Group 02 Dr. Deepani B.Guruge Ms.D.W.C.P.Kumari Members J.M.N.D.Jayasekara I.K.N.Mudalige K.A.D.I.H.Gunarathna S.R.T.B.Samaraweera K.G.Abeysekera Staff Workload Management System 10/30/2012 Group2 Project - 2012

Transcript of 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System...

Page 1: 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System 10/30/2012 Group2 Project - 2012.

Group 02

Dr. Deepani B.GurugeMs.D.W.C.P.Kumari

Members J.M.N.D.Jayasekara I.K.N.Mudalige K.A.D.I.H.Gunarathna S.R.T.B.Samaraweera K.G.Abeysekera

Staff Workload Management System

10/30/2012Group2 Project - 2012

Page 2: 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System 10/30/2012 Group2 Project - 2012.

Group2 Project - 2012

Evenly workload allocation Workload comparison between each staff memberTransparency

Clarity of expectation

Facilitation of time

management

sense of fairnessTraceability

Flexibility

career development

& documentatio

n

Department

Work load

Department

Work load

Equitable

WorkloadSystem

WorkloadSystem

10/30/2012

Objective

Page 3: 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System 10/30/2012 Group2 Project - 2012.

Group2 Project - 2012

Login(Emp_ID , Pwd , Level)Info(Emp_ID ,Name ,Post ,Degree, Current _residency )Value(work_type, value1, value2)

Work(Emp_ID, Date, Str_hr, End_hr, work_type, course#)

Emp_ID

Course#

Date

Work_type

End_hr

Str_hr

Mutually Dependant

Normalization

Not fully

functionally

Dependant

10/30/2012

DB Structure

Page 4: 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System 10/30/2012 Group2 Project - 2012.

Group2 Project - 2012

So Work relation can be divided in to three relations as follows

Emp_work(Emp_ID , work_type , course#)Emp(Emp_ID ,Date )Type(Emp_ID, Str_hr, End_hr, work_type)

10/30/2012

Load FormulaLet assume week is 35 hrs

f= #of lec_hrs*load value+#of practical_hrs*load value+…..

Page 5: 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System 10/30/2012 Group2 Project - 2012.

Group2 Project - 2012

LAMP as platformPHP as server side softwareJavaScriptAjaxHTML for create web pages

10/30/2012

Software used

Page 6: 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System 10/30/2012 Group2 Project - 2012.

Group2 Project - 2012 10/30/2012

week 1 2 3 4 5 6 7 8 9 10

Kamal

Deshani

Thilini

Kelumi

Ishara

Time Line

Graphs

DB design

Interface design

Ajax auto complete

Formula for

workload

Error checking

Testing

Tuning

Page 7: 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System 10/30/2012 Group2 Project - 2012.

Group2 Project - 2012 10/30/2012

End of the presentation

Thank you…