIR-CONDITIONING SYSTEM
VOLUME II-K/1 SPECIFICATIONS FOR COAL HANDLING SYSTEM
VOLUME II-K/2 SPECIFICATIONS FOR ASH HANDLING SYSTEM
VOLUME II-K/3 SPECIFICATIONS FOR LIMESTONE HANDLING SYSTEM AND ACCESSORIES (GENERAL & MECHANICAL WORKS)
VOLUME II-K/4 SPECIFICATIONS FOR WATER & EFFLUENT TREATMENT SYSTEM
VOLUME II-K/5 SPECIFICATIONS FOR HEATING, VENTILATION & AIR-CONDITIONING SYSTEM
VOLUME II-K/6 SPECIFICATION FOR MILL REJECTS HANDLING SYSTEM
[BOOK-7, BOOK-8 & BOOK-9]
VOLUME II-L : TENDER DRAWINGS
[BOOK-7] MECHANICAL
[BOOK-7] INSTRUMENTATION & CONTROL
[BOOK-8] ELECTRICAL
[BOOK-9] CIVIL, STRUCTURAL AND ARCHITECTURAL
[BOOK-10]VOLUME-II-N : PORT FACILITY
(document.doc) TOC : 10
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-1]
VOLUME : II-A LEAD SPECIFICATION
SECTIONS DESCRIPTION
SECTION-I : INTENT OF SPECIFICATION
SECTION-II : PROJECT SYNOPSIS AND GENERAL INFORMATION
SECTION-III : SCOPE OF SUPPLY & SERVICES
SECTION-IV : GENERAL TECHNICAL REQUIREMENTS
SECTION-V : PROJECT MANAGEMENT & SITE SERVICES
SECTION-VI : ENGINEERING SERVICES
SECTION-VII : QUALITY ASSURANCE REQUIREMENTS
SECTION-VIII : REQUIREMENT OF SPARES, TOOLS & TACKLE, LUBRICANTS / OIL / CONSUMABLES
SECTION-IX : SALIENT DESIGN DATA
SECTION-X : PERFORMANCE GUARANTEE AND TESTS
SECTION-XI : LONG TERM MAINTENANCE SERVICE
(document.doc) TOC : 11
Rev-B
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-1]
VOLUME : II-B SPECIFICATIONS FOR STEAM GENERATOR & AUXILIARIES
SECTIONS DESCRIPTION
SECTION-I : STEAM GENERATOR AND ACCESSORIES
SECTION-II : ELECTROSTATIC PRECIPITATOR
SECTION-IIIA : FUEL OIL TRANSFERING SYSTEM
SECTION-IIIB : FUEL OIL PRESSURISING SYSTEM
SECTION-IV : CHEMICAL DOSING SYSTEM
SECTION-V : FGD SYSTEM
SECTION-VI : AUXILIARY BOILER – REV. A
(document.doc) TOC : 12
Rev-B
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-1]
VOLUME : II-C SPECIFICATIONS FOR TURBINE-GENERATOR, AUXILIARIES & OTHER FEED CYCLE EQUIPMENT
SECTIONS DESCRIPTION
SECTION-IA : STEAM TURBINE
SECTION-IB : GENERATORS AND GENERATOR SYSTEMS
SECTION-II : FEED WATER HEATERS & DEAERATOR
SECTION-III : POWER CYCLE PUMPS, DRIVES & ACCESSORIES
SECTION-IV : CONDENSERS & AUXILIARIES
SECTION-V : TURBINE OIL PURIFICATION SYSTEM
SECTION-VI : CONDENSATE POLISHING SYSTEM
SECTION-VII : CONDENSER ONLINE TUBE CLEANING SYSTEM
(document.doc) TOC : 13
Rev-B
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-1]
VOLUME : II-D SPECIFICATIONS FOR POWER CYCLE PIPING, VALVES, SPECIALTIES & THERMAL INSULATION
SECTIONS DESCRIPTION
SECTION-I : POWER CYCLE PIPING, VALVES & SPECIALTIES
SECTION-II : THERMAL INSULATION
(document.doc) TOC : 14
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-2]
VOLUME : II-E TECHNICAL SPECIFICATIONS FOR INSTRUMENTATION AND CONTROL
SECTIONS DESCRIPTION
SECTION-I : GENERAL TECHNICAL REQUIREMENTS
SECTION-II : SCOPE OF WORK
SECTION-III : INSTRUMENTATION AND CONTROL FOR STEAM GENERATING UNIT & AUXILIARIES
SECTION-IV : INSTRUMENTATION AND CONTROL FOR TURBINE GENERATOR, AUXILIARIES & FEED CYCLE EQUIPMENT
SECTION-V : INSTRUMENTATION & CONTROL FOR PLANT AUXILIARIES AND OFF-SITE PLANTS
SECTION-VI : TECHNICAL SPECIFICATION - INSTRUMENTS AND CONTROL SYSTEMS (DCS)
SECTION-VII : STEAM AND WATER ANALYSIS SYSTEM (SWAS)
SECTION-VIII : ERECTION AND COMMISSIONING
SECTION-IX : LABORATORY INSTRUMENTS
(document.doc) TOC : 15
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-2]
VOLUME : II-F/1 TECHNICAL SPECIFICATIONS FOR ELECTRICAL EQUIPMENT & ACCESSORIES
SECTIONS DESCRIPTION
SECTION-I : GENERAL ELECTRICAL SPECIFICATION
VOLUME-II [BOOK-3]
VOLUME : II-F/1 TECHNICAL SPECIFICATIONS FOR ELECTRICAL EQUIPMENT & ACCESSORIES
SECTIONS DESCRIPTION
SECTION-II : A.C. & D.C. MOTORS
SECTION-III : ELECTRICAL MOTOR ACTUATORS
SECTION-IV : GENERATOR BUS DUCT
SECTION-V : MV SWITCHGEARS
SECTION-VI : 10 KV & 3 KV SEGREGATED PHASE BUS DUCT
SECTION-VII : PCC/MCC, ACDB AND DCDB
SECTION-VIII : MISCELLANEOUS LOCAL PANELS
SECTION-IX : GENERATOR TRANSFORMER
SECTION-X : UNIT TRANSFORMER
SECTION-XI : STATION TRANSFORMER
SECTION-XII : VARIABLE FREQUENCY DRIVES
SECTION-XIII : NON-SEGREGATED PHASE BUS DUCT
SECTION-XIV : GENERATOR CIRCUIT BREAKER
(document.doc) TOC : 16
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-3]
VOLUME : II-F/2 TECHNICAL SPECIFICATIONS FOR ELECTRICAL EQUIPMENT & ACCESSORIES
SECTIONS DESCRIPTION
SECTION-I : NEUTRAL GROUNDING RESISTOR
SECTION-II : L.V. AUX. TRANSFORMERS
SECTION-III : BATTERIES AND BATTERY CHARGERS
SECTION-IV : CABLES
SECTION-V : PROTECTION & RELAY PANELS AND SYNCHRONISING PANEL
SECTION-VI : 10/3.15 KV AUXILIARY POWER TRANSFORMER
SECTION-VII : ILLUMINATION SYSTEM
SECTION-VIII : EHV LIGHTNING ARRESTORS
SECTION-IX : INSTALLATION OF CABLING, EARTHING AND LIGHTNING PROTECTION SYSTEMS
SECTION-X : ERECTION OF ELECTRICAL EQUIPMENT
SECTION-XI : PLANT COMMUNICATION SYSTEM
SECTION-XII : EMERGENCY DIESEL GENERATOR SET
SECTION-XIII : ELECTRICAL LABORATORY INSTRUMENTS
SECTION-XIV : UNINTERRUPTIBLE POWER SUPPLY SYSTEM
SECTION-XV : EHV CURRENT TRANSFORMERS
SECTION-XVI : EHV VOLTAGE TRANSFORMERS
(document.doc) TOC : 17
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-4]
VOLUME : II-G/1 GENERAL SPECIFICATION AND DESIGN CRITERIA FOR CIVIL AND STRUCTURAL WORK
VOLUME : II-G/2 GENERAL SPECIFICATION AND DESIGN CRITERIA FOR ARCHITECTURAL WORK
(document.doc) TOC : 18
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-4]
VOLUME : II-G/3 TECHNICAL SPECIFICATION FOR CIVIL, STRUCTURAL AND ARCHITECTURAL WORK
SECTIONS DESCRIPTION
SECTION-I : TOPOGRAPHIC SURVEY
SECTION-II : GEOTECHNICAL INVESTIGATION
SECTION-III : CLEARING AND GRADING
SECTION-IV : SOIL IMPROVEMENT WORK
SECTION-V : EARTH WORK
SECTION-VI : CAST IN PLACE CONCRETE
SECTION-VII : CONCRETE PILING
SECTION-VIII : STRUCTURAL STEEL
SECTION-IX : MISCELLANEOUS METAL
SECTION-X : ROADS AND PAVEMENT
SECTION-XI : MASONRY AND ALLIED WORK
SECTION-XII : FINISH TO MASONRY AND CONCRETE
SECTION-XIII : CAULKING AND SEALING
SECTION-XIV : PREFORMED SINGLE AND SANDWICH INSULATED METAL SIDING
SECTION-XV : CARPENTRY AND MILL WORK
SECTION-XVI : HOLLOW METAL DOORS, WINDOWS, VENTILATORS AND LOUVERS
SECTION-XVII : ALUMINIUM FRAMED GLAZED CURTAIN WALLS AND STRUCTURAL GLAZING
SECTION-XVIII : ROLLING STEEL DOORS
SECTION-XIX : FINISH HARDWARE
SECTION-XX : GLASS AND GLAZING
(document.doc) TOC : 19
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II : VOLUME : II-G/3 (CONT’D.)
SECTIONS DESCRIPTION
SECTION-XXI : FINISH AND ALLIED WORK
SECTION-XXII : ACCESS FLOORING
SECTION-XXIII : PAINTING
SECTION-XXIV : SUSPENDED ACOUSTIC CEILING
SECTION-XXV : SHEET WORK IN ROOF AND SIDING
SECTION-XXVI : ROOF WATER PROOFING, INSULATION AND ALLIED WORK
SECTION-XXVII : DRAINAGE AND PLUMBING
SECTION-XXVIII : LANDSCAPING WORK
SECTION-XXIX : HEALTH, SAFETY AND ENVIRONMENTAL (HSE) REQUIREMENTS
SECTION-XXX : PROJECT DISPLAY MODEL
(document.doc) TOC : 20
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-4]
VOLUME : II-G/4 ANNEXURES
ANNEXURES DESCRIPTION
ANNEXURE-A GEO-TECHNICAL INVESTIGATION REPORT (DOC NO. 11/2010-PMC2-C-RPT-2000) [UPTO SOIL RESISTIVITY TEST]
VOLUME-II [BOOK-5]
VOLUME : II-G/4 ANNEXURES
ANNEXURES DESCRIPTION
ANNEXURE-A GEO-TECHNICAL INVESTIGATION REPORT (DOC NO. 11/2010-PMC2-C-RPT-2000)[POWER BLOCK ONWARDS]
ANNEXURE-B BOREHOLE LOCATION PLAN
ANNEXURE-C BORELOGS FROM SOIL INVESTIGATION CARRIED OUT DURING FS REPORT
ANNEXURE-D PLANT AREA MAPING
ANNEXURE-E HAU RIVER CROSS SECTION
(document.doc) TOC : 21
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-6]
VOLUME : II-H SPECIFICATIONS FOR MAIN & AUXILIARY COOLING WATER SYSTEMS & ACCESSORIES
SECTIONS DESCRIPTION
SECTION-I : GENERAL DESIGN REQUIREMENTS FOR MAIN AND AUXILIARY COOLING WATER SYSTEMS
SECTION-II : HORIZONTAL CENTRIFUGAL PUMPS
SECTION-IIIA : VERTICAL PUMPS
SECTION-IIIB : CONDENSER COOLING WATER PUMPS
SECTION-IV : COOLING WATER HEAT EXCHANGERS
SECTION-V : INTAKE CHLORINATION SYSTEM
(document.doc) TOC : 22
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-6]
VOLUME : II-I SPECIFICATIONS FOR AUXILIARY SYSTEMS VIZ. PLANT WATER SYSTEM, COMPRESSED AIR SYSTEM, FIRE PROTECTION SYSTEM, LP PIPING & VALVES ETC.
SECTIONS DESCRIPTION
SECTION-I : PLANT WATER SYSTEM
SECTION-II : COMPRESSED AIR SYSTEM
SECTION-III : FIRE PROTECTION & DETECTION SYSTEM
SECTION-III : FIRE FIGHTING AND FIRE PROTECTION TECHNICAL ANNEXURE-VIII DESIGN REPORTS # 11/2010-PMC2-G-RPT-2000 REV. F
SECTION-IV : CO2 AND N2 GAS CYLINDERS
SECTION-V : LARGE DIAMETER LOW PRESSURE PIPING, VALVES AND FABRICATED TANKS
SECTION-VI : LOW PRESSURE PIPING, VALVES AND SPECIALTIES
SECTION-VII : HYDROGEN GENERATION PLANT
(document.doc) TOC : 23
Rev-B
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-6]
VOLUME : II-J SPECIFICATIONS FOR SUMP PUMPS, MISCELLANEOUS CRANES & HOISTS, ELEVATORS AND LABORATORY EQUIPMENT
SECTIONS DESCRIPTION
SECTION-I : SUMP PUMPS, DRIVES AND ACCESSORIES
SECTION-IIA : TG HALL EOT CRANE
SECTION-IIB : MISCELLANEOUS CRANES
SECTION-III : MISCELLANEOUS HOISTS
SECTION-IV : ELEVATORS
SECTION-V : STACK ELEVATOR
SECTION-VI : CHEMICAL LABORATORY EQUIPMENT
SECTION-VII : WORKSHOP EQUIPMENT – REV. A
(document.doc) TOC : 24
Rev-B
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-6]
VOLUME : II-K SPECIFICATIONS FOR COAL HANDLING, ASH HANDLING, WATER & EFFLUENT TREATMENT, VENTILATION & AIR-CONDITIONING SYSTEM
VOLUME II-K/1 : SPECIFICATIONS FOR COAL HANDLING SYSTEM
VOLUME II-K/2 : SPECIFICATIONS FOR ASH HANDLING SYSTEM
VOLUME II-K/3 : SPECIFICATIONS FOR LIMESTONE HANDLING SYSTEM AND ACCESSORIES (GENERAL & MECHANICAL WORKS)
(document.doc) TOC : 25
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-6]
VOLUME II-K/4 : SPECIFICATIONS FOR WATER & EFFLUENT TREATMENT SYSTEM
SECTIONS DESCRIPTION
SECTION-I : RIVER WATER PRE-TREATMENT SYSTEM
SECTION-II : DESALINATION RO POTABLE WATER TREATMENT AND DEMINERALIZATION RO SYSTEMS
SECTION-III : WASTE WATER TREATMENT SYSTEM
SECTION-III : EIA REPORTANNEXURE-IX
(document.doc) TOC : 26
Rev-B
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-6]
VOLUME II-K/5 : SPECIFICATION FOR HEATING, VENTILATION & AIR-CONDITIONING SYSTEM
VOLUME II-K/6 : SPECIFICATION FOR MILL REJECTS HANDLING SYSTEM
(document.doc) TOC : 27
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-7, BOOK-8 & BOOK-9]
VOLUME : II-L TENDER DRAWINGS
[BOOK-7] MECHANICAL
[BOOK-7] INSTRUMENTATION & CONTROL
[BOOK-8] ELECTRICAL
[BOOK-9] CIVIL, STRUCTURAL AND ARCHITECTURAL
(document.doc) TOC : 28
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-II [BOOK-10]
VOLUME : II-N PORT FACILITY
SECTION 1 GENERAL INFORMATION
SECTION 2 SCOPE OF WORK
SECTION 3 DESIGN REQUIREMENTS
SECTION 4 CONSTRUCTION REQUIREMENTS
(document.doc) TOC : 29
2x600 MW Long Phu 1 EPC RFP Document
CONTENTS
VOLUME-III : CONDITIONS OF CONTRACT
SECTION-1 : CONTRACT AGREEMENT
SECTION-2 : CONDITIONS OF CONTRACT
(document.doc) TOC : 30
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-1 : CONTRACT AGREEMENT
ARTICLE NO. DESCRIPTION
1.0 DEFINITIONS
2.0 CONTRACT DOCUMENTS
3.0 CONTRACT PRICE AND PRIMARY COVENANTS
4.0 TIME FOR COMPLETION
5.0 PERFORMANCE GUARANTEES
6.0 DEFECT NOTIFICATION PERIOD
7.0 COMMUNICATIONS
8.0 EFFECTIVE DATE
9.0 COMMENCEMENT DATE
10.0 BASIC PRINCIPLE FOR SUCCESSFUL IMPLEMENTATION
(document.doc) TOC : 31
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 : CONDITIONS OF CONTRACT
ARTICLE NO. DESCRIPTION
1.0 GENERAL PROVISIONS
1.1 Definitions
1.2 Interpretation
1.3 Communications
1.4 Law and Language
1.5 Priority of documents
1.6 Contract effectiveness
1.7 Assignment
1.8 Care and supply of documents
1.9 Confidentiality
1.10 Owner’s use of contractor’s documents
1.11 Contractor’s use of owner’s documents
1.12 Not used
1.13 Compliance with laws
1.14 Joint and several liability
1.15 Prior work
2.0 THE OWNER
2.1 Right of access to the site
2.2 Permits, licences or approvals
2.3 Owner’s personnel
2.4 Financing arrangement
2.5 Owner’s claims
3.0 THE OWNER’S ADMINISTRATION
3.1 The Owner’s representative
3.2 Other Owner’s personnel
3.3 Delegated persons
3.4 Instructions
(document.doc) TOC : 32
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
3.0 THE OWNER’S ADMINISTRATION (CONT’D)
3.5 Determinations
4.0 THE CONTRACTOR
4.1 Contractor’s General Obligations
4.2 Bonds
4.3 Contractor’s Representative
4.4 Subcontractors
4.5 [Not Used]
4.6 Co-operation
4.7 Setting Out
4.8 Safety Procedures
4.9 Quality Assurance
4.10 Site Data
4.11 Sufficiency of the Contract Price
4.12 Unforeseeable Difficulties
4.13 Rights of Way and Facilities
4.14 Avoidance of Interference
4.15 Access Route
4.16 Transport of Goods
4.17 Contractor’s Equipment
4.18 Protection of the Environment
4.19 Electricity, Water and other Consumables
4.20 Not Used
4.21 Progress Reports
4.22 Security of the Site
4.23 Contractor’s Operations on Site
4.24 Fossils
4.25 Contractor’s Specific Warranties
(document.doc) TOC : 33
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
3.0 THE CONTRACTOR (CONT’D)
4.26 Coordination Meetings
4.27 Tropical Serviceability
4.28 Old Materials
5.0 DESIGN
5.1 General Design Obligations
5.2 Contractor’s Documents
5.3 Contractor’s Undertaking
5.4 Technical Standards and Regulations
5.5 Training
5.6 As-Built Documents
5.7 Operation and Maintenance Manuals
5.8 Design Error
5.9 Warranties Unaffected
5.10 No Duty of Care or Liability Imposed on the Owner
6.0 STAFT AND LABOUR
6.1 Engagement of Staff and Labour
6.2 Rates of Wages and Conditions of Labour
6.3 Persons in the Service of Others
6.4 Labour Laws
6.5 Working Hours
6.6 Facilities for Staff and Labour
6.7 Health and Safety
6.8 Contractor’s Superintendence
6.9 Contractor’s Personnel
(document.doc) TOC : 34
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
6.0 STAFT AND LABOUR (CONT’D)
6.10 Records of Contractor’s Personnel and Equipment
6.11 Disorderly Conduct
7.0 PLANT, MATERIALS AND WORKMANSHIP
7.1 Manner of Execution
7.2 Samples
7.3 Inspection
7.4 Testing
7.5 Rejection
7.6 Remedial Work
7.7 Ownership of Plant and Materials
7.8 Royalties
7.9 Liens
7.10 Spare Parts Prior to Taking Over
7.11 Spare Parts After Taking Over
8.0 COMMENCEMENT, DELAYS AND SUSPENSION
8.1 Commencement of Works
8.2 Date for Completion
8.3 Programme
8.4 Extension of Time for Completion
8.5 Delays caused by Authorities
8.6 Rate of Progress
8.7 Delay Damages
8.8 Suspension of Work
8.9 Consequences of Suspension
(document.doc) TOC : 35
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
8.0 COMMENCEMENT, DELAYS AND SUSPENSION (CONT’D)
8.10 Payment for Plant and Materials in Event of Suspension
8.11 Prolonged Suspension
8.12 Resumption of Work
9.0 TESTS ON COMPLETION
9.1 Contractor’s Obligations
9.2 Delayed Tests
9.3 Retesting
9.4 Failure to Pass Tests on Completion
9.5 Guaranteed Performance Levels
9.6 Minimum Performance Levels
9.7 Exceeding the Limits of Other Plant Performance
9.8 Creation of Punch List
10.0 OWNER’S TAKING OVER
10.1 Taking Over of the Works and Unit
10.2 Taking Over of Parts of the Works
10.3 Interference with Test on Completion
10.4 Clearance of Site upon Taking-over
11.0 DEFECTS LIABILITY
11.1 Completion of Outstanding Work and Remedying Defects
11.2 Cost of Remedying Defects
11.3 Extension of Defects Notification Period
11.4 Failure to Remedy Defects
11.5 Removal of Defective Work
(document.doc) TOC : 36
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
11.0 DEFECTS LIABILITY (CONT’D)
11.6 Further Tests
11.7 Right of Access
11.8 Contractor to Search
11.9 Performance Certificate
11.10 Unfulfilled Obligations
11.11 Clearance of Site
12.0 NOT USED
13.0 VARIATIONS AND ADJUSTMENTS
13.1 Right to Vary
13.2 Contractor’s Right to Submit Proposal
13.3 Variation Procedure
13.4 Payment in Applicable Currencies
13.5 Not used
13.6 Daywork
13.7 Adjustments for Changes in Legislation
13.8 Adjustments for changes in Cost
14.0 CONTRACT PRICE AND PAYMENT
14.1 The Contract Price
14.2 Not Used
14.3 Advance Payment
14.4 Application for Interim Payments
14.5 Payment Procedures
14.6 Plant and Material Intended for the worked
14.7 Interim Payments
(document.doc) TOC : 37
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
14.0 DEFECTS LIABILITY (CONT’D)
14.8 Timing of Interim Payments
14.9 Delayed Payment
14.10 Payment Withheld and Retention
14.11 Statement at Completion
14.12 Cessation of Owner’s Liability
14.13 Currencies of Payment
14.14 Taxes and Duties
14.15 Payment Disputes
15.0 TERMINATION BY OWNER
15.1 Notice to Correct
15.2 Termination by Owner
15.3 Valuation at date of Termination
15.4 Payment after Termination
15.5 Owner’s Entitlement to Termination
16.0 SUSPENSION AND TERMINATION BY CONTRACTOR
16.1 Contractor’s Entitlement to Suspend Work
16.2 Termination by Contractor
16.3 Cessation of Work and Removal of Contractor’s Equipment
16.4 Payment on Termination
17.0 RISK AND RESPONSIBILITY
17.1 Indemnities
17.2 Contractor’s Care of the Works
17.3 Owner’s Risks
(document.doc) TOC : 38
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
17.0 RISK AND RESPONSIBILITY (CONT’D)
17.4 Consequences of Owner’s Risks
17.5 Intellectual and Industrial Property Rights
17.6 Limitation of Liability
18.0 INSURANCE
18.1. General Requirements for Insurance
18.2. Cargo Insurance
18.3. Construction All Risk Insurance
18.4. Construction Equipment Insurance
18.5. Third Party Liability Insurance
18.6. Insurance for Contractor’s Personnel
18.7. Professional Indemnity Insurance for Contractor’s Consultants / Engineers
18.8. Approval of Insurance Policies
19.0 FORCE MAJEURE
19.1 Definition of Force Majeure
19.2 Notice of Force Majeure
19.3 Duty to Minimise Delay
19.4 Consequences of Force Majeure
19.5 Force Majeure Affecting Subcontractor
19.6 Optional Termination, Payment and Release
19.7 Release from Performance under the Law
(document.doc) TOC : 39
2x600 MW Long Phu 1 EPC RFP Document
DETAILED TABLE OF CONTENTS
VOLUME-III
SECTION-2 (CONT’D)
ARTICLE NO. DESCRIPTION
20.0 CLAIMS, DISPUTES AND ARBITRATION
20.1 Contractor’s Claims
20.2 Amicable Settlement
20.3 Arbitration
20.4 Works to Continue
20.5 Time Limit for Arbitration
(document.doc) TOC : 40
2x600 MW Long Phu 1 EPC RFP Document
CONTENTS
[BOOK 1, BOOK 2]
VOLUME-IV : BID PROPOSAL SHEETS / BIDDING FORMS [TECHNICAL & GENERAL]
VOLUME-IVA : TECHNICAL PROPOSAL PARTICULARS FOR STEAM GENERATOR, TURBINE-GENERATOR, PIPING AND AUXILIARIES
VOLUME-IVB : TECHNICAL PROPOSAL PARTICULARS FOR AUXILIARY SYSTEM AND EQUIPMENT
VOLUME-IVC : TECHNICAL PROPOSAL PARTICULARS FOR ELECTRICAL WORKS
VOLUME-IVD : TECHNICAL PROPOSAL PARTICULARS FOR CONTROL AND INSTRUMENTATION
VOLUME-VIE : GENERAL PROPOSAL EXHIBIT SHEETS
SCHEDULE-IVE/1 : PROGRESS SCHEDULE
SCHEDULE-IVE/2 : DRAWING AND DOCUMENT SUBMISSION SCHEDULE
SCHEDULE-IVE/3 : DEVIATION FROM SPECIFICATION (PART-A)
SCHEDULE-IVE/4 : DEVIATION FROM SPECIFICATION (PART-B)
SCHEDULE-IVE/5 : EXPERIENCE LIST
[BOOK 3] : PORT TECHNICAL SCHEDULE
(document.doc) TOC : 41
Rev-B
2x600 MW Long Phu 1 EPC RFP Document
CONTENTS
VOLUME-V : BID PROPOSAL SHEETS / BIDDING FORMS [PRICE]
(document.doc) TOC : 42