1.0 THE COMPANY 1.1 GENERAL - Philafe

26
PHILAFE ENGINEERING LIMITED - Profile 1 1.0 THE COMPANY 1.1 GENERAL PHILAFE ENGINEERING LIMITED (PEL) is a well-established Kenyan company with limited liabilities. Founded in 1995, PEL specializes in Electrical Power, Electronics and Telecommunication Engineering designs, systems implementation and post implementation support services . We have also ventured into Building and Civil Engineering construction works. PEL is registered and licensed by the National Construction Authority (NCA) as- 1) NCA1 – Electrical Engineering Services Contractor - NCA1 – General Electrical Installation Works - NCA1 – Electronics – Telecommunications PABX, Intercoms and Telephone wiring. - NCA1 – Electronics – Structured Cabling and Computer Networking Installations - NCA1 – Electronics – Security Surveillance Systems (CCTV) intruder alarm and access control systems. - NCA1 – Construction of Power Transmission Lines and Installation of Power Distribution equipment. - NCA1 - Generating Plants and Control Panels. - NCA1 - Solar Power Generation and Photovoltaic cells Installation. 2) NCA1 – Mechanical Engineering Services Contractor 3) NCA4 – Building Works Contractor 4) NCA5 – Civil Engineering – Road Works Contractor PEL is also licensed by the Energy Regulatory Commission as follows:- 1) Class A-1 – Electrical Contractor Besides this, PEL is also fully licensed by the Communications Authority of Kenya (CAK) to carry out Telecommunication equipment Vending, Telecommunications equipment and cables (overhead and underground) Installations and Telecommunications equipment Maintenance services. At PEL we always stress the importance of maintaining high level of professionalism coupled with extensive consultations and liaison before work commences; the establishment of a detailed works program and a realistic completion timetable. It is also our intention to maintain a sound base reputation and to provide the highest level of engineering service practice available in accordance to our laid down work ethics and QMS based on the ISO 9001:2015. 1.2 COMPANY DATA Company Name : Philafe Engineering Limited Address : P.O. Box 61152-00200 City Square, Industrial Area, off Mombasa Road NAIROBI, KENYA Landline : +254 (0)20-2433 595 /6 Cellular : +254 (0) 722 209634 / 735 337767 Fax : +254 (0) 20-2433 597 E-mail : [email protected] Web site : www.philafe.co.ke PIN Number : PO51112918K

Transcript of 1.0 THE COMPANY 1.1 GENERAL - Philafe

PHILAFE ENGINEERING LIMITED - Profile

1

1.0 THE COMPANY1.1 GENERAL

PHILAFE ENGINEERING LIMITED (PEL) is a well-established Kenyan company with limitedliabilities. Founded in 1995, PEL specializes in Electrical Power, Electronics andTelecommunication Engineering designs, systems implementation and postimplementation support services. We have also ventured into Building and CivilEngineering construction works.PEL is registered and licensed by the National Construction Authority (NCA) as-

1) NCA1 – Electrical Engineering Services Contractor- NCA1 – General Electrical Installation Works- NCA1 – Electronics – Telecommunications PABX, Intercoms and

Telephone wiring.- NCA1 – Electronics – Structured Cabling and Computer Networking

Installations- NCA1 – Electronics – Security Surveillance Systems (CCTV) intruder

alarm and access control systems.- NCA1 – Construction of Power Transmission Lines and Installation of

Power Distribution equipment.- NCA1 - Generating Plants and Control Panels.- NCA1 - Solar Power Generation and Photovoltaic cells Installation.

2) NCA1 – Mechanical Engineering Services Contractor3) NCA4 – Building Works Contractor4) NCA5 – Civil Engineering – Road Works Contractor

PEL is also licensed by the Energy Regulatory Commission as follows:-1) Class A-1 – Electrical Contractor

Besides this, PEL is also fully licensed by the Communications Authority of Kenya (CAK)to carry out Telecommunication equipment Vending, Telecommunications equipmentand cables (overhead and underground) Installations and Telecommunicationsequipment Maintenance services.

At PEL we always stress the importance of maintaining high level of professionalismcoupled with extensive consultations and liaison before work commences; theestablishment of a detailed works program and a realistic completion timetable.It is also our intention to maintain a sound base reputation and to provide the highestlevel of engineering service practice available in accordance to our laid down workethics and QMS based on the ISO 9001:2015.

1.2 COMPANY DATACompany Name : Philafe Engineering LimitedAddress : P.O. Box 61152-00200 City Square,

Industrial Area, off Mombasa RoadNAIROBI, KENYA

Landline : +254 (0)20-2433 595 /6Cellular : +254 (0) 722 209634 / 735 337767Fax : +254 (0) 20-2433 597E-mail : [email protected] site : www.philafe.co.kePIN Number : PO51112918K

PHILAFE ENGINEERING LIMITED - Profile

2

VAT Reg. Number : 0105626A

Bankers : Standard Chartered Bank (K) Ltd.,Harambee Avenue Branch, NAIROBIA/C No. 0102012811500

: Barclays Bank of Kenya Ltd.,Queensway House Branch, NAIROBIA/C No. 8236435.

: African Banking Corporation Limited,Koinange Street Branch, NAIROBIA/C No. 00200000000289

: Equity Bank Limited,Mombasa Road Branch, NAIROBIA/C No. 1080294688851

Insurance : Fredo Insurance Agency LimitedWakulima House, Haile Sellasie Avenue,P. O. Box 58288, NAIROBI – Kenya.

PHILAFE ENGINEERING LIMITED - Profile

3

FIRM’S CAPABILITY1.1 CAPABILITY STATEMENT

Philafe is an ISO-9001:2015 certified firm that offers comprehensive and specializesservices to her esteemed clients in the following broad areas of Electrical powersystems, Electronics, ICT and Telecommunication Engineering. In the year 2010, Philafewas also admitted to the Club of top 100 Medium Sized Companies in the country forthe year 2010/2011. The ranking is done in recognition of prudent management andreporting of financial and technical status. Here below is a summary of areas withinour specialization;

Supply and Installation of Street lighting systems both for grid electricity andstand-alone solar powered. We have accomplished a number of such projectswithin the country.

Electrical installation works for Industrial and agricultural complexes, Multi-storyoffice blocks, Hotel complex, educational complexes, Hospital complexes,churches, large-scale residential estate including comprehensive street lightingsystem.

66KV, 33KV, 11KV & LV overhead and underground power transmission anddistribution lines including power sub-stations.

Design and end-to-end implementation of electrical power sub-stations up to132KV complete with erection of pylons and conductor stringing.

Pumping stations installations - petroleum stations, water stations and irrigationsystems.

Design, supply and installation of remote GSM sites power solution (RSP) withWind, Solar, Batteries, GenSet and systems controls. We have also implementeda complete pure ‘green power’ solution without any GenSet at remoteSafaricom GSM/VSAT sites of FAZA and NDAU in the Kiwayu archipelago, northof Lamu Island, Kenya.

Power support maintenance for GSM BTS sites including maintenance of MSRswitch-stations.

Installation and Maintenance of intelligent shelter BTS sites. Telecommunications active equipment placement and networking. Installation and maintenance of overhead and underground fiber optic cable

networks; GPON & HFC. Installation and maintenance of passive optical network (PON) devices. Electronics security system installation including CCTV system. Fire detection and alarm systems. Communication systems. ICT infrastructure complete with structured cabling system. Airports electrical distribution system, Airfield lighting system and Air navigation

system.PEL is registered and projects pre-qualified by most major corporate organizations,Architectural, Engineering and Building Services Consulting firms and Contractorssome of which are enlisted here below: - Safaricom Limited. Airtel Kenya Limited. Wananchi Group. Kenya Power & Lighting Company Limited. Rural Electrification Authority

PHILAFE ENGINEERING LIMITED - Profile

4

Kenya Commercial Bank Kenya Tea Development Agency Kenya Re-Insurance Limited H-Young & Company (E.A.) Ltd, Building/Civil/Structural Contractors Ericsson (K) Limited Siemens (K) Limited Kenya Airways Limited ILRI Pwani University Ministry of Housing Utalii College Stima Sacco Ltd Stima Investments Ltd Kenya Medical Supplies Agency Kenya Industrial Research & Development Institute Mumias Sugar Ministry of Energy Warren Enterprises Limited Epco Builders Ltd., Building & Civil Engineering Contractors. Servconsult Consulting Engineers. Geomax Consulting Engineers. Habitech Consultants Zpojawo Consultants Clarion Architects Mecoy Associates Donn Consultants Synchro consult Associates West consult Rex consultants Mesmon consultants Scope Designs Rimba Planning Systems Triad Architects Ministry of Public Works Feradon Associates, Engineering Consultants. Otieno & Kungu Associates, Architects. Kobil Petroleum Limited Gedox Consulting Engineers

1.2 HUMAN RESOURCESThe capability of PEL relies on the qualifications and experience of the technical andsupport personnel. The works experience of majority of our staff range between 5 and30 years in services with various organizations both in the private and public sectors.

The Executive Chairman, Eng. Portash Akida Oloo, obtained a BSc (Hons) degree inElectronic & Electrical Engineering from the University of Nairobi (Kenya) in 1980 andan MSc degree in Communication Engineering from the University of Bradford(England) in 1989. Eng. Oloo has over 28 years of experience in the field of Electrical,Electronic and Telecommunication Engineering design, systems implementation andmaintenance works.

PHILAFE ENGINEERING LIMITED - Profile

5

THE CHIEF EXECUTIVE OFFICERThe CEO Mr. Bernard Otieno Muga holds of Bachelor’s degree in Commerce (BCom),Finance option from Kenyatta University, CPA 3 and a Diploma in SuppliesManagement.

Philafe is composed of two divisions namely: - Operations with six departments andOperations Support with Three departments:-

OPERATIONS/TECHNICAL DIVISIONThis division is headed by Mr. Eric Okuon. He is a Registered Graduate TechnicianEngineer and a holder of HND Electrical Engineering from the Kenya PolytechnicUniversity College. He has a wide experience in Telecommunication Networks. He hasbeen with PEL for 7 years and he had worked with Telkom Kenya for over 30 years. Heis in charge of the below six Technical departments.

SI Department is headed by Mr. Sebastian Oduor. He is a holder of HND in ElectricalEngineering (Power Option) from Kenya Polytechnic University College. He has beenwith PEL for 6 years and has a vast experience in systems designs and implementationof Industrial, commercial and industrial complexes.

SM Department is headed by Mr. Paul Muli Ndeto. He holds a Diploma in Electronic &Electrical Engineering from Mombasa Polytechnic. He has been with PEL for 12 yearsand has a vast experience in systems maintenance at GSM BTS, BSC or MSR sites.

EI&SS Department is headed by Mr. Titus Werova He has been with PEL for 8 years; Mr.Titus had worked with Kenya Power and Lighting Company (KP&LC) for 7 years wherehe carried out a number of tasks in electrical power systems

CN & ICT Department is headed by Mr. Job Oguya. He is a holder of Bachelor ofScience (Hons) in Computer Science from Kenyatta University and WEB DesignCertificate from Institute of Advanced technology (IET) He has a wide experience inTelecommunication Networks. He has been with PEL for 4 years.

Building & Construction Department is headed by Mr. Ammos Okaka. He is a holder ofHND in Construction, Building Economics Option). Mr. Okaka is a registered member ofthe Institute of Quantity Surveyors of Kenya. He has a wide experience in BuildingConstructions & Civil Engineering.

OPERATIONS SUPPORT DIVISIONIt has Four support departments.

Finance and Accounts is headed by Mr. Peter Kiongera Njehu. He is a holder of CPA Kand Bachelor of Science in International Business Administration from USIU.

Technical Sales and Marketing is headed by Mr. Douglas Koroso. He is responsible foroverseeing and coordinating the Technical Sales and Marketing Manager. Mr. Korosois a Diploma holder in Electrical & Electronic Engineering (Telecommunications option)from the Kenya Polytechnic University College, a licensed TelecommunicationTechnician by the Communication Authority of Kenya (CAK) and a Certified

PHILAFE ENGINEERING LIMITED - Profile

6

Technician by the Institution of Engineering Technologists and Technicians of Kenya(IET). He has a wide experience in Business strategy and marketing.

Human Resource and Administration is headed by Ms. Faith Obondo. She is a holderof Diploma in Human Resource Management from CHRM and Bachelor of BusinessAdministration in Human Resources from KEMU.

Supply Chain Department is headed by Mr. Bernard Mautiah Oruru. He is a diplomaholder in procurement and supplies.

PEL total establishment has a workforce of about 150 persons in the categories ofengineers, technical staff, office administrative, accounts and support division staff.

1.3 EQUIPMENTPEL is well equipped with all the necessary measuring instruments, tools, equipmentand machinery, as well as design software which enables the firm to executeengineering tasks conveniently and efficiently. The list of part of the full range of theavailable equipment is listed elsewhere in this document.

1.4 SUPPLIERSPEL has the financial capacity to undertake most of the projects, even the major ones.In order to facilitate the implementation of projects and enhance capacity, the firmhas over the years, built relations and credibility with a number of reputablemanufacturers and suppliers. Some of which are listed here below:

Local Schneider Electrics Ltd Kenwestfal Limited Power Controls Limited Switchgear and Controls Limited Pylon (EA) Limited Professional Tools Limited El-Bulbs Electricals Electrical Supermarket Thames Electrical Host of foreign suppliers and

manufacturers. Specialized Power Systems Ltd New Shakar Electrical and

Hardware Limited

East African Cables Limited Raj Metals Limited Sitima Enterprises Filmico Limited Teldor Limited Vish Electrical Ltd ABB Simba Colt Motors Ltd.

Overseas Associates Systems Sunlight S.A., Greece Isotron / IBADESA, Spain CHINT Electric Company Ltd.,

China Anhui TEC Tower Co., LTD, China

PHILAFE ENGINEERING LIMITED - Profile

7

COMPANY REGISTRATION DOCUMENTS & CERTIFICATIONS

Certificate of Incorporation - C.68008 PIN Certificate No. PØ51112918K

VAT Registration No. 0105626A TAX Compliance Certificate

PHILAFE ENGINEERING LIMITED - Profile

8

Business Permit/Trade Licence ERC Electrical Contractor – Class A-1

Communication Authority of kenya Licence

PHILAFE ENGINEERING LIMITED - Profile

9

National Construction Authority (NCA)NCA-1 – Electrical Works

National Construction Authority (NCA)NCA-1 – Mechanical Works

National Construction Authority (NCA)NCA-4 – Building Works

National Construction Authority (NCA)NCA-5 – Civil Works

PHILAFE ENGINEERING LIMITED - Profile

10

ISO 9001:2015 QMS CertificationBureau Veritas

Mid Sized Company Award 2017KPMG

APS Solution Partner Certificate of Registration of a work Place – DOHS

PHILAFE ENGINEERING LIMITED - Profile

11

REFERENCE LETTERS & TESTIMONIALSSafaricom Limited

Powersense Technologies Limited

Airtel Networks Limited

Stima Sacco

PHILAFE ENGINEERING LIMITED - Profile

12

Zain (K) Limited H-Young & Co. (EA) Limited

Habitech Consult Power Technics

PHILAFE ENGINEERING LIMITED - Profile

13

3.0 COMPANY EXPERIENCESELECTED CONTRACTS

No PROJECT DESCRIPTION CLIENT’S DETAILS ANDLOCATION PROJECT DURATION

1

Electrical Installations, StructuredCabling and Lightening Protection forthe Proposed Academia Block atKibabii University College, Bungoma

Kibabii UniversityCollege, Bungoma

April 2015 – March2017

2

Supply, Installation, testing andCommissioning of Electrical Works and550KVA Standby Generator at Sisibo TeaFactory in Elgeyo Marakwet

Sisibo Tea Factory Jan 2015 – Sep 2015

3

Take delivery, Installation, test andCommissioning of CCTV Cameras forthe Integrated Security (Mwewe)project in Nairobi for the GOK

Huawei TechnologiesLimited

Apr. – Sep. 2015

4

Take delivery, install, test andCommissioning of New Switch Panelsand Variable Speed Drives (VSDs) atKenGen’s Turkwel Power Station

Giza Systems July – Sep. 2015

5Proposed Refurbishment of ElectricalWorks for the Church of Jesus Christ ofLatter day Saints – Buruburu Chapel

Church of Jesus Christof Latter day Saints

Sep. – Nov. 2015

6

Rural Electrification along the 400KVTransmission Line Under The Kenya –Tanzania Power Interconnection Project(KTPIP)

KETRACO May 2018 – May 2021

7Proposed 20No. classrooms phase II atRongo University College

Rongo UniversityCollege

Feb. 2015

8

Last Mile Connectivity Project Phase 1&2 LOT 10 - Design and Construction of LVlines, service line and installation ofmeters in Mandera, Marsabit and Wajir.

Kenya Power April 2018- April 2020

9Construction of Proposed Laboratoriesand Innovation Centre along Dunga Rd.Nairobi

Kenya IndustrialResearch Development

Institute (KIRDI)Feb 2013 – March 2020

10Proposed Research Centre Kisumu –Electrical & Structured Cabling works

Kenya IndustrialResearch Development

Institute (KIRDI)June 2015

11 Proposed office building phase II Tea Board of Kenya February 2015

12Refurbishment of Kenol kobil Fuel DepotCongo

Warren Enterprises March 2015

13Construction of relocation units andstalls for RAP project at Kibera/ Mukuru

H-young & WarrenEnterprises for Kenya

RailwaysDecember 2020

14Proposed Street Lighting project at ILRIgrounds

International LivestockResearch Institute (ILRI)

March 2015

PHILAFE ENGINEERING LIMITED - Profile

14

15Proposed office Block Phase II andadditional floors to the existing KASNEBtowers

KASNEB December 2018

16Construction of Proposed Gymnasiumand Hotel façade at Utalii Hotel, Nairobi

Kenya Utalii CollegeJune 2012 – August

2012

17Supply and Installation of 20KVAStandby generator to Stima Saccooffice Branch - Mombasa

Stima Sacco SocietyLimited

June 2012

18Supply and Installation of 250KVAStandby generator for the proposedStima Mall in Parklands Nairobi.

Stima InvestmentLimited

August 2014

19Construction of Proposed ResearchBuildings in Kisumu

Kenya IndustrialResearch Development

Institute (KIRDI)April 2011 - Dec 2014

20Construction of Proposed Office blockand Farmers Care Centre

Mumias SugarCompany Limited

May 2011 - Dec 2012

21Construction of Fiber /Copper Hybrid(HFC) overhead and undergroundplant.

Wananchi Group Aug 2010- March 2013

22

Tower construction and associated civilworks(Greenfield Sites) Meru Tiber,Tigoni, Ritongo, Gaena, Migori,Rianyagechanga, Oldonyo ereko.

Linksoft Integrated LtdOctober 2017- ongoing

23Construction of phases 1, 2&3 of “lioncable” fiber network (GPON) overheadand underground plant.

Wananchi Group Aug 2010- March 2013

24Installation, termination and testing ofPassive Optical Network (PON) devicesfor “lion cable” network.

Wananchi Group Aug 2010- March 2013

25Provision of BTS Maintenance Servicesfor Remote sites

Safaricom Limited Jan 2011 – Dec 2011

26Construction of Banking Hall and officesuits – Electrical installations

Kenya Canners SaccoLimited

Jan 2011 – Dec 2011

27Construction & Completion of TwinHostel – Electrical installations

Pwani UniversityCollege

Jan 2011 – Dec 2011

28Construction of Club House Gymnasium– Electrical installations

Multimedia UniversityCollege

Dec 2010 –April 2011

29Construction of Science Lab – Electricalinstallations

Bondo UniversityCollege

Oct 2010 –Oct 2011

PHILAFE ENGINEERING LIMITED - Profile

15

30Remodelling and Maintenance of RetailShops and Fit out Countywide

Safaricom LimitedAugust 2016

31Construction & Completion of OfficeBlock Wing C-– Electrical installations

Pwani UniversityCollege Jan 2010 -Dec 2010

32Rewiring of UNHCR Compound atKakuma

United Nations HighCommissioner for

Refugees (UNHCR)Jan 2009 –July 2009

33Design and Construction of KP&LCpower lines to Zain BTS sites countrywide.

Zain Kenya Ltd.May 2008 – On Going

On Contract Basis.

34

Electrical Installation Works to 243Housing Units at Langata Phase 1,including street lighting and associatedfeeder pillars.

National HousingCorporation NHC. Sub-

Contractors toEPCO Builders Limited

Completed In June2008.

35

Electrical Installation Works to 108Housing Units at Pumwani Phase 2,including street lighting and associatedfeeder pillars.

National HousingCorporation ( NHC)Sub-Contractors to

EPCO Builders Limited

Completed In July2007.

36

Electrical Installation Works for officeblocks and street lighting to USAID newRegional Headquarters at USA Embassyground, Gigiri, Nairobi

Sub-Contractors toH-Young (EA) Limited

Completed InNovember 2007.

37

Construction of 62.5km of 33KV O/HPower lines at Lessos-Kapsabet,Musaga-Sibembe, Nakuru-Elburgon andMarima.

Joint Venture withPower Technics Ltd forKP&LC - Loss Reduction

Project.

Completed In July2007.

38

Internal and external ElectricalInstallation works at Sameer IndustrialPark. Sub-Contractors to H. Young (EA)Ltd.

Sameer Group ofCompanies.

Completed In July2007.

39

Supply and installation ofSolar/Wind/Battery ‘green’ power BTSsite for Safaricom at Faza and Ndauislands in Lamu.

Safaricom LimitedNov. 2006 – January

2007

40

Supply and installation of Diesel/Batterysystem (DBS) power enhancer for Tot,Nasianda, Mau Narok and Shanamu HillBTS sites,

Safaricom Limited August 2006 - Feb. 2007

PHILAFE ENGINEERING LIMITED - Profile

16

41Design and Construction of KP&LCpower lines to Safaricom BTS sitescountrywide.

Safaricom Limited. April 2006 – On GoingOn Contract Basis

42

Construction of MV/LV overhead &underground power reticulationcomplete with alarm cables for hilltopsplit BTS sites.

Safaricom Limited

26nos GSM Sites

April 2006 – On GoingOn Contract Basis

43Internal and Street Lighting ElectricalInstallation works. Sub-Contractors toKinden Corporation of Tokyo, Japan

African Institute forCapacity

Development (AICAD)

Completed InDecember 2006.

44

Construction of 2.8km of 66KV O/HPower line, Baba Dogo and 18km 11KVO/H power lines in Bahati and BabaDogo

Siemens Kenya Ltd.KPLC - Loss reduction

Project.

Completed In March2006.

45Provision of Wayleave services contract(Zone 1). AFD – Western Kenya

Kenya Power andLighting Co. Ltd

AFD Project

Completed In July2006.

46Power Support maintenance Contractfor all Safaricom BTS/BSC / MSR sites inKenya.

Safaricom LimitedMay 2005 - On Going

On Contract Basis.

47

Electrical Internal InstallationRehabilitation Works. Sub-Contractors toSumitomo Densetsu Co. Ltd of Tokyo,Japan.

Kenya MedicalResearch Institute.

Completed InNovember 2005.

48

Electrical Installation Works at NationalOil Corporation (NOCK) Terminal onNanyuki Road, Nairobi. Sub-Contractorsto H. Young (EA) Ltd.

National OilCorporation ofKenya (NOCK).

Completed In May2004.

49Installation of µ-Wave VSAT Cabinetscountrywide.

Kencel/Celtel/ZainKenya Ltd

July 2003 – January2010, Was On Contract

Basis.

50Electrical and Earthing Installation Worksfor BTS sites countrywide. Sub-Contractors to H. Young (EA) Ltd.

Kencel / Celtel / ZainKenya Ltd.

March 2003 – October2009, Was On Contract

Basis.

51

Electrical works (Internal and Externalpower reticulations and Street Lighting)at the Base Camp, Intake Yard and siteestablishment for the proposedSondu/Miriu Hydropower station.

Sub-contractor toKonoike and EPCO

BuildersCompleted 2003

52Design and installation of 415V LVsystem reticulation and Alarm Solutionat various split BTS/Gen hilltop site

Safaricom Limited. March 2002 – On GoingOn Contract Basis.

53

Electrical Installation works for theContractor’s site offices at OlkariaGeothermal Phase 2. Sub-Contractors toH. Young (EA) Ltd.

KENGEN

Completed In May2002.

PHILAFE ENGINEERING LIMITED - Profile

17

54Construction of 33KV, 11KV and systemsc/w Tx. Installation, LV reticulation andservice lines.

Kenya Power & LightingCo. Ltd.

February 2000 –Ongoing On Contract

Basis.

55

Electrical Installation Works. Sub-contractors to Zenitaka Corporationand Sumitomo Densetsu Co. Ltd both ofTokyo, Japan

Kenya Institute ofSurveying & Mapping,

Completed In May1999.

56Rehabilitation of the Runway-21approach lighting system at MoiInternational Airport.

Kenya Airport AuthorityMombasa

Completed In June1998.

57Pure Green Energy Power Installation(6Kw) Solar, wind solution (7.5Kw) atFaza GSM site

Safaricom Limited. Completed In June2006

58Pure Green Energy Power Installation(6Kw) Solar, wind solution (7.5Kw) atNdau GSM site

Safaricom Limited. Completed In June2006

59Green Energy Installation (2.1Kw) Solar,wind solution (10 Kw) any Generator atOsupuko GSM site(indoor)

Safaricom Limited. Completed In 2010.

60Green Energy Installation (2.1Kw) Solar,wind solution (5 Kw) and Generator atMajimoto GSM site(outdoor)

Safaricom Limited. Completed In 2011

61Construction of fiber /copper hybrid(HFC) overhead and undergroundplant.

Camusat Kenya Ltd April 2013-Ongoing OnContract

62 Installation of multi-dweller units (MDU) Camusat Kenya Ltd April 2013-Ongoing OnContract

63Construction of phases 1, 2&3 of “lioncable” fiber network (GPON) overheadand underground plant.

Camusat Kenya Ltd April 2013-Ongoing OnContract

64Installation, termination and testing ofPassive Optical Network (PON) devicesfor Wananchi (ZUKU) network.

Camusat Kenya Ltd April 2013-Ongoing OnContract

PHILAFE ENGINEERING LIMITED - Profile

18

SELECTED PICTORIAL

STREET LIGHTING PROJECT AT SONDU MIRIUHYDROPOWER PROJECT

LVPOWER & ALARMS LINES AT ARCHERS POST

HILLTOP BTS SITE

STREET LIGHTING PROJECT AT AICAD, JOMOKENYATTA UNIVERSITY OF AGRICULTURE &

TECHNOLOGY

CONCRETE MIXING AT POLYVIEW HOUSINGPROJECT IN KISUMU

LANGATA-1 HOUSING PROJECT FOR NATIONAL STREET LIGHTING PROJECT AT THE NATIONAL OIL

PHILAFE ENGINEERING LIMITED - Profile

19

HOUSING CORPORATION, NAIROBI CORPORATION DEPOT, NAIROBI

INSTALLATION OF THE μ-WAVE CABINETS AT BTSSITE

SERVICE OF INVERTERS AT SAFARICOM MAUNAROK BTS SITE

TERMINAL POLE FOR OVERHEAD POWER &ALARMS LINES AT HILLTOP GSM SITE

33KV MUSAGA SUB - STATION

INSTALLED AIRCRAFT WARNING LIGHT (AWL) ONGSM SITE TOWER

NEW TRAINING CENTRE AT KEMRI, NAIROBI

PHILAFE ENGINEERING LIMITED - Profile

20

INSTALLATION OF HYBRID POWER & BTS SHELTER INSTALLATION OF HIGH VOLTAGE SWITCHGEARSAT LESSOS SUB-STATION

50 KVA 33/.433KV LOCAL TRANSFORMER FORMARIMA 2.5MVA SUB-TATION

PUMWANI-2 PROJECT FOR NATIONAL HOUSINGCORPORATION, NAIROBI

33/11KV SIBEMBE SUB-STATION PHILAFE BULK MATERIAL STORAGE

PHILAFE ENGINEERING LIMITED - Profile

21

4.0 COMPANY STRUCTURE

Philafe Engineering Limited management is regulated by an established Board of Directors witha clear legal mandate to drive the company in the growth trajectory. The organ gram belowshows the current overall structure of the company.

PHILAFE ENGINEERING LIMITED - Profile

22

5.0 COMPANY HUMAN RESOURCEPhilafe Engineering Limited Staff Establishment as at September 2015.

DEPARTMENTS NO. OF PERSONNELOffice of the Executive Chairman & CEOExecutive ChairmanChief Executive OfficerPersonal Assistant /Executive SecretaryExecutive Driver

1111

Divisional HeadsOperations Manager (OM)– Head of TechnicalServicesOperations Support Manager (OSM) – Head ofFinance & Administration Services

1

1

Department of Energy Infrastructure & SpecializedSystemsHead of DepartmentEngineersForemenTechniciansTechnical Assistants

114

1016

Department of Systems Design, Production &MarketingHead of DepartmentEngineersForemenTechniciansTechnical Assistants

115

1218

Department of Systems ImplementationHead of DepartmentProjects CoordinatorsForemenTechniciansTechnical AssistantsSafety Officers

138

15202

Department of Strategy & Business DevelopmentHead of DepartmentBusiness Development Executives

12

Department of Systems MaintenanceHead of DepartmentEngineersForemenTechniciansTechnical Assistants

115

1218

PHILAFE ENGINEERING LIMITED - Profile

23

Department of Communication Networks & ICTHead of DepartmentEngineersTechniciansTechnical Assistants

11

1020

Department of Building & ConstructionHead of DepartmentQuantitative surveyorTechniciansTechnical Assistants

125

10Department of Human Resource, Administration &Board SecretariatHead of DepartmentHuman Resource AssistantAdministration ManagerTransport ManagerProperty /Site Manager(s)DriversMechanicsO-in-C of Registry & ArchivesOffice AssistantsSecretarial SupportMessengers

11111

1051222

Department of FinanceHead of DepartmentAccountant/Financial ControllerDebt Collector(s)Accounts Clerks

1112

Department of Supply Chain & StoresHead of DepartmentSupply Chain ClerksStores ManagerStores Assistants

1212

Department of Internal Risk and AuditHead of DepartmentInternal AuditorAudit Assistants

112

PHILAFE ENGINEERING LIMITED - Profile

24

5.0 TECHNICAL EQUIPMENT AND MACHINERY5.1 EQUIPMENT, TOOLS, TEST & MEASURING INSTRUMENTS

DESCRIPTION QUANTITY5.1.2 GENERAL EQUIPMENT/TOOLSConcrete Mixer 1 No.Plate Compactor 1 No.Poker Vibrator 1 No.Concrete Hoist 1 No.Dynometer tension 5000 Kgs 3 PcsHydraulic Crimping tool 150mm2 2 PcsManual Crimping tool 150mm2 3 Pcs3 ton Tifor 1 Pc3 ton pull lift 5 Pcs5 ton chain block 4 PcsScarfolder 1 PcVice clamp c/w bender 1 PcLeveling machine c/w stands 1 PcAdjustable Torque wrench(2.5-12nM) 3 PcsAdjustable Torque wrench(25-135nM) 3 PcsProfessional electrical tool kits 5 setsFirst Aid Kit 8 setsDigital cameras 20 Pcs5.1.3 MEASURING EQUIPMENTSPower Analyzer 1 PcDigital Imaging Camera 1 PcUltra battery tester 1 PcDigital Earth tester sanwa 5 PcsDigital clamp meter ac/dc Sanwa 19 PcsFluke clamp meter ac/dc 5 Pcs5.1.4 POWER MACHINESHilti Drill changeable chuck 10 PcsPower Saw 1 Pcs7” dewalt grinder machine 2 PcsAir compressor (50L0 FIMA 1 Pcs5.1.5 GENERATORSPower generators 5 Pieces5.1.6 FIBER CABLE DEPLOYMENT SPECIALISED EQUIPMENTSplicing Machine 2 PcsOptical Time Domain Reflectometer (OTDR) 2 PcsPower meter 2 PcsLashing machine 2 PcsComplete Tool boxes 6 Pcs5.1.7 COMMUNICATION EQUIPMENTCisco router 800 Series 1 PcWireless for CDMA for Huawei 5 Pcs

PHILAFE ENGINEERING LIMITED - Profile

25

Wireless terminals GSM 3 PcsUPS APC 650VA 10 PcsOffice server LCD / HP 1

5.2 VEHICLES AVAILABLE FOR PROJECTS

MAKE UNITSToyota Hilux pick-up – 1810cc 1Toyota Hilux Double Cabin 4WD 1Nissan Sahara 4WD Pick- up Truck 1Mitsubishi L200 4WD 1 ton pick-ups single & double cabs 6Toyota HIACE 2 ton truck 4WD 1Mitsubishi Canter 5 ton 2Mitsubishi Fuso 10 ton 1FAW Truck 15 ton 1Ford Ranger Double Cabin 4WD 1Saloon and station wagon cars 7Isuzu DMax Double Cabin 4WD 1Nissan Hardbody 4WD Pick-up 1Toyota Land cruiser Pick- up 1Motorbikes 2

PHILAFE ENGINEERING LIMITED - Profile

26

5.3 OTHER EQUIPMENTS OWNED BY THE COMPANY.

TYPE QUANTITYDesktop Computers, Pentium class complete with full multimedia. 22 sets.HP, Toshiba, Dell & Acer laptop Computers. 16 nos.Canon Bubble Jet Printers. 6 no.Epson MJ-500 Printer. 1 no.Fixed Telephone. 10 sets.Cordless Telephone. 12set.Mobile telephones/Blackberries 15 setsPanasonic Fax Machine. 2 set.Adding Machine/Calculators. 8nos.Toshiba Printer/Photocopying Machine. 1 no.Assortment of standard office furniture. Lot