Heat, Ventilation &Air ConditionLegal Regulations
Heat, Ventilation &Air ConditionLegal Regulations
Department of Maritime Studies Hochschule WismarProf. Dr.-Ing. Michael RachowE-Mail: [email protected]
Dept. of Marine Engineering ITSSutopo Purwono Fitri, Ph.D.Email: [email protected]
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 2
II. Heat ExchangerI. Boiler III. Fuels
IV. CombustionCalculation
V. Firing System VI. Combustion AirSupplying
VII. Feed Water VIII. Water SteamCirculation
IX. CondensateManagement
X. LegalRegulations
XII. Boiler DamageXI. Safety Equipment
XII. Thermal Oil XIV. Boiler Operation
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 3
Structure of legal regulations
EU law and there realization in Germany
Rules for steam plant equipment
Rules for steam plant operation
Requirements on operator
Special rules for shipping lines in Germany
Examples
Transitional arrangement
Overview
Structure of legal regulations
EU law and there realization in Germany
Rules for steam plant equipment
Rules for steam plant operation
Requirements on operator
Special rules for shipping lines in Germany
Examples
Transitional arrangement
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 4
Production safety law
arranged the safety requirements on technical tools
Labor protection law
arranged measures of labor protection
Legal Rules
Production safety law
arranged the safety requirements on technical tools
Labor protection law
arranged measures of labor protection
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 5
Arranged since 01.december 2011 in Germany the safetyrequirements of technical tools and consume products
Especially are arranged:putting into circulation and exhibition of productssetup and operation of plants with requirements on
supervising
Transpose a lot of EU- regulations: law of simple pressure reciever 87/404/EWG law of pressure device 97/23/EG
Production Safety Law
Arranged since 01.december 2011 in Germany the safetyrequirements of technical tools and consume products
Especially are arranged:putting into circulation and exhibition of productssetup and operation of plants with requirements on
supervising
Transpose a lot of EU- regulations: law of simple pressure reciever 87/404/EWG law of pressure device 97/23/EG
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 6
Aim: to secure and improve the health of all employees bymeasures of labor protection
Dominant parts:hazardous assessmentassessment of labor conditions
Beside of classical types of danger, like physical, chemicaland biological risks, is also assessed dangers which aregiven of design of production processes, labor processesand the interaction of both, as well inadequatequalifications and instructions of employee.
Labor Protection Law
Aim: to secure and improve the health of all employees bymeasures of labor protection
Dominant parts:hazardous assessmentassessment of labor conditions
Beside of classical types of danger, like physical, chemicaland biological risks, is also assessed dangers which aregiven of design of production processes, labor processesand the interaction of both, as well inadequatequalifications and instructions of employee.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 7
Pressure device guideline 97/23/EG
Guideline 97/23/EG of European parliament and Councilfrom may 1997 to adapt the different laws of all memberstates
Production Safety Law
Pressure device guideline 97/23/EG
Guideline 97/23/EG of European parliament and Councilfrom may 1997 to adapt the different laws of all memberstates
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 8
To pressure devices are counted:container (non fired pressure container)steam boilerpipes and tubespressure holding partsequipment parts with safety functionwith overpressure of more than 0.5 bar.
for the compliance of these rules can the manufacturerkeeping on European EU or German norms DIN
Pressure Device Guidelines
To pressure devices are counted:container (non fired pressure container)steam boilerpipes and tubespressure holding partsequipment parts with safety functionwith overpressure of more than 0.5 bar.
for the compliance of these rules can the manufacturerkeeping on European EU or German norms DIN
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 9
Assumption effectfor the fulfillment of requirements the manufacturer can
presume that, when he applied the harmonized normsthat he complied the basics of safety and healthrequirements.
The pressure device guideline arranged only the puttinginto circulation of pressure devices. The operation rules ofpressure devices, valid for operator, are regulated inoperational safety regulation.
Pressure Device Guidelines
Assumption effectfor the fulfillment of requirements the manufacturer can
presume that, when he applied the harmonized normsthat he complied the basics of safety and healthrequirements.
The pressure device guideline arranged only the puttinginto circulation of pressure devices. The operation rules ofpressure devices, valid for operator, are regulated inoperational safety regulation.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 10
Selected norms:
EN 13445 for pressure tank without firing
EN 13480 for industrial pipelines
EN 12952 for water tube boiler
EN 12953 for large water space boiler
EN and DIN Norms for Steam Boiler
Selected norms:
EN 13445 for pressure tank without firing
EN 13480 for industrial pipelines
EN 12952 for water tube boiler
EN 12953 for large water space boiler
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 11
Selected examples about rules for construction,process, changing, repairing and operation
EN 12952
Water Tube Boiler
Selected examples about rules for construction,process, changing, repairing and operation
EN 12952
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 12
Preface:1. The responsibility of requirements for pressure devices
are also valid for assembly which are pose a thread inthe same way
2. The essential requirements laid down in this directiveare compulsory.
3. The producer have to carry out a risk analysis, the resultof that determines the rules which have to respect forthe construction process.
4. The essential requirements are to interpret and to apply,that the product correspond the state of art technicaland the praxis at the time of conception and producingas well the technical and economical considerations.
Firing and Other Heated Devices and Devices withRisk of Overheating
Preface:1. The responsibility of requirements for pressure devices
are also valid for assembly which are pose a thread inthe same way
2. The essential requirements laid down in this directiveare compulsory.
3. The producer have to carry out a risk analysis, the resultof that determines the rules which have to respect forthe construction process.
4. The essential requirements are to interpret and to apply,that the product correspond the state of art technicaland the praxis at the time of conception and producingas well the technical and economical considerations.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 13
Pressure device have to constructed, produced, approved,equipped and installed, that the safety is given every time.
During the chosen of best solution, the producer have torespect the follow basics at the given sequence:disposal or avoiding of hazardsapplying of suitable protection measures for non
disposability hazards if necessary instruction of users about residual risks
and recommendations for suitable, especially measuresto decreasing the hazards during installation oroperation
If the opportunity of improper applying known orforeseeable, have the construction to design in this way,that the danger can prevent, if that impossible have toappear a warning about the danger
General
Pressure device have to constructed, produced, approved,equipped and installed, that the safety is given every time.
During the chosen of best solution, the producer have torespect the follow basics at the given sequence:disposal or avoiding of hazardsapplying of suitable protection measures for non
disposability hazards if necessary instruction of users about residual risks
and recommendations for suitable, especially measuresto decreasing the hazards during installation oroperation
If the opportunity of improper applying known orforeseeable, have the construction to design in this way,that the danger can prevent, if that impossible have toappear a warning about the danger
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 14
Generals EN 12952-3:5.1 to 5.7Design of necessary load- bearing capacity EN 12952-3;EN 12952-
8:4.2.1 to 4.2.5Prevention of safety in handling and operation EN12952-12:5 EN12952- 8:4.3.6Prevention for inspection EN 12952-3: 5.6.2;Draining and ventilation opportunity EN 12952-3: 5.6.2;
5.6.3; EN 12952-7: 5.2; 5.3;EN 12952-12:5;Corrosion and other chemical influence EN 12952-3: 5.8;Wear and tear EN 12952-3: 5.8.6;protection for exceeds of allowed limits of pressure devices
EN 12952-7: 4; 5.1; 5.8; 6:1; 6.2; EN 12952-8: 4.2.4; EN 12952-10: 5;
Equipment with protection order EN 12952-7: 8; EN 12952-10: 5; 7;
EN 12952-11: 4; 5;6;extern fire/ assembly /Filling and empty -
Design
Generals EN 12952-3:5.1 to 5.7Design of necessary load- bearing capacity EN 12952-3;EN 12952-
8:4.2.1 to 4.2.5Prevention of safety in handling and operation EN12952-12:5 EN12952- 8:4.3.6Prevention for inspection EN 12952-3: 5.6.2;Draining and ventilation opportunity EN 12952-3: 5.6.2;
5.6.3; EN 12952-7: 5.2; 5.3;EN 12952-12:5;Corrosion and other chemical influence EN 12952-3: 5.8;Wear and tear EN 12952-3: 5.8.6;protection for exceeds of allowed limits of pressure devices
EN 12952-7: 4; 5.1; 5.8; 6:1; 6.2; EN 12952-8: 4.2.4; EN 12952-10: 5;
Equipment with protection order EN 12952-7: 8; EN 12952-10: 5; 7;
EN 12952-11: 4; 5;6;extern fire/ assembly /Filling and empty -
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 15
Manufacture process EN 12952-5: 6.1; 6.2; 6.3; 6.4; 7.1;7.2; 6.3; 7.4; 8.1.1 to 8.1.3; 8.4;8.6; 8.7; 10; EN 12952-6: 6; 7 to8.2; 9.2;
Approval EN 12952-6: 4.5; 10.1;
Declaration EN 12952-6: 10.2;
Operation manual -
Manufacture
Manufacture process EN 12952-5: 6.1; 6.2; 6.3; 6.4; 7.1;7.2; 6.3; 7.4; 8.1.1 to 8.1.3; 8.4;8.6; 8.7; 10; EN 12952-6: 6; 7 to8.2; 9.2;
Approval EN 12952-6: 4.5; 10.1;
Declaration EN 12952-6: 10.2;
Operation manual -
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 16
Finale approval EN 12952-6: 4.5; 10.1;
Pressure approval
Check of safety equipment
Approval
Finale approval EN 12952-6: 4.5; 10.1;
Pressure approval
Check of safety equipment
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 17
Approving of compliancy of rules by visual check andchecking of accompanying documents
Approvals, which are carry out during manufactureprocess can be considered
Final approval is executed on inside and outside of allparts which are accompanying to device.
Finale Approval
Approving of compliancy of rules by visual check andchecking of accompanying documents
Approvals, which are carry out during manufactureprocess can be considered
Final approval is executed on inside and outside of allparts which are accompanying to device.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 18
This approval contains a pressure strength test in kind ofhydrostatic pressure test
For devices of category I, which are produced in seriescan carry out random samples
If the hydrostatic test disadvantageous or impossible, it ispossible to replace that by other testsAll other tests like the hydrostatic pressure test required
additional pretests like non destructive tests or equalprocesses
Hydrostatic test pressure have to follow the higher value1.25 times higher than highest load-bearing capacity in
operation conditions with consideration of allowed highpressure and temperature
1.43 times higher than the allowed high pressure
Pressure Approval
This approval contains a pressure strength test in kind ofhydrostatic pressure test
For devices of category I, which are produced in seriescan carry out random samples
If the hydrostatic test disadvantageous or impossible, it ispossible to replace that by other testsAll other tests like the hydrostatic pressure test required
additional pretests like non destructive tests or equalprocesses
Hydrostatic test pressure have to follow the higher value1.25 times higher than highest load-bearing capacity in
operation conditions with consideration of allowed highpressure and temperature
1.43 times higher than the allowed high pressure
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 19
This test refers on assemblies where are checked, that the
requirements to protect of exceeding the allowed limits of
pressure devices are fulfilled complete. Additional
contains this approval a testing of equipment parts with
protection function.
Test of Safety Equipment
This test refers on assemblies where are checked, that the
requirements to protect of exceeding the allowed limits of
pressure devices are fulfilled complete. Additional
contains this approval a testing of equipment parts with
protection function.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 20
It must ensure that:a) suitable protection equipment's are planned with that operational parameter
like heat adding, heat dissipating and where its correctly liquid levels can
limited to avoid the risk of local or general overheating
b) if necessary, sampling points are planned with that the properties of fluids
can be assess to avoid risk in relation to deposits and /or corrosion
c) suitable prevents to remove the hazards of damage as result of deposits
d) opportunities for safety dissipating of post heating after shut down are
given
e) measures are planned with that hazardous collection of inflammable
mixings that contains combustible materials and air, as well flash back
avoided
Operation
It must ensure that:a) suitable protection equipment's are planned with that operational parameter
like heat adding, heat dissipating and where its correctly liquid levels can
limited to avoid the risk of local or general overheating
b) if necessary, sampling points are planned with that the properties of fluids
can be assess to avoid risk in relation to deposits and /or corrosion
c) suitable prevents to remove the hazards of damage as result of deposits
d) opportunities for safety dissipating of post heating after shut down are
given
e) measures are planned with that hazardous collection of inflammable
mixings that contains combustible materials and air, as well flash back
avoided
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 21
a) at putting into circulation have to added the pressure device amanual for users which contains all information of follow safetyaspects: mounting and connecting of more than one devices initial operation using maintenance including inspection by users
b) manual must contain the same information which are attached onthe device itself with exception of serial number. The manual mustcontaining the technical documents as well the drawings anddiagrams which are necessary for a correct understanding of thismanual
c) occasion arise the manual to indicate of hazards by improperapplying and also on especially marks of design
Operation Manual
a) at putting into circulation have to added the pressure device amanual for users which contains all information of follow safetyaspects: mounting and connecting of more than one devices initial operation using maintenance including inspection by users
b) manual must contain the same information which are attached onthe device itself with exception of serial number. The manual mustcontaining the technical documents as well the drawings anddiagrams which are necessary for a correct understanding of thismanual
c) occasion arise the manual to indicate of hazards by improperapplying and also on especially marks of design
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 22
Equipment NumbersSafety valve (saturated steam) 1Safety valve (super heater) 1Pressure governor 1Water level governor 1
Equipment for Small Natural or Forced CirculationBoiler
Water level governor 1Low water level limiter 1High water level limiter -Water level display 1a
Feed water pump 1Limiter for feed water conductivity 1b
Limiter for boiler water conductivity 1b
Limiter for feed water hardness 1b
a direct or indirectb can replaced by manual check
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 23
Equipment NumbersMax. pressure limiter 1Pressure governor 1Current limiter 1a
Feed water pump 1
Equipment for Once Through Forced Boiler
Feed water pump 1Temperature display super heater 1Temperature limiter super heater 1Limiter for feed water conductivity 1b
Limiter for boiler water conductivity 1b
Limiter for feed water hardness 1b
a or equivalent equipmentb can replaced by manual check
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 24
Equipment NumbersMax. pressure limiter 1Pressure governor -Low water level limiter 1Water level governor -
Equipment for Small Natural or Forced Hot WaterGenerator
Water level governor -Water level display 1a
Temperature limiter 1Temperature display 1Feed water pump 1Circulation pump 1b
a only for hot water generator with steam spaceb if necessary
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 25
Equipment NumbersMax. pressure limiter 1Min pressure limiter 1a
Pressure governor -Current limiter 1c
Equipment for Once Through Hot WaterGenerator
Current limiter 1c
Temperature limiter 1Temperature display 1Feed water pump 1Circulation pump 1b
a only for plants with foreign pressure holdingb if necessaryc or equivalent
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 26
Number Activity area Test process1 construction and general documentation1.1 Construction data and
calculationsTest of design data/calculation ofagreement: technical specificationand requirements of EU norm
List of Test, to Carry out by Manufacturer
Test of design data/calculation ofagreement: technical specificationand requirements of EU norm
1.2 Name of product Test the drawing data of agreementConstruction dataTechnical specificationsRequirements of EU norm
1.3 Order specifications Test of material and componentsspecification
1.4 Specification of subcontracts Test of specification for subcontracts
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 27
List of Test, to Carry out by ManufacturerNumber Activity area Test process1 Material test2.1 Material certification Test that data from certification and
results of designs are agree2.2 Welding additives Test if the applied welding additives
agree with the normTest if the applied welding additivesagree with the norm
2.3 material specifications Identify the materials on basis ofmaterial certification and test oflabeling
2.4 Stamp of materials Test if the taking over of labelingagree with recognized processes
2.5 Approval of sub contracts Test, that the sub contracts agreewith producer specifications
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 28
Number Activity area Test process
3 manufacture and welding
3.1 Welding order Test of suitable welding order
3.2 Recognizing of welding process Welding process and materials
3.3 Welder license test, if the license approve correctly
List of Test, to Carry out by Manufacturer
3.3 Welder license test, if the license approve correctly
3.4 Deformation process Test, that the order for deformation areavailable and the content agrees withthe parts
3.5 Welding preparation Test of material edge after thermalcutting and evidence of correct profileworking
3.6 Deformed parts Test, that the deformed parts agree therequirements of EU norm
3.7 Weld seam in attached conditions Test of welding seam includingdimension check
3.8 Welding roots Test of seam counter side
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 29
Number Activity area Test process
4 non destructive testsProcess, certification, carry outand protocols
Test of processes, tester,requirements
5 heat treatment after welding
List of Test, to Carry out by Manufacturer
5 heat treatment after weldingProcess, certification, carry outand reporting
Check of process, temperatureand times
6 Construction inspection and labelingTest of water pressure before,during and afterSafety equipment
Check of process, pressure,labeling, safety equipment's,Documentations
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 30
Aim: to ensure and improve the health of all employees
by measures of work protection
Its basis of authorization for regulation
previous directives are:
workplace regulations,
industrial safety regulation
regulation for working with display screens
noise and vibration work protection regulation
Labor Protection Law
Aim: to ensure and improve the health of all employees
by measures of work protection
Its basis of authorization for regulation
previous directives are:
workplace regulations,
industrial safety regulation
regulation for working with display screens
noise and vibration work protection regulation
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 31
Arranged is
providing of working tool by employer
using of working tools by employees during the work
time
operation of plants with required supervision in sense of
work protection
This concept has to apply of all working tools
Industrial Safety Regulation
Arranged is
providing of working tool by employer
using of working tools by employees during the work
time
operation of plants with required supervision in sense of
work protection
This concept has to apply of all working tools
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 32
A uniform risk assessment of working tools
Safety- technical assessment for operation of required
supervision plants
state of the art technology to be uniform safety scale
Suitable protection measures and tests
Minimum requirements for conditions of tools, agrees the
European harmonization directives
Basic Assembly of Protection Concept
A uniform risk assessment of working tools
Safety- technical assessment for operation of required
supervision plants
state of the art technology to be uniform safety scale
Suitable protection measures and tests
Minimum requirements for conditions of tools, agrees the
European harmonization directives
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 33
For plants with required supervising has to respectadditional regulation:check before startrecurring approvals of required supervision plants
some plants of this kind are regulated with specialreservation with regard to granting permission byresponsible administration
To these plants are counted:steam boilerpressure plants lift plantsplants in explosion endangered areas......
Approval
For plants with required supervising has to respectadditional regulation:check before startrecurring approvals of required supervision plants
some plants of this kind are regulated with specialreservation with regard to granting permission byresponsible administration
To these plants are counted:steam boilerpressure plants lift plantsplants in explosion endangered areas......
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 34
Mechanical dangerous
Dangerous by drop down of person, loads or materials
Electrical dangerous
Dangerous by steam and pressure
Dangerous by fire or explosion endangered
Thermal dangerous
Dangerous by other physical influence
Rules Which refers on Danger
Mechanical dangerous
Dangerous by drop down of person, loads or materials
Electrical dangerous
Dangerous by steam and pressure
Dangerous by fire or explosion endangered
Thermal dangerous
Dangerous by other physical influence
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 35
Give:
state of the art technical
state of the art medical
state of the art hygiene
the providing and using of tools, as well the operation of
required supervision plants
Technical Rules for Industrial Safety
Give:
state of the art technical
state of the art medical
state of the art hygiene
the providing and using of tools, as well the operation of
required supervision plants
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 36
The employer has to assess the dangers which can occur
by using of provided tools
The operator must indicate the dangers, which can occur
in operating of required supervision plants
This rules help to investigate and assess of according
dangers
Determine essential measures for providing and using of
tools or for the operation
Applying of Technical Rules for Industrial Safety
The employer has to assess the dangers which can occur
by using of provided tools
The operator must indicate the dangers, which can occur
in operating of required supervision plants
This rules help to investigate and assess of according
dangers
Determine essential measures for providing and using of
tools or for the operation
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 37
Realization of EU- law
Separation between equipment and operation
Equipment production Safety law with pressure devicedirectives presumption principle by EN and DIN norm
Operation work protection law with industrial safetydirective presumption principle by Technical Rules for
Industrial Safety
Conclusion
Realization of EU- law
Separation between equipment and operation
Equipment production Safety law with pressure devicedirectives presumption principle by EN and DIN norm
Operation work protection law with industrial safetydirective presumption principle by Technical Rules for
Industrial Safety
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 38
Hazardous assessment by employer
Results of assessment is significant for the measures of
employer
directives for prevention of accident from professional
association must respect
Directives of classification society arranged especially the
condition, approval periods and the approval quantity,
which is given by hazardous potential
Practical Realization
Hazardous assessment by employer
Results of assessment is significant for the measures of
employer
directives for prevention of accident from professional
association must respect
Directives of classification society arranged especially the
condition, approval periods and the approval quantity,
which is given by hazardous potential
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 39
Reoccur approvals as part ofprotection concept, agrees with
hazardous assessment ofemployer
Approval of Steam Boiler
Reoccur approvals as part ofprotection concept, agrees with
hazardous assessment ofemployer
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 40
Outside check (annually)
inside check (3 year period, on cruise liner or
passenger vessel each year)
Water pressure check (9 year period)
Reoccur approvals
Outside check (annually)
inside check (3 year period, on cruise liner or
passenger vessel each year)
Water pressure check (9 year period)
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 41
General condition of plant Equipment part on water and steam side which are
essential in refer to building and equipment regulations,and be safety relatedsafety circuitkind of operationexpanding of selected boiler partsavailability of manuals and the boiler operator are
instructed in according plantcompliancy of calculated pressure on entrance of once
through boiler with steam generating
Reoccur Approval Outside
General condition of plant Equipment part on water and steam side which are
essential in refer to building and equipment regulations,and be safety relatedsafety circuitkind of operationexpanding of selected boiler partsavailability of manuals and the boiler operator are
instructed in according plantcompliancy of calculated pressure on entrance of once
through boiler with steam generating
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 42
Visual check of drums
Boiler jacket and bottom, flame pipes, chambers and other
are checked on water and steam side
Round collector with bolt locker, four side collector, full
chamber, part chamber and rust cooling bar are check
visual
Combustion chamber walls and pipes
Pipe lines, connecting pipes from outside
Parts, where can in worst case create a pressure must
significantly respected
Reoccur Approval Inside
Visual check of drums
Boiler jacket and bottom, flame pipes, chambers and other
are checked on water and steam side
Round collector with bolt locker, four side collector, full
chamber, part chamber and rust cooling bar are check
visual
Combustion chamber walls and pipes
Pipe lines, connecting pipes from outside
Parts, where can in worst case create a pressure must
significantly respected
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 43
Formed parts and fittings
Economizer on exhaust side, on water side only when the
access is given, main part is corrosion
Super heat steam cooler is handled like collector
Pressure expanding tank on water and steam side
Screws, made of steel X22CrMoV required a surface
crack test or ultra sonic sound test in case of the screws
stay mounted
Reoccur Approval Inside
Formed parts and fittings
Economizer on exhaust side, on water side only when the
access is given, main part is corrosion
Super heat steam cooler is handled like collector
Pressure expanding tank on water and steam side
Screws, made of steel X22CrMoV required a surface
crack test or ultra sonic sound test in case of the screws
stay mounted
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 44
Test pressure could never higher than the pressure at the
first test -- mostly 1.3 times of operation pressure
Test pressure should effected round half hour
The water for fill up must be clean
Parts under pressure must be checked on cracks,
prohibited deformation, or leakages.
Reoccur Water Pressure Check
Test pressure could never higher than the pressure at the
first test -- mostly 1.3 times of operation pressure
Test pressure should effected round half hour
The water for fill up must be clean
Parts under pressure must be checked on cracks,
prohibited deformation, or leakages.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 45
Boiler operator who has passed a boiler operator training
is called representative employee
This activity included the using of tools with special
dangers. The boiler operator has the task:
maintenance of plant and supervising
to report lacks on plant and incidents direct to
designated person
shut down of plant, if given certain hazards for
employees or third person
Boiler Operator
Boiler operator who has passed a boiler operator training
is called representative employee
This activity included the using of tools with special
dangers. The boiler operator has the task:
maintenance of plant and supervising
to report lacks on plant and incidents direct to
designated person
shut down of plant, if given certain hazards for
employees or third person
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 46
If the using of tools with significant hazardous for safety and
security of employee given. The employer must taken
measures, with that the using of this tool is only reserved
for representative person.
Additional Security Measures
If the using of tools with significant hazardous for safety and
security of employee given. The employer must taken
measures, with that the using of this tool is only reserved
for representative person.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 47
Building and equipment are arranged international by
classification directives
Work protection is part of flag state regulation
In EU are uniform directives realized
Beside of work protection law is the ISM (international
Safety Management) valid = international standard for
measures for safety operation of ships and to prevent the
sea pollution
Specials for Ship Operation
Building and equipment are arranged international by
classification directives
Work protection is part of flag state regulation
In EU are uniform directives realized
Beside of work protection law is the ISM (international
Safety Management) valid = international standard for
measures for safety operation of ships and to prevent the
sea pollution
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 48
Dasar Hukum K3 bidang boiler : Permenaker No. 04 tahun 1987 tentang Panitia
Pembinaan Kesehatan dan Keselamatan Kerja (P2K3), UU No. 13 tahun 2003 tentang penyelenggaraan Sistem
Manajemen K3 (SMK3) Undang-Undang No. 1 tahun 1970 Undang-Undang Uap Stbl 225 tahun 1930 Peraturan Uap Stbl 339 tahun 1930 Peraturan Menteri Tenaga Kerja RI No. 01/ MEN/1988
tentang kualifikasi dan syarat-syarat operator pesawat uap Peraturan-Peraturan terkait lainnya
Kesehatan dan Keselamatan Kerja (K3)
Dasar Hukum K3 bidang boiler : Permenaker No. 04 tahun 1987 tentang Panitia
Pembinaan Kesehatan dan Keselamatan Kerja (P2K3), UU No. 13 tahun 2003 tentang penyelenggaraan Sistem
Manajemen K3 (SMK3) Undang-Undang No. 1 tahun 1970 Undang-Undang Uap Stbl 225 tahun 1930 Peraturan Uap Stbl 339 tahun 1930 Peraturan Menteri Tenaga Kerja RI No. 01/ MEN/1988
tentang kualifikasi dan syarat-syarat operator pesawat uap Peraturan-Peraturan terkait lainnya
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 49
Kep Menaker No: Per.01/MEN/1988 tentang Kualifikasidan Syarat-syarat Operator Pesawat Uap, kualifikasoperator boiler terdiri dari 2 kelas yaitu :
Operator Kelas I (pesawat uap kapasitas > 10 ton)Operator Kelas 2 (pesawat uap kapasitas < 10 ton)
Kesehatan dan Keselamatan Kerja (K3)
Kep Menaker No: Per.01/MEN/1988 tentang Kualifikasidan Syarat-syarat Operator Pesawat Uap, kualifikasoperator boiler terdiri dari 2 kelas yaitu :
Operator Kelas I (pesawat uap kapasitas > 10 ton)Operator Kelas 2 (pesawat uap kapasitas < 10 ton)
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 50
Pemakaian suatu Boiler perlu memperhatikan hal-halsebagai berikut :
Dalam hal pengadaan Pilihlah Ketel Uap yang pembuatannya memenuhi prosedur yang berlaku. Memiliki dokumen meliputi :
o 1) Gambar konstruksi,o 2) Gambar detail sambungan,o 3) Sertifikat bahan,o 4) Perhitungan kekuatan konstruksi,o 5) Surat keterangan hasil Radiography Test dan atau Ultrasonic
Test sambungan las dano 6) Laporan pengawasan pembuatan pesawat uap yang
ditandatangani engineer perusahaan pembuat boiler yang bersangkutan danPengawas Ketenagakerjaan spesialis Pesawat Uap.
Kesehatan dan Keselamatan Kerja (K3)
Pemakaian suatu Boiler perlu memperhatikan hal-halsebagai berikut :
Dalam hal pengadaan Pilihlah Ketel Uap yang pembuatannya memenuhi prosedur yang berlaku. Memiliki dokumen meliputi :
o 1) Gambar konstruksi,o 2) Gambar detail sambungan,o 3) Sertifikat bahan,o 4) Perhitungan kekuatan konstruksi,o 5) Surat keterangan hasil Radiography Test dan atau Ultrasonic
Test sambungan las dano 6) Laporan pengawasan pembuatan pesawat uap yang
ditandatangani engineer perusahaan pembuat boiler yang bersangkutan danPengawas Ketenagakerjaan spesialis Pesawat Uap.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 51
Dalam hal pengoperasian
Sebelum dioperasikan harus dilakukan pemeriksaan dan pengujian pertamaoleh Ahli Keselamatan dan Kesehatan Kerja ( AK3)
Feed Water Boiler ) yang digunakan harus selalu memenuhi standardengan melalui proses water treatment.
Pekerja yang mengoperasikannya harus yang sudah terlatih danberpengalaman yang dibuktikan dengan Sertifikat operator Ketel Uap yangditerbitkan oleh Dirjen Pembinaan Pengawasan KetenagakerjaanKemenakertrans R.I.
Kesehatan dan Keselamatan Kerja (K3)
Dalam hal pengoperasian
Sebelum dioperasikan harus dilakukan pemeriksaan dan pengujian pertamaoleh Ahli Keselamatan dan Kesehatan Kerja ( AK3)
Feed Water Boiler ) yang digunakan harus selalu memenuhi standardengan melalui proses water treatment.
Pekerja yang mengoperasikannya harus yang sudah terlatih danberpengalaman yang dibuktikan dengan Sertifikat operator Ketel Uap yangditerbitkan oleh Dirjen Pembinaan Pengawasan KetenagakerjaanKemenakertrans R.I.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 52
Dalam hal pengoperasian
Ketel Uap yang sedang operasi tidak boleh ditinggalkan oleh operator yangbertugas melayaninya.
Setelah beroperasi beberapa lama, maka pemakai wajib memeriksakan KetelUapnya secara berkala kepada AK3 spesialis Pesawat Uap dari PJK3 yangmemiliki SKP dari Dirjen Pembinaan Pengawasan Kemenakertrans R.I Untuk Ketel uap yang dipakai di kapal laut perusahaan pelayaran
pemeriksaan berkalanya minimal sekal tiap tahun, untuk Ketel Uap yang dipakai di darat pemeriksaan berkalanya minimal
sekali tiap 2 tahun, untuk Ketel Lokomotif pemeriksaan berkalanya minimal sekali tiap 3
tahun.
Kesehatan dan Keselamatan Kerja (K3)
Dalam hal pengoperasian
Ketel Uap yang sedang operasi tidak boleh ditinggalkan oleh operator yangbertugas melayaninya.
Setelah beroperasi beberapa lama, maka pemakai wajib memeriksakan KetelUapnya secara berkala kepada AK3 spesialis Pesawat Uap dari PJK3 yangmemiliki SKP dari Dirjen Pembinaan Pengawasan Kemenakertrans R.I Untuk Ketel uap yang dipakai di kapal laut perusahaan pelayaran
pemeriksaan berkalanya minimal sekal tiap tahun, untuk Ketel Uap yang dipakai di darat pemeriksaan berkalanya minimal
sekali tiap 2 tahun, untuk Ketel Lokomotif pemeriksaan berkalanya minimal sekali tiap 3
tahun.
-
PM 24 Heat Ventilation and Air Condition 04/2012
Legal Regulations 53
Dalam hal pengoperasian
Untuk melakukan perbaikan, penggantian atau perobahan kostruksi danatau perlengkapan Ketel Uap, pemakai wajib melaporkan terlebih dahulu keDinas Tenaga Kerja setempat,
Agar kerak ketel ( scale ) yang terjadi di dalam Ketel Uap tidak semakin tebaldan keras yang dapat mengakibatkan over heating ( pemanasan lebih ),maka sebaiknya Ketel Uap secara teratur dilakukan cleaning dengan caramanual, mekanis maupun chemis oleh orang yang ahlinya.
Kesehatan dan Keselamatan Kerja (K3)
Dalam hal pengoperasian
Untuk melakukan perbaikan, penggantian atau perobahan kostruksi danatau perlengkapan Ketel Uap, pemakai wajib melaporkan terlebih dahulu keDinas Tenaga Kerja setempat,
Agar kerak ketel ( scale ) yang terjadi di dalam Ketel Uap tidak semakin tebaldan keras yang dapat mengakibatkan over heating ( pemanasan lebih ),maka sebaiknya Ketel Uap secara teratur dilakukan cleaning dengan caramanual, mekanis maupun chemis oleh orang yang ahlinya.