1.040/1.401 1.040/1.401 Project Management Project Management Spring 2007 Spring 2007 Estimating Estimating Dr. SangHyun Lee Department of Civil and Environmental Engineering Department of Civil and Environmental Engineering Massachusetts Institute of Technology Massachusetts Institute of Technology

Transcript of 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581...

Page 1: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

1.040/1.4011.040/1.401

Project ManagementProject ManagementSpring 2007Spring 2007

EstimatingEstimating

Dr. SangHyun Lee

Department of Civil and Environmental EngineeringDepartment of Civil and Environmental EngineeringMassachusetts Institute of Technology Massachusetts Institute of Technology

Page 2: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Project Management PhaseProject Management Phase

FEASIBILITY DEVELOPMENT CLOSEOUT OPERATIONS

Fin.&Eval.

RiskEstimatingEstimating

Planning

DESIGNDESIGNPLANNING PLANNING

Organization

Page 3: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Estimation Levels Estimation Levels -- IntroductionIntroduction

Source: Barrie & Paulson, 1992

Different types of estimates are required as a project evolvesDifferent types of estimates are required as a project evolvesConceptual & Preliminary EstimatesConceptual & Preliminary Estimates

Prepared early in the project prior to engineering design complePrepared early in the project prior to engineering design completion (e.g., to tion (e.g., to tell Owner whether the contemplated project scope is feasible)tell Owner whether the contemplated project scope is feasible)

Incorporate new information from design to obtain an updated estIncorporate new information from design to obtain an updated estimate of imate of the projectthe project

Detailed EstimatesDetailed EstimatesPrepared from completed plans and specificationsPrepared from completed plans and specifications

Definitive EstimatesDefinitive EstimatesForecast the project cost within allowable limits from a combinaForecast the project cost within allowable limits from a combination of tion of conceptual and detailed information often including partial contconceptual and detailed information often including partial contract and ract and other procurement awardsother procurement awards

Page 4: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

ConstructionPre-bidDetaileddesign

ConceptualdesignFeasibility

Detailed EstimatesDetailed EstimatesDefinitiveDefinitiveEstimatesEstimates

ConceptualConceptual && PreliminaryPreliminaryEstimatesEstimates

Design & Estimating ProcessDesign & Estimating Process

Page 5: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

OutlineOutline

Conceptual & Preliminary EstimatesConceptual & Preliminary EstimatesCost indicesCost indices

Cost capacity factorCost capacity factor

Parameter CostParameter Cost

Detailed EstimatesDetailed EstimatesEstimatesEstimates

Cost classificationCost classification

CalculationCalculation

Page 6: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Conceptual and Preliminary EstimatesConceptual and Preliminary Estimates

Decide FeasibilityDecide Feasibility

Great Variability According to TypeGreat Variability According to Type

Categories:Categories:

TimeTime--referenced Cost Indicesreferenced Cost Indices

CostCost--capacity Factorscapacity Factors

Parameter CostsParameter Costs

Acc

ura

cy

Com

ple

xity

Page 7: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

OutlineOutline

Conceptual & Preliminary EstimatesConceptual & Preliminary EstimatesCost indicesCost indicesCost capacity factorCost capacity factorParameter CostParameter Cost

Detailed EstimatesDetailed EstimatesEstimatesEstimatesCost classificationCost classificationCalculationCalculation

Page 8: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost IndicesCost Indices

Source: http://www.enr.com/features/conEco/

Show changes of costs over time by upgrading the cost of similarShow changes of costs over time by upgrading the cost of similar facilities facilities from the past to the presentfrom the past to the present

Cost indices show the changes of a certain facility’s costs over timeYear 1913 = 100, …Year 2007 = 4432

If Facility A is similar to my ‘wish’ facility and I know the value of Facility A at 1913,I can assume my ‘wish’ facility’s value at 2007.

Sketch of building and surroundings removed due to copyright restrictions.

Page 9: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost IndicesCost Indices

Source: http://www.enr.com/features/conEco/

Show changes of costs over time by upgrading the cost of similarShow changes of costs over time by upgrading the cost of similar facilities facilities from the past to the presentfrom the past to the present

Used to determine the general construction costs of structuresUsed to determine the general construction costs of structures

Published periodically by Engineering News Record (ENR) and othePublished periodically by Engineering News Record (ENR) and other r publicationspublications

ENRENR’’ss Building Cost Index (BCI): Changes of facilityBuilding Cost Index (BCI): Changes of facility’’s costs over times costs over timeFacilityFacility’’s components are:s components are:

1,088 Board Feet of Lumber (2x4, 201,088 Board Feet of Lumber (2x4, 20--city Average)city Average)1 Board Feet = 11 Board Feet = 1’’ x 1x 1’’ x 1x 1”” = 144 in= 144 in33

(e.g., 2(e.g., 2××4 4 -- 10 ft long contains [(210 ft long contains [(2××4)4)××10] 10] ×× 12] = 960 in12] = 960 in3 3 →→ 6.67 board feet)6.67 board feet)

2500 Pounds of Structural2500 Pounds of Structural--Steel Shapes (20Steel Shapes (20--city Average, Base Mill Price before 1996, city Average, Base Mill Price before 1996, Fabricated after 1996)Fabricated after 1996)

1.128 Tons of Portland Cement (Bulk, 201.128 Tons of Portland Cement (Bulk, 20--city Average)city Average)

66.38 Hours of Skilled Labor (2066.38 Hours of Skilled Labor (20--City Average of Bricklayers, Carpenters, and Structural City Average of Bricklayers, Carpenters, and Structural Ironworkers)Ironworkers)

Page 10: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Building Cost Index Data (1990Building Cost Index Data (1990––Date)Date)

Source: http://www.enr.com/features/conEco/

JAN. FEB. MARCH APRIL MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. ANNUAL AVG.

1990 2664 2668 2673 2676 2691 2715 2716 2716 2730 2728 2730 2720 2702

1991 2720 2716 2715 2709 2723 2733 2757 2792 2785 2786 2791 2784 2751

1992 2784 2775 2799 2809 2828 2838 2845 2854 2857 2867 2873 2875 2834

1993 2886 2886 2915 2976 3071 3066 3038 3014 3009 3016 3029 3046 2996

1994 3071 3106 3116 3127 3125 3115 3107 3109 3116 3116 3109 3110 3111

1995 3112 3111 3103 3100 3096 3095 3114 3121 3109 3117 3131 3128 3111

1996 3127 3131 3135 3148 3161 3178 3190 3223 3246 3284 3304 3311 3203

1997 3332 3333 3323 3364 3377 3396 3392 3385 3378 3372 3350 3370 3364

1998 3363 3372 3368 3375 3374 3379 3382 3391 3414 3423 3424 3419 3391

1999 3425 3417 3411 3421 3422 3433 3460 3474 3504 3505 3498 3497 3456

JAN. FEB. MARCH APRIL MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. ANNUAL AVG.

2000 3503 3523 3536 3534 3558 3553 3545 3546 3539 3547 3541 3548 3539

2001 3545 3536 3541 3541 3547 3572 3625 3605 3597 3602 3596 3577 3574

2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623

2003 3648 3655 3649 3652 3660 3677 3684 3712 3717 3745 3766 3758 3694

2004 3767 3802 3859 3908 3955 3996 4013 4027 4103 4129 4128 4123 3984

2005 4112 4116 4127 4167 4188 4194 4196 4209 4218 4265 4312 4329 4203

2006 4333 4338 4330 4335 4332 4340

Base: 1913=1002007 4432

Page 11: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Building Cost Index Data (Prior to 1990)Building Cost Index Data (Prior to 1990)

Source: http://www.enr.com/features/conEco/

Page 12: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Indices Time ConversionCost Indices Time Conversion

Example:Example:

Warehouse Estimate: Assume you have an estimate to a similar warWarehouse Estimate: Assume you have an estimate to a similar warehouse ehouse

located nearby and completed in 1993 for a cost of $4,200,000. Wlocated nearby and completed in 1993 for a cost of $4,200,000. We are e are

planning to build a new warehouse in Feb. of 2007. The Building planning to build a new warehouse in Feb. of 2007. The Building Cost Cost

Index from ENR for 1993, relative to the base date of 1913, was Index from ENR for 1993, relative to the base date of 1913, was 2996% 2996%

and Building Cost Index from ENR for Feb. 2007 is 4432%. What isand Building Cost Index from ENR for Feb. 2007 is 4432%. What is the the

estimated project cost if you establish the estimate using Buildestimated project cost if you establish the estimate using Building Cost ing Cost

Index from ENR? Index from ENR?

Adapted from: Barrie & Paulson, 1992

Page 13: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Indices Time ConversionCost Indices Time Conversion

What Information Do We Need?What Information Do We Need?

Current Building Cost Index (Feb. 2007) = 4432Current Building Cost Index (Feb. 2007) = 4432

Building Cost Index for Year 1993 = 2996Building Cost Index for Year 1993 = 2996

Similar FacilitySimilar Facility’’s Cost at Year 1993 = $4,200,000s Cost at Year 1993 = $4,200,000

We Convert From One Base Period to AnotherWe Convert From One Base Period to Another

2996 : $4,200,000 = 4432 : $X2996 : $4,200,000 = 4432 : $X

$X = (4432/2996) * $4,200,000 = $6,213,084 $X = (4432/2996) * $4,200,000 = $6,213,084

Adapted from: Barrie & Paulson, 1992

Page 14: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Indices Component CalculationsCost Indices Component Calculations

ENRENR’’s Construction Cost Index:s Construction Cost Index:

Used when labor costs are a high proportion of total costUsed when labor costs are a high proportion of total cost

Components:Components:

1,088 Board Feet of Lumber (2x4, 201,088 Board Feet of Lumber (2x4, 20--city Average)city Average)

1 Board Feet = 11 Board Feet = 1’’ x 1x 1’’ x 1x 1”” = 144 in= 144 in33

2,500 Pounds of Structural2,500 Pounds of Structural--Steel Shapes (20Steel Shapes (20--city Average, Base Mill Price Before city Average, Base Mill Price Before 1996, Fabricated after 1996)1996, Fabricated after 1996)

1.128 Tons of Portland Cement (Bulk, 201.128 Tons of Portland Cement (Bulk, 20--city Average)city Average)

200 Hours of Common Labor (20200 Hours of Common Labor (20--city Average)city Average)

Page 15: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Indices Use and AccuracyCost Indices Use and Accuracy

Accuracies Within 20% to 30% of Actual CostsAccuracies Within 20% to 30% of Actual Costs

Negligible Time and EffortNegligible Time and Effort

Valuable for Preliminary PlanningValuable for Preliminary Planning

Page 16: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Indices Cost Indices -- LimitationsLimitations

Adapted from: Barrie & Paulson, 1992

Problems could arise if the proportions of the input components (e.g., lumber) in a building type cost index do not reflect the resources used on the project in question

E.g., about 40 % of the costs in a petrochemical project is in pE.g., about 40 % of the costs in a petrochemical project is in piping (pipe and pipe iping (pipe and pipe fitters)fitters)

Problems could arise if the project on which the Index is based has very little in common with the project under consideration

Some types of indices do not consider factors such as: productivity, changes in technology, and competitiveness of contractors

Page 17: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

OutlineOutline

Conceptual & Preliminary EstimatesConceptual & Preliminary EstimatesCost indicesCost indicesCost capacity factorCost capacity factorParameter CostParameter Cost

Detailed EstimatesDetailed EstimatesEstimatesEstimatesCost classificationCost classificationCalculationCalculation

Page 18: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

CostCost--Capacity FactorCapacity Factor

Apply to changes in size, scope, or capacity of projects of similar types

Reflect the nonlinear increase in cost with size (economies of scale, learning curves)

C2 = C1 (Q2/Q1) x

Where Where CC2 2 = estimated cost of the new facility w/capacity Q= estimated cost of the new facility w/capacity Q22

CC11 = known cost of facility of capacity Q= known cost of facility of capacity Q11

x = the costx = the cost--capacity factor for this type of work capacity factor for this type of work

Page 19: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

CostCost--Capacity Factor Capacity Factor

Source: Barrie & Paulson, 1992

Q is a parameter that reasonably reflects the size of the faciliQ is a parameter that reasonably reflects the size of the facility ty (e.g., barrels per day produced by a refinery, tons of steel per(e.g., barrels per day produced by a refinery, tons of steel per day day produced by a steel mill, gross floor area for a warehouse)produced by a steel mill, gross floor area for a warehouse)

X is an empirically derived factor based on wellX is an empirically derived factor based on well--documented documented historical records for a variety of different types of projectshistorical records for a variety of different types of projects

Page 20: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

CostCost--Capacity Factor ExampleCapacity Factor Example

Example Revisit:Example Revisit:

Warehouse Estimate: Assume you have an estimate to a similar warWarehouse Estimate: Assume you have an estimate to a similar warehouse ehouse

located nearby and completed in 1993 for a cost of $4,200,000. Wlocated nearby and completed in 1993 for a cost of $4,200,000. We are e are

planning to build a new warehouse in Feb. of 2007. The ENR indexplanning to build a new warehouse in Feb. of 2007. The ENR index for for

1993, relative to the base date of 1913, was 2996% and the ENR i1993, relative to the base date of 1913, was 2996% and the ENR index for ndex for

2007 is 4432%.2007 is 4432%.

Consider the costConsider the cost--capacity factor x = 0.8 for a warehouse. capacity factor x = 0.8 for a warehouse.

The above warehouse has a usable area of 120,000 square feetThe above warehouse has a usable area of 120,000 square feetThe prospective owner for the new warehouse wants a structure with a usable area of 150,000 square feet

Page 21: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

CostCost--Capacity Factor ExampleCapacity Factor Example

What Information Do We Need?What Information Do We Need?

QQ2/Q/Q1 = 150,000/120,000 = 1.25= 150,000/120,000 = 1.25

CostCost--capacity factor x = 0.8capacity factor x = 0.8

Known cost = $4,200,000 Known cost = $4,200,000

C2 = $4,200,000 * (1.25)C2 = $4,200,000 * (1.25)0.80.8 = $5,020,851= $5,020,851

A 25% more capacity implies only 20% more costsA 25% more capacity implies only 20% more costs

Page 22: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Combining Cost Indices & CostCombining Cost Indices & Cost--Capacity FactorCapacity Factor

Combine Cost Indices & Cost Capacity Factors to take into Combine Cost Indices & Cost Capacity Factors to take into account changes in both time & capacityaccount changes in both time & capacity

C2 = C1 (Ib / Ia) (Q2 / Q1)x

Where Where IIbb = Index number = Index number ““NowNow”” or present time.or present time.IIaa = Index number at that time = Index number at that time

Source: Barrie & Paulson, 1992

Page 23: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Indices & CostCost Indices & Cost--Capacity Factor Capacity Factor ExampleExample

Example Revisit:Example Revisit:

Warehouse Estimate: Assume you have an estimate to a similar warWarehouse Estimate: Assume you have an estimate to a similar warehouse ehouse

located nearby and completed in 1993 for a cost of $4,200,000. Wlocated nearby and completed in 1993 for a cost of $4,200,000. We are e are

planning to build a new warehouse in Feb. of 2007. The ENR indexplanning to build a new warehouse in Feb. of 2007. The ENR index for for

1993, relative to the base date of 1913, was 2996% and the ENR i1993, relative to the base date of 1913, was 2996% and the ENR index for ndex for

2007 is 4432%.2007 is 4432%.

Consider the costConsider the cost--capacity factor x = 0.8 for a warehouse. capacity factor x = 0.8 for a warehouse.

The above warehouse has a usable area of 120,000 square feetThe above warehouse has a usable area of 120,000 square feetThe prospective owner for the new warehouse wants a structure with a usable area of 150,000 square feet

Page 24: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

CC22 = 4,200,000 * (4432/2996) * (150,000/120,000)= 4,200,000 * (4432/2996) * (150,000/120,000)0.80.8 = $7,188,731= $7,188,731

Cost Indices & CostCost Indices & Cost--Capacity Factor Capacity Factor ExampleExample

Page 25: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

OutlineOutline

Conceptual EstimatesConceptual EstimatesCost indicesCost indices

Cost capacity factorCost capacity factor

Parameter CostParameter Cost

Detailed EstimatesDetailed EstimatesEstimatesEstimates

Cost classificationCost classification

CalculationCalculation

Page 26: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Parameter Costs Source DataParameter Costs Source Data

Commonly used in building constructionCommonly used in building constructionENR ENR ““Quarterly Cost RoundupQuarterly Cost Roundup””R.S. Means R.S. Means ““Means Square Foot CostsMeans Square Foot Costs””

Source: RS Means, Square Foot Costs Data, 2006

Page 27: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Parameter Costs CharacteristicsParameter Costs Characteristics

Source: Barrie & Paulson, 1992

Relates all costs of a project to just a few physical measures, Relates all costs of a project to just a few physical measures, or or ““ParametersParameters””, that reflect the size or scope of the project, that reflect the size or scope of the project

E.g., warehouse E.g., warehouse -- the the ““ParameterParameter”” would be would be ““Gross Enclosed Floor Gross Enclosed Floor AreaArea””

all costs represented by X ($/S.F) all costs represented by X ($/S.F) →→ total cost = X ($/S.F.) total cost = X ($/S.F.) ×× the the projectproject’’s gross enclosed floor area (S.F.)s gross enclosed floor area (S.F.)

With good historical records on comparable structures, With good historical records on comparable structures, parameter costing can give reasonable levels of accuracy for parameter costing can give reasonable levels of accuracy for preliminary estimatespreliminary estimates

Page 28: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Means Square Foot CostMeans Square Foot CostCosts per Square FootCosts per Square FootType of Facility (total 23,000 S.F apartment with 3 stories)Type of Facility (total 23,000 S.F apartment with 3 stories)

Source: RS Means, Square Foot Costs Data, 2006

Story Height = 10Story Height = 10’’ and No Basementand No Basement

Commercial/Industrial/Institutional1. M.010 2. Apartment, 1-3 Story

Figure by MIT OCW.

Page 29: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Parameter Cost ExampleParameter Cost Example

Source: RS Means, Square Foot Costs Data, 2006

What is the Cost for an apartment building (7 Story) if the What is the Cost for an apartment building (7 Story) if the perimeter of the building is 502 L.F. and the story height is perimeter of the building is 502 L.F. and the story height is 1111’’--44””? Assume that the apartment building has decorative ? Assume that the apartment building has decorative concrete block on the east, west & south walls. The north concrete block on the east, west & south walls. The north walls external finish is brick with concrete block backup. walls external finish is brick with concrete block backup. The area of each floor of the apartment building 11,460 S.F. The area of each floor of the apartment building 11,460 S.F. The basement floor area s 4,200 S.F. Please use the Means The basement floor area s 4,200 S.F. Please use the Means Square Foot Cost to obtain an estimate. The building frame Square Foot Cost to obtain an estimate. The building frame is steel. The apartment building is located in Atlantic City, is steel. The apartment building is located in Atlantic City, New Jersey, Zip Code 07410.New Jersey, Zip Code 07410.

Page 30: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Characteristics of the Apartment BuildingCharacteristics of the Apartment Building6060’’ x 191x 191’’ = 11,460 S.F./Floor= 11,460 S.F./Floor2 * [1912 * [191’’ + 60+ 60’’] = 502 L.F. Perimeter] = 502 L.F. Perimeter7 Floors7 FloorsExterior Walls: Exterior Walls:

North wall: Face brick w/ concrete block backupNorth wall: Face brick w/ concrete block backupEast, West & South walls: Decorative Concrete BlockEast, West & South walls: Decorative Concrete Block

Story Height: 11Story Height: 11’’--44””Basement Area: 4,200 S.FBasement Area: 4,200 S.FSteel FrameSteel FrameLocated in Atlantic City, New Jersey, Zip Code 07410Located in Atlantic City, New Jersey, Zip Code 07410

Coefficients are determined from Model Number M.020 for ApartmenCoefficients are determined from Model Number M.020 for Apartment, t, 44--7 Story type (Refer to RS Means (2006) 7 Story type (Refer to RS Means (2006) -- Square Foot Costs, page 80) Square Foot Costs, page 80)

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Page 31: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Costs per square foot of floor area

Exterior WallS.F. Area 40000 45000 50000 55000 60000 70000 80000 90000 100000

550

126.80

131.30

121.05

122.50

2.50

1.25 1.15

2.15

126.85

125.55

122.00

120.60

130.70

126.25

594

126.15

127.50

433 466

133.40

138.85

126.50

128.05

133.60

134.95 134.30

132.90

127.45

125.90

138.20

132.85

500 510

130.05

134.95

123.65

125.20

129.75

131.10

3.05

1.40 1.20

2.65

129.10

127.85

123.70

122.25

133.00

128.35

530

3.95

1.65 1.55

3.55

134.20

139.65

127.20

128.75

134.45

135.75

4.30

1.65

400

135.15

140.75

128.00

129.55

135.45

136.85

4.75

1.70

366

136.25

141.95

128.95

130.55

136.65

138.00

5.35

1.80

L.F. Perimeter

Steel Frame

Steel Frame

Steel Frame

Per 100 L.F.

Per 1 Ft.

R/Conc. Frame

R/Conc. Frame

R/Conc. Frame

Face Brick with ConcreteBlock Back-up

Decorative Concrete Block

Precost Concrete Panels

Perimeter Adj., Add or Deduct

Story Hgt. Adj., Add or Deduct

For Basement, add $ 27.30 per square foot of basement area

The above costs were calculated using the basic specifications shown on the facing page. These costs should be adjusted where necessary for design alternatives and owner's requirements. Reported completed project costs, for this type of structure, range from $ 54.35 to $ 157.75 per S.F.

Commercial/Industrial/InstitutionalM.020 Apartment, 4-7 Story

RS Means (2006) – Square Foot Costs, Page 80

Choose type

Figure by MIT OCW.

Page 32: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Costs per square foot of floor area

Exterior WallS.F. Area 40000 45000 50000 55000 60000 70000 80000 90000 100000

550

126.80

131.30

121.05

122.50

2.50

1.25 1.15

2.15

126.85

125.55

122.00

120.60

130.70

126.25

594

126.15

127.50

433 466

133.40

138.85

126.50

128.05

133.60

134.95 134.30

132.90

127.45

125.90

138.20

132.85

500 510

130.05

134.95

123.65

125.20

129.75

131.10

3.05

1.40 1.20

2.65

129.10

127.85

123.70

122.25

133.00

128.35

530

3.95

1.65 1.55

3.55

134.20

139.65

127.20

128.75

134.45

135.75

4.30

1.65

400

135.15

140.75

128.00

129.55

135.45

136.85

4.75

1.70

366

136.25

141.95

128.95

130.55

136.65

138.00

5.35

1.80

L.F. Perimeter

Steel Frame

Steel Frame

Steel Frame

Per 100 L.F.

Per 1 Ft.

R/Conc. Frame

R/Conc. Frame

R/Conc. Frame

Face Brick with ConcreteBlock Back-up

Decorative Concrete Block

Precost Concrete Panels

Perimeter Adj., Add or Deduct

Story Hgt. Adj., Add or Deduct

For Basement, add $ 27.30 per square foot of basement area

The above costs were calculated using the basic specifications shown on the facing page. These costs should be adjusted where necessary for design alternatives and owner's requirements. Reported completed project costs, for this type of structure, range from $ 54.35 to $ 157.75 per S.F.

Commercial/Industrial/InstitutionalM.020 Apartment, 4-7 Story

RS Means (2006) – Square Foot Costs, Page 80

Figure by MIT OCW.

Page 33: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

What should be adjusted when the cost is to be established What should be adjusted when the cost is to be established by using the Means Square Foot Cost Method?by using the Means Square Foot Cost Method?

Exterior Wall VariationExterior Wall Variation

Perimeter AdjustmentPerimeter Adjustment

Story Height AdjustmentStory Height Adjustment

Basement AdditionBasement Addition

Location ModifierLocation Modifier

Parameter Cost ExampleParameter Cost Example

Page 34: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Costs per square foot of floor area

Exterior WallS.F. Area 40000 45000 50000 55000 60000 70000 80000 90000 100000

550

126.80

131.30

121.05

122.50

2.50

1.25 1.15

2.15

126.85

125.55

122.00

120.60

130.70

126.25

594

126.15

127.50

433 466

133.40

138.85

126.50

128.05

133.60

134.95 134.30

132.90

127.45

125.90

138.20

132.85

500 510

130.05

134.95

123.65

125.20

129.75

131.10

3.05

1.40 1.20

2.65

129.10

127.85

123.70

122.25

133.00

128.35

530

3.95

1.65 1.55

3.55

134.20

139.65

127.20

128.75

134.45

135.75

4.30

1.65

400

135.15

140.75

128.00

129.55

135.45

136.85

4.75

1.70

366

136.25

141.95

128.95

130.55

136.65

138.00

5.35

1.80

L.F. Perimeter

Steel Frame

Steel Frame

Steel Frame

Per 100 L.F.

Per 1 Ft.

R/Conc. Frame

R/Conc. Frame

R/Conc. Frame

Face Brick with ConcreteBlock Back-up

Decorative Concrete Block

Precost Concrete Panels

Perimeter Adj., Add or Deduct

Story Hgt. Adj., Add or Deduct

For Basement, add $ 27.30 per square foot of basement area

The above costs were calculated using the basic specifications shown on the facing page. These costs should be adjusted where necessary for design alternatives and owner's requirements. Reported completed project costs, for this type of structure, range from $ 54.35 to $ 157.75 per S.F.

Commercial/Industrial/InstitutionalM.020 Apartment, 4-7 Story

Basic SF Costs for 80,000 S.F apartment building with Face Brick w/ Concrete Block Backup

Basic SF Costs for 80,000 S.F apartment building with Decorative Concrete Block

Figure by MIT OCW.

Page 35: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Basic SF Cost in R.S. Means for S.F Area=80000, L.F Perimeter = Basic SF Cost in R.S. Means for S.F Area=80000, L.F Perimeter = 530, Story 530, Story Height = 10Height = 10’’ & No Basement& No Basement

$128.35/SF when exterior walls are Brick w/ Concrete Block Backu$128.35/SF when exterior walls are Brick w/ Concrete Block Backup (North)p (North)

$122.25/SF when exterior walls are Decorative Concrete Block (Ea$122.25/SF when exterior walls are Decorative Concrete Block (East, West, south)st, West, south)

North wall makes up:North wall makes up:

[191[191’’/502/502’’] x 100 = 38.04 % of total building perimeter] x 100 = 38.04 % of total building perimeter

East, West & South walls make up:East, West & South walls make up:

[(191[(191’’+2x60+2x60’’)/502)/502’’] x 100 = 61.96 % of total building perimeter] x 100 = 61.96 % of total building perimeter

Exterior Wall VariationExterior Wall Variation

[$128.35 * 38.04%] + [$122.25 * 61.96%] = $124.6/S.F.[$128.35 * 38.04%] + [$122.25 * 61.96%] = $124.6/S.F.

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Page 36: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

What should be adjusted when the cost is to be established What should be adjusted when the cost is to be established by using the Means Square Foot Cost Method?by using the Means Square Foot Cost Method?

Exterior Wall VariationExterior Wall Variation

Perimeter AdjustmentPerimeter Adjustment

Story Height AdjustmentStory Height Adjustment

Basement AdditionBasement Addition

Location ModifierLocation Modifier

Parameter Cost ExampleParameter Cost Example

Page 37: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Costs per square foot of floor area

Exterior WallS.F. Area 40000 45000 50000 55000 60000 70000 80000 90000 100000

550

126.80

131.30

121.05

122.50

2.50

1.25 1.15

2.15

126.85

125.55

122.00

120.60

130.70

126.25

594

126.15

127.50

433 466

133.40

138.85

126.50

128.05

133.60

134.95 134.30

132.90

127.45

125.90

138.20

132.85

500 510

130.05

134.95

123.65

125.20

129.75

131.10

3.05

1.40 1.20

2.65

129.10

127.85

123.70

122.25

133.00

128.35

530

3.95

1.65 1.55

3.55

134.20

139.65

127.20

128.75

134.45

135.75

4.30

1.65

400

135.15

140.75

128.00

129.55

135.45

136.85

4.75

1.70

366

136.25

141.95

128.95

130.55

136.65

138.00

5.35

1.80

L.F. Perimeter

Steel Frame

Steel Frame

Steel Frame

Per 100 L.F.

Per 1 Ft.

R/Conc. Frame

R/Conc. Frame

R/Conc. Frame

Face Brick with ConcreteBlock Back-up

Decorative Concrete Block

Precost Concrete Panels

Perimeter Adj., Add or Deduct

Story Hgt. Adj., Add or Deduct

For Basement, add $ 27.30 per square foot of basement area

The above costs were calculated using the basic specifications shown on the facing page. These costs should be adjusted where necessary for design alternatives and owner's requirements. Reported completed project costs, for this type of structure, range from $ 54.35 to $ 157.75 per S.F.

Commercial/Industrial/InstitutionalM.020 Apartment, 4-7 Story

RS Means (2006) – Square Foot Costs, Page 80

Perimeter & Height Adjustment Factors

Figure by MIT OCW.

Page 38: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Exterior Wall Variation : Exterior Wall Variation :

[$128.35 * 38.04%] + [$122.25 * 61.96%] = $124.6/S.F.[$128.35 * 38.04%] + [$122.25 * 61.96%] = $124.6/S.F.

Perimeter Adjustment:Perimeter Adjustment:

Apartment building perimeter is 28 L.F (530 Apartment building perimeter is 28 L.F (530 --502) less than the M.020 model building in RS Means502) less than the M.020 model building in RS Means

Perimeter adjustment factor: $2.65 per 100 L.F Perimeter adjustment factor: $2.65 per 100 L.F

$124.6 $124.6 –– ( $2.65/100 L.F * 28 L.F ) = $123.9/S.F( $2.65/100 L.F * 28 L.F ) = $123.9/S.F

Height Adjustment: Height Adjustment:

Apartment building story height is 1Apartment building story height is 1’’ 44”” (11(11’’ 44’’’’--1010’’) more than the M.020 model building in RS Means) more than the M.020 model building in RS Means

Height adjustment factor: $1.20 per ft Height adjustment factor: $1.20 per ft

$123.9 + $1.20 * 1.3 = $125.5/S.F.$123.9 + $1.20 * 1.3 = $125.5/S.F.

Apartment Building initial total cost: $125.5 * 80,220 S.F = $10Apartment Building initial total cost: $125.5 * 80,220 S.F = $10,067,610,067,610

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Page 39: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

What should be adjusted when the cost is to be established What should be adjusted when the cost is to be established by using the Means Square Foot Cost Method?by using the Means Square Foot Cost Method?

Exterior Wall VariationExterior Wall Variation

Perimeter AdjustmentPerimeter Adjustment

Story Height AdjustmentStory Height Adjustment

Basement AdditionBasement Addition

Location ModifierLocation Modifier

Parameter Cost ExampleParameter Cost Example

Page 40: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Costs per square foot of floor area

Exterior WallS.F. Area 40000 45000 50000 55000 60000 70000 80000 90000 100000

550

126.80

131.30

121.05

122.50

2.50

1.25 1.15

2.15

126.85

125.55

122.00

120.60

130.70

126.25

594

126.15

127.50

433 466

133.40

138.85

126.50

128.05

133.60

134.95 134.30

132.90

127.45

125.90

138.20

132.85

500 510

130.05

134.95

123.65

125.20

129.75

131.10

3.05

1.40 1.20

2.65

129.10

127.85

123.70

122.25

133.00

128.35

530

3.95

1.65 1.55

3.55

134.20

139.65

127.20

128.75

134.45

135.75

4.30

1.65

400

135.15

140.75

128.00

129.55

135.45

136.85

4.75

1.70

366

136.25

141.95

128.95

130.55

136.65

138.00

5.35

1.80

L.F. Perimeter

Steel Frame

Steel Frame

Steel Frame

Per 100 L.F.

Per 1 Ft.

R/Conc. Frame

R/Conc. Frame

R/Conc. Frame

Face Brick with ConcreteBlock Back-up

Decorative Concrete Block

Precost Concrete Panels

Perimeter Adj., Add or Deduct

Story Hgt. Adj., Add or Deduct

For Basement, add $ 27.30 per square foot of basement area

The above costs were calculated using the basic specifications shown on the facing page. These costs should be adjusted where necessary for design alternatives and owner's requirements. Reported completed project costs, for this type of structure, range from $ 54.35 to $ 157.75 per S.F.

Commercial/Industrial/InstitutionalM.020 Apartment, 4-7 Story

RS Means (2006) – Square Foot Costs, Page 80

Basement Addition FactorFigure by MIT OCW.

Page 41: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Apartment Building initial total cost: $125.5 * 80,220 S.F = $10Apartment Building initial total cost: $125.5 * 80,220 S.F = $10,067,610,067,610

Basement Addition:Basement Addition:

Apartment building has 4,200 S.F basementApartment building has 4,200 S.F basement

Basement Addition Factor: $27.30 per S.F of basement areaBasement Addition Factor: $27.30 per S.F of basement area

Basement added cost : $10,067,610 + $27.30 * 4,200 S.F = $10,182Basement added cost : $10,067,610 + $27.30 * 4,200 S.F = $10,182,270,270

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Page 42: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

What should be adjusted when the cost is to be established What should be adjusted when the cost is to be established by using the Means Square Foot Cost Method?by using the Means Square Foot Cost Method?

Exterior Wall VariationExterior Wall Variation

Perimeter AdjustmentPerimeter Adjustment

Story Height AdjustmentStory Height Adjustment

Basement AdditionBasement Addition

Location ModifierLocation Modifier

Parameter Cost ExampleParameter Cost Example

Page 43: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

Location Modifier

State/Zip

New Jersey070-071072073074-075076077

080,083081082,084085,086087088-089

Newark 1.15

1.15

1.15

1.151.091.10

1.10

1.101.101.10

1.06

1.061.07

1.131.131.11

1.11

1.111.111.11

1.11

1.12

1.121.15

1.181.14

1.14

1.14

PatersonHackensackLong BranchDoverSummitVinelandCamdenAtlantic CityTrentonPoint PleasantNew Brunswick

ElizabethJersey City

078079

City Residential Commercial

Figure by MIT OCW.

RS Means (2006) – Square Foot Costs, Page 455

Parameter Cost ExampleParameter Cost Example

Page 44: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Basement Addition:Basement Addition:

$10,182,270$10,182,270

Location Modifier for Residential Bldg: 1.13 (Refer to RS Means Location Modifier for Residential Bldg: 1.13 (Refer to RS Means (2006) (2006) --Square Foot Costs, page 455) Square Foot Costs, page 455)

Apartment building modified total cost: $10,182,270 * 1.13 = $ Apartment building modified total cost: $10,182,270 * 1.13 = $ 11,505,96511,505,965

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Page 45: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Parameter Cost ExampleParameter Cost Example

Source: RS Means, Square Foot Costs Data, 2006

What is the Cost for an apartment building (7 Story) if the What is the Cost for an apartment building (7 Story) if the perimeter of the building is 502 L.F. and the story height is perimeter of the building is 502 L.F. and the story height is 1111’’--44””? Assume that the apartment building has decorative ? Assume that the apartment building has decorative concrete block on the east, west & south walls. The north concrete block on the east, west & south walls. The north walls external finish is brick with concrete block backup. walls external finish is brick with concrete block backup. The area of each floor of the apartment building 11,460 S.F. The area of each floor of the apartment building 11,460 S.F. The basement floor area s 4,200 S.F. Please use the Means The basement floor area s 4,200 S.F. Please use the Means Square Foot Cost to obtain an estimate. The building frame Square Foot Cost to obtain an estimate. The building frame is steel is steel with an observed age of 20 years. with an observed age of 20 years. The apartment The apartment building is located in Atlantic City, New Jersey, Zip Code building is located in Atlantic City, New Jersey, Zip Code 07410.07410.

Page 46: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: RS Means, Square Foot Costs Data, 2006

What should be adjusted when the cost is to be established by usWhat should be adjusted when the cost is to be established by using the ing the Means Square Foot Cost Method?Means Square Foot Cost Method?

Exterior Wall VariationExterior Wall Variation

Perimeter AdjustmentPerimeter Adjustment

Story Height AdjustmentStory Height Adjustment

Basement AdditionBasement Addition

Location ModifierLocation Modifier

Depreciation AdjustmentDepreciation Adjustment

Parameter Cost ExampleParameter Cost Example

Page 47: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

RS Means (2006) – Square Foot Costs, Page 228

Depreciation Adjustment Factor

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Observed Age(Years)

Frame Masonry onWood

Masonry onMasonry or

Steel1

2

3

4

1%

2

3

4

0%

0

0%

1

12

23

3

8

5

15

1520

20

6

20

25

30

35

40

5

15

20

25

25

25

30

30

30

45

45

45

45

50

50

50

50

55

55

55

55

60

60

60

60

65

6570

35

35

35

40

40

40

10

Building Material

Depreciation Table Commercial/Industrial/Institutional

Figure by MIT OCW.

Page 48: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Location Modifier for Residential BuildingLocation Modifier for Residential Building

$ 11,505,965$ 11,505,965

Depreciation Adjustment for steel frame building with 20 year obDepreciation Adjustment for steel frame building with 20 year observed served age: 20 % (Refer to RS Means (2006) age: 20 % (Refer to RS Means (2006) -- Square Foot Costs, page 228)Square Foot Costs, page 228)

Depreciation Amount: 0.2 * $ 11,505,965 = $ 2,301,193Depreciation Amount: 0.2 * $ 11,505,965 = $ 2,301,193

Total Existing Building Cost: $ 11,505,965 Total Existing Building Cost: $ 11,505,965 -- $ 2,301,193 = $9,204,772$ 2,301,193 = $9,204,772

Source: RS Means, Square Foot Costs Data, 2006

Parameter Cost ExampleParameter Cost Example

Page 49: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

OutlineOutline

Conceptual EstimatesConceptual EstimatesCost indicesCost indices

Cost capacity factorCost capacity factor

Parameter CostParameter Cost

Detailed EstimatesDetailed EstimatesEstimatesEstimates

Cost classificationCost classification

CalculationCalculation

Page 50: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Estimation Levels Estimation Levels -- RevisitRevisit

Source: Barrie & Paulson, 1992

Different types of estimates are required as a project evolvesDifferent types of estimates are required as a project evolvesConceptual & Preliminary EstimatesConceptual & Preliminary Estimates

Prepared early in the project prior to engineering design complePrepared early in the project prior to engineering design completion (to tell tion (to tell Owner whether the contemplated project scope is feasible)Owner whether the contemplated project scope is feasible)

Incorporate new information from design to obtain an updated estIncorporate new information from design to obtain an updated estimate of imate of the projectthe project

Detailed EstimatesDetailed Estimates

Prepared from completed plans and specificationsPrepared from completed plans and specifications

Definitive EstimatesDefinitive EstimatesForecast the project cost within allowable limits from a combinaForecast the project cost within allowable limits from a combination of tion of conceptual and detailed information often including partial contconceptual and detailed information often including partial contract and ract and other procurement awardsother procurement awards

Page 51: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

ConstructionPre-bidDetaileddesign

ConceptualdesignFeasibility

Detailed EstimatesDetailed EstimatesDefinitiveDefinitiveEstimatesEstimates

ConceptualConceptual && PreliminaryPreliminaryEstimatesEstimates

Design & Estimating ProcessDesign & Estimating Process

Page 52: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Important General LessonImportant General Lesson

Precision in detailed estimates does not mean accuracy!Precision in detailed estimates does not mean accuracy!More an art than a scienceMore an art than a science

Detailed quantitative estimates possible Detailed quantitative estimates possible –– but ignore important qualitative factorsbut ignore important qualitative factors

Have differing ranges of uncertaintiesHave differing ranges of uncertainties

Actual costs depend on systemic complexityActual costs depend on systemic complexityTwo types of complexity at issueTwo types of complexity at issue

Detail complexity (myriad components required)Detail complexity (myriad components required)

System complexity (dynamic interactions, etc.)System complexity (dynamic interactions, etc.)

Always consider:Always consider:What are assumptions behind the estimate?What are assumptions behind the estimate?

What factors are being ignored?What factors are being ignored?

How might these factors change the estimate?How might these factors change the estimate?

Page 53: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Detailed EstimatesDetailed Estimates

After most or all of the detail design work is complete, After most or all of the detail design work is complete, approximate estimates are refined using detailed estimatesapproximate estimates are refined using detailed estimates

EngineerEngineer’’s Detailed Estimatess Detailed Estimates

Bid Detailed EstimatesBid Detailed Estimates

Page 54: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

ConstructionPre-bidDetaileddesign

ConceptualdesignFeasibility

Detailed EstimatesDetailed EstimatesDefinitiveDefinitiveEstimatesEstimates

ConceptualConceptual && PreliminaryPreliminaryEstimatesEstimates

Design & Estimating ProcessDesign & Estimating Process

Engineer’s

Page 55: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

EngineerEngineer’’s Detailed Estimatess Detailed Estimates

Part of actual bid documentsPart of actual bid documents

Who? Who? -- owner, consultant, CM, or designowner, consultant, CM, or design--build teambuild team

Use unit prices databasesUse unit prices databases

Estimate = Estimate = ΣΣ [Quantity] [Quantity] ×× [Unit Prices] [Unit Prices]

RS Means or other sourcesRS Means or other sources

Unit prices as result of average industry standardsUnit prices as result of average industry standards

Page 56: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

EngineerEngineer’’s Detailed Estimatess Detailed Estimates

Part of actual bid documentsPart of actual bid documents

Who? Who? –– owner, consultant, or CMowner, consultant, or CM

Use unit prices databasesUse unit prices databases

Estimate = Estimate = ΣΣ[Quantity[Quantity] ] ×× [Unit Prices] [Unit Prices]

RS Means or other sourcesRS Means or other sources

Unit prices as result of average industry standardsUnit prices as result of average industry standards

No lumpNo lump--sum subcontract quotationssum subcontract quotations

May be simplified number of line items (e.g., markMay be simplified number of line items (e.g., mark--up: not detailed)up: not detailed)

Page 57: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

EngineerEngineer’’s Breakdown s Breakdown -- ExampleExample

BuildingBuilding

FoundationsFoundations

PilesPiles

Concrete Concrete foundationsfoundations

Steel Steel erectionerection

StructuralStructural steelsteel

ColumnsColumns

BeamsBeams

DetailDetail steelsteel

Concrete Concrete decksdecks

StairsStairs

Page 58: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

ConstructionPre-bidDetaileddesign

ConceptualdesignFeasibility

Detailed EstimatesDetailed EstimatesDefinitiveDefinitiveEstimatesEstimates

ConceptualConceptual && PreliminaryPreliminaryEstimatesEstimates

Design & Estimating ProcessDesign & Estimating Process

Engineer’s Bid

Page 59: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Bid Detailed EstimatesBid Detailed Estimates

ContractorContractor’’s estimate low enough to obtain the work, yet high enough to maks estimate low enough to obtain the work, yet high enough to make e profitprofit

Who? Who? –– contractorcontractor

More detail depending upon the contractorMore detail depending upon the contractor’’s own procedures s own procedures

Overall unit prices (past) Overall unit prices (past) →→ detailed categories (present)detailed categories (present)

Often relies on Often relies on Historical productivity data for companyHistorical productivity data for company

Intuition on speed of movementIntuition on speed of movement

Quantity takeoff for most important itemsQuantity takeoff for most important items

Subcontractor bidsSubcontractor bidsSometimes less detailed than engineerSometimes less detailed than engineer’’s estimates s estimates -- subcontractors from 30% to 80% of subcontractors from 30% to 80% of the projectthe project

Page 60: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Bid Breakdown Bid Breakdown –– ExampleExample

Building (Bid estimates)Building (Bid estimates)

Piles (material Piles (material taketake--offoff))

Concrete subcontract (lumpConcrete subcontract (lump--sum)sum)

Steel erection subcontract (lumpSteel erection subcontract (lump--sum)sum)

Building (EngineerBuilding (Engineer’’s estimates)s estimates)

FoundationsFoundations

PilesPiles

Concrete Concrete foundationsfoundations

Steel Steel erectionerection

StructuralStructural steelsteel

ColumnsColumns

BeamsBeams

DetailDetail steelsteel

Concrete Concrete decksdecks

StairsStairs

Page 61: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Bid Detailed EstimatesBid Detailed Estimates

Is estimating a streamlined process? Is estimating a streamlined process? A look at bids received for a typical project in a competitive aA look at bids received for a typical project in a competitive area will rea will sometimes show more than 50% difference between the low and the sometimes show more than 50% difference between the low and the high high biddersbidders

Page 62: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Estimation Levels Estimation Levels -- RevisitRevisit

Source: Barrie & Paulson, 1992

Different types of estimates are required as a project evolvesDifferent types of estimates are required as a project evolvesConceptual & Preliminary EstimatesConceptual & Preliminary Estimates

Prepared early in the project prior to engineering design complePrepared early in the project prior to engineering design completion (to tell tion (to tell Owner whether the contemplated project scope is feasible)Owner whether the contemplated project scope is feasible)

Incorporate new information from design to obtain an updated estIncorporate new information from design to obtain an updated estimate of imate of the projectthe project

Detailed EstimatesDetailed EstimatesPrepared from completed plans and specificationsPrepared from completed plans and specifications

Definitive EstimatesDefinitive Estimates

Forecast the project cost within allowable limits from a combinaForecast the project cost within allowable limits from a combination tion of conceptual and detailed information often including partial of conceptual and detailed information often including partial contract and other procurement awardscontract and other procurement awards

Page 63: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

ConstructionPre-bidDetaileddesign

ConceptualdesignFeasibility

Detailed EstimatesDetailed EstimatesDefinitiveDefinitiveEstimatesEstimates

ConceptualConceptual && PreliminaryPreliminaryEstimatesEstimates

Design & Estimating ProcessDesign & Estimating Process

Page 64: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Definitive EstimatesDefinitive Estimates

There comes a time when a definitive estimate can be prepared thThere comes a time when a definitive estimate can be prepared that will forecast at will forecast the final project cost with little margin for errorthe final project cost with little margin for error……

This error can be minimized through the proper addition of an evThis error can be minimized through the proper addition of an evaluated aluated contingencycontingency

EngineerEngineer’’s estimates can complete this processs estimates can complete this process

The proper time to classify an estimate as The proper time to classify an estimate as ‘‘definitivedefinitive’’ will vary according to the will vary according to the characteristics of the project. For example:characteristics of the project. For example:

Traditional Traditional

UnitUnit--price price

Professional CMProfessional CM

DesignDesign--BuildBuild

Page 65: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Definitive Estimates:Definitive Estimates:Traditional & Unit PriceTraditional & Unit Price

Start ContractDetailed design Preliminary design

Start ContractDetailed design Preliminary design

DBB definitive estimateDBB definitive estimate

Unit Price definitive estimateUnit Price definitive estimate

Page 66: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Definitive Estimates:Definitive Estimates:CM & DesignCM & Design--BuildBuild

Start ContractDetailed design Preliminary design

Start Contract Detailed design Preliminary design

CM definitive estimateCM definitive estimate

DesignDesign--Build definitive estimateBuild definitive estimate

Page 67: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

OutlineOutline

Conceptual EstimatesConceptual EstimatesCost indicesCost indices

Cost capacity factorCost capacity factor

Parameter CostParameter Cost

Detailed EstimatesDetailed EstimatesEstimatesEstimates

Cost classificationCost classification

CalculationCalculation

Page 68: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Classification Cost Classification

Direct CostDirect CostLabor CostLabor Cost

Direct Labor Direct Labor

Indirect LaborIndirect Labor

Material CostMaterial Cost

Equipment CostEquipment Cost

SubcontractorSubcontractor PricePrice

Indirect Cost (i.e., Job Overhead)Indirect Cost (i.e., Job Overhead)Project OverheadProject Overhead

MarkupMarkupGeneral OverheadGeneral Overhead

ProfitProfit

ContingencyContingency

Source: Shtub et al., 1994

Page 69: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Classification Cost Classification -- Direct CostDirect CostLabor CostLabor Cost

Direct Labor CostDirect Labor CostDifficult to evaluate precisely but all effort is done to get anDifficult to evaluate precisely but all effort is done to get an accurate estimate as possibleaccurate estimate as possible

Greatest amount of uncertainty in project estimationGreatest amount of uncertainty in project estimation

Indirect Labor CostIndirect Labor CostCosts that are additional to the basic hourly rates (e.g., tax, Costs that are additional to the basic hourly rates (e.g., tax, insurance, fringe benefits)insurance, fringe benefits)

Substantial in amount: add 25 to 50 percent to direct labor costSubstantial in amount: add 25 to 50 percent to direct labor costss

Commonly used approach adds indirect labor costs as a percentageCommonly used approach adds indirect labor costs as a percentage to the total direct labor costs or for to the total direct labor costs or for each major work categoryeach major work category

Material CostMaterial Cost

All materials that are utilized in the finished structure.All materials that are utilized in the finished structure.

Equipment CostEquipment Cost

Costs Includes: ownership, lease or rental expenses, and operatCosts Includes: ownership, lease or rental expenses, and operating costsing costs

Subcontractor PriceSubcontractor Price

Includes quotations from all subcontractors working on the projeIncludes quotations from all subcontractors working on the projectct

Quotations submitted by the subcontractor usually require extensQuotations submitted by the subcontractor usually require extensive review by the general ive review by the general contractorcontractor’’s estimator to determine what they include & do not includes estimator to determine what they include & do not include

Source: Clough et al., 2005; Barrie & Paulson, 1992

Page 70: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: Clough et al., 2005

Cost Classification Cost Classification –– Indirect CostIndirect Cost

Project Overhead (i.e., Job Overhead)Project Overhead (i.e., Job Overhead)

Costs that do not pertain directly to any given construction worCosts that do not pertain directly to any given construction workk

Generally constitutes 5Generally constitutes 5--15 percent of the total project cost15 percent of the total project cost

Costs computed by listing & evaluating each item of overhead inCosts computed by listing & evaluating each item of overhead individuallydividually

Examples of typical items included: Examples of typical items included:

Job Mobilization, Project Manager, General Superintendent, NonwoJob Mobilization, Project Manager, General Superintendent, Nonworking Foremen, Heat, rking Foremen, Heat, Utilities, Storage Buildings, Field Office Supplies, Job TelephoUtilities, Storage Buildings, Field Office Supplies, Job Telephone, Computer Equipment & ne, Computer Equipment & Software, Computer Networking & Internet Connectivity, Small TooSoftware, Computer Networking & Internet Connectivity, Small Tools, Permits & Fees, ls, Permits & Fees, Special Insurance, BuilderSpecial Insurance, Builder’’s Risk Insurance, Security Clearances, Material & Load Tests, s Risk Insurance, Security Clearances, Material & Load Tests, Storage Area Rental, Protection of Adjoining Property, Field OffStorage Area Rental, Protection of Adjoining Property, Field Offices, Parking Areas, Legal ices, Parking Areas, Legal Expenses, Surveys, Engineering Services.Expenses, Surveys, Engineering Services.

Page 71: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Source: Clough et al., 2005

Cost Classification Cost Classification –– MarkupMarkup

Markup Markup Added at the close of the estimating processAdded at the close of the estimating processVaries between 5 to 20 percent of the job costVaries between 5 to 20 percent of the job costReflects the contractorReflects the contractor’’s appraisal of the probability of being the lowest s appraisal of the probability of being the lowest bidder for the project & the chances of making a reasonable profbidder for the project & the chances of making a reasonable profititFactors considered when deciding on a job markup include: projecFactors considered when deciding on a job markup include: project size & t size & complexity, provisions of the contract documents, difficulties icomplexity, provisions of the contract documents, difficulties inherent in nherent in the work, identities of the owner & architect/engineerthe work, identities of the owner & architect/engineerInclude allowance for:Include allowance for:

General Overhead or Office OverheadGeneral Overhead or Office OverheadIncludes costs that are incurred to support the overall company Includes costs that are incurred to support the overall company construction program construction program Normally included in the bid as a percentage of the total estimaNormally included in the bid as a percentage of the total estimated job cost ted job cost Examples of general business expenses include: office rent, offiExamples of general business expenses include: office rent, office insurance, heat, electricity, ce insurance, heat, electricity, office supplies, furniture, telephone & internet, legal expensesoffice supplies, furniture, telephone & internet, legal expenses, donations, advertising, travel, , donations, advertising, travel, association dues, and the salaries of executives & office employassociation dues, and the salaries of executives & office employeesees

ProfitProfitContingencyContingency

Page 72: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Classification (Example)Cost Classification (Example)

Source: Clough et al., 2005Bid Estimates = Direct Cost + Overhead + Markup (including Firm Overhead)

Clearing

Item No.

Bid Item Unit EstimatedQuantity

Labor Cost EquipmentCost

MaterialCost

SubcontractCost

Direct Cost BidUnit Total

Estimator: GASBid Date: August 9,20----

Recap Sheet For Unit Price BidProject: Holloman Taxiways and Aprons

1 l.s. Job $5,139$5,726

$75,636$352,670

$1,001,795

$1,572,819$1,035

$5,183

$2,937$111

$3,278$9,035

$3,560$28,506

Totals $3,067,430 $1,416,887$7,977

$675

$20,576$10,367

$164$3,756

$5,439

$1,304$318,252

$202,708

$7,383$11,097

$159,479$791,063

$1,241,967$2,208

$801$5,126

$9,315

$16,236$13,109

$20,132.64$16,255.16

$20,133$16,255

$250,830 $311,029.20 $311,029$1,164,144 $1,443,538.56 $1,443,539$1,995,566 $2,474,501.84 $2,474,502

$3,133,038 $3,884,967.12 $3,884,967$4,547 $5,638.28 $5,638

$26,099 $32,362.76 $32,363

$13,502 $16,742.48 $16,742$1,076 $1,334.24 $1,334

$18,771 $23,276.04 $23,276$45,706 $56,675.44 $56,675$9,315 $11,550.60 $11,551

$45,710 $56,680.40 $56,680$26,313 $32,628.12 $32,628$8,918 $11,058.32 $11,058

$165,960 $205,790.40 $205,790$8,921,548$7,194,797

$272,091Job Overhead

Markup, 15%

Bond

Sales TaxTotal Project Bid

$7,466,888$1,120,033$8,586,921

$71,815

$8,658,736$259,762

$8,918,498

$255,957 $317,386.68 $317,387$255,957

$45,710$26,313

$337,295

$16,095

$4,683$129,477

$2,373,185

$15,477

$6,809

$651,995$175,194

Job127,00079,50090,000

1,000

2300

6001,200

634,000

12070

Job26,000

115,400150

l.s.

l.s.

l.f.

l.f.

l.f.l.f.

l.f.

l.f.

ea.

ea.

ea.ea.

c.y.ton

ton

s.y.

s.y.

2345

67

8

91011121314

15161718

DemolitionExcavationBase CourseConcrete Pavement, 9"

Concrete Pavement, 11"

Concrete Pipe, 12"

Concrete Pipe, 36"InletFiber Duct, 4-wayFiber Duct, 8-wayElectrical ManholeUnderground Cable

Taxiway markingFence

Taxiway LightsApron Lights

Asphalt Concrete Surface

Factor = $8.921.548

$7,194,797

--

-

-------

-

----

-

-

--

---

-

---

--

--

= 1.240

Figure by MIT OCW.

Page 73: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Cost Classification (Example)Cost Classification (Example)

Source: Clough et al., 2005Bid Estimates = Direct Cost + Overhead + Markup (including Firm Overhead)

Clearing

Item No.

Bid Item Unit EstimatedQuantity

Labor Cost EquipmentCost

MaterialCost

SubcontractCost

Direct Cost BidUnit Total

Estimator: GASBid Date: August 9,20----

Recap Sheet For Unit Price BidProject: Holloman Taxiways and Aprons

1 l.s. Job $5,139$5,726

$75,636$352,670

$1,001,795

$1,572,819$1,035

$5,183

$2,937$111

$3,278$9,035

$3,560$28,506

Totals $3,067,430 $1,416,887$7,977

$675

$20,576$10,367

$164$3,756

$5,439

$1,304$318,252

$202,708

$7,383$11,097

$159,479$791,063

$1,241,967$2,208

$801$5,126

$9,315

$16,236$13,109

$20,132.64$16,255.16

$20,133$16,255

$250,830 $311,029.20 $311,029$1,164,144 $1,443,538.56 $1,443,539$1,995,566 $2,474,501.84 $2,474,502

$3,133,038 $3,884,967.12 $3,884,967$4,547 $5,638.28 $5,638

$26,099 $32,362.76 $32,363

$13,502 $16,742.48 $16,742$1,076 $1,334.24 $1,334

$18,771 $23,276.04 $23,276$45,706 $56,675.44 $56,675$9,315 $11,550.60 $11,551

$45,710 $56,680.40 $56,680$26,313 $32,628.12 $32,628$8,918 $11,058.32 $11,058

$165,960 $205,790.40 $205,790$8,921,548$7,194,797

$272,091Job Overhead

Markup, 15%

Bond

Sales TaxTotal Project Bid

$7,466,888$1,120,033$8,586,921

$71,815

$8,658,736$259,762

$8,918,498

$255,957 $317,386.68 $317,387$255,957

$45,710$26,313

$337,295

$16,095

$4,683$129,477

$2,373,185

$15,477

$6,809

$651,995$175,194

Job127,00079,50090,000

1,000

2300

6001,200

634,000

12070

Job26,000

115,400150

l.s.

l.s.

l.f.

l.f.

l.f.l.f.

l.f.

l.f.

ea.

ea.

ea.ea.

c.y.ton

ton

s.y.

s.y.

2345

67

8

91011121314

15161718

DemolitionExcavationBase CourseConcrete Pavement, 9"

Concrete Pavement, 11"

Concrete Pipe, 12"

Concrete Pipe, 36"InletFiber Duct, 4-wayFiber Duct, 8-wayElectrical ManholeUnderground Cable

Taxiway markingFence

Taxiway LightsApron Lights

Asphalt Concrete Surface

Factor = $8.921.548

$7,194,797

--

-

-------

-

----

-

-

--

---

-

---

--

--

= 1.240

× 1.24

Figure by MIT OCW.

Page 74: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

OutlineOutline

Conceptual EstimatesConceptual EstimatesCost indicesCost indices

Cost capacity factorCost capacity factor

Parameter CostParameter Cost

Detailed EstimatesDetailed EstimatesEstimatesEstimates

Cost classificationCost classification

CalculationCalculation

Page 75: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Detailed Estimates Detailed Estimates -- MethodologyMethodology

Stage 1: Quantity takeoffStage 1: Quantity takeoff

Decomposition into items, measurement of quantitiesDecomposition into items, measurement of quantities

Challenges: tremendous detail complexityChallenges: tremendous detail complexity

Stage 2: Direct Cost contributionStage 2: Direct Cost contribution

ΣΣ[Quantity] [Quantity] ×× [Unit Price][Unit Price]

Challenge: determination unit price (based on historical data)Challenge: determination unit price (based on historical data)

Example:Example:

ItemItem unitunit quantityquantity Unit priceUnit price priceprice

Reinforced steelReinforced steel lblb 6,3006,300 0.600.60 $ 3,780$ 3,780

Page 76: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Labor CostsLabor Costs

Categorized Bid Estimate (not overall unit prices)Categorized Bid Estimate (not overall unit prices)

Basic Unit Labor Cost = P / LP ($/unit)Basic Unit Labor Cost = P / LP ($/unit)

P = Price of all money elements ($/hours)P = Price of all money elements ($/hours)

LP = Labor Productivity (units/hour)LP = Labor Productivity (units/hour)

Total Labor Cost = Q * P/LPTotal Labor Cost = Q * P/LP

Q = Total quantity of workQ = Total quantity of work

Estimation of labor costs particularly trickyEstimation of labor costs particularly tricky

Prices: In United States, highly detail intensivePrices: In United States, highly detail intensive

Productivity: Many qualitative componentsProductivity: Many qualitative components

Page 77: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Labor Cost Labor Cost -- Prices RelatedPrices Related

ComponentsComponentsWages (varies by area, seniority, Wages (varies by area, seniority, ……))Insurance (varies w/contractor record, work type)Insurance (varies w/contractor record, work type)Social security benefitsSocial security benefitsFringe benefits (healthFringe benefits (health……))Wage premiums (e.g., overtime, shiftWage premiums (e.g., overtime, shift--work differentials, hazardous work) work differentials, hazardous work)

Page 78: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Labor Cost Labor Cost -- ProductivityProductivity

Difficult but criticalDifficult but critical

High importance of qualitative factors (environment, morale, fatHigh importance of qualitative factors (environment, morale, fatigue, igue, learning, etc)learning, etc)

The primary means by which to control labor costsThe primary means by which to control labor costs

Historical data availableHistorical data available

Firm updated databaseFirm updated database

Department of Labor, professional organizations, state governmenDepartment of Labor, professional organizations, state governmentsts

= P / LP ($/unit)= P / LP ($/unit)

Page 79: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Productivity ConsiderationsProductivity Considerations

ConsiderationsConsiderationsLocation of jobsite (local skill base, jurisdiction rules Location of jobsite (local skill base, jurisdiction rules –– hiring & firing)hiring & firing)Learning curvesLearning curvesWork schedule (overtime, shift work)Work schedule (overtime, shift work)Weather Weather EnvironmentEnvironment

Location on jobsite, noise, proximity to materialsLocation on jobsite, noise, proximity to materialsManagement style (e.g., incentive)Management style (e.g., incentive)Worksite rulesWorksite rules

Page 80: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Learning CurvesLearning Curves

Particularly useful for repetitive works

Ave

rage

man

-hou

rs p

er u

nit

Number of units Number of unitsn

Figure by MIT OCW.

Page 81: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Productivity Effects of OvertimeProductivity Effects of Overtime

0

2.5

2.0

1.5

1.01 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Week

Cos

t inc

reas

e fa

ctor

(40-

hour

wee

k =

1.0)

50-hour week

60-hour week

Cumulative cost of overtime(including productivity & premium losses)

00.5

0.8

0.9

1.0

0.6

0.7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Week

Prod

uctiv

ity r

elat

ive

to40

-hou

r w

eek

50-hour week

60-hour week

Points of no return

Cumulative effect of overtime on productivity

Figure by MIT OCW.

Page 82: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Concluding RemarksConcluding Remarks

Functions of EstimatingFunctions of Estimating

Could Assess cost of construction from the conceptual design phaCould Assess cost of construction from the conceptual design phase se (Owner, Designer & Sometimes Contractor ). Feedback to(Owner, Designer & Sometimes Contractor ). Feedback to

Conceptual Design for Alternative ArchitectureConceptual Design for Alternative Architecture

Feasibility of the Project Feasibility of the Project

Project / Company Alignment of Objectives, Constraints, StrategiProject / Company Alignment of Objectives, Constraints, Strategic Goals c Goals and Policiesand Policies

Provide the basis for bidding & contracting (Contractor) Provide the basis for bidding & contracting (Contractor)

Provide a baseline for cost control and post project evaluation Provide a baseline for cost control and post project evaluation (Owner & Contractor)(Owner & Contractor)

Page 83: 1.040/1.401 Project Management - DSpace@MIT: Home · Project Management Spring 2007 ... 2002 3581 3581 3597 3583 3612 3624 3652 3648 3655 3651 3654 3640 3623 ... project’s gross

Concluding RemarksConcluding Remarks

In Converting an Estimate to a Control Budget, Consider:In Converting an Estimate to a Control Budget, Consider:

The organization and categorization of costs suitable for preparThe organization and categorization of costs suitable for preparing an ing an estimate are often not compatible with realistic field cost contestimate are often not compatible with realistic field cost control (e.g., rol (e.g., might be convenient for the owner)might be convenient for the owner)

Estimates necessarily deal in averages, whereas tighter standardEstimates necessarily deal in averages, whereas tighter standards are s are sometimes desirable for control purposessometimes desirable for control purposes