1000 series- Balancing Area Operations - Forward Market Activities · 2018-02-10 · 1000 series-...
Transcript of 1000 series- Balancing Area Operations - Forward Market Activities · 2018-02-10 · 1000 series-...
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 1
(916) 351-4400
1000 series- Balancing Area Operations - Forward Market Activities
Section Topic Number Title Original No. 1100 Forecasting 1120 Load Error Detection and Correction M-401C
1200 Day Ahead Market 1210 Running the Day Ahead Market M-401, M-401D
1210A Day Ahead Market Checklist M-401G
1210B ELC Units Requiring Start-Up Steam M-401E 1300-1400 Procurement and
Commitment Adjustments
1310 Reliability Must Run Unit Commit and Dispatch Procedure
G-203
1310A Reliability Must-Run References G-203R
1320 Market Substitution for RMR Dispatches G-203C, D
1320A RMR Unit Substitution Request Form G-203E
1330 Exceptional Dispatch Procedures M-402, -402A
1360 Generator Forbidden Operating Regions M-408
1390 Over Generation Actions and Notifications G-202, -202A
1390A Exceptional Dispatch Generation Reduction Form G-202B
1460 Generation Facility(ies) Outage Notification Process
T-113I
1490 CAISO Client Inquiry M-410
1500 Interchange Management
1510 Pre-Schedule and Check-Out Validation S-312
1520 CRN Transfer Day Ahead S-330
1520A Secondary CRN Request S-330A
1600 D+X Analysis
1610 Pre Market Validation M-401F
1700 Market Disruptions
1710 Market Disruption Procedures M-406
California Independent System Operator Corporation
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 2
(916) 351-4400
2000 series- Balancing Area Operations - Real Time Activities
Section Topic Number Title Original No. 2200 Real Time Market 2210 Real Time Market Activities M-403, M-403A,
M-403B
2210Z Effectiveness Factors - All M-403Z 2300 - 2400 Procurement and
Commitment Adjustments
2310 RMR Unit Dispatch & Commit Procedure G-203
2330 Exceptional Dispatch Procedures M-402, -402A 2330A Exceptional Dispatch Unit Commitment
Validation M-402B
2330C Exceptional Dispatch Instruction Type Codes M-402C
2330B Exceptional Dispatch Competitive Constraints M-402D
2340 Ancillary Service Procurement and Availability Validation
M-401A, B
2340A Procuring A/S Capacity from RMR Units G-203K
2340B Reliability Must-Run References G-203R
2360 Generator Forbidden Operating Regions M-408
2390 Over Generation Actions and Notifications G-202, -202A
2390A Exceptional Dispatch Generation Reduction Form G-202B
2500 Interchange Management
2510 Nerc Tagging Requirements S-313 2510A POR/POD-Scheduling Path Cross Reference S-313A
2520 Real-Time and After-the-Fact Check-Out Procedures
S-311
2530 Exceptional Dispatch Non-Market Interchange Transactions Procedure
S-318
2540 Interchange Schedule Curtailments S-303
2550 Inadvertent Interchange ATEC Payback S-310 2560 EMS Daylight Savings Time Workaround C-608 2700 Market Disruptions
2710 Market Disruptions - RTM Failure M-403C
2720 Market Disruptions - Manual Dispatch and Interchange Scheduling of RT Energy
S-304
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 3
(916) 351-4400
3000 series- Transmission Area Operations
Section Topic Number Title Original No. 3100 Policy
3110 Coordination Operation for Reliability T-124 3120 Transmission Jurisdiction T-111
3200 Outage Coordination
3210 Outage Coordination Activities T-113 3210A CDWR-SWP System Outage Procedure T-113J 3210B PGE Delegation Authority, Critical Facilities List,
and Equipment Significant to CRRs T-113H, Q
3210C SCE Delegation Authority, Critical Facilities List, and Equipment Significant to CRRs
T-113G, R
3210D SDG&E Delegation Authority, Critical Facilities List, and Equipment Significant to CRRs
T-113F, S
3210E WAPA-WASN 500 kV Outage Management T-113P
3210F CAISO Folsom Outage Coordination Contact Information
T-113A
3210G Notification to CAISO of New Equipment Release, RE-rated Equipment, or Existing Equipment Removal
T-113T
3220 Transmission Induced Generation Outage Procedure
T-113O
3230 Reporting Outages to CAISO T-113N
3230A Transmission Outage Request T-113B 3230B Status of Emissions Limitations T-113D
3230C Outages to Connect New or RE-arranged Facilities
T-113E
3240 CAISO Outage Management Seniority Lottery Procedure
T-113K
3300 System and Voltage Monitoring and Control
3310 HVAC Transmission Procedure T-107
3320 Voltage and VAR Control Procedure T-105 3340 Interconnection Switching T-109 3340A APS Switching Operations T-109A
3340B BPA Switching Operations T-109B
3340C CFE Switching Operations T-109C
3340D IID Switching Operations T-109D
3340E LADWP Switching Operations T-109E
3340F NVEnergy Switching Operations T-109F
3340G PACW Switching Operations T-109G
3340H PASA Switching Operations T-109H
3340J SRP Switching Operations T-109J
3340K WALC Switching Operations T-109K
3340L SMUD Switching Operations T-109L
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 4
(916) 351-4400
3340M TID Switching Operations T-109M
3350 Offsite Power Requirements and Restoration for Nuclear Power Plants
T-112
3350D Big Creek to SONGS Start-Up Power Actions and Voltage Profile, Vincent – Serrano Route (SCE Actions)
T-112D
3350E Big Creek to SONGS Start-Up Power Actions and Voltage Profile, Vincent – Mira Loma –Chino Route (SCE Actions)
T-112E
3350F Hoover to SONGS Start-Up Power Actions and Voltage Profile (SCE Actions)
T-112F
3400 Protection Systems
3410 Remedial Action Scheme Reference T-101 3500 Interchange
Management
3510 Unscheduled Flow Procedures S-301, -301E 3510A WECC Unscheduled Flow Reduction Procedure S-301A
3510B WECC UFAS Admin Practice 002 - Qualified Path Loading Required to Request Relief of Unscheduled Flow
S-301C
3510C WECC UFAS Practice 005 - Rapid Advancement ot Latter Steps of Procedure
S-301D
3520 Emergency Overload Mitigation for Stability Rated Paths
S-315
3530 Stranded Load S-328 3530A Drum-Summit Intertie One-line Diagram S-328A
3530B Control-Silver Peak Intertie One-line Diagram S-328B
3530C Eagle Mtn.-Blythe Intertie One-line Diagram S-328C
3530D Cascade/Crag View Diagram S-328D
3540 Emergency Load Transfer S-327
3540A IID Narrows 88 kV Emergency Load Transfer One Line Diagram
S-327A
3530G Gene 200Kv One Line Diagram S-328G
3600 System Modeling
3610 Modeling-Nomograms, Transmission Corridors, and Contingencies
M-405
3610A Nomograms, Tcors, and Contingency Data M-405A
3620 Modeling-Transmission Conforming M-409
3630 Modeling-Scheduling ETC and TOR Rights M-423
3630A ETC/TOR Instructions M-423A
3640 Modeling-Existing Transmission Contract Calculator Update Procedure
M-424
3640A Path 15 ETC Administration M-424A
3640B Path 58 and Mead MSL ETC Administration M-424B
3650 Transmission Reliability Margin and Capacity Benefit Margin Procedures
S-322
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 5
(916) 351-4400
4000 series- Emergency Operations
Section Topic Number Title Original No. 4100 Adverse Operating
Conditions
4110 Adverse Operating Conditions: Wildfire, Earthquake, Malicious Mischief, Solar Flare, Flood, Tsunami
E-504
4200 Restricted Maintenance Operations
4220 Restricted Maintenance Operations E-509
4220A Allowable Transmission Maintenance Activities During Restricted Maintenance Operations
E-509A
4220B SONGS Essential Component List E-509B
4220C Diablo Canyon Essential Component List E-509C
4300 Emergency Notifications
4310 Operations Emergency Notifications to Enterprise Incident Command System
E-507
4310A Events Requiring Systems Operations Coordinator Notification
E-507A
4310B Notification Flowchart for Operations to Incident Response Command
E-507B
4310C ERC Contact Matrix E-507C
4310D ERC External Emergency Contacts E-507D
4310E System Operations Coordinator Notification Checklist
E-507E
4400 Electric and Capacity Emergencies
4410 Emergency Assistance E-505 4410A Prices-Emergency Assistance to the CAISO E-505B
4410B CFE Emergency Request E-505C
4410C Emergency Assistance Resource IDs E-505D
4420 Electric System Emergency E-508
4420A Alert/Warning/Emergency (AWE) Guide E-508B
4420B Electric Emergency Notice Templates E-508C
4420C CAISO Switching and Emergency Declaration Guidelines
E-508D
4500 Load Management
4510 Load Management E-502, E-503, E-511
4510A Load Shed Calculation Guideline E-508A
4510B UDC Interruptible Service Limitations and Conditions
E-511B
4510C UFLS and Islanding- Real Time Monitoring E-503A 4510D PG&E Interruptible Service Curtailment Groups E-511C
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 6
(916) 351-4400
4600 System Restoration
4610 System Restoration E-501
4610A Black Start and Dual Fuel Units E-501A and E-501B
4700 Control Room Evacuation
4710 Control Room Evacuation E-518
4710A Control Room Evacuation Maps and Images E-518A
4710B Evacuation Reference Lists E-518B
4710C Scheduling Department Emergency Plan E-518C
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 7
(916) 351-4400
5000 series- Communications and Administrative
Section Topic Number Title Original No. 5100 Communications
and Reporting
5110 Real-Time Communications D-52 5110A Suggested Phrases for Marketing Entities D-52A 5120 Real-Time Shift Turnover D-52B 5130 Reporting Requirements for Other Operating
Entities to the CAISO D-51, -51.1, 51.2
5130A CAISO Fire Reporting Guidelines D-51A 5140 Public Information N-702 5140A CAISO Office of Communications & Public
Relations Contacts N-702A
5150 Significant Event Notification, Reporting, and Investigation
N-703
5150A DOE, NERC and WECC Significant Event Reporting Requirements
N-703A
5200 SLIC Logging and Reports
5210 SLIC Logging D-50
5210A Transmission Desk Logging D-50A
5210B Generation Desk Logging D-50B
5210C Scheduling Desk Logging D-50C
5210D Day Ahead Market Ops Desk Logging D-50D
5220 SLIC Outage Logging D-50E 5230 SLIC Reports D-50G 5240 SLIC User Guide D-50H 5300 Resource
Certification and Testing
5310 Generation Station Requirements and Communications
G-200
5310A Generator Control Room Phone Numbers G-200A
5330 Ancillary Services Certification Testing G-213
5330A PI Trend Setup G-213C 5330B Ancillary Services Testing Process Flowchart G-213F
5330C Ancillary Services Test Request Form G-213I
5330D Spinning and Non-Spinning Reserve Imports G-213B
5330E Request for Cert. of Dynamic Imports of Spinning and Non-Spinning Reserve
G-213D
5330F Request for Cert. of Imports of Regulation G-213E
5330G A/S Test Administrator Test Form G-213G
5330H Black Start Test Report Form G-213H
5340 Pre-Market Testing and Certification Procedures - RMR Units
G-203I, J, M
5340A RMR Availability Test Request Form G-203F
5340B RMR Test Request Form Availability Test1
Ambient Temperature Supplement G-203G
5340C RMR Test Dispatch Operational Flowcharts G-203H
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 8
(916) 351-4400
5340D RMR Unit Emissions/ Heat Input Test Process Flowchart
G-203P
5340E RMR Dual Fuel Test Process Flowchart G-203Q
5340F Pre-Market Testing and Certification Procedures - Unannounced Compliance Testing
G-214
5340G CAISO RMR Availability notice G-203B 5350 Black Start Certification and Testing G-203I, J, M 5350A Black Start Process Flowchart G-213I 5350B Black Start Test Report Form G-213H 5350C Unannounced compliance testing for black start
5360 Annual SCP Proxy Substitution Request G-214
5400 Systems and Communications Fallback and Testing
5410 Communications Loss/Failure C-610
5410A Communications Contacts C-610C
5420 Communications Testing Testing Portion from C-610
5420A Communications Hardware & Functionality C-610A 5420B ECN Description C-610B
5430 Loss of Communications to/from Scheduling Coordinators
C-609
5500 Procedure Maintenance
5510 Procedure Review Guidelines A-02F, -02F.1 5520 Development and Distribution of Operating
Procedures A-02, -02.1
5520A Procedure Revisions Due to Tariff or BPM Changes
A-02A
5520B Operating Procedure Development Flowchart A-02C, -02C.1
5520C Procedure Exam Development and Maintenance Process
A-02D, -02D.1
5520D Electronic Signature Approval Process A-02E, -02E.1 5520E Determining Distribution Restrictions for CAISO
Operating Procedures A-03
5530 Operating Procedure Exchange Process Between CAISO and Other Entities
N-701
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 9
(916) 351-4400
6000 series- Bulk/ TOP007 Reportable Paths Section Topic Number Title Original No. 6000 General
6010 PG&E 500 kV AC & 1000 kV DC Contingency SOL T-118
6010A Outages South of COI- Curtailments of COI, PDCI, Path 15, & Path 26
T-118A
6020 Adverse Operating Conditions of Critical 500 ad 230 kV Transmission Facilities
T-120
6030 WECC Open Loop Operation T-161 6100 COI/ Path 66
6110 COI Master Operating Procedure T-100, 102, 104, 104A, 116, 116A, 116D, S-315A, T-116Q
6120 BPA/CAISO COI Coordination S-317 6130 BPA- CAISO Communications Facilities I-1203 6200 Drum-Summit/ Path
24
6210 Drum Area/Summit Operations T-154 6210A Drum Area / Summit Inter-Tie Operations
(available on Internet only) T-154A
6210E Drum-Summit OTC Limits During Spill Conditions T-154E
6210F Marble Tie Management T-154F 6300 Midway-Los Banos/
Path 15
6310 Path 15 (Midway-Los Banos) T-122
6310A West of Borah Versus Path 15 Nomograms T-122A
6320 Emergency Overload Mitigation for Path 15 in the South-North Direction Following Contingencies
T-141
6400 Midway-Vincent/ Path 26
6410 Path 26 - Midway Vincent T-168, T-153
6500 SCIT 6510 SCIT T-103, T-103A, T-
103B, T-103C, T-103D, S-315D
6510A APS Attachment 1 PV West Operating Guidelines T-103F
6600 Lugo-Victorville/ Path 61
6610 Lugo-Victorville 500 kV Line (Path 61) T-135 6700 SCE-General 6710 Vincent 500/220 kV AA Transformer Bank
Overload Mitigation T-159
6720 Lugo"Vincent #1 or #2 500 kV Lines T-143
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 10
(916) 351-4400
6730 South of Lugo 500 kV Lines and Looped / De-looped Operation of Lugo—Rancho Vista - Mira Loma and Mira Loma-Serrano #1 lines at Mira Loma Substation (Interim Procedure)
T-144
6730A South-of-Lugo 500 kV Lines and Looped / De-looped arrangements of Lugo-Mira Loma #1 and Mira Loma-Serrano #1 lines at Mira Loma Substation and SOL RAS
T-144A
6740 Mira Loma 500/220 kV AA Transformer Bank Overload Mitigation
T-139
6750 Serrano 500/220 AA Transformer Banks T-137
6900 External BAs
6910 Pacific Direct Current Intertie (PDCI) T-106, T-117
6920 PDCI Scheduling and Repayment of Losses S-321 6930 Eldorado Intertie and System (Eldorado-Four
Corners) Scheduling S-320
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 11
(916) 351-4400
7000 series- PTO Regional Book Chapter PTO Region Number Title Original No.
7100 PGE Northwest
7110 Humboldt Area T-138
7110D Humboldt Area Description T-138D
7120 North Geysers T-151
7200 PGE Northeast
7230 Palermo- Rio Oso Area T-165
7300 PGE Bay Area
7310 Bay Area Generation Commitment G-233
7310A Bay Area Generation Groups G-233A
7310B Delta Dispatch Instructions G-233B
7320 Bay Area Transmission Management T-133
7330 San Francisco Dispatch Instructions T-126
7330C Trans Bay Cable Model and General Operation Description
T-126C
7330D Trans Bay Cable Communications T-126D
7330E Trans Bay Cable Project Description T-126E
7400 PGE Central
7410 Tesla / Bellota Area (Summer) Operating Instructions
T-167
7420 Westley Operations T-173
7430 Fresno Area T-129
7430A Load Calculation and Area Sketch T-129B
7430B Fresno Area Planned & Forced Outage Requirements
T-129F
7500 SCE Ventura-Magunden
7510 South of Magunden Nomogram Operations T-163
7510A South of Magunden Nomograms T-163A 7600 SCE LA Basin 7620 South-of-Lugo Generation Requirements G-217
7630 SCE Local Area Generation Requirements G-219
7640 Barre-Ellis Overload Mitigation T-136
7650 Serrano - Villa Park and Serrano - Lewis Line Clearance
T-158
7660 Santiago 230 kV Bus Voltage After Loss of Both San Onofre- Santiago 230 kV Lines
T-145
7670 Huntington Beach Power Plant Units 1-4 Split Bus Operation
T-152
7700 SCE Desert
7710 Copper Mountain - Pilot Pseudo Tie Generating Unit
G-216
7720 Julian Hinds-Mirage 230 kV Line Overload Mitigation & Eagle Mountain 3A Bank Emergency Operation-Mitigation
T-169
7730 Mirage-Tamarisk and Mirage-Concho 115 kV Line Overload Mitigation
T-170
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 12
(916) 351-4400
7740 Parker-Gene Overload Mitigation T-174
7800 SDGE San Diego 7810 San Diego Area Generation Requirements G-206
7820 San Diego Area T-132, T-132A, T-132B, T-132C, T-132D, T-132G
7820F Palo Verde Branch Group T-132F
Created by: Operations Compliance and Control CAISO LSUPDT: 03/09/11
250 Outcropping Way Folsom, California 95630 Page 13
(916) 351-4400
8000 series- Other PTOs/BAs
Chapter Topic Region Number Title Original No.
8100 Other PTOs
Southern Cities
8110 Southern Cities Market Transmission S-326
8110A Physical Transmission System S-326A 8110B Market Scheduling Limits S-326B 8110F IPP - Entitlement - ETCC Data S-326F 8110G NERC Tags and SIBR Market Bids S-326G
8500 Other BAs
SMUD
8510 Calpine Sutter Pseudo Tie Generator G-215
8520 SMUD-CAISO Inter-Tie Operations T-121
8520A SMUD-CAISO Load, Generation & Inter-Connection Ratings
T-121A
8530 New Melones Pseudo-Tie S-316
8600 LADWP 8610 Path 41 Sylmar Transformer Banks T-131