1.0 Lanco Corporate Presentation
-
Upload
narendra-sai -
Category
Documents
-
view
104 -
download
7
Transcript of 1.0 Lanco Corporate Presentation
© LANCO Group, All Rights Reserved© LANCO Group, All Rights Reserved
POWEREPC INFRASTRUCTURESOLAR RESOURCES
Date: September 2011
© LANCO Group, All Rights Reserved
Welcome To Italcementi Team
Mr. G.Gavarini (Project Director)Mr. M. Maconi (Chief Project Engineering)Mr. A. Dentone (Dy GM Major Projects)Mr. C.Pedroni (Procurement Manager)Mr. E.Gilardi (HSE Manager) Mr. M.Pulice (Bravo Solutions)
© LANCO Group, All Rights Reserved
Safety Evacuation Plan
Asse
mbl
y Ar
ea
© LANCO Group, All Rights Reserved© LANCO Group, All Rights Reserved
POWEREPC INFRASTRUCTURESOLAR RESOURCES
Date: September 2011
© LANCO Group, All Rights Reserved
Lanco Group is One of India’s leading Integrated Infrastructure players
Gross Revenue (B.E) USD 2.5 Billion(as on March 2011)
Global Presence(20 states in India & 7 other Countries)
Employees over 7000
Partners in progress: Genting, Harbin, GE, Dongfang, Doosan, Hammon , Alpine, Takraf, etc
Member of
Corporate Overview
Diverse businesses in 5 Sectors
© LANCO Group, All Rights Reserved
Mission: Development of Society through Leadership, Entrepreneurship,
Ownership
Vision: Most Admired Integrated Infrastructure Enterprise
Values:Integrity
Humility & Respect
Achievement Drive
Positive Attitude
Accountability
ContinuousLearning
Teamwork
Mission, Vision and Values
Organization before Self
© LANCO Group, All Rights Reserved
Solar
Resources Infrastructure
CoreCompetencies
Power
EPC
Our Competencies
© LANCO Group, All Rights Reserved
EPC Lines of Business
Thermal Power Projects
Hydro Power Projects
Solar Power Projects
Water Treatment and Conveyance
Roads & Highways
Urban Infrastructure
Industrial Projects
© LANCO Group, All Rights Reserved
Growth: Financial (EPC)
FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12* FY 13*
Turover (In Crores)
11 337 1102 3132 4315 4060 8484 12000
1000
3000
5000
7000
9000
11000
13000
*Forecast
CAGR226%
CAGR 171%
© LANCO Group, All Rights Reserved
Overall Project Management
EPC Capabilities Under One Roof
Engineering- User requirement- Project/ process design- Equipment Selection
Project Developer
Lanco Infratech Limited
Procurement- Contract formulation- Vendor Development- Delivery Schedule- Cost advantage
Construction- Project management- Site civil construction- Mechanical/ elect. erection- Completion within time
Testing & CommissioningPerformance Acceptance Test
EPC
© LANCO Group, All Rights Reserved
Key Process
Complete EPC Setup
Engineering
Quality Management
Procurement & Contracts
Planning
Project Management
Construction
Erection & Commissioning
Knowledge Management
© LANCO Group, All Rights Reserved
One of the Largest EPC team in Indian Power Sector – Strong in house Project Management & Monitoring
Over 10,000 MW of projects under O&M and execution, (3,292 MW under operation and 7,148 MW under execution)
160 KM of National Highway completed on EPC basis and 280 KM under construction
Executing One of India’s largest Water Treatment and Conveyance EPC project (River Intake, 120Km MS Pipeline and RWR ) for IOCL Paradeep Refinery
Executing Metro Rail Project on EPC basis for Chennai Metro Rail Limited
25 yrs of experience in Civil Construction Projects and 7 yrs in implementing Projects via EPC route
Lanco Infratech Limited is - ISO 9001, ISO 14001 and BS:OHSAS 18001 certified
Handling Experience of wide range of Hydro/Thermal Equipment 5 - 125 MW hydro 100/300/600 MW sub-critical thermal 660 MW supercritical thermal 660 MW Ultra supercritical* (565/600 ºC) thermal Combined cycle gas projects
Highlights of Lanco’s EPC Business
© LANCO Group, All Rights Reserved
More than 4,000 employees in EPC, Core team comprises:
EPC - Manpower Strength
S. No Country No. of Employees
1. India 3950
2. Singapore 26
3. China 25
S. No Discipline No. of Employees
1. Engineering 325
2. Commissioning 55
3. Procurement 85
4. Inspection 22 + Outsourced
© LANCO Group, All Rights Reserved
Value Proposition of Lanco -EPC
Largest EPC player in Indian Power sector – leadership position
achieved through successful execution of large projects
Turnkey project design & execution capability
In house Design & Engineering Expertise for Civil & Structures,
Mechanical, Electrical and C&I works
Latest tools & Softwares
Strong Project Management & Execution team
Proven execution model – emphasis on time, cost and quality
© LANCO Group, All Rights Reserved
EPC ProjectsCompleted
© LANCO Group, All Rights Reserved
Kondapalli – Phase I
• 368 MW Gas Based Combined Cycle Power Plant, Located at Vijayawada, Andhra Pradesh
• Turnkey EPC contract for the complete Balance of Plant (BoP) works for 368 MW of Gas based combine cycle project including all related civil works.
• The first private sector Power Project to receive disbursement of finance from PFC.
• In Operation since October 2000
© LANCO Group, All Rights Reserved
• 366 MW Gas Based Combined Cycle Power Plant, Located at Vijayawada, Andhra Pradesh
• Turnkey EPC contract for the complete EPC works for 366 MW of Gas based combine cycle project including all related civil works.
• First plant of 366 MW rating to be completed in less than 3 years of time from Concept to Commissioning.
• Open Cycle - In Operation since December 2009, Combined Cycle - In Operation since June 2010
Kondapalli – Phase II
Projects
© LANCO Group, All Rights Reserved
2 X 300 MW Coal Based Thermal Power Plant, Located at Korba, Chhatisgarh.Turnkey EPC contract for the Balance of Plant (BoP) works for Unit – I of 300 MW, and complete EPC works for Unit – II of 300MW.First private funded project approved under fast track scheme of PFC.Unit – I in operation since May 2009, Unit – II in operation since February 2010
Amarkantak Unit 1 & 2
Projects
© LANCO Group, All Rights Reserved
• 2 X 600 MW Coal Based Thermal Power Plant, Located at Mangalore, Karnataka.
• Turnkey EPC contract for the complete EPC package for 1200 MW (2x600 MW) Project.
• Udupi #1 (600 MW) was synchronized in 31 months from first pouring of boiler foundation.
Udupi Power
Projects
© LANCO Group, All Rights Reserved
• Constructed the Road on EPC basis• 16 KM 6 Lanning • 64 Km 4 Lanning• 12 Flyovers, 1 ROB, 2 Major Brigjes,
9 Minor Bridges and 156 UP/ CD Structure
KR Puram – Mulbagal Road Project
Projects
80 KM NHAI Road Located in Karnataka
© LANCO Group, All Rights Reserved
• Constructed the Road on EPC basis• 80 Km 4 Lanning• 1 ROB, 3 Major Brigjes, 2 Minor
Bridges
Nellemangal – Devihalli Road Project
Projects
80 KM Section of NH 48 for NHAI, Located in Karnataka
© LANCO Group, All Rights Reserved
• Constructed the IT SEZ & Residential Towers, One of the Largest integrated developments in Southern India.
• Achieved Slab Cycle of 7 Days
• 30 – 32 Storied Buildings
Lanco Hills
Projects
IT SEZ and Residential Tower for Lanco Hills Technology Park, Located at Hyderabad
© LANCO Group, All Rights Reserved
• Construction Contract of the Lal Bhadur Sastry International Airport
Lal Bhadur Sastry International Airport Located in Varnasi, Uttar Pradesh
© LANCO Group, All Rights Reserved
EPC ProjectsUnder Execution
© LANCO Group, All Rights Reserved
Turnkey EPC contract for the complete EPC package of 1320 MW (2x660MW) for Unit – III and Unit – IV.The project is the first Super critical unit of LANCOIn 16 months, the project completed 111720 m3 of concreting against the planned schedule of 68000 m3. Scheduled for commissioning by FY 2013-14
Amarkantak Unit 3 & 42 X 660 MW Supercritical Coal Based Thermal Power Plant,
Located at Korba, Chhatisgarh.
© LANCO Group, All Rights Reserved
• Turnkey EPC contract for the complete EPC package of 1200 MW (2x600 MW) for Unit – I and Unit – II.
• First Tariff based project won under competitive bidding.
• Unit - I – Synchronised in March 2011, Unit - II – Scheduled for commissioning by FY 2011-12
Anpara Power Project
Projects
2 X 600 MW Coal Based Thermal Power Plant, Located at Anpara, Uttar Pradesh
© LANCO Group, All Rights Reserved
• Turnkey EPC contract for the complete EPC package for 2x371 MW Gas based combine cycle project including all related civil works.
• 2 nos. GE Frame 9FA, Heat recovery steam generator from Thermax and Steam Turbine from Harbin
• Unit I & Unit II - Scheduled for commissioning by FY 2011-12
Kondapalli – PH III
Projects
2 X 371 MW Gas Based Combined Cycle Power Plant, Located at Vijayawada, Andhra Pradesh
© LANCO Group, All Rights Reserved
• Turnkey EPC contract for the complete EPC package of 1320 MW (2x660MW) for Unit – I and Unit – II.
• Unit - I & Unit II – Scheduled for commissioning by FY 2013-14
Vidharba Power
Projects
2 X 660 MW Supercritical Coal Based Thermal Power Plant, Located at Vidharba, Maharashtra.
© LANCO Group, All Rights Reserved
Projects
• Turnkey EPC contract for the complete EPC package of 1320 MW (2x660 MW) for Unit – I and Unit – II.
• Unit - I – Scheduled for commissioning by FY 2013-14, Unit – II by FY 2014-15
Babandh Power2 X 660 MW Supercritical Coal Based Thermal Power Plant,
Located at Dhenkanal, Orissa.
© LANCO Group, All Rights Reserved
• Turnkey EPC contract for the complete 500 MW Hydro Electric Power Project
Teesta VI HEP500MW Hydro Electric Power Project,
Located at Singdham, Sikkim.
© LANCO Group, All Rights Reserved
• Turnkey EPC contract for the Balance of Plant (BoP) works for 1980 MW (3 x 660 MW) Project for Mahagenco’s Koradi Project.
• Won under international competitive bidding among top players in the EPC business.
Mahagenco Koradi - TPS Expansion (BoP), 3 x 660 MW
Projects
3 X 660 MW Supercritical Coal Based Thermal Power Plant, Located at Koradi, Maharashtra.
© LANCO Group, All Rights Reserved
• Turnkey EPC contract for the complete EPC package for 1200 MW (2x600MW) for Unit – I and Unit – II.
• Unit – I – Scheduled for commissioning by FY 2013-14, Unit - II – by FY 2014-15
MoserBaer Power
Projects
2 X 600 MW Coal Based Thermal Power Plant, Located at Annupur, Madhya Pradesh.
© LANCO Group, All Rights Reserved
• Constructing the 280 KM NHAI Road from Kanpur to Alighar
Kanpur – Alighar Road Project
Projects
280 KM Section of NH 91, Located in Uttar Pradesh
© LANCO Group, All Rights Reserved
• EPC Trunkey Project• River Water Intake,• Raw Water Reservoir• 120 Km Pipe Line• 100 MLD Water Treatment Plant• Clear Water Reservoir
IOCL Paradeep – Water Conveyance ProjectFrom Cuttak to Paradeep, Located in Odissa
© LANCO Group, All Rights Reserved
• Construction Contract of the Biju Patnaik Airport.
Biju Patnaik Airport Located in Bhuwaneswar, Odissa
© LANCO Group, All Rights Reserved
400 KV Switch Yards and Substations for Maha Infra, AP Transco, PGCIL and LANCO
Transmission & Distribution
© LANCO Group, All Rights Reserved
Transmission Lines for PGCIL, NPCIL, AP Transco, APCPDCL, PGCIL and LANCO
Transmission & Distribution
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
Summary of Executed Projects – Power Projects
Sl. Project Fuel Type Capacity(MW) Commissioned
1 Tanjore Power, Tamil Nadu Gas CCPP 120 Open Cycle : Feb-05Closed Cycle : Aug-05
2 Kondapalli – Stage I, Vijayawada, AP Gas CCPP 368 Sep 2000
3 Amarkantak – Unit 1 & 2, Korba, Chhatisgarh
Coal Sub-critical 2 x 300 01-May-09 22-Feb-10
4 Kondapalli CCPP - Stage II, Vijayawada, AP Gas CCPP 366 17-Dec-09 30-Jun-10
5 Udupi - Unit 1 & 2, Mangalore, Karnataka Imported Coal Sub-critical 2 x 600 03-Jun-10 07-Mar-11
6 Anpara-C - Unit 1, Uttar Pradesh Coal Sub-critical 600 19-Mar-11 NA
7 IKU-II, Himachal Pradesh Hydro Renewable 5 19-Jan-09
8 Baner III, Himachal Pradesh Hydro Renewable 5 20-Jun-09
9 Drinidhar, Himachal Pradesh Hydro Renewable 5 29-Mar-10
10 Upper Khauli, Himachal Pradesh Hydro Renewable 5 29-Dec-10
11 Chitradurga, Karnataka Wind energy Renewable 3
12 Tirunelveli, Tamil Nadu Wind energy Renewable 10
13 Lanco Solar, Gujarat Solar Renewable 5
Total = 3,292 MW
© LANCO Group, All Rights Reserved
Summary of Power Projects Under Execution
Project Fuel Type Capacity (MW) Commissioning schedule
1 Anpara-C - Unit 2, Uttar Pradesh Coal Sub-critical 600 NA 15-Jun-11
2 Amarkantak – Unit 3 & 4, Korba, Chhatisgarh Coal Super critical 2 x 660 31-Oct-12 28-Feb-13
3 Kondapalli CCPP- Stage III, Vijayawada, AP Gas CCPP 2 x 371 30-Jun-1131-Dec-11
31-Aug-1128-Feb-12
4 Babandh – Unit 1 & 2, Dhenkanal, Orissa Coal Super critical 2 x 660 30-Apr-13 31-Aug-13
5 Vidarbha – Unit 1 & 2, Maharashtra Coal Super critical 2 x 660 30-Oct-13 28-Feb-14
6 Koradi BOP, Maharashtra, (For MAHAGENCO) Coal Super critical 3 x 660 Feb-14 (Progressively)
7 Annuppur, MP, (For Moserbaer) Coal Sub-critical 2 x 600 15 Nov-13 15 Mar-14
8 Budhil Hydro Power, Himachal Pradesh Hydro Renewable 70 30- Jun-11
9 Mandakini Hydro Energy, Uttarakhand Hydro Renewable 76 30-Nov-12
10 Teesta Hydro Power, Sikkim Hydro Renewable 500 30-Nov-13
11 Solar Mfg. Unit, Chhatisgarh 1500 MTPA 23-Mar-12
12 Akaz Power, Iraq (For MOE, IRAQ) Gas Open Cycle 2 x 125 FY 2013-14
Total = 9,378 MW + 1500 MTPA Solar Wafer/ Polysilicon Manufacturing Plant
© LANCO Group, All Rights Reserved
EPC Power Projects Under Discussion
Sl Project Fuel Type Capacity(MW) Zero Date SYNCHRO
1 Udupi - Unit 3 & 4,Mangalore, Karnataka
Coal Super critical
2 x 660 1-Jun-11 1-Jun-14
2 Vainetaya,Tuticorin, Tamil Nadu
Coal Super critical
2 x 660 1-May -11 1-May -14
3 Pragdisa,Krishnapatnam, AP
Coal Super critical
2 x 660 1-Oct-11 1-Oct-14
4 Amarkantak – Unit 5 & 6,Korba, Chhatisgarh
Coal Super critical
2 x 660 1-May-11 1-May-14
5 Himavat,Bhognipur, Uttar Pradesh
Coal Super critical
2 x 660 1-Jul-11 1-Jul-14
6 Anpara – Unit 3 & 4,Uttar Pradesh
Coal Super critical
2 x 660 1-Aug-11 1-Aug-14
7 BanasShahdol, MP
Coal Super critical
2 x 660 1-Sep-11 1-Sep-14
8 Babandh – Unit 3 & 4,Dhenkanal, Orissa
Coal Super critical
2 x 660 1-Sep-11 1-Sep-14
Total = 10,560 MW
© LANCO Group, All Rights Reserved
Summary of EPC - Infra Projects
Sl Project
Executed
1. Design, Build of 80 Km section of NH 4 from KR Puram to Mulbagal in the State of Karnataka
2. Design, Build of 80 Km section of NH 48 from Nellemangal to Devihalli in the State of Karnataka
Under Execution
1. Design, Build of 280 Km section of NH 91 from Kanpur to Aligarh in the state of Uttar Pradesh
2. Design, Build of Water Treatment Plant, Raw Water Reservoir and 100 Km MS Water Pipeline from Cuttak to Paradeep in the state of Orrisa.
3. Design & Build of OTA to Airport Section of Chennai Metro Rail Project Involving Via Duct, Cut and Cover Tunnel and Station Buildings
© LANCO Group, All Rights Reserved
Building 35 MW Solar Farm in Gujarat, out of which 5 MW already commissioned and another 5MW under execution
Establishing 1250 TPA ploy Silicon and 80 MW Wafer facility in India
Qualified to develop 5 MW PV Project and 100 MW Solar Thermal Project in Rajasthan
Expertise in:• Project Development• Product Distribution• Manufacturing• EPC for Solar Plants• Marketing & Sales
Lanco - Solar Business
© LANCO Group, All Rights Reserved
Lanco Foundation
A member of the UN Global Compact and led by Lanco
Foundation, we have a number of initiatives in place that help us to
make a difference…
Focused work in the areas of: Disability Education Safe Drinking water Mobile Health Services Support of traditional arts & crafts
At Lanco, we pride ourselves on being an organization that care for the world we live in.
© LANCO Group, All Rights Reserved
Our Presence
© LANCO Group, All Rights Reserved
Thank You