100 Millimetres B259 A2260 -...

1
H IFT IFT DIL DIL DIL DIL DIL DIL DIL DIL DIL DIL DIL DIL 0 100 200 RS RS NORTHBOUND A2260 WIDENED TO THREE LANES ON EXIT FROM WEST ROUNDABOUT WITH LANE DROP TO TIE INTO EXISTING TWO LANES NORTHFLEET WEST GRID SUB STATION- DEMOLISHED EBBSFLEET GREEN A2260 A2260 B259 INTERNATIONAL WAY EBBSFLEET STATION PARKING SOUTHBOUND A2260 WIDENED TO THREE LANES ON ENTRY TO WEST ROUNDABOUT WITH LANE DROP TO TIE INTO EXISTING TWO LANES TIE-IN TO EXISTING NMU ROUTE PROPOSED LIGHTING HAZARD (SEE GENERAL NOTE 3 AND KEY) EXISTING EASEMENT TO DRAINAGE FOR CONTINUATION REFER TO SHEET 8 EXTENT OF MAIN WORKS EXTENT OF MAIN WORKS SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following significant residual risks (Reference shall also be made to the design hazard log). Construction HS/HLG/01 & 03-PROPOSED COLUMN IN THE VICINITY OF THE EXISTING OH LINE. Maintenance / Cleaning REFER TO HEALTH AND SAFETY RISK REGISTER DOCUMENT No. HE543917-ATK-GHS-XX-HS-ZS-000004. Use REFER TO HEALTH AND SAFETY RISK REGISTER DOCUMENT No. HE543917-ATK-GHS-XX-HS-ZS-000004. Decommissioning / Demolition REFER TO HEALTH AND SAFETY RISK REGISTER DOCUMENT No. HE543917-ATK-GHS-XX-HS-ZS-000004. Copyright C Atkins Limited (2018) www.atkinsglobal.com Tel: Fax: Epsom Gateway Ashley Avenue Epsom Surrey KT18 5AL +44 (0)1372 726140 +44 (0)1372 740055 Drawing Title Project Title Drawing Suitability DO NOT SCALE Client Status Millimetres 100 10 0 Drawing Number Project Originator Volume Location Type Role Number - - - - - - A1 Scale: Original Size: Rev: Project Ref. No: of Sheet: Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description This Drawing is saved on ProjectWise. Plotted: 22/02/2019 19:08:28 By: KNRA9354 A2 APPROVED - ORDERS / LICENSES A2 Bean and Ebbsfleet Junctions Improvement PCF STAGE 3 – PRELIMINARY DESIGN ENGINEERING GENERAL ARRANGEMENT 1:1000 AEM 16 RKK 16 EBB RJM 22/02/19 HE543917 ATK HGN XX DR CH 000216 C05 C05 A2 FOR INFORMATION CH RKK AEM CH 18/01/19 C04 A1 FOR INFORMATION; EBBSFLEET PYLON ACCESS REVISED ON SHEETS 8 AND 16 AEM RKK JA CH 21/11/18 C03 A1 FOR STAGE 3 SIGN-OFF CT RKK JA CH 22/08/18 C02 A1 STAGE 3 DESIGN FIX 3 5158159 CT RKK OP CH 05/07/18 C01 B1 FOR HE REVIEW SHEET LAYOUT N.T.S 4 12 13 14 11 6 8 16 9 10 1 5 7 15 2 3 1a BEAN JUNCTION EBBSFLEET JUNCTION A2 M25 J2 PEPPERHILL OVERBRIDGE 2. FOR GENERAL NOTES AND KEY REFER TO DRG. No. HE543917-ATK-HGN-XX-DR-CH-000200. 1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE STATED. Scale 1:1000 10m 10m 0m 20m 60m 40m 30m 50m 70m This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office. © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Highways England 100018928, 2018. NOTES "THESE DRAWINGS ARE A PRELIMINARY DESIGN FOR USE DURING PCF STAGE 3. THEY SHOW AN INDICATION OF THE PROPOSED LAYOUT BUT DO NOT SHOW FULL CONSTRUCTIONAL DETAILS OR WIDTHS. FURTHER REFINED DETAILED DESIGN WILL BE UNDERTAKEN DURING LATER STAGES OF DEVELOPMENT OF THE SCHEME PRIOR TO CONSTRUCTION. FOR INFORMATION ONLY."

Transcript of 100 Millimetres B259 A2260 -...

Page 1: 100 Millimetres B259 A2260 - assets.highwaysengland.co.ukassets.highwaysengland.co.uk/roads/road-projects/a2-bean-ebbsfleet... · h ift ift dil dil dil dil dil dil dil dil dil dil

H

IF

T

IF

T

D

IL

D

IL

DIL

D

IL

D

IL

D

IL

D

I

L

D

IL

DIL

DIL

DIL

D

I

L

0

100

200

R

S

R

S

NORTHBOUND A2260 WIDENED TO

THREE LANES ON EXIT FROM WEST

ROUNDABOUT WITH LANE DROP TO

TIE INTO EXISTING TWO LANES

NORTHFLEET

WEST GRID

SUB STATION-

DEMOLISHED

EBBSFLEET

GREEN

A2260

A

2

2

6

0

B

2

5

9

IN

TE

R

N

A

TIO

N

A

L W

A

Y

EBBSFLEET

STATION PARKING

SOUTHBOUND A2260 WIDENED TO

THREE LANES ON ENTRY TO WEST

ROUNDABOUT WITH LANE DROP TO

TIE INTO EXISTING TWO LANES

TIE-IN TO EXISTING NMU ROUTE

PROPOSED LIGHTING HAZARD

(SEE GENERAL NOTE 3 AND KEY)

EXISTING EASEMENT

TO DRAINAGE

FOR CONTINUATION REFER TO SHEET 8

EXTENT OF

MAIN WORKS

EXTENT OF

MAIN WORKS

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

HS/HLG/01 & 03-PROPOSED COLUMN IN THE VICINITY OF THE

EXISTING OH LINE.

Maintenance / Cleaning

REFER TO HEALTH AND SAFETY RISK REGISTER DOCUMENT No.

HE543917-ATK-GHS-XX-HS-ZS-000004.

Use

REFER TO HEALTH AND SAFETY RISK REGISTER DOCUMENT No.

HE543917-ATK-GHS-XX-HS-ZS-000004.

Decommissioning / Demolition

REFER TO HEALTH AND SAFETY RISK REGISTER DOCUMENT No.

HE543917-ATK-GHS-XX-HS-ZS-000004.

Copyright C Atkins Limited (2018)

www.atkinsglobal.com

Tel:

Fax:

Epsom Gateway

Ashley Avenue

Epsom

Surrey

KT18 5AL

+44 (0)1372 726140

+44 (0)1372 740055

Drawing Title

Project TitleDrawing Suitability

DO

N

OT

S

CA

LE

Client

Status

Millim

etres

10

010

0

Drawing Number

Project Originator Volume

Location Type RoleNumber

-

- - -

--

A1

Scale:

Original

Size:

Rev:

Project

Ref. No:

of

Sheet:

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

This Drawing is saved on ProjectWise. Plotted: 22/02/2019 19:08:28 By: KNRA9354

A2APPROVED - ORDERS / LICENSES A2 Bean and Ebbsfleet Junctions Improvement

PCF STAGE 3 – PRELIMINARY DESIGN

ENGINEERING GENERAL ARRANGEMENT

1:1000

AEM

16

RKK

16

EBB RJM 22/02/19

HE543917 ATK HGN

XX DR CH 000216

C05C05A2

FOR INFORMATION

CHRKK AEM CH 18/01/19C04A1

FOR INFORMATION; EBBSFLEET PYLON ACCESS REVISED ON SHEETS 8 AND 16

AEMRKK JA CH 21/11/18C03A1

FOR STAGE 3 SIGN-OFF

CTRKK JA CH 22/08/18C02A1

STAGE 3 DESIGN FIX 3

5158159

CTRKK OP CH 05/07/18C01B1

FOR HE REVIEW

SHEET LAYOUT

N.T.S

4

12

13

14

11

6

8

16

9

1

0

1

5 7

15

2

3

1a

BEAN

JUNCTION

EBBSFLEET

JUNCTION

A2

M25 J2

PEPPERHILL

OVERBRIDGE

2. FOR GENERAL NOTES AND KEY REFER TO DRG. No. HE543917-ATK-HGN-XX-DR-CH-000200.

1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE STATED.

Scale 1:1000

10m 10m0m 20m 60m40m30m 50m 70m

This map is based on Ordnance Survey material with the

permission of Ordnance Survey on behalf of the Controller

of Her Majesty's Stationery Office. © Crown copyright.

Unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Highways

England 100018928, 2018.

NOTES

"THESE DRAWINGS ARE A PRELIMINARY DESIGN FOR USE DURING PCF

STAGE 3. THEY SHOW AN INDICATION OF THE PROPOSED LAYOUT BUT

DO NOT SHOW FULL CONSTRUCTIONAL DETAILS OR WIDTHS. FURTHER

REFINED DETAILED DESIGN WILL BE UNDERTAKEN DURING LATER

STAGES OF DEVELOPMENT OF THE SCHEME PRIOR TO CONSTRUCTION.

FOR INFORMATION ONLY."

AutoCAD SHX Text
BOL
AutoCAD SHX Text
LP
AutoCAD SHX Text
RS
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 19.37m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 19.09m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 19.82m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 20.05m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 20.12m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 20.12m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 20.51m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 21.79m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 22.36m
AutoCAD SHX Text
IC
AutoCAD SHX Text
CL 22.05m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 18.75m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.11m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 18.74m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 18.39m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.18m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.46m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.69m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.57m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.90m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.98m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 19.96m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 20.05m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 20.11m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 20.47m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 20.17m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 20.73m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 20.40m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 21.08m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 20.75m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 21.50m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 21.15m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 21.70m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 21.87m
AutoCAD SHX Text
G
AutoCAD SHX Text
CL 22.07m
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
P