10 years of Electricity Act 2003: Competition in Electricity D r . Rajiv Kr. Mishra

17
1 10 years of Electricity Act 2003: Competition in Electricity Dr. Rajiv Kr. Mishra ED, PTC India Ltd. Monday, February 7, 2 022

description

10 years of Electricity Act 2003: Competition in Electricity D r . Rajiv Kr. Mishra ED , PTC India Ltd. Scenario before Electricity Act 2003. Before Electricity Act 2003, generators as well as consumers were bound to a particular discom No choice to sell or buy from - PowerPoint PPT Presentation

Transcript of 10 years of Electricity Act 2003: Competition in Electricity D r . Rajiv Kr. Mishra

Page 1: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 1

10 years of Electricity Act 2003: Competition

in Electricity

Dr. Rajiv Kr. MishraED, PTC India Ltd.

Page 2: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 2

• Before Electricity Act 2003, generators as well as consumers were bound to a particular discom

• No choice to sell or buy from• This model was sometimes misused by discoms –

payments were delayed• World over, competition and market development

resulted in • Significant gains in efficiency• Lower costs• Reduced fuel use• Environmental controls• Fewer power plants needed to meet the demand

• With these basic presumptions, Electricity Act 2003 was introduced

Scenario before Electricity Act 2003

Page 3: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 3

• Electricity Act 2003 introduced various enabling provisions for creating a vibrant power market in the country

• “Promoting competition” one of the objectives of the Act• Recognition of ‘Electricity Trading’ as a distinct activity• ‘Open Access’ was defined• Providing non-discriminatory OA – one of the

functions/duties of Transmission Utilities & Licensees (Section 38)

• OA to be provided to everyone having load more than 1 MW within 5 years from notification of the Act (Section - 42)

• Appropriate Commission to consider factors which would encourage competition while specifying terms and conditions of tariff determination (Section- 61)

• Promotion of competition – one of the functions of Commissions (Section 79)

Electricity Act 2003 and Competition

Page 4: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 4

• Case-1, case-2 bidding were viewed as fundamental change to attract private sector and discover competitive prices

• However, serious issues persists• Lack of capacity/inadequate preparation for handling competitive

process at utility level• Inequitable risk sharing

• Fuel risks and foreign currency risks passed on to bidders• Long drawn negotiation process

• Frequent changes and non-finalization/cancellation• Numerable cases where commitments were not fulfilled as per LOI

or even LOI was cancelled either by procurer or by developer resulting in shortage of power for procurer and loss of opportunity for developer• Lock-in period for developers• Investments stuck up

• There are few successes and the process of procurement through case-1 bidding has either stalled or has not given optimum benefits

Competitive Bidding

Examples

Page 5: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 5

Open Access

• Two types of OA• OA in Transmission (for Generators and Distributors)

• OA to consumers (for retail or industrial consumers – having load more than 1 MW)

• Benefits• Enable competition in generation & supply – choice to

discoms and bulk consumers

• Would facilitate power trading and redistribution of surplus across the system

• Higher techno-economic efficiencies• Optimal utilization of wires• Essential for much needed private investment

• Quality and reliable power supply

• Difficulties in full scale implementation of OA

Page 6: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 6

Open Access contd…

• Provided on month to month basis• States invoked Section 11 of the Electricity Act to disallow OA

to generators within the state which is meant to be invoked only in extraordinary circumstances, not to restrict open access

• Distribution companies (Discoms) are resistant to giving OA to industrial consumers (bulk consumer category), since industrial supply rates are usually high– Since most of distribution utilities are facing shortages, providing

OA would be beneficial to them as they would be provide more reliable supply to existing customer

• High cross-subsidy and wheeling charges are one of the major deterrents in availing OA

• Sometimes, metering infrastructure and mechanism to settle deviations not in place

• Congestion in transmission another bottleneck

Page 7: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 7

Way Forward

• Best system is one where consumer has a choice that comes out of competition

• Competition and markets do not have to wait for shortages in supplies to be overcome

• Trading is a bridge even in shortage situations• Immediate need for strengthening transmission network• Bottled up capacities of IPPs and CPPs need to be tapped in a

commercial way• Vital necessities for competition (lessons from around the world):• Adequate availability of power• Its unrestricted flow across geographical boundaries• Strong commercial mechanism• Paying ability of consumers• Enabling rules and regulations at each level (intra and inter state)• Reasonable wheeling, cross-subsidy and other charges

Page 8: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 8

Visit us at www.ptcindia .com

Page 9: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 9

• Power Trading growth• Absolute volume has grown from 22 BUs in

2008 to 99 BUs in FY13• As percentage of total generation, ST market

has grown from 3% in 2008 to 11% in FY13• Power Exchanges started in 2008

• Two exchanges – IEX and PXIL• PTC co-promoter of first National PX Indian

Energy Exchange (IEX) – has > 97% market share

• Type of Trades• Day Ahead Market (DAM) – 95% of PX trades• Term Ahead Market (TAM) – 5% of PX trades

• Renewable Energy Certificates (RECs)FY10 FY11 FY12 FY13

0

20

40

60

80

100

120

0

2

4

6

8

10

12

ST Market Volume (BUs)% of Generation

Indian Power Market

Development of Power Trading has created Market Structure facilitating private investment in the sector

Page 10: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 10

Power Market Over the Last Two Fiscals

Bilateral Traders

38%

Direct Bilateral16%

PX16%

UI29%

2011-12Share of Different Segments in Total ST Volume

Year Bilateral (Traders +

TAM)

Direct Bilateral

Power Exchanges (PX)

(Only DAM)

Unscheduled Interchange (UI)

Total Volume in ST

2011-12 (MU) 35840 15370 15550 27760 94510

2012-13 (MU) 36638 14519 23024 24759 98940

Growth (%) 0.21 -5.55 55.34 -10.80 4.69

Bilateral (Traders +

TAM)37%

Direct Bilateral15%

PX23%

UI25%

2012-13

Growth of Different Components of ST Market

Source: CERC

Page 11: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 11

Bilateral vs Power Exchange Prices (Rs./kWh)

Source: CERC Market Monitoring Cell’s reports

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar2

2.5

3

3.5

4

4.5

5

Bilateral vs PX Prices (2012-13) BilateralPX

Buyers ready to pay premium for certainty in

Bilateral contracts

Bilateral prices more

or less stable whereas PX prices highly

volatile

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar0123456

Bilateral vs PX Prices (2011-12)

Page 12: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 12

Power Exchange Rate in NEW & SR (Rs./kWh)

Source: IEX website

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

NEW vs SR Price on IEX (2012-13) NEW

SR

Fragmented market

SR facing deficit,

higher prices

Interconnection expected

by Mar’14

Page 13: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 13

State-wise Power Demand (MUs)

Source: CEA

Delhi

Haryan

a

Himach

al Prad

esh

Jammu &

Kashmir

Punjab

Rajasth

an

Uttar Prad

esh

Uttarakh

and

Chandiga

rh Goa

Gujarat

Chattisga

rh

Madhya

Pradesh

Mahara

shtra

Dadar

Nagar H

aveli

Daman

& Diu

Andhra Prad

esh

Karnata

kaKera

la

Tamil N

adu

Pondicherr

yBihar DVC

Jharkhan

dOris

sa

West Ben

gal

Sikkim

Assam

Manipur

Meghala

ya

Nagalan

d

Tripura

Arunachal

Pradesh

Mizoram

Andaman

- Nico

bar

Laksh

adwee

p0

20000

40000

60000

80000

100000

120000

140000

2012-13

Page 14: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 14

State-wise Power Trade: Bilateral

Source: CERC MMC Reports

Page 15: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 15

State-wise Power Trade: Power Exchanges

Source: CERC MMC Reports

Page 16: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 16

State-wise Power Trade: UI

Source: CERC MMC Reports

Page 17: 10 years of Electricity  Act 2003:  Competition in Electricity D r .  Rajiv Kr. Mishra

April 22, 2023 17

Maharashtra (300 MW)• JSW (Ratnagiri) won bid for 300 MW – PPA signed in 2010• It was asked to install Flue Gas Desulphurization System (FGD) by

government authorities which it cited as ‘Change of Law’ and want to get out of PPA

Adani’s Mundra Project • PPA with Gujarat (1000 MW) and Haryana (1425 MW)• In December 2009, it unilaterally terminated the said PPA citing

unavailability of coal from Gujarat Mineral Development Corporation (GMDC)

Tata’s Mundra Project• Country’s first UMPP (4000 MW) • Petitioned before CERC to increase tariff citing change of law in foreign

countryCERC Order• CERC has concluded that there is a case for compensation on account

of change in law in foreign country but the order is yet to be implemented

Competitive Bidding: Examples

Back