  • Heat, Ventilation &Air ConditionLegal Regulations

    Heat, Ventilation &Air ConditionLegal Regulations

    Department of Maritime Studies Hochschule WismarProf. Dr.-Ing. Michael RachowE-Mail: [email protected]

    Dept. of Marine Engineering ITSSutopo Purwono Fitri, Ph.D.Email: [email protected]

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 2

    II. Heat ExchangerI. Boiler III. Fuels

    IV. CombustionCalculation

    V. Firing System VI. Combustion AirSupplying

    VII. Feed Water VIII. Water SteamCirculation

    IX. CondensateManagement

    X. LegalRegulations

    XII. Boiler DamageXI. Safety Equipment

    XII. Thermal Oil XIV. Boiler Operation

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 3

    Structure of legal regulations

    EU law and there realization in Germany

    Rules for steam plant equipment

    Rules for steam plant operation

    Requirements on operator

    Special rules for shipping lines in Germany

    Examples

    Transitional arrangement

    Overview

    Structure of legal regulations

    EU law and there realization in Germany

    Rules for steam plant equipment

    Rules for steam plant operation

    Requirements on operator

    Special rules for shipping lines in Germany

    Examples

    Transitional arrangement

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 4

    Production safety law

    arranged the safety requirements on technical tools

    Labor protection law

    arranged measures of labor protection

    Legal Rules

    Production safety law

    arranged the safety requirements on technical tools

    Labor protection law

    arranged measures of labor protection

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 5

    Arranged since 01.december 2011 in Germany the safetyrequirements of technical tools and consume products

    Especially are arranged:putting into circulation and exhibition of productssetup and operation of plants with requirements on

    supervising

    Transpose a lot of EU- regulations: law of simple pressure reciever 87/404/EWG law of pressure device 97/23/EG

    Production Safety Law

    Arranged since 01.december 2011 in Germany the safetyrequirements of technical tools and consume products

    Especially are arranged:putting into circulation and exhibition of productssetup and operation of plants with requirements on

    supervising

    Transpose a lot of EU- regulations: law of simple pressure reciever 87/404/EWG law of pressure device 97/23/EG

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 6

    Aim: to secure and improve the health of all employees bymeasures of labor protection

    Dominant parts:hazardous assessmentassessment of labor conditions

    Beside of classical types of danger, like physical, chemicaland biological risks, is also assessed dangers which aregiven of design of production processes, labor processesand the interaction of both, as well inadequatequalifications and instructions of employee.

    Labor Protection Law

    Aim: to secure and improve the health of all employees bymeasures of labor protection

    Dominant parts:hazardous assessmentassessment of labor conditions

    Beside of classical types of danger, like physical, chemicaland biological risks, is also assessed dangers which aregiven of design of production processes, labor processesand the interaction of both, as well inadequatequalifications and instructions of employee.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 7

    Pressure device guideline 97/23/EG

    Guideline 97/23/EG of European parliament and Councilfrom may 1997 to adapt the different laws of all memberstates

    Production Safety Law

    Pressure device guideline 97/23/EG

    Guideline 97/23/EG of European parliament and Councilfrom may 1997 to adapt the different laws of all memberstates

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 8

    To pressure devices are counted:container (non fired pressure container)steam boilerpipes and tubespressure holding partsequipment parts with safety functionwith overpressure of more than 0.5 bar.

    for the compliance of these rules can the manufacturerkeeping on European EU or German norms DIN

    Pressure Device Guidelines

    To pressure devices are counted:container (non fired pressure container)steam boilerpipes and tubespressure holding partsequipment parts with safety functionwith overpressure of more than 0.5 bar.

    for the compliance of these rules can the manufacturerkeeping on European EU or German norms DIN

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 9

    Assumption effectfor the fulfillment of requirements the manufacturer can

    presume that, when he applied the harmonized normsthat he complied the basics of safety and healthrequirements.

    The pressure device guideline arranged only the puttinginto circulation of pressure devices. The operation rules ofpressure devices, valid for operator, are regulated inoperational safety regulation.

    Pressure Device Guidelines

    Assumption effectfor the fulfillment of requirements the manufacturer can

    presume that, when he applied the harmonized normsthat he complied the basics of safety and healthrequirements.

    The pressure device guideline arranged only the puttinginto circulation of pressure devices. The operation rules ofpressure devices, valid for operator, are regulated inoperational safety regulation.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 10

    Selected norms:

    EN 13445 for pressure tank without firing

    EN 13480 for industrial pipelines

    EN 12952 for water tube boiler

    EN 12953 for large water space boiler

    EN and DIN Norms for Steam Boiler

    Selected norms:

    EN 13445 for pressure tank without firing

    EN 13480 for industrial pipelines

    EN 12952 for water tube boiler

    EN 12953 for large water space boiler

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 11

    Selected examples about rules for construction,process, changing, repairing and operation

    EN 12952

    Water Tube Boiler

    Selected examples about rules for construction,process, changing, repairing and operation

    EN 12952

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 12

    Preface:1. The responsibility of requirements for pressure devices

    are also valid for assembly which are pose a thread inthe same way

    2. The essential requirements laid down in this directiveare compulsory.

    3. The producer have to carry out a risk analysis, the resultof that determines the rules which have to respect forthe construction process.

    4. The essential requirements are to interpret and to apply,that the product correspond the state of art technicaland the praxis at the time of conception and producingas well the technical and economical considerations.

    Firing and Other Heated Devices and Devices withRisk of Overheating

    Preface:1. The responsibility of requirements for pressure devices

    are also valid for assembly which are pose a thread inthe same way

    2. The essential requirements laid down in this directiveare compulsory.

    3. The producer have to carry out a risk analysis, the resultof that determines the rules which have to respect forthe construction process.

    4. The essential requirements are to interpret and to apply,that the product correspond the state of art technicaland the praxis at the time of conception and producingas well the technical and economical considerations.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 13

    Pressure device have to constructed, produced, approved,equipped and installed, that the safety is given every time.

    During the chosen of best solution, the producer have torespect the follow basics at the given sequence:disposal or avoiding of hazardsapplying of suitable protection measures for non

    disposability hazards if necessary instruction of users about residual risks

    and recommendations for suitable, especially measuresto decreasing the hazards during installation oroperation

    If the opportunity of improper applying known orforeseeable, have the construction to design in this way,that the danger can prevent, if that impossible have toappear a warning about the danger

    General

    Pressure device have to constructed, produced, approved,equipped and installed, that the safety is given every time.

    During the chosen of best solution, the producer have torespect the follow basics at the given sequence:disposal or avoiding of hazardsapplying of suitable protection measures for non

    disposability hazards if necessary instruction of users about residual risks

    and recommendations for suitable, especially measuresto decreasing the hazards during installation oroperation

    If the opportunity of improper applying known orforeseeable, have the construction to design in this way,that the danger can prevent, if that impossible have toappear a warning about the danger

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 14

    Generals EN 12952-3:5.1 to 5.7Design of necessary load- bearing capacity EN 12952-3;EN 12952-

    8:4.2.1 to 4.2.5Prevention of safety in handling and operation EN12952-12:5 EN12952- 8:4.3.6Prevention for inspection EN 12952-3: 5.6.2;Draining and ventilation opportunity EN 12952-3: 5.6.2;

    5.6.3; EN 12952-7: 5.2; 5.3;EN 12952-12:5;Corrosion and other chemical influence EN 12952-3: 5.8;Wear and tear EN 12952-3: 5.8.6;protection for exceeds of allowed limits of pressure devices

    EN 12952-7: 4; 5.1; 5.8; 6:1; 6.2; EN 12952-8: 4.2.4; EN 12952-10: 5;

    Equipment with protection order EN 12952-7: 8; EN 12952-10: 5; 7;

    EN 12952-11: 4; 5;6;extern fire/ assembly /Filling and empty -

    Design

    Generals EN 12952-3:5.1 to 5.7Design of necessary load- bearing capacity EN 12952-3;EN 12952-

    8:4.2.1 to 4.2.5Prevention of safety in handling and operation EN12952-12:5 EN12952- 8:4.3.6Prevention for inspection EN 12952-3: 5.6.2;Draining and ventilation opportunity EN 12952-3: 5.6.2;

    5.6.3; EN 12952-7: 5.2; 5.3;EN 12952-12:5;Corrosion and other chemical influence EN 12952-3: 5.8;Wear and tear EN 12952-3: 5.8.6;protection for exceeds of allowed limits of pressure devices

    EN 12952-7: 4; 5.1; 5.8; 6:1; 6.2; EN 12952-8: 4.2.4; EN 12952-10: 5;

    Equipment with protection order EN 12952-7: 8; EN 12952-10: 5; 7;

    EN 12952-11: 4; 5;6;extern fire/ assembly /Filling and empty -

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 15

    Manufacture process EN 12952-5: 6.1; 6.2; 6.3; 6.4; 7.1;7.2; 6.3; 7.4; 8.1.1 to 8.1.3; 8.4;8.6; 8.7; 10; EN 12952-6: 6; 7 to8.2; 9.2;

    Approval EN 12952-6: 4.5; 10.1;

    Declaration EN 12952-6: 10.2;

    Operation manual -

    Manufacture

    Manufacture process EN 12952-5: 6.1; 6.2; 6.3; 6.4; 7.1;7.2; 6.3; 7.4; 8.1.1 to 8.1.3; 8.4;8.6; 8.7; 10; EN 12952-6: 6; 7 to8.2; 9.2;

    Approval EN 12952-6: 4.5; 10.1;

    Declaration EN 12952-6: 10.2;

    Operation manual -

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 16

    Finale approval EN 12952-6: 4.5; 10.1;

    Pressure approval

    Check of safety equipment

    Approval

    Finale approval EN 12952-6: 4.5; 10.1;

    Pressure approval

    Check of safety equipment

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 17

    Approving of compliancy of rules by visual check andchecking of accompanying documents

    Approvals, which are carry out during manufactureprocess can be considered

    Final approval is executed on inside and outside of allparts which are accompanying to device.

    Finale Approval

    Approving of compliancy of rules by visual check andchecking of accompanying documents

    Approvals, which are carry out during manufactureprocess can be considered

    Final approval is executed on inside and outside of allparts which are accompanying to device.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 18

    This approval contains a pressure strength test in kind ofhydrostatic pressure test

    For devices of category I, which are produced in seriescan carry out random samples

    If the hydrostatic test disadvantageous or impossible, it ispossible to replace that by other testsAll other tests like the hydrostatic pressure test required

    additional pretests like non destructive tests or equalprocesses

    Hydrostatic test pressure have to follow the higher value1.25 times higher than highest load-bearing capacity in

    operation conditions with consideration of allowed highpressure and temperature

    1.43 times higher than the allowed high pressure

    Pressure Approval

    This approval contains a pressure strength test in kind ofhydrostatic pressure test

    For devices of category I, which are produced in seriescan carry out random samples

    If the hydrostatic test disadvantageous or impossible, it ispossible to replace that by other testsAll other tests like the hydrostatic pressure test required

    additional pretests like non destructive tests or equalprocesses

    Hydrostatic test pressure have to follow the higher value1.25 times higher than highest load-bearing capacity in

    operation conditions with consideration of allowed highpressure and temperature

    1.43 times higher than the allowed high pressure

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 19

    This test refers on assemblies where are checked, that the

    requirements to protect of exceeding the allowed limits of

    pressure devices are fulfilled complete. Additional

    contains this approval a testing of equipment parts with

    protection function.

    Test of Safety Equipment

    This test refers on assemblies where are checked, that the

    requirements to protect of exceeding the allowed limits of

    pressure devices are fulfilled complete. Additional

    contains this approval a testing of equipment parts with

    protection function.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 20

    It must ensure that:a) suitable protection equipment's are planned with that operational parameter

    like heat adding, heat dissipating and where its correctly liquid levels can

    limited to avoid the risk of local or general overheating

    b) if necessary, sampling points are planned with that the properties of fluids

    can be assess to avoid risk in relation to deposits and /or corrosion

    c) suitable prevents to remove the hazards of damage as result of deposits

    d) opportunities for safety dissipating of post heating after shut down are

    given

    e) measures are planned with that hazardous collection of inflammable

    mixings that contains combustible materials and air, as well flash back

    avoided

    Operation

    It must ensure that:a) suitable protection equipment's are planned with that operational parameter

    like heat adding, heat dissipating and where its correctly liquid levels can

    limited to avoid the risk of local or general overheating

    b) if necessary, sampling points are planned with that the properties of fluids

    can be assess to avoid risk in relation to deposits and /or corrosion

    c) suitable prevents to remove the hazards of damage as result of deposits

    d) opportunities for safety dissipating of post heating after shut down are

    given

    e) measures are planned with that hazardous collection of inflammable

    mixings that contains combustible materials and air, as well flash back

    avoided

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 21

    a) at putting into circulation have to added the pressure device amanual for users which contains all information of follow safetyaspects: mounting and connecting of more than one devices initial operation using maintenance including inspection by users

    b) manual must contain the same information which are attached onthe device itself with exception of serial number. The manual mustcontaining the technical documents as well the drawings anddiagrams which are necessary for a correct understanding of thismanual

    c) occasion arise the manual to indicate of hazards by improperapplying and also on especially marks of design

    Operation Manual

    a) at putting into circulation have to added the pressure device amanual for users which contains all information of follow safetyaspects: mounting and connecting of more than one devices initial operation using maintenance including inspection by users

    b) manual must contain the same information which are attached onthe device itself with exception of serial number. The manual mustcontaining the technical documents as well the drawings anddiagrams which are necessary for a correct understanding of thismanual

    c) occasion arise the manual to indicate of hazards by improperapplying and also on especially marks of design

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 22

    Equipment NumbersSafety valve (saturated steam) 1Safety valve (super heater) 1Pressure governor 1Water level governor 1

    Equipment for Small Natural or Forced CirculationBoiler

    Water level governor 1Low water level limiter 1High water level limiter -Water level display 1a

    Feed water pump 1Limiter for feed water conductivity 1b

    Limiter for boiler water conductivity 1b

    Limiter for feed water hardness 1b

    a direct or indirectb can replaced by manual check

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 23

    Equipment NumbersMax. pressure limiter 1Pressure governor 1Current limiter 1a

    Feed water pump 1

    Equipment for Once Through Forced Boiler

    Feed water pump 1Temperature display super heater 1Temperature limiter super heater 1Limiter for feed water conductivity 1b

    Limiter for boiler water conductivity 1b

    Limiter for feed water hardness 1b

    a or equivalent equipmentb can replaced by manual check

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 24

    Equipment NumbersMax. pressure limiter 1Pressure governor -Low water level limiter 1Water level governor -

    Equipment for Small Natural or Forced Hot WaterGenerator

    Water level governor -Water level display 1a

    Temperature limiter 1Temperature display 1Feed water pump 1Circulation pump 1b

    a only for hot water generator with steam spaceb if necessary

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 25

    Equipment NumbersMax. pressure limiter 1Min pressure limiter 1a

    Pressure governor -Current limiter 1c

    Equipment for Once Through Hot WaterGenerator

    Current limiter 1c

    Temperature limiter 1Temperature display 1Feed water pump 1Circulation pump 1b

    a only for plants with foreign pressure holdingb if necessaryc or equivalent

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 26

    Number Activity area Test process1 construction and general documentation1.1 Construction data and

    calculationsTest of design data/calculation ofagreement: technical specificationand requirements of EU norm

    List of Test, to Carry out by Manufacturer

    Test of design data/calculation ofagreement: technical specificationand requirements of EU norm

    1.2 Name of product Test the drawing data of agreementConstruction dataTechnical specificationsRequirements of EU norm

    1.3 Order specifications Test of material and componentsspecification

    1.4 Specification of subcontracts Test of specification for subcontracts

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 27

    List of Test, to Carry out by ManufacturerNumber Activity area Test process1 Material test2.1 Material certification Test that data from certification and

    results of designs are agree2.2 Welding additives Test if the applied welding additives

    agree with the normTest if the applied welding additivesagree with the norm

    2.3 material specifications Identify the materials on basis ofmaterial certification and test oflabeling

    2.4 Stamp of materials Test if the taking over of labelingagree with recognized processes

    2.5 Approval of sub contracts Test, that the sub contracts agreewith producer specifications

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 28

    Number Activity area Test process

    3 manufacture and welding

    3.1 Welding order Test of suitable welding order

    3.2 Recognizing of welding process Welding process and materials

    3.3 Welder license test, if the license approve correctly

    List of Test, to Carry out by Manufacturer

    3.3 Welder license test, if the license approve correctly

    3.4 Deformation process Test, that the order for deformation areavailable and the content agrees withthe parts

    3.5 Welding preparation Test of material edge after thermalcutting and evidence of correct profileworking

    3.6 Deformed parts Test, that the deformed parts agree therequirements of EU norm

    3.7 Weld seam in attached conditions Test of welding seam includingdimension check

    3.8 Welding roots Test of seam counter side

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 29

    Number Activity area Test process

    4 non destructive testsProcess, certification, carry outand protocols

    Test of processes, tester,requirements

    5 heat treatment after welding

    List of Test, to Carry out by Manufacturer

    5 heat treatment after weldingProcess, certification, carry outand reporting

    Check of process, temperatureand times

    6 Construction inspection and labelingTest of water pressure before,during and afterSafety equipment

    Check of process, pressure,labeling, safety equipment's,Documentations

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 30

    Aim: to ensure and improve the health of all employees

    by measures of work protection

    Its basis of authorization for regulation

    previous directives are:

    workplace regulations,

    industrial safety regulation

    regulation for working with display screens

    noise and vibration work protection regulation

    Labor Protection Law

    Aim: to ensure and improve the health of all employees

    by measures of work protection

    Its basis of authorization for regulation

    previous directives are:

    workplace regulations,

    industrial safety regulation

    regulation for working with display screens

    noise and vibration work protection regulation

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 31

    Arranged is

    providing of working tool by employer

    using of working tools by employees during the work

    time

    operation of plants with required supervision in sense of

    work protection

    This concept has to apply of all working tools

    Industrial Safety Regulation

    Arranged is

    providing of working tool by employer

    using of working tools by employees during the work

    time

    operation of plants with required supervision in sense of

    work protection

    This concept has to apply of all working tools

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 32

    A uniform risk assessment of working tools

    Safety- technical assessment for operation of required

    supervision plants

    state of the art technology to be uniform safety scale

    Suitable protection measures and tests

    Minimum requirements for conditions of tools, agrees the

    European harmonization directives

    Basic Assembly of Protection Concept

    A uniform risk assessment of working tools

    Safety- technical assessment for operation of required

    supervision plants

    state of the art technology to be uniform safety scale

    Suitable protection measures and tests

    Minimum requirements for conditions of tools, agrees the

    European harmonization directives

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 33

    For plants with required supervising has to respectadditional regulation:check before startrecurring approvals of required supervision plants

    some plants of this kind are regulated with specialreservation with regard to granting permission byresponsible administration

    To these plants are counted:steam boilerpressure plants lift plantsplants in explosion endangered areas......

    Approval

    For plants with required supervising has to respectadditional regulation:check before startrecurring approvals of required supervision plants

    some plants of this kind are regulated with specialreservation with regard to granting permission byresponsible administration

    To these plants are counted:steam boilerpressure plants lift plantsplants in explosion endangered areas......

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 34

    Mechanical dangerous

    Dangerous by drop down of person, loads or materials

    Electrical dangerous

    Dangerous by steam and pressure

    Dangerous by fire or explosion endangered

    Thermal dangerous

    Dangerous by other physical influence

    Rules Which refers on Danger

    Mechanical dangerous

    Dangerous by drop down of person, loads or materials

    Electrical dangerous

    Dangerous by steam and pressure

    Dangerous by fire or explosion endangered

    Thermal dangerous

    Dangerous by other physical influence

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 35

    Give:

    state of the art technical

    state of the art medical

    state of the art hygiene

    the providing and using of tools, as well the operation of

    required supervision plants

    Technical Rules for Industrial Safety

    Give:

    state of the art technical

    state of the art medical

    state of the art hygiene

    the providing and using of tools, as well the operation of

    required supervision plants

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 36

    The employer has to assess the dangers which can occur

    by using of provided tools

    The operator must indicate the dangers, which can occur

    in operating of required supervision plants

    This rules help to investigate and assess of according

    dangers

    Determine essential measures for providing and using of

    tools or for the operation

    Applying of Technical Rules for Industrial Safety

    The employer has to assess the dangers which can occur

    by using of provided tools

    The operator must indicate the dangers, which can occur

    in operating of required supervision plants

    This rules help to investigate and assess of according

    dangers

    Determine essential measures for providing and using of

    tools or for the operation

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 37

    Realization of EU- law

    Separation between equipment and operation

    Equipment production Safety law with pressure devicedirectives presumption principle by EN and DIN norm

    Operation work protection law with industrial safetydirective presumption principle by Technical Rules for

    Industrial Safety

    Conclusion

    Realization of EU- law

    Separation between equipment and operation

    Equipment production Safety law with pressure devicedirectives presumption principle by EN and DIN norm

    Operation work protection law with industrial safetydirective presumption principle by Technical Rules for

    Industrial Safety

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 38

    Hazardous assessment by employer

    Results of assessment is significant for the measures of

    employer

    directives for prevention of accident from professional

    association must respect

    Directives of classification society arranged especially the

    condition, approval periods and the approval quantity,

    which is given by hazardous potential

    Practical Realization

    Hazardous assessment by employer

    Results of assessment is significant for the measures of

    employer

    directives for prevention of accident from professional

    association must respect

    Directives of classification society arranged especially the

    condition, approval periods and the approval quantity,

    which is given by hazardous potential

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 39

    Reoccur approvals as part ofprotection concept, agrees with

    hazardous assessment ofemployer

    Approval of Steam Boiler

    Reoccur approvals as part ofprotection concept, agrees with

    hazardous assessment ofemployer

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 40

    Outside check (annually)

    inside check (3 year period, on cruise liner or

    passenger vessel each year)

    Water pressure check (9 year period)

    Reoccur approvals

    Outside check (annually)

    inside check (3 year period, on cruise liner or

    passenger vessel each year)

    Water pressure check (9 year period)

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 41

    General condition of plant Equipment part on water and steam side which are

    essential in refer to building and equipment regulations,and be safety relatedsafety circuitkind of operationexpanding of selected boiler partsavailability of manuals and the boiler operator are

    instructed in according plantcompliancy of calculated pressure on entrance of once

    through boiler with steam generating

    Reoccur Approval Outside

    General condition of plant Equipment part on water and steam side which are

    essential in refer to building and equipment regulations,and be safety relatedsafety circuitkind of operationexpanding of selected boiler partsavailability of manuals and the boiler operator are

    instructed in according plantcompliancy of calculated pressure on entrance of once

    through boiler with steam generating

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 42

    Visual check of drums

    Boiler jacket and bottom, flame pipes, chambers and other

    are checked on water and steam side

    Round collector with bolt locker, four side collector, full

    chamber, part chamber and rust cooling bar are check

    visual

    Combustion chamber walls and pipes

    Pipe lines, connecting pipes from outside

    Parts, where can in worst case create a pressure must

    significantly respected

    Reoccur Approval Inside

    Visual check of drums

    Boiler jacket and bottom, flame pipes, chambers and other

    are checked on water and steam side

    Round collector with bolt locker, four side collector, full

    chamber, part chamber and rust cooling bar are check

    visual

    Combustion chamber walls and pipes

    Pipe lines, connecting pipes from outside

    Parts, where can in worst case create a pressure must

    significantly respected

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 43

    Formed parts and fittings

    Economizer on exhaust side, on water side only when the

    access is given, main part is corrosion

    Super heat steam cooler is handled like collector

    Pressure expanding tank on water and steam side

    Screws, made of steel X22CrMoV required a surface

    crack test or ultra sonic sound test in case of the screws

    stay mounted

    Reoccur Approval Inside

    Formed parts and fittings

    Economizer on exhaust side, on water side only when the

    access is given, main part is corrosion

    Super heat steam cooler is handled like collector

    Pressure expanding tank on water and steam side

    Screws, made of steel X22CrMoV required a surface

    crack test or ultra sonic sound test in case of the screws

    stay mounted

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 44

    Test pressure could never higher than the pressure at the

    first test -- mostly 1.3 times of operation pressure

    Test pressure should effected round half hour

    The water for fill up must be clean

    Parts under pressure must be checked on cracks,

    prohibited deformation, or leakages.

    Reoccur Water Pressure Check

    Test pressure could never higher than the pressure at the

    first test -- mostly 1.3 times of operation pressure

    Test pressure should effected round half hour

    The water for fill up must be clean

    Parts under pressure must be checked on cracks,

    prohibited deformation, or leakages.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 45

    Boiler operator who has passed a boiler operator training

    is called representative employee

    This activity included the using of tools with special

    dangers. The boiler operator has the task:

    maintenance of plant and supervising

    to report lacks on plant and incidents direct to

    designated person

    shut down of plant, if given certain hazards for

    employees or third person

    Boiler Operator

    Boiler operator who has passed a boiler operator training

    is called representative employee

    This activity included the using of tools with special

    dangers. The boiler operator has the task:

    maintenance of plant and supervising

    to report lacks on plant and incidents direct to

    designated person

    shut down of plant, if given certain hazards for

    employees or third person

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 46

    If the using of tools with significant hazardous for safety and

    security of employee given. The employer must taken

    measures, with that the using of this tool is only reserved

    for representative person.

    Additional Security Measures

    If the using of tools with significant hazardous for safety and

    security of employee given. The employer must taken

    measures, with that the using of this tool is only reserved

    for representative person.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 47

    Building and equipment are arranged international by

    classification directives

    Work protection is part of flag state regulation

    In EU are uniform directives realized

    Beside of work protection law is the ISM (international

    Safety Management) valid = international standard for

    measures for safety operation of ships and to prevent the

    sea pollution

    Specials for Ship Operation

    Building and equipment are arranged international by

    classification directives

    Work protection is part of flag state regulation

    In EU are uniform directives realized

    Beside of work protection law is the ISM (international

    Safety Management) valid = international standard for

    measures for safety operation of ships and to prevent the

    sea pollution

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 48

    Dasar Hukum K3 bidang boiler : Permenaker No. 04 tahun 1987 tentang Panitia

    Pembinaan Kesehatan dan Keselamatan Kerja (P2K3), UU No. 13 tahun 2003 tentang penyelenggaraan Sistem

    Manajemen K3 (SMK3) Undang-Undang No. 1 tahun 1970 Undang-Undang Uap Stbl 225 tahun 1930 Peraturan Uap Stbl 339 tahun 1930 Peraturan Menteri Tenaga Kerja RI No. 01/ MEN/1988

    tentang kualifikasi dan syarat-syarat operator pesawat uap Peraturan-Peraturan terkait lainnya

    Kesehatan dan Keselamatan Kerja (K3)

    Dasar Hukum K3 bidang boiler : Permenaker No. 04 tahun 1987 tentang Panitia

    Pembinaan Kesehatan dan Keselamatan Kerja (P2K3), UU No. 13 tahun 2003 tentang penyelenggaraan Sistem

    Manajemen K3 (SMK3) Undang-Undang No. 1 tahun 1970 Undang-Undang Uap Stbl 225 tahun 1930 Peraturan Uap Stbl 339 tahun 1930 Peraturan Menteri Tenaga Kerja RI No. 01/ MEN/1988

    tentang kualifikasi dan syarat-syarat operator pesawat uap Peraturan-Peraturan terkait lainnya

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 49

    Kep Menaker No: Per.01/MEN/1988 tentang Kualifikasidan Syarat-syarat Operator Pesawat Uap, kualifikasoperator boiler terdiri dari 2 kelas yaitu :

    Operator Kelas I (pesawat uap kapasitas > 10 ton)Operator Kelas 2 (pesawat uap kapasitas < 10 ton)

    Kesehatan dan Keselamatan Kerja (K3)

    Kep Menaker No: Per.01/MEN/1988 tentang Kualifikasidan Syarat-syarat Operator Pesawat Uap, kualifikasoperator boiler terdiri dari 2 kelas yaitu :

    Operator Kelas I (pesawat uap kapasitas > 10 ton)Operator Kelas 2 (pesawat uap kapasitas < 10 ton)

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 50

    Pemakaian suatu Boiler perlu memperhatikan hal-halsebagai berikut :

    Dalam hal pengadaan Pilihlah Ketel Uap yang pembuatannya memenuhi prosedur yang berlaku. Memiliki dokumen meliputi :

    o 1) Gambar konstruksi,o 2) Gambar detail sambungan,o 3) Sertifikat bahan,o 4) Perhitungan kekuatan konstruksi,o 5) Surat keterangan hasil Radiography Test dan atau Ultrasonic

    Test sambungan las dano 6) Laporan pengawasan pembuatan pesawat uap yang

    ditandatangani engineer perusahaan pembuat boiler yang bersangkutan danPengawas Ketenagakerjaan spesialis Pesawat Uap.

    Kesehatan dan Keselamatan Kerja (K3)

    Pemakaian suatu Boiler perlu memperhatikan hal-halsebagai berikut :

    Dalam hal pengadaan Pilihlah Ketel Uap yang pembuatannya memenuhi prosedur yang berlaku. Memiliki dokumen meliputi :

    o 1) Gambar konstruksi,o 2) Gambar detail sambungan,o 3) Sertifikat bahan,o 4) Perhitungan kekuatan konstruksi,o 5) Surat keterangan hasil Radiography Test dan atau Ultrasonic

    Test sambungan las dano 6) Laporan pengawasan pembuatan pesawat uap yang

    ditandatangani engineer perusahaan pembuat boiler yang bersangkutan danPengawas Ketenagakerjaan spesialis Pesawat Uap.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 51

    Dalam hal pengoperasian

    Sebelum dioperasikan harus dilakukan pemeriksaan dan pengujian pertamaoleh Ahli Keselamatan dan Kesehatan Kerja ( AK3)

    Feed Water Boiler ) yang digunakan harus selalu memenuhi standardengan melalui proses water treatment.

    Pekerja yang mengoperasikannya harus yang sudah terlatih danberpengalaman yang dibuktikan dengan Sertifikat operator Ketel Uap yangditerbitkan oleh Dirjen Pembinaan Pengawasan KetenagakerjaanKemenakertrans R.I.

    Kesehatan dan Keselamatan Kerja (K3)

    Dalam hal pengoperasian

    Sebelum dioperasikan harus dilakukan pemeriksaan dan pengujian pertamaoleh Ahli Keselamatan dan Kesehatan Kerja ( AK3)

    Feed Water Boiler ) yang digunakan harus selalu memenuhi standardengan melalui proses water treatment.

    Pekerja yang mengoperasikannya harus yang sudah terlatih danberpengalaman yang dibuktikan dengan Sertifikat operator Ketel Uap yangditerbitkan oleh Dirjen Pembinaan Pengawasan KetenagakerjaanKemenakertrans R.I.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 52

    Dalam hal pengoperasian

    Ketel Uap yang sedang operasi tidak boleh ditinggalkan oleh operator yangbertugas melayaninya.

    Setelah beroperasi beberapa lama, maka pemakai wajib memeriksakan KetelUapnya secara berkala kepada AK3 spesialis Pesawat Uap dari PJK3 yangmemiliki SKP dari Dirjen Pembinaan Pengawasan Kemenakertrans R.I Untuk Ketel uap yang dipakai di kapal laut perusahaan pelayaran

    pemeriksaan berkalanya minimal sekal tiap tahun, untuk Ketel Uap yang dipakai di darat pemeriksaan berkalanya minimal

    sekali tiap 2 tahun, untuk Ketel Lokomotif pemeriksaan berkalanya minimal sekali tiap 3

    tahun.

    Kesehatan dan Keselamatan Kerja (K3)

    Dalam hal pengoperasian

    Ketel Uap yang sedang operasi tidak boleh ditinggalkan oleh operator yangbertugas melayaninya.

    Setelah beroperasi beberapa lama, maka pemakai wajib memeriksakan KetelUapnya secara berkala kepada AK3 spesialis Pesawat Uap dari PJK3 yangmemiliki SKP dari Dirjen Pembinaan Pengawasan Kemenakertrans R.I Untuk Ketel uap yang dipakai di kapal laut perusahaan pelayaran

    pemeriksaan berkalanya minimal sekal tiap tahun, untuk Ketel Uap yang dipakai di darat pemeriksaan berkalanya minimal

    sekali tiap 2 tahun, untuk Ketel Lokomotif pemeriksaan berkalanya minimal sekali tiap 3

    tahun.

  • PM 24 Heat Ventilation and Air Condition 04/2012

    Legal Regulations 53

    Dalam hal pengoperasian

    Untuk melakukan perbaikan, penggantian atau perobahan kostruksi danatau perlengkapan Ketel Uap, pemakai wajib melaporkan terlebih dahulu keDinas Tenaga Kerja setempat,

    Agar kerak ketel ( scale ) yang terjadi di dalam Ketel Uap tidak semakin tebaldan keras yang dapat mengakibatkan over heating ( pemanasan lebih ),maka sebaiknya Ketel Uap secara teratur dilakukan cleaning dengan caramanual, mekanis maupun chemis oleh orang yang ahlinya.

    Kesehatan dan Keselamatan Kerja (K3)

    Dalam hal pengoperasian

    Untuk melakukan perbaikan, penggantian atau perobahan kostruksi danatau perlengkapan Ketel Uap, pemakai wajib melaporkan terlebih dahulu keDinas Tenaga Kerja setempat,

    Agar kerak ketel ( scale ) yang terjadi di dalam Ketel Uap tidak semakin tebaldan keras yang dapat mengakibatkan over heating ( pemanasan lebih ),maka sebaiknya Ketel Uap secara teratur dilakukan cleaning dengan caramanual, mekanis maupun chemis oleh orang yang ahlinya.