    Department for Business Innovation & Skills

    Pre-Qualification Questionnaire

    ContractRequirement

    Deadline for PQQresponses to be

    received by BIS

    Financial modellingand preparation ofpresentations tofacilitate market

    engagement inrespect of productresearch for the GreenInvestment Bankproject

    20/12/10

    1. Introduction and Background

    1.1 The purpose of this pre-qualification questionnaire (PQQ) isto allow the Department for Business, Innovation and Skills(BIS) to evaluate the expressions of interest it has receivedin response to the advertisement it placed in the Official

    Journal of the European Union on 08/12/2010 ith reference

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    2/42

    Journal of the European Union on 08/12/2010 with reference

    3.1 If you feel that you do not have the necessary project

    experience to carry out all aspects of the project yourself, youare encouraged to participate in this PQQ as part of aconsortium or to consider the use of sub-contractor(s).

    3.2 If you are participating in a consortium then in this PQQ youmust:

    name a lead organisation who (were you to be successful)will take overall responsibility for delivering the services ORidentify the legal entity that will be used to deliver them. Ifyou intend to set up a legal entity for the purposes ofbidding for this contract (e.g. a special purpose vehicle) BISreserves the right to require joint and several guaranteesfrom all members of the consortium enforceable in theevent that that legal entity fails to meet any of itsobligations

    state the name of all consortium members;

    give examples of the qualifications of all members of theconsortium.

    3 3 If you consider that you will want to sub contract the provision

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    3/42

    4. The procurement process and indicative

    timetable4.1 Where the goods or services that BIS requires are of the

    requisite type and value this procurement will be conductedunder the restricted procedure in Regulation 16 of the PublicContracts Regulations 2006. BIS may elect to follow a similarprocedure on a voluntary basis for below threshold or Part Bservices contracts. This procurement process is subject to

    the conditions set out in paragraph 7 of this PQQ.

    4.2 The anticipated key dates for the remainder of theprocurement procedure are set out in the table below(although BIS reserves the right to vary them).

    Event Time/Date

    Last time and date for receipt of queriesabout PQQ

    17.00 on13/12/10

    Answers to PQQ queries circulated by BIS by 12.00 on16/12/10

    PQQ return deadline 17.00 on

    20/12/10

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    4/42

    Preferred supplier selected 28/01/11

    4.3 On receipt of the responses BIS will perform an evaluation ofresponses in accordance with Regulations 23, 24 and 25 of thePublic Contracts Regulations 2006, with a view to selecting ashortlist of applicants to be invited to submit a tender for therequirement.

    4.4 The table at Annex B details the weighting and scoring

    mechanism for each section within the PQQ response.

    5. Responding to the PQQ

    5.1 You must complete all relevant sections of the attached PQQresponse form in full. Additional information and supportingdocumentation should only be supplied where requested.

    5.2 Clearly state, together with reasons, if a section is notapplicable to you. Responses should be in English, and shouldbe concise and relevant.

    5.3 You should provide three hard copies of your response(email responses alone will not be considered) in MicrosoftWord or equivalent format together with three copies of any

    enclosures to the following address

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    5/42

    in the process if it becomes aware of any omission ormisrepresentation in your response to any question.

    6. Queries relating to this PQQ

    6.1 You may submit, by no later than 17.00 on 13/12/10 anyqueries that you have relating to this PQQ. Please submitsuch queries by email to Lai-Sze Lai [email protected].

    6.2 Any queries should clearly reference the appropriateparagraph in the documentation and, to the extent possible,should be aggregated rather than sent individually. As far asis reasonably possible, BIS will respond to all reasonablerequests for clarification of any aspect of this PQQ andsupporting documents in accordance with clause 7.4 below, ifmade before the above deadline. No queries received after

    the above deadline will be answered. Answers will becirculated by BIS by email on or before 17.00 on 16/12/10.

    7. Conditions

    7.1 In submitting a response to this PQQ it will be implied that youaccept all the provisions of this PQQ including theseconditions.

    mailto:[email protected]:[email protected]
  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    6/42

    raised. If BIS considers the contents of the query not to beconfidential, it will inform you and you will have the

    opportunity to withdraw the query.

    7.5 The information contained in this PQQ and the supportingdocuments and in any related written or oral communicationis believed to be correct at the time of issue but BIS will notaccept any liability for its accuracy, adequacy or completenessand no warranty is given as such. This exclusion does not

    extend to any fraudulent misrepresentation made by or onbehalf of BIS.

    7.6 By issuing this PQQ, BIS is not bound in any way to enter intoany contractual or other arrangement with you or any otherparty.

    7.7 It is intended that the remainder of this procurement will take

    place in accordance with the provisions of this PQQ but BISreserves the right to terminate, amend or vary theprocurement process by notice to all tendering organisationsin writing. BIS will accept no liability for any losses (includingbut not limited to your costs in submitting this PQQ) caused toyou as a result of this.

    7 8 You ill not be entitled to claim from BIS an cost or e penses

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    7/42

    legislation or Government policy or where disclosure isrequired by the Information Commissioner or the First-tier

    Tribunal (Information Rights).

    7.11 Additionally, the Governments transparency agenda requiresthat tender documents, including PQQs such as this, arepublished on a designated, publicly searchable web site. Thesame applies to other tender documents issued by BIS,including the invitation to tender, and any contract entered

    into by BIS with its preferred supplier once the procurement iscomplete. By submitting a response to this PQQ you agreethat your participation may be made public. The answers yougive in this response will not be published on the web site (butmay fall to be disclosed under FOIA or EIR (see above)).Where tender documents issued by BIS or contracts with itssuppliers fall to be disclosed BIS will redact them as it thinksnecessary, having regard (inter alia) to the

    exemptions/exceptions in the FOIA or EIR.

    7.12 Any attempt by you or your appointed advisers toinappropriately influence the contract award process in anyway will result in your response being disqualified. Any director indirect canvassing by you or your appointed advisers inrelation to this procurement or any attempt to obtain

    i f ti f f th l t f BIS

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    8/42

    PQQ Response Form

    Contract Requirement

    Deadline for PQQresponses to bereceived by BIS

    Supplier name (pleaseinsert)

    Financial modellingand preparation ofpresentations tofacilitate marketengagement inrespect of product

    research for theGreen InvestmentBank project

    15/12/10

    ________________________

    Section 1 - Details Of Your Organisation

    1.1 You should complete the details in this section and in sections

    2 4 b l f th i ti th t it i d ld t

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    9/42

    (c) contact position (job title)

    (d) contact Address

    (e) contact telephone number

    (f) contact fax number

    (g) contact e-mail address

    (h) li t b it dd

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    10/42

    (n) is your organisation (please select one)

    a public limited company?a limited company?a limited liability partnership?

    a partnership?a sole trader?other? (please specify below)

    (o) name, address and registration number of applicantsparent company (if applicable)

    (p) how many people does your organisation employ?

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    11/42

    Section 2 - Criteria For Rejection Of EconomicOperators

    2.1 The questions in paragraph 2.5 are designed to establishwhether any grounds exist for BIS to treat you as ineligible toparticipate in this procurement as permitted by regulation 23of the Public Contracts Regulations 2006.

    2.2 If you answer yes to any of questions (a) (l) below you will

    be excluded from further participation in the selectionprocess.

    2.3 If you answer yes to any of questions (m) (p) below BIS willhave the discretion to exclude you from further participationin the selection process. In deciding whether or not to excludeyou BIS will have regard to your answer to question 2.6 andwill consider whether there are overriding requirements in thegeneral interest which justify it disregarding the yes answeryou gave.

    2.4 You are reminded that you will also be excluded if you make aserious misrepresentation when providing informationrequired of you in any part of this PQQ response.

    2 5 Pl th ti b l i t f h f th

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    12/42

    section 1 of the Prevention of Corruption Act 1906

    (c) the offence of bribery Yes /No

    (d) the offence of cheating the Revenue Yes /No

    (e) the offence of conspiracy to defraud Yes /

    No

    (f) fraud or theft within the meaning of the Theft Act1968, the Theft Act 1978 or the Fraud Act 2006

    Yes /No

    (g) fraudulent trading within the meaning of section458 of the Companies Act 1985 or section 993 ofthe Companies Act 2006

    Yes /No

    (h) defrauding the Customs within the meaning of theCustoms and Excise Management Act 1979 andthe Value Added Tax Act 1994

    Yes /No

    (i) an offence in connection with taxation in theEuropean Community within the meaning of

    ti 71 f th C i i l J ti A t 1993

    Yes /No

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    13/42

    benefit of your creditors or appeared unable topay, or to have no reasonable prospect of being

    able to pay, a debt within the meaning of section268 of the Insolvency Act 1986, or article 242 ofthe Insolvency (Northern Ireland) Order 1989, or inScotland have granted a trust deed for creditors orbecome otherwise apparently insolvent, or thesubject of a petition presented for sequestration ofyour estate, or the subject of any similar

    procedure under the law of any other state.

    Yes /No

    (n) if you are a partner in a partnership constitutedunder Scots law has your partnership granted atrust deed or become otherwise apparentlyinsolvent or the subject of a petition presented forsequestration of its estate?

    Yes /No

    (o) if you are completing this PQQ on behalf of acompany has that company:

    passed a resolution or been the subject of anorder by the court for its winding up (otherwisethan for the purpose of bona fide reconstruction oramalgamation);

    Yes /No

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    14/42

    Kingdom or of the relevant State in which theeconomic operator is established?

    2.6 If the answer to any of questions (m) (p) is Yes please givedetails of the circumstances below

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    15/42

    Section 3 - Economic And Financial Standing

    3.1 You are required to provide the information specified below inrespect of each of the entities whose details you completed inSection 1.

    3.2 Please provide a statement of your turnover or income foreach of your last three financial years. If applicable pleaseconvert your currency into UK sterling using the rate published

    by the European Central Bank on the date you submit thisPQQ.

    Year 1 Year 2 Year 3FinancialYearstart/enddates

    (pleaseinsert)

    FromTo

    FromTo

    FromTo

    Turnover forthat period

    Please add any comments you wish to make about the

    t fi

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    16/42

    3.8 Please provide following details of your bank so that we canask them for a reference if we decide this is necessary

    Bank Name

    Branch Address

    Contact details

    Insurance

    3.9 If you organisation has employees do you haveEmployers Liability Insurance cover of at least 5M orequivalent?

    What is the value of the cover you have?

    Yes /No

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    17/42

    single calendar year. Were you to be selected to tenderBIS will require you to demonstrate that you have that

    level of cover in place and a failure to do so (or tosatisfy BIS that satisfactory alternative arrangementsare in place) will lead to you being excluded at theaward stage.

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    18/42

    Section 4 Technical and/or Professional Ability

    4.1 So that BIS can assess your skills, efficiency, experience andreliability please provide the following information.

    Quality Assurance

    4.2 Please state if your organisation has, or is seeking,certification under any international, European, British

    or other quality standards (e.g. BS5750, BS EN ISO 9000etc).

    If yes please state the relevant quality standards, thedate of the award and the renewal period, together withthe Certifying Body and enclose any appropriatedocumentary evidence.

    If no please explain what quality assuranceprocedures you use and if you have a written policy

    l id

    Yes /No

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    19/42

    the Certifying Body and enclose any appropriatedocumentary evidence.

    If no please explain what environmental management

    policy your organisation has and provide a copy. Thisshould include ways in which you eliminate or reduceany negative environmental impacts in your operations.Where BIS requirement has no direct environmentalimpact (e.g. the provision of consultancy services) BISwill have regard to matters such as the use by thecontractor or recycled material and its offices energymanagement systems.

    4.5 How is your environmental management policy

    i t d t t ff d li d i ti ?

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    20/42

    4.7 Does your organisation have a written health and safetyat work policy or an alternative system to manage

    health at safety and work?

    If yes please enclose appropriate documentaryevidence.

    4.8 How is this policy communicated to your staff and whathealth and safety training do they receive?

    4.9 Please detail any enforcement action taken against your

    organisation in the past three years by the Health andSafety Executive or other enforcement body withresponsibility for health and safety matters.

    Yes /N

    o

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    21/42

    4.13 In the last three years has your organisation been thesubject of a formal investigation by the Commission forRacial Equality, the Disability Rights Commission or theEqual Opportunities Commission on grounds of allegedunlawful discrimination? If yes please provide details.

    Sub Contracting

    4.14 If you are completing this PQQ as a prime contractorplease indicate if any subcontracting is envisaged aspart of this contract. If Yes then you are remindedthat the sub-contactor(s) needs to be identified and aseparate PQQ Response completed for it/them.

    4 15 If h i 4 14 i Y h

    Yes /No

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    22/42

    4.18 On the next three pages please provide details of up to threecontracts you have performed in the past three years which

    are relevant to BIS current requirement.

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    23/42

    Contract 1

    (a) Customer Organisation

    (b) Date contract awarded to you

    (c) Brief description of work involved (500 words maximum)

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    24/42

    Contract 2

    (a) Customer Organisation

    (b) Date contract awarded to you

    (c) Brief description of work involved (500 words maximum)

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    25/42

    Contract 3

    (a) Customer Organisation

    (b) Date contract awarded to you

    (c) Brief description of work involved (500 words maximum)

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    26/42

    4.19 Have you been involved in any contracts (not limited

    to those mentioned in your answer to question 4.18)where there has been a failure to complete theproject by the scheduled completion date or wherethere have been complaints and/or formal courtclaims in relation to the project.

    4.20 If the answer to question 4.19 is yes please givedetails below:

    Yes /

    No

    4.21 Based on your previous experience please identify themost important factors that have made projects similar tothose involved in BIS requirement a success and describe anypitfalls encountered and how you addressed these (youranswer should be limited to no more than 500 words)

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    27/42

    4.24 Please describe your experience of building financial modelsas applicable to the requirements of the Deliverables section of

    Annex A.

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    28/42

    Section 5 - Declaration and signature

    1. I am authorised on behalf of the organisation identified inSection 1 of this PQQ (and all relevant associated companiesand organisations/sub-contractors) to supply the informationgiven in this PQQ response.

    2. I declare that, at the date of signing this declaration, theinformation given is complete and accurate to the best of my

    knowledge having made reasonable enquiries.

    3. BIS has our permission to:

    carry out all necessary actions to verify the informationprovided; and

    to pass any information provided to a third partycommissioned by BIS for the purposes of evaluating ourresponses.

    4. I acknowledge that:

    it is a offence to give or offer any gift or consideration toemployee of a public body as a reward or inducement in

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    29/42

    .

    Date

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    30/42

    Annex A - Description of BIS

    Requirement

    On 20th October 2010, as part of the Spending Review, theGovernment confirmed its commitment to set up a GreenInvestment Bank (GIB). The Spending Review1 announced:

    The Government will initially capitalise a new institution with 1

    billion of DEL2

    funding together with additional significant proceedsfrom the sale of Government owned assets, subject to a final designwhich meets the tests of effectiveness, affordability andtransparency.

    It further stated that:

    The Government aims to complete design and testing work bySpring 2011.

    Prior to this announcement, a cross-departmental team of officialsworked on the market need for a GIB, potential financialinterventions and alternative structural models. The team has beenled by the Department of Business, Innovation and Skills (BIS), butwith significant contributions from other government departments:

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    31/42

    Structural Reform plan for BIS 3 states that this phase must becomplete by end May 2011.

    The next phase (Phase II) of the project has the following key aims:

    Complete the economic case and value for money assessmentfor the GIB

    Complete detailed design and market testing of the types offinancial intervention (product) which the GIB might carry out

    Finalise the business model of the GIB

    Complete planning for the establishment phase of the GIB

    Following this Phase II, it is intended that a further Phase III wouldcommence which involves the establishment of the institution. Asnoted in the Structural Reform Plan, this should be completed byDecember 2011. Thereafter, the institution would begin operationsand be able to make its first investments, subject to funding.

    Significant components of this work will be conducted by the BISteam, whilst certain work streams will involve consultant support.The project will be overseen by a Project Board comprising keysenior civil servants from several government departments. Theproject leader will report to the Director of Advanced ManufacturingServices and ultimately to the Permanent Secretary of BIS.

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    32/42

    professional support which is the subject of separate selectionprocesses. Bidders will need to be aware of the interfaces among

    the work streams and they need to be prepared to interact withofficials and advisors supporting those work streams. Bidders maybid for the advisory roles on one or more of the other work streams;however, the selection criteria for have been set and will beassessed independently for each work stream and BIS has nopreference for or aversion to an organisation undertaking more thanone advisory role.

    Objectives

    Review the initial core GIB team hypotheses of areas ofmarket failure resulting in under-investment in greeninfrastructure, potential required GIB product interventionsand conduct a rapid market testing of this work viacomparison to latest available published reports andmarket interviews amongst key players (a 2-3 week

    exercise is anticipated in this area). Identify and describe both qualitatively and quantitatively

    the nature of a range of detailed financial productinterventions which the GIB should be prepared toimplement in the market place following its launch across arange of target sectors

    Detailed financial product interventions will initially be

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    33/42

    For each sector, the range of potential financialinterventions need to be quantitatively modelled to enable

    detailed market testing of the attractiveness of suchinterventions, the potential of the interventions to mobiliseadditional private sector capital, and their investmentcharacteristics for the GIB. It is envisaged that this willrequire a two-fold approach to modelling by sub-sector:

    o Modelling a typical project or asset, e.g. offshorewind farm, new nuclear plant, major industrial energy

    efficiency investment, etc. This would include cashflows, profit and loss statement, and balance sheet topermit the modelling of one or more GIB financinginterventions in the project.

    o Modelling of the returns to GIB of each of the types offinancing intervention, e.g. co-investment equity, orof different classes of debt assuming a projectfinance structure, etc.

    Following modelling of a range of interventions, theconsultant will prepare summary presentations of thecharacteristics of each proposed intervention for use indiscussions with market participants (e.g. utilities,industrial players, waste management companies, privateequity investors, institutional investors, project developers,project finance and commercial bank teams) to determine

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    34/42

    Deliverables

    Financial models for each sub-sector target investment(total of 6 models currently envisaged for offshore windfarm, new nuclear plant, industrial energy efficiencyinvestment, industrial renewable heat plant, commercialand industrial waste plant and waste-to- energy plant),including modelling of each financial intervention

    Presentations of the proposed GIB products by sub-sector,

    for use in one-to-one discussions with industry andpotential co-financiers with the GIB

    Summary of the proposed GIB products, including likelyrisk/ reward profile and other key attributes (e.g. levels ofmobilised capital), reflecting the results of market testing

    Summary model and presentation of the financing gapacross target sectors for investment and the size of GIBproduct interventions to meet this gap, phased over thedecade to 2020.

    Process, timing and responsibilities

    The core BIS team will generate a list of potential GIBfinancial interventions by sector area by end December(i.e. before this research exercise commences)

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    35/42

    Note that additional sectors may be added to, or replace, awork stream either before or after work commences, and

    therefore a typical cost per sector (or sub-sector) shouldgiven in the tender. This may occur following furtherevidence of financing market failures arising fromeconomic analysis in the Value for Money work stream orfrom the interviews taking place in this work. Further, it ispossible that some additional support will be required toidentify evidence of market failures or to model additionalelements of financial interventions. The contractors shouldremain flexible to carry out additional work related to thiscore invitation to tender.

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    36/42

    Annex B - Scoring

    The table below details the scoring and weighting for each section within the PQQ. Some questions are PASS/FAIL,with failure on any one of them meaning that the organisation will be excluded form further participation in theprocurement.

    Where a question is scored the response given will be rated using a 0 to 5 scale where:

    0 = Unacceptable1 = Weak2 = Unsatisfactory3 = Acceptable4 = Good5 = Excellent

    Weightings are given to the questions that are scored. An organisations total score will be determined by the

    aggregate of the scores for each question once multiplied by the applicable weighting.

    Question Scoring Mechanism Weighting

    Section 1 Details of your Organisation

    Question 1.4Applicantdetails

    This question will not be evaluated per se but the information provided may be relevantto other questions. BIS reserves the right to exclude an applicant from the procurementprocess where it fails to provide all of the required information.

    N/A

    Section 2 Criteria For Rejection of Economic Operators

    Question 2.5Rejection

    This is a PASS/FAIL question. N/A

    Department for Business Innovation & Skills Crown copyright 2010Pre Qualification Questionnaire Version 1.02 (11.10)

    Page 36 of 42

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    37/42

    criteria A Yes answer to any question (a) (l) will lead to the applicant being excluded fromthe procurement process

    A Yes answer to any question (m) (p) will lead to the applicant being excluded fromthe procurement process unless in BIS reasonable opinion the answer to question 2.6

    makes this unnecessary.

    Section 3 Economic and Financial Standing

    Questions 3.2and 3.3turnover andauditedaccounts

    These are both PASS/FAIL questions.

    Turnover figures and accounts will be subjected to a risk analysis. BIS will want toensure that the applicants turnover is consistent with the value of the proposedcontract and if it is not the applicant may be excluded.

    BIS will subject the accounts to a risk assessment to satisfy itself that the applicant

    appears to be in a sufficiently strong financial position to perform the contract were it tobe awarded it.

    Without prejudice to that general assertion where the most recent accounts contain aqualified opinion from the applicants auditors BIS may regard that as a FAIL response tothis question.

    In analysing accounts BIS will have regard to the principles and guidance contained inthe Office of Government Commerce document Supplier Financial Appraisal Guidancea copy of which is available at

    http://www.ogc.gov.uk/documents/commodities_database/Financial_Appraisal_Guidance.pdf.pdf

    BIS may also/alternatively requisition and have regard to information provided by a thirdparty supplier of business and credit information.

    N/A

    Department for Business Innovation & Skills Crown copyright 2010Pre Qualification Questionnaire Version 1.02 (11.10)

    Page 37 of 42

    http://www.ogc.gov.uk/documents/commodities_database/Financial_Appraisal_Guidance.pdf.pdfhttp://www.ogc.gov.uk/documents/commodities_database/Financial_Appraisal_Guidance.pdf.pdfhttp://www.ogc.gov.uk/documents/commodities_database/Financial_Appraisal_Guidance.pdf.pdfhttp://www.ogc.gov.uk/documents/commodities_database/Financial_Appraisal_Guidance.pdf.pdf
  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    38/42

    Question 3.4Bankingfacilities andloan

    agreements

    This is a PASS/FAIL question.

    A No answer to this question may lead to the supplier being excluded from theprocurement process unless in BIS reasonable opinion the information given in

    answering question 3.5 makes this unnecessary.

    N/A

    Question 3.6Payment ofemployees andcreditors

    This is a PASS/FAIL question.

    A No answer to this question may lead to the supplier being excluded from theprocurement process unless in BIS reasonable opinion the information given inanswering question 3.7 makes this unnecessary.

    N/A

    Question 3.8Bank reference

    This is a PASS/FAIL question.

    Where BIS decides to take up bank references it will subject them to a risk assessment.

    Where an organisation declines to provide contact details for the obtaining of areference or the bank provides a reference casting doubt on the organisations financialstanding BIS may regard that as a FAIL response to this question.

    N/A

    Question 3.9EmployersLiability Cover

    As the need for this insurance is a statutory requirement this is a PASS/FAIL question(with failure to have it causing a fail

    Where an organisation has at least one employee it is required by law to haveEmployers Liability cover of at least 5million and failure to do so will lead to itsexclusion.

    Provided the applicant does not fail on that basis BIS will conduct a risk assessment toconsider whether the amount of cover that the applicant has is commensurate with thetype of risks and potential liability that might arise in the course of performing thecontract.

    N/A

    Department for Business Innovation & Skills Crown copyright 2010Pre Qualification Questionnaire Version 1.02 (11.10)

    Page 38 of 42

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    39/42

    Question 3.10Public Liabilityinsurance cover

    This is not a pass/fail question, but it will identify issues over the applicants publicliability insurance cover. If the applicant were to be selected to tender and cannotdemonstrate that the necessary cover will be in place at the contract start date then itwill be excluded at the selection stage.

    N/A

    Question 3.11Professionalindemnityinsurance cover

    This is not a pass/fail question, but it will identify issues over the applicants professionalindemnity insurance cover. If the applicant were to be selected to tender and cannotdemonstrate that the necessary cover will be in place at the contract start date then itwill be excluded at the selection stage.

    N/A

    Section 4 Technical and/or Professional Ability

    Questions 4.2 -4.3Quality

    Assurance

    This is a PASS/FAIL question.

    BIS requires the applicant to have in place robust quality assurance arrangements to

    ensure it can perform the contract to the required standard.

    N/A

    Questions 4.4 4.5Environmentalstandards

    This is a PASS/FAIL question.

    BIS requires the applicant to have due regard to environmental considerations whencarrying on its business, in particular minimising effects on the environment andmeeting the requirements of any applicable environmental protection legislation.

    N/A

    Question 4.6Educational or

    professionalqualifications

    This is a PASS/FAIL question.

    Where BIS requirement specifies that only those with particular educational orprofessional qualifications can perform certain tasks the applicant must demonstratecompliance. Failure to do so will lead to the applicant being excluded from thisprocurement.

    N/A

    Department for Business Innovation & Skills Crown copyright 2010Pre Qualification Questionnaire Version 1.02 (11.10)

    Page 39 of 42

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    40/42

    Questions 4.7 4.9Health andsafety

    Employers that employ five or more staff are legally required to have a written healthand safety policy, and failure to do so will constitute a FAIL.

    BIS requires the applicant to understand its legal obligations and has adequatemeasures in place to provide for the health and safety of its employees.

    N/A

    Questions 4.10 4.13EqualOpportunities

    This is a PASS/FAIL question.

    BIS requires the applicant to understand its legal obligations and to have adequatemeasures in place to ensure that it treats its employees in a non-discriminatory way andfully complies with all relevant equality legislation.

    N/A

    Questions 4.14- 4.17Sub-contracting

    These are PASS/FAIL questions.

    If the answer to question 4.14 is Yes and the reply to question 4.15 is 20% or greaterBIS will conduct a risk assessment based on the answer given to question 4.16 and 4.17.

    BIS will require to be satisfied that the applicant has an appropriate policy in place toensure that its significant sub-contractors are supervised in a way that minimises thepossibility of their prejudicing the performance of the contract.

    N/A

    Question 4.18Previousexperience/Track record

    The responses to this question will be scored using the 0-5 grading system referred toabove.

    BIS will assess the quality of the service that the applicant has provided to its pastcustomers and based on this the likelihood of it being able to meet BIS requirements.References will be taken up at BIS discretion. Where references would be taken but the

    applicant has objected to this in question (g) the response will be disqualified unlessthere is good reason not to.

    15%

    Questions 4.19 4.20

    This is a PASS/FAIL question. N/A

    Department for Business Innovation & Skills Crown copyright 2010Pre Qualification Questionnaire Version 1.02 (11.10)

    Page 40 of 42

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    41/42

    Previouscontractsterminated forbadperformance

    A Yes answer to question 4.19 renders the supplier liable to be excluded from theprocurement process unless in BIS reasonable opinion the information provided in theanswer to question 4.20 makes this unnecessary.

    Question 4.21Factors that willdrive success /possible pitfalls

    The answer to this question will be scored using the 0-5 grading system referred toabove.

    The answer given to question 4.21 will allow BIS to understand how the applicant hasapproached previous contracts which are similar to this particular requirement.

    15%

    Question 4.22Experience ofworking withcentral

    governmentdepartments

    The answer to this question will be scored using the 0-5 grading system referred toabove.

    The answer given to this question will allow BIS to gauge the applicants experience of

    working with central government departments/other large organisations.

    15%

    Question 4.23Relevant sub-sectorknowledge

    The answer to this question will be scored using the 0-5 grading system referred toabove.

    The answer given to this question will allow BIS to gauge the applicants knowledge ofthe low-carbon sub-sectors identified in Annex A.

    35%

    Question 4.24

    Relevantfinancialmodellingexperience

    The answer to this question will be scored using the 0-5 grading system referred to

    above.

    The answer given to this question will allow BIS to gauge the applicants capability ofcarrying out the financial modelling identified in Annex A.

    35%

    100%

    Department for Business Innovation & Skills Crown copyright 2010Pre Qualification Questionnaire Version 1.02 (11.10)

    Page 41 of 42

  • 8/7/2019 10-1341-green-investment-bank-pqq-product-research

    42/42

    Department for Business Innovation & Skills Crown copyright 2010Pre Qualification Questionnaire Version 1.02 (11.10)

    Page 42 of 42